CN104917185B - Method to illuminating load power intelligent control - Google Patents
Method to illuminating load power intelligent control Download PDFInfo
- Publication number
- CN104917185B CN104917185B CN201410095531.3A CN201410095531A CN104917185B CN 104917185 B CN104917185 B CN 104917185B CN 201410095531 A CN201410095531 A CN 201410095531A CN 104917185 B CN104917185 B CN 104917185B
- Authority
- CN
- China
- Prior art keywords
- load
- group
- priority
- lighting
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Landscapes
- Circuit Arrangement For Electric Light Sources In General (AREA)
Abstract
The present invention provides a kind of methods to illuminating load power intelligent control, provide a kind of mode, the lighting load of access is grouped and in-group priority management, it is participated in by group in the unified priority distribution of micro-grid system, each group goal of regulation and control is assigned according to whole requirement by master control system, grouping is regulated and controled according to preset strategy and in-group priority.The multipath dynamic for realizing configuration parameter simultaneously adjusts, easy to use quick.The present invention can change fast automatic regulation and control lighting load according to power limit, ensure that the preferential operation of important load in some important groups and group, it can be made to keep original operating status by way of locking some particular demands.By realizing intelligence and automatic management to whole lighting loads in up regulation method, stability and the intelligence of micro-grid system are greatly strengthened, economic benefit is realized in energy saving consumption.
Description
Technical field
The present invention relates to the micro-capacitance sensor control technology fields in intelligent grid, more particularly to one kind to illuminating load power
The method of intelligent control.
Background technology
Micro-capacitance sensor is a kind of novel network structure, is that one group of micro battery, load, energy-storage system and control device are constituted
System unit, while being one and can realize self-contr ol, protection and the autonomous system of management.It both can be grid-connected with external electrical network
Operation, can also isolated operation.And in micro-capacitance sensor, illumination is often the larger main loads of accounting, to lighting load from
I controls and management, can effectively improve the automation and intelligence of micro-capacitance sensor autonomous system.
Management of the existing power grid intelligence to lighting system lacks typically based on the application of some scenes of lighting load
Few to constrain the power of lighting load in system, outer net is rationed the power supply under grid-connected conditions or power is not under the conditions of isolated network
When the situation of foot, lighting load can not be regulated and controled to meet power limit automatically as needed, need to pass through background system
It is remotely controlled or on-site manual regulation and control, and the load quantity of access system is more, is operated according to existing mode time-consuming and laborious, reaches
Less than micro-capacitance sensor quick response demand.
Invention content
It, can technical problem to be solved by the present invention lies in a kind of method to illuminating load power intelligent control is provided
Lighting load is regulated and controled to meet power regulation automatically as needed, is realized in micro-grid system to lighting load
Automation and intelligentized control method.
The present invention is achieved through the following technical solutions:
Method to illuminating load power intelligent control, wherein excellent in first the lighting load of access is grouped and is organized
First grade management, with organize be logical device unit participate in micro-grid system unified priority distribution in, by master control system according to
The whole goal of regulation and control for requiring to assign each group, each group are not carried out using preset strategy and according to goal of regulation and control according to in-group priority
Regulation and control.
The method of lighting load grouping and in-group priority management in one of the embodiments, includes the following steps:
Step (1):The priority of definition grouping and each group;
Step (2):All lighting loads of access are divided into according to importance in each group, and define its load in group
Priority;
Step (3):The unified priority distribution of micro-grid system is participated in using each group as independent logical device unit.
Further, monitoring each group intraoral illumination load puts into operation state and power in real time, counts the actual power of each group.
Further, using preset strategy and the method that is not regulated and controled according to in-group priority, include the following steps:
Step 1:The power for monitoring each group is sentenced after each group realtime power that institute's monitoring and statistics go out after delay waits for and stablizing
Section where determining power;
Step 2:Deduction calculating is carried out according to priority to the lighting load in group, lighting apparatus that determination to be regulated and controled and its
Target load numerical value;
Step 3:Increase lighting load to target to then automatically engaging illumination in the lighting load for hauling oneself willingly into section or adjusting
Numerical value.
Step 4:Then is cut off by lighting load or is adjusted for lighting load in off-load section and lowers lighting load to target
Below numerical value;
Step 5:It jumps to step 1 cycle to execute, selfdiscipline management and control is carried out to subsequent load variations.
Further, it in the case where meeting goal of regulation and control, when there is high priority lighting load to need to come into operation, first cuts off
Or the low priority lighting load of enough power is turned down, then high priority lighting load is received to come into operation.
Further, the lighting load of particular demands is locked, locked load power will be reserved, and no longer be joined
With the regulation and control of preset strategy.
Further, lighting load grouping and in-group priority management can realize that the multipath dynamic of configuration parameter is adjusted
It is whole;The priority of priority, load in group of load grouping, group logical device in microgrid being capable of Configuration Online and dynamic
Adjustment.
Beneficial effects of the present invention are as follows:
In user side distribution system, illumination is the larger main loads of accounting, and most has the load of regulation and control potentiality.This hair
The bright method to illuminating load power intelligent control provides a kind of mode, is grouped to the lighting load of access and group
Interior priority management, grouping may participate in the unified priority distribution of micro-grid system, by master control system according to whole requirement
Grouping goal of regulation and control is assigned, preset strategy is regulated and controled according to grouping and in-group priority.The more of configuration parameter are realized simultaneously
Approach dynamic adjusts, easy to use quick.By realizing intelligence and automation to whole lighting loads in up regulation method
Management ensures that economic benefit is realized in microgrid stable operation, energy saving consumption.The present invention can change fast according to power limit
Fast auto-control lighting load ensure that operations of important load in some important groupings and group, can be with to some particular demands
Make its operation by way of locking, greatly strengthens stability and the intelligence of micro-grid system.
Description of the drawings
Fig. 1 is micro-capacitance sensor structural schematic diagram of the present invention to the method for illumination load power intelligent control;
Fig. 2 is grouping dynamic management process schematic diagram of the present invention to the method for illumination load power intelligent control;
Fig. 3 is that the present invention is grouped the monitoring for illuminating the method for load power intelligent control and the flow of grouping internal loading is shown
It is intended to;
Fig. 4 is that the present invention regulates and controls lighting load the preset strategy for illuminating the method for load power intelligent control
Flow diagram.
Specific implementation mode
The present invention is in order to solve problems in the prior art, it is proposed that a method of to illuminating load power intelligent control,
Wherein, first the lighting load of access is grouped and in-group priority management, is that logical device unit participates in micro- electricity with group
In the unified priority distribution of net system, the goal of regulation and control of each group is assigned according to whole requirement by master control system, each group is according to tune
Control target is not regulated and controled using preset strategy and according to in-group priority.
The method of lighting load grouping and in-group priority management in one of the embodiments, includes the following steps:
Step (1):The priority of definition grouping and each group;
Step (2):All lighting loads of access are divided into according to importance in each group, and define its load in group
Priority;
Step (3):The unified priority distribution of micro-grid system is participated in using each group as independent logical device unit.
Further, monitoring each group intraoral illumination load puts into operation state and power in real time, counts the actual power of each group.
Further, using preset strategy and the method that is not regulated and controled according to in-group priority, include the following steps:
Step 1:The power for monitoring each group is sentenced after each group realtime power that institute's monitoring and statistics go out after delay waits for and stablizing
Section where determining power;
Step 2:Deduction calculating is carried out according to priority to the lighting load in group, lighting apparatus that determination to be regulated and controled and its
Target load numerical value;
Step 3:Increase lighting load to target to then automatically engaging illumination in the lighting load for hauling oneself willingly into section or adjusting
Numerical value.
Step 4:Then is cut off by lighting load or is adjusted for lighting load in off-load section and lowers lighting load to target
Below numerical value;
Step 5:It jumps to step 1 cycle to execute, selfdiscipline management and control is carried out to subsequent load variations.
Further, it in the case where meeting goal of regulation and control, when there is high priority lighting load to need to come into operation, first cuts off
Or the low priority lighting load of enough power is turned down, then high priority lighting load is received to come into operation.
Further, the lighting load of particular demands is locked, locked load power will be reserved, and no longer be joined
With the regulation and control of preset strategy.
Further, lighting load grouping and in-group priority management can realize that the multipath dynamic of configuration parameter is adjusted
It is whole;The priority of priority, load in group of load grouping, group logical device in microgrid being capable of Configuration Online and dynamic
Adjustment.
With reference to the accompanying drawings of the specification, to the tool of the method to illuminating load power intelligent control in the embodiment of the present invention
Body embodiment illustrates.
It is provided by the invention to illuminate load power intelligent control novel method, as shown in Figure 1, to the lighting load of access
Be grouped with in-group priority management, with organize be logical device participate in micro-grid system unified priority distribution in, by
Master control system assigns the goal of regulation and control of each group according to whole requirement, and each group is according to goal of regulation and control using preset strategy according to preferential in group
Grade is regulated and controled.
Such as Fig. 2, the method for definition grouping and in-group priority management includes the following steps:
Step S1:Start;
Step S2:User is defined the priority of grouping and each group in micro-grid system;
Step S3:User carries out lighting apparatus management, and all lighting loads of access are put into according to importance in grouping,
And define its load priority in group;
Step S5:Regulate and control terminal by network service module, handles and store grouping information to persistent storage module, and
Send messages to the message processing module of regulation and control terminal;
Step S6:The message processing module for regulating and controlling terminal handles the message from network service module;
Step S7:The reading grouped data module for regulating and controlling terminal reads the grouping information of persistent storage module storage;
Step S8:Regulate and control the grouping management module of terminal, handle grouping information and is placed into memory database;
Step S9:Terminate.
Such as Fig. 3, the intraoral illumination load of monitoring grouping in real time puts into operation state and power, the method for counting each grouping actual power,
Include the following steps:
Step t1:Start;
Step t2:Regulate and control the lighting load in one grouping of terminal acquirement;
Step t3:Judge whether load statistics is completed, such as organizes internal loading and be all disposed, then jump to step t9;Such as group
Internal loading is untreated to be finished, and t4 is thened follow the steps;
Step t4:Communication obtains the actual working state of equipment;
Step t5:Judge the type of load, if load type is uncontrollable, step t6 is jumped to, if load
Type is adjustable, then jumps to step t7;
Step t6:Calculating for unadjustable load jumps to step according to rated power calculated load actual power
t8;
Step t7:Step is jumped to according to brightness and rated power calculated load actual power for adjustable carry calculation
Rapid t8;
Step t8:Load power, which calculates, to be completed, and is jumped to step t2 and is continued to execute;
Step t9:The actual power of statistics group internal loading;
Step t10:Terminate.
Such as the method that Fig. 4, preset strategy regulate and control lighting load, include the following steps:
Step r1:Start;
Step r2:Initialization preparation is carried out to strategy;
Step r3:The execution state of strategy is checked;
Step r4:The power of analysis grouping in real time, obtains stationary value after the delay by setting;
Step r5:Off-load interval judgement is hauled oneself willingly into, is to haul oneself willingly into section also where judging packet power by the stationary value of acquirement
It is off-load section;
Step r6:Judge, in section or off-load section is hauled oneself willingly into, if hauling oneself willingly into section, to jump to step r7,
Off-load section then jumps to step r9;
Step r7:It carries out hauling oneself willingly into load deduction calculating, according to stationary value and power limit value, to the lighting load in grouping
It is deduced according to priority, the lighting apparatus and its target load numerical value that determination to be regulated and controled;
Step r8:It automatically engages the lighting apparatus that need to regulate and control or adjusts and increase its load to target value, jump to step
r11;
Step r9:It carries out off-load load and deduces calculating, according to stationary value and power limit value, to the lighting load in grouping
It is deduced according to priority, the lighting apparatus and its target load numerical value that determination to be regulated and controled;
Step r10:It cuts off the lighting apparatus that need to regulate and control or adjusts and lower its load to target value, jump to step r11.
Step r11:A wheel load control is completed, step r3 is jumped to and continues;
Step r12:Terminate.
It is described in the case where meeting goal of regulation and control preferably, as one embodiment, when there is high priority lighting load
When can come into operation, the low priority lighting load of certain power is first cut off, then high priority lighting load is received to come into operation.
Preferably, as one embodiment, the lighting load to particular demands locks, locked load work(
Rate will be reserved, and be no longer participate in the regulation and control of preset strategy.
Preferably, as one embodiment, the lighting load grouping and in-group priority management realize configuration parameter
Multipath dynamic adjust.Load is grouped, and priority, load priority group in of the group logical device in microgrid can be
Line configures and dynamic adjusts.
It illustrates:This method can be realized in micro-grid system, as shown in Figure 1, web platforms are realized in definition grouping and group
Priority management.Monitoring grouping and the actual power of statistical packet simultaneously report master control system.Master control system is deduced according to priority
As a result the power limit of each grouping is issued, preset strategy constantly recycles the power and power limit of more each grouping, according to
The state of each load being adjusted in the priority deduction grouping of load, then illumination is sent a command to by regulation and control execution module and is born
Lotus realizes regulation and control.Whole process is automatically performed without intervening, fast response time.
Several embodiments of the invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the guarantor of the present invention
Protect range.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (9)
1. a kind of method to illuminating load power intelligent control, which is characterized in that be first grouped to the lighting load of access
With in-group priority management, all lighting loads of access are divided into according to importance in each group, and it is negative in group to define it
Lotus priority has a group priority between each group lighting load, has in-group priority between the lighting load in each group;Its
In, group priority refers to, is that logical device unit participates in the unified priority distribution of micro-grid system to organize;It is preferential in group
Grade refers to, using the lighting apparatus in group as unit, its load priority in group being determined according to importance;
According to whole requirement, in conjunction with the group priority of each group lighting load, master control system assigns the regulation and control mesh of each group lighting load
Mark;
The power for monitoring each group lighting load, according to the goal of regulation and control of each group lighting load, to the lighting load in each group according to
In-group priority carries out deduction calculating, and the lighting apparatus and its target load numerical value that determination to be regulated and controled judge that the lighting load is
No be in hauls oneself willingly into section or off-load section, and the regulation and control of each group lighting load are carried out according to in-group priority.
2. the method according to claim 1 to illuminating load power intelligent control, which is characterized in that monitor each group in real time
Intraoral illumination load puts into operation state and power, counts the actual power of each group.
3. the method according to claim 1 to illuminating load power intelligent control, which is characterized in that use preset strategy
And the method not regulated and controled according to in-group priority, include the following steps:
Step 1:The power for monitoring each group judges work(after each group realtime power that institute's monitoring and statistics go out after delay waits for and stablizing
Section where rate;
Step 2:Deduction calculating is carried out according to priority to the lighting load in group, the lighting apparatus and its target that determination to be regulated and controled
Load value;
Step 3:Increase lighting load to target value to then automatically engaging illumination in the lighting load for hauling oneself willingly into section or adjusting;
Step 4:Then is cut off by lighting load or is adjusted for lighting load in off-load section and lowers lighting load to target value
Below;
Step 5:It jumps to step 1 cycle to execute, selfdiscipline management and control is carried out to subsequent load variations.
4. the method according to claim 1 or 3 to illuminating load power intelligent control, which is characterized in that adjusted meeting
In the case of controlling target, when there is high priority lighting load to need to come into operation, the low priority of enough power is first cut off or turned down
Lighting load, then high priority lighting load is received to come into operation.
5. the method according to claim 1 or 3 to illuminating load power intelligent control, which is characterized in that particular needs
The lighting load asked is locked, and locked load power will be reserved, and is no longer participate in the regulation and control of preset strategy.
6. the method according to claim 1 to illuminating load power intelligent control, which is characterized in that lighting load is grouped
It can realize that the multipath dynamic of configuration parameter adjusts with in-group priority management;Load grouping, group logical device are in microgrid
Priority in group of priority, load can Configuration Online and dynamic adjust.
7. the method according to claim 1 to illuminating load power intelligent control, which is characterized in that definition grouping and group
The method of interior priority management, includes the following steps:
Step S1:Start;
Step S2:User is defined the priority of grouping and each group in micro-grid system;
Step S3:User carries out lighting apparatus management, and all lighting loads of access are put into according to importance in grouping, and fixed
Its adopted load priority in group;
Step S5:Regulate and control terminal by network service module, handles and store grouping information to persistent storage module, and send
Message processing module of the message to regulation and control terminal;
Step S6:The message processing module for regulating and controlling terminal handles the message from network service module;
Step S7:The reading grouped data module for regulating and controlling terminal reads the grouping information of persistent storage module storage;
Step S8:Regulate and control the grouping management module of terminal, handle grouping information and is placed into memory database;
Step S9:Terminate.
8. the method according to claim 2 to illuminating load power intelligent control, which is characterized in that the grouping of monitoring in real time
Intraoral illumination load puts into operation state and power, and the method for counting each grouping actual power includes the following steps:
Step t1:Start;
Step t2:Regulate and control the lighting load in one grouping of terminal acquirement;
Step t3:Judge whether load statistics is completed, such as organizes internal loading and be all disposed, then jump to step t9;It such as organizes interior negative
Lotus is untreated to be finished, and t4 is thened follow the steps;
Step t4:Communication obtains the actual working state of equipment;
Step t5:Judge the type of load, if load type is uncontrollable, step t6 is jumped to, if load type
It is adjustable, then jump to step t7;
Step t6:Calculating for unadjustable load jumps to step t8 according to rated power calculated load actual power;
Step t7:Step is jumped to according to brightness and rated power calculated load actual power for adjustable carry calculation
t8;
Step t8:Load power, which calculates, to be completed, and is jumped to step t2 and is continued to execute;
Step t9:The actual power of statistics group internal loading;
Step t10:Terminate.
9. the method according to claim 3 to illuminating load power intelligent control, which is characterized in that preset strategy compares
The method that bright load is regulated and controled, includes the following steps:
Step r1:Start;
Step r2:Initialization preparation is carried out to strategy;
Step r3:The execution state of strategy is checked;
Step r4:The power of analysis grouping in real time, obtains stationary value after the delay by setting;
Step r5:Off-load interval judgement is hauled oneself willingly into, by hauling oneself willingly into section where the stationary value judgement packet power of acquirement or subtracting
Carry section;
Step r6:Judge, in section or off-load section is hauled oneself willingly into, if hauling oneself willingly into section, step r7 to be jumped to, in off-load
Section then jumps to step r9;
Step r7:Haul oneself willingly into load and deduce and calculate, according to stationary value and power limit value, to the lighting load in grouping according to
Priority is deduced, the lighting apparatus and its target load numerical value that determination to be regulated and controled;
Step r8:It automatically engages the lighting apparatus that need to regulate and control or adjusts and increase its load to target value, jump to step r11;
Step r9:Carry out off-load load and deduce to calculate, according to stationary value and power limit value, to the lighting load in grouping according to
Priority is deduced, the lighting apparatus and its target load numerical value that determination to be regulated and controled;
Step r10:It cuts off the lighting apparatus that need to regulate and control or adjusts and lower its load to target value, jump to step r11;
Step r11:A wheel load control is completed, step r3 is jumped to and continues;
Step r12:Terminate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410095531.3A CN104917185B (en) | 2014-03-14 | 2014-03-14 | Method to illuminating load power intelligent control |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410095531.3A CN104917185B (en) | 2014-03-14 | 2014-03-14 | Method to illuminating load power intelligent control |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104917185A CN104917185A (en) | 2015-09-16 |
CN104917185B true CN104917185B (en) | 2018-08-07 |
Family
ID=54086006
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410095531.3A Active CN104917185B (en) | 2014-03-14 | 2014-03-14 | Method to illuminating load power intelligent control |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104917185B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106597082B (en) * | 2015-10-16 | 2020-11-10 | 得能创科有限公司 | Electrical appliance energy consumption identification method and identification system |
WO2018119813A1 (en) * | 2016-12-29 | 2018-07-05 | 李姗姗 | Intelligent method for distribution of electric energy |
CN112671252B (en) * | 2020-12-07 | 2024-04-09 | 珠海格力电器股份有限公司 | DC illumination start control method, device and system |
CN113762785A (en) * | 2021-09-10 | 2021-12-07 | 新疆信息产业有限责任公司 | Method for realizing motor-pumped well load flexible scheduling based on multi-data fusion |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2008118395A1 (en) * | 2007-03-23 | 2008-10-02 | Bpl Global , Ltd. | System and method for adaptive islanding for stored/distributed energy devices |
US9634488B2 (en) * | 2009-06-26 | 2017-04-25 | Abb Schweiz Ag | Load scheduling optimization in distributed system |
JP6081444B2 (en) * | 2011-04-04 | 2017-02-15 | フィリップス ライティング ホールディング ビー ヴィ | Device and method for adjusting the electrical consumption of a plurality of lighting devices in a lighting system |
CN102738834B (en) * | 2012-06-21 | 2014-08-20 | 浙江大学 | Method for dynamically dividing and operating multiple islands of city micro power grid with photovoltaic power supplies |
CN104037774B (en) * | 2013-03-06 | 2016-03-02 | 珠海优特电力科技股份有限公司 | Based on equipment regulate and control method and system in the micro-capacitance sensor of priority |
CN103501006B (en) * | 2013-09-26 | 2015-11-04 | 北京北变微电网技术有限公司 | Micro-capacitance sensor centralized control method |
CN103619103B (en) * | 2013-11-29 | 2015-10-07 | 中达电通股份有限公司 | For the road lamp management method and system of street lamp central power supply system |
-
2014
- 2014-03-14 CN CN201410095531.3A patent/CN104917185B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104917185A (en) | 2015-09-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104917185B (en) | Method to illuminating load power intelligent control | |
CN104037774B (en) | Based on equipment regulate and control method and system in the micro-capacitance sensor of priority | |
WO2016045508A1 (en) | Intelligent management and control device and method for new energy power station concentration area | |
CN104134994B (en) | A kind of AGC of utilization carries out the out-of-limit Corrective control method of stable cross section trend | |
CN105978043B (en) | Photovoltaic plant multi-inverter active power controller method | |
CN102244677B (en) | Green energy Cloud computing method and system | |
CN111049167B (en) | Energy storage system power control method and system | |
CN109167368B (en) | User voltage optimization and regulation method and system with distributed photovoltaic | |
CN110492486B (en) | 10kV bus voltage optimization method, system and medium capable of improving power distribution network voltage qualification rate | |
CN106096776A (en) | A kind of custom power regulation and control method analyzing model based on customer charge | |
CN104035475B (en) | Automatic active-power control method with both safety of power grid and minimum light waste considered for photovoltaic power stations | |
CN115128999A (en) | Integrated distributed rural sewage treatment station intelligent control system | |
CN205829301U (en) | Intelligent monitoring system for transformer | |
CN115933563A (en) | Intelligent water affair control system of large-scale thermal power plant | |
CN105429181A (en) | Automatic photovoltaic power station active power control method | |
CN105743134A (en) | Adaptive quick regulation photovoltaic AVC (automatic voltage control) method | |
CN105844368A (en) | Building and industry energy efficiency managing system | |
KR20130089440A (en) | System and method for controling pump adapted power | |
CN112366693B (en) | Power dispatching method and system for source network load storage multi-element coordination flexible control | |
CN113158566B (en) | User ordered power utilization control method, system and medium based on demand side | |
CN210640693U (en) | Digital controller device for micro-grid | |
CN113437748A (en) | Load regulation and control method and system for power system | |
CN104578079B (en) | Power grid section power control method for automatic power generation control | |
CN104037771B (en) | Network load decline method of adjustment and system | |
CN107179785B (en) | The system and method for dynamic temperature control for multimode terminal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |