CN104912039A - 混凝土面板脱空修补方法 - Google Patents

混凝土面板脱空修补方法 Download PDF

Info

Publication number
CN104912039A
CN104912039A CN201510196878.1A CN201510196878A CN104912039A CN 104912039 A CN104912039 A CN 104912039A CN 201510196878 A CN201510196878 A CN 201510196878A CN 104912039 A CN104912039 A CN 104912039A
Authority
CN
China
Prior art keywords
nothing
grouting
panel
repairing
region
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510196878.1A
Other languages
English (en)
Inventor
王栋良
周廷清
王登银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201510196878.1A priority Critical patent/CN104912039A/zh
Publication of CN104912039A publication Critical patent/CN104912039A/zh
Pending legal-status Critical Current

Links

Abstract

本发明涉及一种混凝土面板脱空修补方法。本发明的目的是提高混凝土防渗面板脱空修补的效率,增强了工程运行的安全性和可靠性。本发明的技术方案是:步骤如下:a、脱空区域检测:采用LTD探地雷达对面板脱空区域进行探测,确定面板脱空区域,采集脱空的深度信息;b、灌浆孔位布置:在面板脱空区域内进行灌浆孔位布置,灌浆孔间距d1=2~3m,排距d2=2~4m,梅花型布置或矩形布置均可;c、钻孔:按照上述灌浆孔位布置进行钻孔;d、灌浆:灌浆时从面板下部开始往上逐级注浆;e、封孔:灌浆完成2小时后,采用水泥砂浆对灌浆孔进行封堵,封堵高度要高出面板约3~5mm,静置约8小时后,对面板表面打磨平整;f、养护:天气炎热时,在脱空修补区域应洒水养护。

Description

混凝土面板脱空修补方法
技术领域
本发明涉及一种混凝土面板脱空修补方法。适用于混凝土面板堆石坝面板脱空处理等类似工程。
背景技术
混凝土面板堆石坝是上世纪60年代以后发展起来的一种坝型,由于其良好的经济性、施工便捷等特点在世界范围内被广泛采用,目前世界上最高的水布垭混凝土面板防渗工程(最大坝高233m)已于2011年竣工,最大坝高223.5m的猴子岩混凝土面板坝工程正在兴建中。
对于高混凝土面板堆石坝而言,由于施工缺陷、坝体的不均匀变形等因素均可造成面板的脱空现象;对于强震区的混凝土面板堆石坝,在地震动荷载作用下,也可造成面板的脱空,2008年汶川地震作用下的紫平铺水电站就出现了严重的面板脱空现象。面板脱空后,在坝前水荷载的作用下,钢筋混凝土面板极易破裂,影响工程的安全运行。
现阶段,国内外面板脱空后常用的修补处理措施为将破碎的面板凿除,填补脱空区域后重新浇筑面板。该方法施工效率低、投资大,重新浇筑的面板与老面板的结合是否良好也存在诸多的不确定性。
发明内容
本发明要解决的技术问题是:针对上述存在的问题,提供一种混凝土面板脱空修补方法,以提高混凝土防渗面板脱空修补的效率,增强了工程运行的安全性和可靠性。
本发明所采用的技术方案是:一种混凝土面板脱空修补方法,其特征在于步骤如下:
a、脱空区域检测:采用LTD探地雷达对面板脱空区域进行探测,确定面板脱空区域,采集脱空的深度信息;在上述确定的面板脱空区域进行钻孔取芯检查,对上述信息进行复核和修正,得到最终的面板脱空区域、脱空深度信息;
b、灌浆孔位布置:在面板脱空区域内进行灌浆孔位布置,灌浆孔间距d1=2~3m,排距d2=2~4m,梅花型布置或矩形布置均可;沿脱空区域边界布设一排灌浆孔,孔距一般采用d3=3~4m;
c、钻孔:按照上述灌浆孔位布置进行钻孔;
d、灌浆:对面板脱空区采用水泥粉煤灰稳定浆液注浆法进行灌浆处理,灌浆时浆液由孔口自流注入,对于局部脱空部位浆液无法流入时,加小于0.1MPa的压力;灌浆时从面板下部开始往上逐级注浆;
e、封孔:灌浆完成2小时后,采用水泥砂浆对灌浆孔进行封堵,封堵高度要高出面板约3~5mm,静置约8小时后,对面板表面打磨平整;
f、养护:天气炎热时,在脱空修补区域应洒水养护;封孔完成至少3天后,坝前方可蓄水,修补后初次蓄水的速率应小于1m/d;
所述水泥粉煤灰稳定浆液采用重量比为水泥:粉煤灰:水=1:9:5拌合而成。
步骤c中钻孔深度要求进入面板脱空区域下方密实层20cm。
所述灌浆孔距离面板垂直缝大于铜止水水平长度的一半。
本发明的有益效果是:a、该方法不对原混凝土面板进行凿除和扰动,保持了混凝土面板、止水的原始特征,通过钻孔灌浆对面板下部的脱空部位充填密实,确保了工程运行的安全性;b、该方法操作简单,施工便利,不需要特殊的工程设备,具有较强的实用性;c、该方法仅采用常规的灌浆手段可达到理想的处理效果,无需将面板、止水凿除,较常规处理方法减少了大量的施工环节,工程投资也大大降低,具有良好的经济性。
附图说明
图1为实施例的俯视图。
图2为图1的A-A剖视图。
具体实施方式
如图1、图2所示,混凝土面板堆石坝坝面由下而上依次为过渡层103、垫料层102和面板101,本实施例提供一种混凝土面板脱空修补方法,步骤如下:
a、脱空区域检测:采用LTD探地雷达对面板101下方的面板脱空区域104进行探测,确定面板脱空范围,对脱空的深度等信息进行采集,为方案设计决策使用;此外,在上述确定的面板脱空区域104进行钻孔取芯检查,对上述信息进行复核和修正,得到最终的面板脱空区域、脱空深度等信息。
b、灌浆孔2位布置:在面板脱空区域内进行灌浆孔2位布置,横向布置若干排,同排灌浆孔2之间间距d1=2~3m,排距d2=2~4m,梅花型布置或矩形布置均可;脱空区域边界1041布设一排灌浆孔2,孔距一般采用3~4m;为避免钻孔时破坏面板铜止水,灌浆孔2距离面板垂直缝应不小于铜止水水平长度的一半(一般情况下不小于20cm)。
c、钻孔:按照上述灌浆孔位布置进行钻孔,钻孔过程中若遇到面板钢筋时,孔位可适当偏移,钻孔过程中根据钻进情况(是否掉钻等)对孔位脱空深度进行判断,钻孔深度要求进入面板脱空区域104下方密实层20cm左右,一般情况下钻孔仅在垫层料102中,对于面板底部脱空特别严重的工程,钻孔深度可能会延伸至过渡层103中。
d、灌浆:按照上述灌浆孔位布置进行钻孔;对面板脱空区采用水泥粉煤灰稳定浆液注浆法进行灌浆处理,浆液采用重量比为水泥:粉煤灰:水=1:9:5拌合而成;为减小灌浆对面板的影响,灌浆时浆液由孔口自流注入,不起压,对于局部脱空部位浆液无法流入时,可加小于0.1MPa的压力;灌浆时从面板下部开始往上逐级注浆。
e、封孔:灌浆完成2小时后,采用水泥砂浆对灌浆孔、钻孔进行封堵,封堵高度要高出面板约3~5mm,静置约8小时后,对面板表面打磨平整。
f、养护:天气炎热时,在脱空修补区域应洒水养护;封孔完成至少3天后,坝前方可蓄水,修补后初次蓄水的速率应小于1m/d。

Claims (3)

1.一种混凝土面板脱空修补方法,其特征在于步骤如下:
a、脱空区域检测:采用LTD探地雷达对面板脱空区域进行探测,确定面板脱空区域,采集脱空的深度信息;在上述确定的面板脱空区域进行钻孔取芯检查,对上述信息进行复核和修正,得到最终的面板脱空区域、脱空深度信息;
b、灌浆孔位布置:在面板脱空区域内进行灌浆孔位布置,灌浆孔间距d1=2~3m,排距d2=2~4m,梅花型布置或矩形布置均可;沿脱空区域边界布设一排灌浆孔,孔距一般采用d3=3~4m;
c、钻孔:按照上述灌浆孔位布置进行钻孔;
d、灌浆:对面板脱空区采用水泥粉煤灰稳定浆液注浆法进行灌浆处理,灌浆时浆液由孔口自流注入,对于局部脱空部位浆液无法流入时,加小于0.1MPa的压力;灌浆时从面板下部开始往上逐级注浆;
e、封孔:灌浆完成2小时后,采用水泥砂浆对灌浆孔进行封堵,封堵高度要高出面板约3~5mm,静置约8小时后,对面板表面打磨平整;
f、养护:天气炎热时,在脱空修补区域应洒水养护;封孔完成至少3天后,坝前方可蓄水,修补后初次蓄水的速率应小于1m/d;
所述水泥粉煤灰稳定浆液采用重量比为水泥:粉煤灰:水=1:9:5拌合而成。
2.根据权利要求1所述的混凝土面板脱空修补方法,其特征在于:步骤c中钻孔深度要求进入面板脱空区域下方密实层20cm。
3.根据权利要求1或2所述的混凝土面板脱空修补方法,其特征在于:所述灌浆孔距离面板垂直缝大于铜止水水平长度的一半。
CN201510196878.1A 2015-04-23 2015-04-23 混凝土面板脱空修补方法 Pending CN104912039A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510196878.1A CN104912039A (zh) 2015-04-23 2015-04-23 混凝土面板脱空修补方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510196878.1A CN104912039A (zh) 2015-04-23 2015-04-23 混凝土面板脱空修补方法

Publications (1)

Publication Number Publication Date
CN104912039A true CN104912039A (zh) 2015-09-16

Family

ID=54081445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510196878.1A Pending CN104912039A (zh) 2015-04-23 2015-04-23 混凝土面板脱空修补方法

Country Status (1)

Country Link
CN (1) CN104912039A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735206A (zh) * 2016-05-05 2016-07-06 中国电建集团华东勘测设计研究院有限公司 严寒地区病态混凝土重力坝的修复结构及施工方法
CN106192908A (zh) * 2016-07-27 2016-12-07 中国水利水电第十工程局有限公司 一种防止混凝土面板与堆石坝坝体脱空的系统及施工方法
CN106759561A (zh) * 2017-02-23 2017-05-31 中冶集团武汉勘察研究院有限公司 一种建/构筑物浅埋基础脱空处理方法
CN109281292A (zh) * 2018-11-13 2019-01-29 中南大学 一种水库深水混凝土面板脱开裂缝修补方法
CN110185004A (zh) * 2019-05-29 2019-08-30 中国葛洲坝集团第一工程有限公司 混凝土面板堆石坝脱空处理方法
WO2019192267A1 (zh) * 2018-04-04 2019-10-10 水利部交通运输部国家能源局南京水利科学研究院 一种混凝土面板堆石坝面板脱空区水下修复系统
CN110608066A (zh) * 2019-10-10 2019-12-24 中国五冶集团有限公司 一种隧洞灌浆深度的检测系统
CN112196269A (zh) * 2020-10-21 2021-01-08 三门核电有限公司 一种用于核电厂换料水池钢覆面板起拱处理的方法

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735206A (zh) * 2016-05-05 2016-07-06 中国电建集团华东勘测设计研究院有限公司 严寒地区病态混凝土重力坝的修复结构及施工方法
CN106192908A (zh) * 2016-07-27 2016-12-07 中国水利水电第十工程局有限公司 一种防止混凝土面板与堆石坝坝体脱空的系统及施工方法
CN106759561A (zh) * 2017-02-23 2017-05-31 中冶集团武汉勘察研究院有限公司 一种建/构筑物浅埋基础脱空处理方法
CN106759561B (zh) * 2017-02-23 2019-03-05 中冶集团武汉勘察研究院有限公司 一种建/构筑物浅埋基础脱空处理方法
WO2019192267A1 (zh) * 2018-04-04 2019-10-10 水利部交通运输部国家能源局南京水利科学研究院 一种混凝土面板堆石坝面板脱空区水下修复系统
US11198984B2 (en) 2018-04-04 2021-12-14 Nanjing Hydraulic Research Institute Under The Ministry Of Water Resources, The Ministry Of Transport And The Ministry Of Electric Underwater repair system for cavity region of concrete panel rock-fill dam panel
CN109281292A (zh) * 2018-11-13 2019-01-29 中南大学 一种水库深水混凝土面板脱开裂缝修补方法
CN110185004A (zh) * 2019-05-29 2019-08-30 中国葛洲坝集团第一工程有限公司 混凝土面板堆石坝脱空处理方法
CN110185004B (zh) * 2019-05-29 2020-06-12 中国电建集团成都勘测设计研究院有限公司 混凝土面板堆石坝脱空处理方法
CN110608066A (zh) * 2019-10-10 2019-12-24 中国五冶集团有限公司 一种隧洞灌浆深度的检测系统
CN112196269A (zh) * 2020-10-21 2021-01-08 三门核电有限公司 一种用于核电厂换料水池钢覆面板起拱处理的方法

Similar Documents

Publication Publication Date Title
CN104912039A (zh) 混凝土面板脱空修补方法
CN101634148B (zh) 一种土钉墙基坑支护及施工方法
CN202370525U (zh) 回风立井风化基岩段井筒壁后注浆施工结构
CN108457658B (zh) 一种土质地层隧道单洞双向施工交汇段施工方法
CN106761790A (zh) 一种敞开式tbm过全断面炭质板岩掘进及支护方法
CN105201001B (zh) 一种岩溶地区大型溶洞的复合防渗结构及其施工方法
CN206667278U (zh) 溶岩裂隙涌水处理施工结构
CN101781889A (zh) 一种h型止水帷幕施工工艺
CN109854297A (zh) 一种基于定向钻探工艺的小煤窑采空区注浆方法
CN110617067A (zh) 一种极软弱围岩隧道全断面边界超前管棚低风险施工方法
CN104819010A (zh) 一种煤矿工作面过导水断层时预防顶板和底板突水的施工方法
CN108678753B (zh) 反坡隧道施工方法
CN110965595A (zh) 一种腐蚀性地质环境下筏板基础建筑抬升加固结构及方法
CN107191188B (zh) 基岩段不良含水层定位靶向注浆立井井壁结构、施工装置及方法
CN110106883A (zh) 一种矫正地铁隧道水平变形的实时反馈注浆方法
CN205243528U (zh) 隧道底部沉降衬砌开裂加固结构
CN114109442B (zh) 隧道岩溶破碎带溜塌半断面帷幕前进式注浆加固处理方法
CN102235007B (zh) 上钉下桩组合的深基支护方法
CN114483109A (zh) 穿越隧道断层破碎带的帷幕注浆超前大管棚贯通施工方法
CN206736963U (zh) 一种沟谷段高水位区盖挖隧道止水结构
CN203080558U (zh) 一种薄衬砌灌浆洞内直接式高压灌浆帷幕连接结构
CN113006733A (zh) 一种地表深层注浆工艺
CN116220554A (zh) 一种用于急倾斜多煤层采空区充填的组合钻探方法
CN104763437B (zh) 一种强透水地层隧道开挖方法
CN107747317B (zh) 一种软岩基础防渗墙槽底沉渣处理方法及软岩基础防渗墙槽底结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150916

RJ01 Rejection of invention patent application after publication