CN104911994A - Bolt-connection-free assembled bridge guardrail - Google Patents

Bolt-connection-free assembled bridge guardrail Download PDF

Info

Publication number
CN104911994A
CN104911994A CN201510330882.2A CN201510330882A CN104911994A CN 104911994 A CN104911994 A CN 104911994A CN 201510330882 A CN201510330882 A CN 201510330882A CN 104911994 A CN104911994 A CN 104911994A
Authority
CN
China
Prior art keywords
hollow section
section column
bridge guardrail
hole
gag lever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510330882.2A
Other languages
Chinese (zh)
Inventor
徐俊
冯国恩
毛建峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changshu Huacheng Construction Engineering Co Ltd
Original Assignee
Changshu Huacheng Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changshu Huacheng Construction Engineering Co Ltd filed Critical Changshu Huacheng Construction Engineering Co Ltd
Priority to CN201510330882.2A priority Critical patent/CN104911994A/en
Publication of CN104911994A publication Critical patent/CN104911994A/en
Pending legal-status Critical Current

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a bolt-connection-free assembled bridge guardrail. The bolt-connection-free assembled bridge guardrail comprises fixed bases and hollow pipe stand columns which are sequentially arranged at intervals, and transversely-arranged connecting rods are arranged between the hollow pipe stand columns; a connecting pipe extending to the interior of the corresponding hollow pipe stand column is vertically arranged on each fixed base, and through holes are formed in the lower portions of the two sides of each hollow pipe stand column; guide holes corresponding to the through holes and limiting rods arranged in the guide holes are arranged on the side faces of the connecting pipes, and the outer portions of the limiting rods are sleeved with springs; and downward slope surfaces are arranged at the tail ends of the limiting rods. Through the manner, by means of the bolt-connection-free assembled bridge guardrail, the slope surfaces are utilized for pushing the limiting rods to the interiors of the connecting pipes, and after the hollow pipe stand columns descend to the bottoms, the through holes are communicated with the guide holes to enable the limiting rods to be pulled into the through holes under the effect of the springs; displacement of the hollow pipe stand columns is limited, and the bridge guardrail is rapid in construction, firm in structure, attractive in appearance and convenient to maintain.

Description

One exempts from bolted assembling Bridge guardrail
Technical field
The present invention relates to bridge engineering field, particularly relate to one and exempt from bolted assembling Bridge guardrail.
Background technology
The both sides of bridge are usually provided with guardrail and carry out security protection.In order to improve efficiency of construction, guardrail mostly is the standard component according to figure paper conversion, transports directly on bridge and carries out combination installation, with bolts or welding, sound construction.
Guardrail on bridge mostly is welded, also will polish and spray paint after welding, and speed of application is slow, and cost is high, and is difficult to safeguard and change, and needs to cut, improve the cost of maintenance when replacing.In order to reduce difficulty of construction, part guardrail have employed bolt and connects, but the bolt of One's name is legion reduces installation effectiveness, and screw bolt and nut is all outside exposed, affects the aesthetic measure of guardrail, and bolt gets rusty easily and is difficult to safeguard.
Summary of the invention
The technical problem that the present invention mainly solves is to provide one and exempts from bolted assembling Bridge guardrail, quick for installation, easy to maintenance.
For solving the problems of the technologies described above, the technical scheme that the present invention adopts is: provide one to exempt from bolted assembling Bridge guardrail, comprise: spaced firm banking and hollow section column successively, described hollow section column is vertically arranged on the top of firm banking respectively, horizontal connecting rod is provided with between described hollow section column, described firm banking is vertically provided with the tube connector that a section extends to hollow section column inside, the bottom of described hollow section column both sides is provided with through hole, the gag lever post that described tube connector side is provided with the pilot hole corresponding with through hole and is arranged in pilot hole, described gag lever post outer cover is provided with spring, described both ends of the spring is connected with gag lever post top with tube connector inwall respectively and gag lever post is drawn in through hole, the end of described gag lever post is provided with downward domatic.
In a preferred embodiment of the present invention, described hollow section column top is provided with a waterproof cover.
In a preferred embodiment of the present invention, described horizontal connecting rod runs through hollow section column successively, and described hollow section column is provided with the through hole corresponding with horizontal connecting rod.
In a preferred embodiment of the present invention, the inwall of described hollow section column is corresponding with the outer wall of tube connector.
In a preferred embodiment of the present invention, outside described through hole, be respectively arranged with the protective cover extended in through hole.
In a preferred embodiment of the present invention, be provided with T-shaped locating piece below described firm banking, described T-shaped locating piece, firm banking and tube connector are integrated.
The invention has the beneficial effects as follows: the one that the present invention points out exempts from bolted assembling Bridge guardrail, utilize horizontal connecting rod that hollow section column is together in series, then when hollow section column is enclosed within tube connector outside downwards, utilizes domatic and gag lever post is pushed to tube connector inside, after hollow section column drops to bottom, through hole and pilot hole are connected and make gag lever post draw in through hole under the action of the spring, limit the displacement of hollow section column, quick construction, sound construction, exterior appearance, easy to maintenance.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme in the embodiment of the present invention, below the accompanying drawing used required in describing embodiment is briefly described, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings, wherein:
Fig. 1 is a kind of structural representation of exempting from the preferred embodiment of bolted assembling Bridge guardrail one of the present invention;
Fig. 2 is the part A enlarged drawing in Fig. 1.
Detailed description of the invention
Be clearly and completely described to the technical scheme in the embodiment of the present invention below, obviously, described embodiment is only a part of embodiment of the present invention, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making other embodiments all obtained under creative work prerequisite, belong to the scope of protection of the invention.
Refer to Fig. 1 to Fig. 2, the embodiment of the present invention comprises:
One exempts from bolted assembling Bridge guardrail, comprising: spaced firm banking 1 and hollow section column 2 successively, and described hollow section column 2 is vertically arranged on the top of firm banking 1 respectively, is provided with horizontal connecting rod 3 between described hollow section column 2.Utilize horizontal connecting rod 3 hollow section column 2 successively spaced series, described hollow section column 2 is provided with the through hole corresponding with horizontal connecting rod 3, described horizontal connecting rod 3 runs through hollow section column 2 successively, during practical operation, middle hollow section column 2 is run through, through hole on head and the tail two hollow section columns 2 only gets through the side of hollow section column 2, and opposite side is closed, good to the stationarity of horizontal connecting rod 3.
Described firm banking 1 is vertically provided with the tube connector 12 that a section extends to hollow section column 2 inside, the bottom of described hollow section column 2 both sides is provided with through hole 21, described tube connector 12 side is provided with the pilot hole corresponding with through hole 21 and is arranged on the gag lever post 5 in pilot hole, described gag lever post 5 outer cover is provided with spring 6, described spring 6 two ends are connected with gag lever post 5 top with tube connector 12 inwall respectively and gag lever post 5 are drawn in through hole 21, and the end of described gag lever post 5 is provided with downward domatic.When hollow section column 2 is enclosed within tube connector 12 outside downwards; utilize the domatic of gag lever post 5 and gag lever post 5 is pushed to tube connector 12 inside; after hollow section column 2 drops to bottom; through hole 21 and pilot hole are connected and make gag lever post 5 under the effect of spring 6, draw in through hole 21; limit the displacement of hollow section column about 2; quick construction; and sound construction; outside does not have weld mark or exposed bolt; better appearance; and easy to maintenance, import steel pole in through hole 21 outer end, make gag lever post 5 retraction pilot hole can extract hollow section column 2.
Described hollow section column 2 top is provided with a waterproof cover 4, prevents dust or rainwater from invading hollow section column 2 from top, avoids internal rust, increase the service life.
The inwall of described hollow section column 2 is corresponding with the outer wall of tube connector 12, closely cooperates, and limits the swing of hollow section column 2.
Be respectively arranged with the protective cover 22 extended in through hole 21 outside described through hole 21, crypticity is good, reduces the possibility that through hole 21 is intake.
Be provided with T-shaped locating piece 11 below described firm banking 1, described T-shaped locating piece 11, firm banking 1 and tube connector 12 are integrated, and during bridge construction, T-shaped locating piece 11 is embedded in the concrete of bridge deck surfaces, positions firm banking 1.
In sum, the one that the present invention points out exempts from bolted assembling Bridge guardrail, quick construction, sound construction, outside welding vestige or exposed bolt, and anticorrosive property is good, durable in use, and is convenient to safeguard, with low cost.
The foregoing is only embodiments of the invention; not thereby the scope of the claims of the present invention is limited; every utilize description of the present invention to do equivalent structure or equivalent flow process conversion; or be directly or indirectly used in other relevant technical field, be all in like manner included in scope of patent protection of the present invention.

Claims (6)

1. exempt from bolted assembling Bridge guardrail for one kind, comprise: spaced firm banking and hollow section column successively, described hollow section column is vertically arranged on the top of firm banking respectively, horizontal connecting rod is provided with between described hollow section column, it is characterized in that, described firm banking is vertically provided with the tube connector that a section extends to hollow section column inside, the bottom of described hollow section column both sides is provided with through hole, the gag lever post that described tube connector side is provided with the pilot hole corresponding with through hole and is arranged in pilot hole, described gag lever post outer cover is provided with spring, described both ends of the spring is connected with gag lever post top with tube connector inwall respectively and gag lever post is drawn in through hole, the end of described gag lever post is provided with downward domatic.
2. according to claim 1ly exempt from bolted assembling Bridge guardrail, it is characterized in that, described hollow section column top is provided with a waterproof cover.
3. according to claim 1ly exempt from bolted assembling Bridge guardrail, it is characterized in that, described horizontal connecting rod runs through hollow section column successively, and described hollow section column is provided with the through hole corresponding with horizontal connecting rod.
4. according to claim 1ly exempt from bolted assembling Bridge guardrail, it is characterized in that, the inwall of described hollow section column is corresponding with the outer wall of tube connector.
5. according to claim 1ly exempt from bolted assembling Bridge guardrail, it is characterized in that, outside described through hole, be respectively arranged with the protective cover extended in through hole.
6. according to claim 1ly exempt from bolted assembling Bridge guardrail, it is characterized in that, be provided with T-shaped locating piece below described firm banking, described T-shaped locating piece, firm banking and tube connector are integrated.
CN201510330882.2A 2015-06-16 2015-06-16 Bolt-connection-free assembled bridge guardrail Pending CN104911994A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510330882.2A CN104911994A (en) 2015-06-16 2015-06-16 Bolt-connection-free assembled bridge guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510330882.2A CN104911994A (en) 2015-06-16 2015-06-16 Bolt-connection-free assembled bridge guardrail

Publications (1)

Publication Number Publication Date
CN104911994A true CN104911994A (en) 2015-09-16

Family

ID=54081400

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510330882.2A Pending CN104911994A (en) 2015-06-16 2015-06-16 Bolt-connection-free assembled bridge guardrail

Country Status (1)

Country Link
CN (1) CN104911994A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109267479A (en) * 2018-11-20 2019-01-25 庆元县古韵廊桥研究所 The installation method of reassembling type wooden fence applied to ancient rhythm shelter bridge

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050021423A (en) * 2005-02-07 2005-03-07 김길평 Guardrail using bridge can regulate wind pressure
CN201810036U (en) * 2010-09-10 2011-04-27 无锡惠特金属护栏有限公司 Tongue-shaped electric sheet clamping fence
CN103334632A (en) * 2013-06-17 2013-10-02 浙江美典新材料有限公司 Barrier
CN203783240U (en) * 2014-04-09 2014-08-20 刘浦贵 Assembly wall for precast concrete
CN203834834U (en) * 2014-04-15 2014-09-17 湖南凯沃其型材有限公司 Guardrail
CN204326405U (en) * 2014-12-01 2015-05-13 沈阳远大铝业工程有限公司 Assembled railing grafting positioner
CN204753373U (en) * 2015-06-16 2015-11-11 常熟市华诚建设工程有限责任公司 Bolted connection's equipment bridge railing exempts from

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050021423A (en) * 2005-02-07 2005-03-07 김길평 Guardrail using bridge can regulate wind pressure
CN201810036U (en) * 2010-09-10 2011-04-27 无锡惠特金属护栏有限公司 Tongue-shaped electric sheet clamping fence
CN103334632A (en) * 2013-06-17 2013-10-02 浙江美典新材料有限公司 Barrier
CN203783240U (en) * 2014-04-09 2014-08-20 刘浦贵 Assembly wall for precast concrete
CN203834834U (en) * 2014-04-15 2014-09-17 湖南凯沃其型材有限公司 Guardrail
CN204326405U (en) * 2014-12-01 2015-05-13 沈阳远大铝业工程有限公司 Assembled railing grafting positioner
CN204753373U (en) * 2015-06-16 2015-11-11 常熟市华诚建设工程有限责任公司 Bolted connection's equipment bridge railing exempts from

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109267479A (en) * 2018-11-20 2019-01-25 庆元县古韵廊桥研究所 The installation method of reassembling type wooden fence applied to ancient rhythm shelter bridge
CN109267479B (en) * 2018-11-20 2020-09-11 浙江鑫直建筑有限公司 Mounting method of detachable wooden guardrail applied to ancient rhyme gallery bridge

Similar Documents

Publication Publication Date Title
CN204753373U (en) Bolted connection's equipment bridge railing exempts from
CN104911994A (en) Bolt-connection-free assembled bridge guardrail
CN204703595U (en) One exempts from bolted steel pipe fence
CN201010870Y (en) Double plating coat assembled guard rail
CN202672699U (en) Steel pipe scaffold non-metallic chassis
CN202148490U (en) Guardrail column profile
CN209468724U (en) A kind of light-duty safety guide rail
CN204000605U (en) A kind of steel bridge guardrail
CN203284749U (en) Combined road slope guardrail
CN2839473Y (en) Fences
CN202227266U (en) Snap spring for assembled type guardrail
CN205276698U (en) Angle steel in system hole in concrete
CN204780589U (en) Assemble bridge railing fast
CN205164221U (en) Pigment pressure filter operation platform
CN204040453U (en) A kind of novel scaffold Tiebar structure for civil construction project
CN205531413U (en) Building construction protective fence
CN205088599U (en) Guardrail structure suitable for urban rail transit above -ground route
CN216504770U (en) Multifunctional fire hydrant spanner
CN202851049U (en) Dust falling device for sinking and driving engineering
CN103485580A (en) Novel safety fence
CN202148658U (en) Connecting piece for connection between guard rail section bar components and buildings
CN204983785U (en) Transformer frame girder access path
CN204238220U (en) The concrete construction passage that vertically puts in storage
CN101906899A (en) Base-fixed safe fence
CN205205731U (en) Urban road guardrail

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150916