CN104900380B - A kind of cooling system of offshore wind farm main transformer - Google Patents

A kind of cooling system of offshore wind farm main transformer Download PDF

Info

Publication number
CN104900380B
CN104900380B CN201510299575.2A CN201510299575A CN104900380B CN 104900380 B CN104900380 B CN 104900380B CN 201510299575 A CN201510299575 A CN 201510299575A CN 104900380 B CN104900380 B CN 104900380B
Authority
CN
China
Prior art keywords
oil
water
main transformer
tank
cooling system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510299575.2A
Other languages
Chinese (zh)
Other versions
CN104900380A (en
Inventor
谭茂强
郑明�
贾斌
汤东升
钱可弭
周伟
周冰
冯奕敏
阳熹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Original Assignee
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd filed Critical China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Priority to CN201510299575.2A priority Critical patent/CN104900380B/en
Publication of CN104900380A publication Critical patent/CN104900380A/en
Application granted granted Critical
Publication of CN104900380B publication Critical patent/CN104900380B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses the cooling system of a kind of offshore wind farm main transformer, including main transformer, emergency oil tank, accident oil pipe and cooling water tank.Main transformer is provided with water-cooling system and for collecting the collection oil pit of accident oil extraction.Emergency oil tank floats on sea and is positioned at the lower section of described main transformer.The oil inlet end of accident oil pipe and the oil outlet end relative set collecting oil pit, the oil outlet end of accident oil pipe and the oil inlet end relative set of emergency oil tank, accident oil pipe is for guiding the accident oil extraction in described collection oil pit in described emergency oil tank.Cooling water tank is connected with described emergency oil tank and cooling water tank is positioned at below described emergency oil tank, and cooling water tank is provided with return pipe, outlet pipe and is arranged on the pump housing on outlet pipe or return pipe.Return pipe is communicated to the water side of described water-cooling system, and outlet pipe is communicated to the water inlet end of described water-cooling system.The present invention can save taking up room on offshore boosting station platform, can replace the mode of air-cooled reduction main transformer temperature, and good cooling results and the saving energy.

Description

A kind of cooling system of offshore wind farm main transformer
Technical field
The present invention relates to offshore wind farm main transformer technical field of electric equipment, especially relate to a kind of sea turn The cooling system of electricity main transformer.
Background technology
Based on marine moistureproof, Defend salt fog and the anti-consideration that electrical equipment is corroded, offshore boosting station Platform Designing Should be the most airtight.And consider from radiating efficiency, main transformer cooling fan needs and outside exchange of air, The outdoor layouts of electrical equipment such as main transformer fan electromotor are best, but this is unfavorable for protection against the tide and Defend salt fog.And such as Really offshore boosting station platform total enclosing, often uses pipeline to carry out cooling down main transformer to platform interior ventilation and sets Standby, so need persistently to strengthen transformer fan and exert oneself, the most both increased operation power consumption, also increased cold But system failure probability, and add unwatched offshore boosting station O&M maintenance difficulty.
During additionally, offshore boosting station has an accident, for preventing main transformer accident leakage of oil from flowing to sea, marine Booster stations platform need to arrange emergency oil tank and collect main transformer accident leakage of oil.And emergency oil tank is set and will occupy and build Be set as this most high offshore boosting station platform space, so influence whether offshore wind farm safe operation reliability with And project whole economic efficiency.
Although there had large-scale 500kV underground substation, city main transformer to use secondary water-cooling pattern to substitute to be strong Compel oil circulation air cooling way, but cooling water still needs with air heat-exchange that to carry out secondary the coldest, its cooling effect It is not highly desirable yet.
Summary of the invention
Based on this, the invention reside in the defect overcoming prior art, it is provided that one can save the energy, take sky Between the cooling system of offshore wind farm main transformer of little and good cooling results.
Its technical scheme is as follows: the cooling system of a kind of offshore wind farm main transformer, including: main transformer, Described main transformer is provided with water-cooling system and for collecting the collection oil pit of accident oil extraction;Emergency oil tank, described thing Therefore fuel tank floats on sea and is positioned at the lower section of described main transformer;Accident oil pipe, described accident oil pipe The oil outlet end relative set of oil inlet end and described collection oil pit, the oil outlet end of described accident oil pipe and described accident The oil inlet end relative set of fuel tank, described accident oil pipe is for guiding institute by the accident oil extraction in described collection oil pit State in emergency oil tank;Cooling water tank, described cooling water tank is connected with described emergency oil tank and described cooling water Case is positioned at below described emergency oil tank, and described cooling water tank is provided with return pipe, outlet pipe and goes out described in being arranged on The pump housing on water pipe or described return pipe, described return pipe is communicated to the water side of described water-cooling system, described Outlet pipe is communicated to the water inlet end of described water-cooling system.
Wherein in an embodiment, described cooling water tank connects a coil, one end of described coil with Described return pipe is connected, and the other end of described coil connects with described cooling water tank.
Wherein in an embodiment, described coil has more than one, between more than one described coil It is connected in series.
Wherein in an embodiment, described main transformer is arranged on offshore boosting station platform, described sea It is provided with pipe pile foundation below booster stations platform.
Wherein in an embodiment, described emergency oil tank or described cooling water tank connect hawser, described Hawser is connected with described pipe pile foundation.
Wherein in an embodiment, described offshore boosting station platform is additionally provided with rain collector and/or sky Water transfer collection device, described rain collector and/or air conditioner water collection device pass through pipeline communication to purifying dress Putting, described purifier is by pipeline communication to described return pipe or described cooling water tank.
Wherein in an embodiment, described water-cooling system is provided with water quantity detector, at described purifier Water side be communicated on the pipeline of described return pipe or described cooling water tank be provided with moisturizing control valve, described Water quantity detector is electrically connected with described moisturizing control valve.
Wherein in an embodiment, described water-cooling system is provided with level switch, at described purifier Water side be communicated on the pipeline of described return pipe or described cooling water tank be provided with moisturizing control valve, described Level switch is electrically connected with described moisturizing control valve.
Wherein in an embodiment, described cooling water tank is connected to form integrated case with described emergency oil tank, Being provided with profit dividing plate in described integration case, described emergency oil tank is positioned at the top of described profit dividing plate, institute State cooling water tank and be positioned at the lower section of described profit dividing plate.
Below in conjunction with technique scheme, principle, the effect of the present invention are further illustrated:
The cooling system of 1, above-mentioned offshore wind farm main transformer, first, floats on emergency oil tank on sea, So can save taking up room on offshore boosting station platform, it is possible to reduce the loading that pipe pile foundation undertakes.And Be connected with cooling water tank being made of one case by emergency oil tank, and emergency oil tank buoyancy across the sea can be utilized to incite somebody to action Cooling water tank is installed across the sea.Secondly, cooling water tank connects with the water-cooling system of main transformer, cools down water Case receives the high-temperature water in water-cooling system, and makes high-temperature water and sea water carry out heat exchange to obtain water at low temperature, and follows Ring is delivered in water-cooling system, for reducing main transformer temperature, and then can replace air-cooled reduction main transformer pressure The mode of device temperature.The most visible, the main transformer type of cooling of the present invention is by forced oil-circulation fan coolling side Formula changes forced oil circulation water-cooling mode into, and main transformer water-cooling system uses and purifies water closed cycle, then warp It is the coldest that the cooling water tank on floating sea and bottom coil heat exchange wall realize sea water secondary.Marine liter will be arranged in The emergency oil tank collecting main transformer accident oil extraction on pressure platform moves to put down on sea and with offshore boosting station Floating below platform main transformer draws stationary cooling water tank to form integration case.Therefore, the present invention can save energy Source, take up room little and good cooling results.
2, described emergency oil tank or described cooling water tank connect hawser, described hawser and described pipe pile foundation It is connected.So so that emergency oil tank is floating with cooling water tank one draws stationary to be arranged on offshore boosting station platform On the sea of lower section.
3, described cooling water tank is connected to form integrated case with described emergency oil tank, arranges in described integration case Having profit dividing plate, described emergency oil tank to be positioned at the top of described profit dividing plate, described cooling water tank is positioned at described The lower section of profit dividing plate.So, cooling water tank is integrated with emergency oil tank to be connected, and top is main transformer thing Therefore fuel tank, bottom is cooling water tank and heat exchange wall, and FCL utilizes the emergency oil tank conduct that most of time is vacant Source for buoyancy makes the floating sea, lower section drawing stationary to be arranged on booster stations platform main transformer of FCL.
4, the high-temperature water in water-cooling system first passes through return pipe and drains into coil, and coil and sea water carry out heat exchange Make high-temperature water become water at low temperature, the most again water at low temperature is delivered in cooling water tank, water at low temperature in cooling water tank Deliver to the water-cooling system of main transformer is lowered the temperature to main transformer, so make water route form closed cycle. Water in cooling water tank is directly contacted with sea water by cooling water tank and carries out heat exchange with sea water simultaneously so that with sea Coolant-temperature gage keeps consistent as far as possible, and in water-cooling system delivered to by outlet pipe.Coil quantity is the most and sea water Contact surface is the biggest so that cooling water tank is the highest with the heat exchange efficiency of sea water.
5, collection oil pit is positioned at offshore boosting station platform main transformer bottom, and emergency oil tank is positioned at cooling water and accident Oil integration upper box part, as the Source for buoyancy on the floating sea of FCL during not collecting accident oil, accident oil pipe First line of a couplet offshore boosting station platform main transformer collection oil pit, under connect emergency oil tank, for will collection oil pit in accident row Oil guides in described emergency oil tank.
6, by rain collector, the rainwater of offshore boosting station plain roof is collected, or through air-conditioning Offshore boosting station room air conditioner draining is collected by water collecting device, and by defeated to rainwater or the air conditioner water of collection Delivering to purifier and carry out purified treatment, purified treatment can be such as to carry out the rainwater collected or air conditioner water Simple precipitation processes and acid-base value neutral chemical processes.The most again by air conditioner water or the rainwater conveying of purified treatment To return pipe or cooling water tank, to add in water-cooling system in time.
7, arranging level switch at described main transformer cooling water tank, described main transformer cooling water purification fills The water side put is communicated on the pipeline of described return pipe or described heat-exchanging water tank arrange moisturizing control valve, described Level switch automatic controlled water replanishing control valve opening and closing realizes the cooling water automatic water supplement of described main transformer.
Accompanying drawing explanation
Fig. 1 is the cooling system structure schematic diagram of offshore wind farm main transformer described in the embodiment of the present invention;
Fig. 2 is emergency oil tank described in the embodiment of the present invention and described cooling water tank attachment structure schematic diagram;
The side view of Fig. 3 bitmap 2.
Description of reference numerals:
10, main transformer, 11, collection oil pit, 20, emergency oil tank, 21, accident oil pipe, 22, fuel outlet valve, 30, cooling water tank, 31, return pipe, 32, outlet pipe, 33, coil, 34, the pump housing, 40, marine Booster stations platform, 41, pipe pile foundation, 50, hawser, 60, rain collector, 70, air conditioner water collects Device, 80, purifier, 90, mend water control valve.
Detailed description of the invention
Below embodiments of the invention are described in detail:
As it is shown in figure 1, the cooling system of offshore wind farm main transformer of the present invention, including main transformer 10, emergency oil tank 20, accident oil pipe 21 and cooling water tank 30.Described main transformer 10 is provided with water-cooling system (not illustrating in figure) and the collection oil pit 11 for collecting accident oil extraction.Described emergency oil tank 20 floats on sea On face and be positioned at the lower section of described main transformer 10.The oil inlet end of described accident oil pipe 21 and described oil-collecting The oil-feed of the oil outlet end relative set in hole 11, the oil outlet end of described accident oil pipe 21 and described emergency oil tank 20 End relative set, described accident oil pipe 21 is for guiding described thing by the accident oil extraction in described collection oil pit 11 Therefore in fuel tank 20.In embodiments of the present invention, the oil inlet end of described accident oil pipe 21 and described collection oil pit 11 Oil outlet end be connected, the oil outlet end of described accident oil pipe 21 is connected with the oil inlet end of described emergency oil tank 20 Logical.Certainly, the oil outlet end of described collection oil pit 11 is arranged on the bottom of collection oil pit 11, makes accident oil pipe 21 Oil inlet end is corresponding with collection oil pit 11, can be entered with collection oil pit 11 oil outlet end by accident oil pipe 21 oil inlet end Row connects, and the accident oil extraction in emergency oil tank 20 can be made to be flowed in accident oil pipe 21.Described cooling Water tank 30 is connected with described emergency oil tank 20 and described cooling water tank 30 is positioned at described emergency oil tank 20 times Side, described cooling water tank 30 is provided with return pipe 31, outlet pipe 32 and is arranged on described outlet pipe 32 or described The pump housing 34 on return pipe 31.Described return pipe 31 is communicated to the water side of described water-cooling system, described in go out Water pipe 32 is communicated to the water inlet end of described water-cooling system.
The cooling system of above-mentioned offshore wind farm main transformer, first, floats on sea by emergency oil tank 20, So can save taking up room on offshore boosting station platform 40, it is possible to reduce the lotus that pipe pile foundation 41 undertakes Weight.And emergency oil tank 20 is connected with cooling water tank 30, emergency oil tank 20 buoyancy across the sea can be utilized Cooling water tank 30 is installed across the sea.Secondly, cooling water tank 30 connects with the water-cooling system of main transformer 10 Logical, the high-temperature water in main transformer 10 and sea water are carried out heat exchange and obtain water at low temperature by cooling water tank 30, and follow Ring is delivered in water-cooling system, for reducing main transformer 10 temperature, and then can replace air-cooled reduction main transformer The mode of depressor 10 temperature.The most visible, the main transformer type of cooling of the present invention is cold by forced oil-circulation fan But mode changes forced oil circulation water-cooling mode into, and main transformer water-cooling system uses and purifies water closed cycle, Sea water secondary is realized again the coldest through the cooling water tank 30 on floating sea and bottom coil 33 heat exchange wall.By cloth Put collect at sea booster stations platform the emergency oil tank of main transformer accident oil extraction move on sea and with sea Floating below upper boosting platform main transformer is drawn stationary cooling water tank 30 to be formed and floating draws stationary integration Case.Therefore, the present invention can save the energy, take up room little and good cooling results.
Referring to Fig. 2 and 3, described cooling water tank 30 connects coil 33, the one of described coil 33 End is connected with described return pipe 31, and the other end of described coil 33 connects with described cooling water tank 30. So high-temperature water in water-cooling system first passes through return pipe 31 and drains into coil 33, and coil 33 enters with sea water Row heat exchange makes high-temperature water become water at low temperature, delivers in cooling water tank 30 the most again, and heat transfer effect is preferable.Cold But the water in water tank 30 also can carry out heat exchange with sea water simultaneously so that keep consistent with ocean temperature as far as possible, and Deliver in water-cooling system through outlet pipe 32.Described coil 33 has more than one, and more than one is described snakelike It is connected in series between pipe 33.Coil 33 quantity is the most the biggest with contact with sea water face so that cooling water tank 30 is the highest with the heat exchange efficiency of sea water.
Described main transformer 10 is arranged on offshore boosting station platform 40, described offshore boosting station platform 40 times Side is provided with pipe pile foundation 41.Described emergency oil tank 20 or described cooling water tank 30 connect hawser 50, Described hawser 50 is connected with described pipe pile foundation 41.Emergency oil tank 20 or cooling water tank 30 are through hawser 50 Draw and be fixed in pipe pile foundation 41, can prevent from being shifted over by stormy waves fluctuation.And when main transformer generation thing Therefore, emergency oil tank 20 fills accident oil extraction, and when discharging not over fuel outlet valve 22, hawser 50 is avoided that Emergency oil tank 20 and cooling water tank 30 sink to seabed.
Rain collector 60 and/or air conditioner water collection device it is additionally provided with on described offshore boosting station platform 40 70.Described rain collector 60 and/or air conditioner water collection device 70 pass through pipeline communication to purifier 80. Described purifier 80 is by pipeline communication to described return pipe 31 or described cooling water tank 30.Thus by Rainwater is collected by rain collector 60, or air-conditioning waste discharge is entered by air conditioner water collection device 70 Row is collected, and the rainwater of collection or air conditioner water are delivered to purifier 80 carry out purified treatment, therein only It can be that the rainwater collected or air conditioner water are carried out simple precipitation process and acid-base value neutralization that change processes.Then Again air conditioner water or the rainwater of purified treatment are delivered to return pipe 31 or cooling water tank 30, to add in time In water-cooling system, it is to avoid water-cooling system is due to moisture loss and can not get supplementing and causes heat exchange not and occur damaging Bad phenomenon.
Wherein, the pipeline of described water-cooling system is provided with water quantity detector (not illustrating in figure).Described only The water side of gasifying device 80 is communicated on the pipeline of described return pipe 31 or described cooling water tank 30 be provided with benefit Water control valve 90.Described water quantity detector is electrically connected with described moisturizing control valve 90.In another embodiment In, described water-cooling system is provided with level switch (not illustrating in figure).Going out of described purifier 80 Water end (W.E.) is communicated on the pipeline of described return pipe 31 or described cooling water tank 30 be provided with moisturizing control valve 90. Described level switch is electrically connected with described moisturizing control valve 90.So, by water quantity detector or water level The water yield in detector detection water-cooling system or hydraulic pressure, and by the water yield signal of water-cooling system or hydraulic signal and Time feed back to moisturizing control valve 90, moisturizing control valve 90 then according in water-cooling system the water yield height or hydraulic pressure big Little control valve is turned on and off, enabling preferably control the water yield in water-cooling system.
To sum up, present invention have the advantage that
The cooling system of 1, above-mentioned offshore wind farm main transformer 10, first, floats on emergency oil tank 20 On sea, so can save taking up room on offshore boosting station platform 40, it is possible to reduce offshore boosting station and put down The loading that platform pipe pile foundation 41 undertakes.And emergency oil tank 20 is connected with cooling water tank 30, accident can be utilized Cooling water tank 30 is arranged on offshore boosting station platform lower sea by fuel tank 20 buoyancy across the sea.Its Secondary, cooling water tank 30 connects with the water-cooling system of main transformer 10, and cooling water tank 30 receives in water-cooling system High-temperature water, and make high-temperature water and sea water carry out heat exchange to obtain water at low temperature, and circulate and be delivered to water-cooling system In, for reducing main transformer 10 temperature, and then the side of air-cooled reduction main transformer 10 temperature can be replaced Formula.The most visible, main transformer 10 type of cooling of the present invention is changed into by force by forced oil-circulation fan coolling mode Compel oil circulation water-cooling mode, and main transformer 10 water-cooling system uses and purifies water closed cycle, then through floating sea It is the coldest that the cooling water tank 30 in face and bottom heat exchange wall realize sea water secondary.To be arranged on offshore boosting station platform Collect the emergency oil tank 20 of main transformer 10 accident oil extraction move on sea and with offshore boosting station platform master Floating below transformator 10 draws stationary cooling water tank 30 to form integration case.Therefore, the present invention can save The energy, take up room little and good cooling results.
2, described emergency oil tank 20 or described cooling water tank 30 connect hawser 50, described hawser 50 with Described pipe pile foundation 41 is connected.So so that emergency oil tank 20 and cooling water tank 30 are formed and floating draw stationary Integration case is arranged on offshore boosting station platform lower sea.
3, described cooling water tank 30 is connected to form integrated case, described integration case with described emergency oil tank 20 Inside being provided with profit dividing plate, described emergency oil tank 20 is positioned at the top of described profit dividing plate, described cooling water tank 30 lower sections being positioned at described profit dividing plate.So, cooling water tank 30 is integrated with emergency oil tank 20 to be connected, Top is main transformer 10 emergency oil tank 20, and bottom is cooling water tank 30 and heat exchange wall, and FCL utilizes mostly Number times vacant emergency oil tank 20 makes as Source for buoyancy that FCL is floating draws stationary to be arranged on offshore boosting station platform The sea, lower section of main transformer 10.
4, the high-temperature water in water-cooling system first passes through return pipe 31 and drains into coil 33, coil 33 and sea water Carrying out heat exchange makes high-temperature water become water at low temperature, water at low temperature is delivered in cooling water tank 30 the most again, cools down water Lower the temperature to during water at low temperature delivers to the water-cooling system of main transformer 10 in case 30 main transformer 10, so make Water route forms closed cycle.Water in cooling water tank 30 is directly contacted with sea water and sea by cooling water tank 30 Water carries out heat exchange simultaneously so that keeps with ocean temperature consistent as far as possible, and delivers to water-cooling system through outlet pipe 32 In.Coil 33 quantity is the most the biggest with contact with sea water face so that cooling water tank 30 and the heat exchange of sea water Efficiency is the highest.
5, collection oil pit 11 is positioned at offshore boosting station platform main transformer 10 bottom, and emergency oil tank 20 is positioned at cold But water upper box part integrated with accident oil, as the Source for buoyancy on the floating sea of FCL during not collecting accident oil, Accident oil pipe 21 first line of a couplet offshore boosting station platform main transformer 10 collects oil pit 11, under connect emergency oil tank 20, use Within collecting oil pit 11, accident oil extraction guides in described emergency oil tank 20;Through accident oil pipe 21 first line of a couplet sea liter Pressure platform main transformer 10 collects oil pit 11, collects main transformer 10 accident oil extraction.
6, by rain collector 60, the rainwater of offshore boosting station plain roof is collected, or warp Offshore boosting station room air conditioner draining is collected by air conditioner water collection device, and by the rainwater collected or air-conditioning Water is delivered to purifier 80 and carries out purified treatment, and purified treatment can be such as to the rainwater collected or air-conditioning Water carries out simple precipitation process and acid-base value neutral chemical processes.The most again by air conditioner water or the rain of purified treatment Water is delivered to return pipe 31 or cooling water tank 30, to add in water-cooling system in time, it is to avoid water-cooling system Due to moisture loss and can not get supplementing and cause heat exchange not and damage phenomenon occurs.
7, arranging level switch at described main transformer 10 cooling water tank 30, described main transformer 10 is cold But the water side of water purification installation 80 is communicated on the pipeline of described return pipe 31 or described heat-exchanging water tank arrange Moisturizing control valve, described level switch automatic controlled water replanishing control valve opening and closing realizes described main transformer 10 Cooling water automatic water supplement.
Each technical characteristic of embodiment described above can combine arbitrarily, for making description succinct, the most right The all possible combination of each technical characteristic in above-described embodiment is all described, but, if these skills There is not contradiction in the combination of art feature, is all considered to be the scope that this specification is recorded.
Embodiment described above only have expressed the several embodiments of the present invention, and it describes more concrete and detailed, But can not therefore be construed as limiting the scope of the patent.It should be pointed out that, for this area For those of ordinary skill, without departing from the inventive concept of the premise, it is also possible to make some deformation and change Entering, these broadly fall into protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be with appended power Profit requires to be as the criterion.

Claims (7)

1. the cooling system of an offshore wind farm main transformer, it is characterised in that including:
Main transformer, described main transformer is provided with water-cooling system and for collecting the collection oil pit of accident oil extraction, institute State main transformer to be arranged on offshore boosting station platform, below described offshore boosting station platform, be provided with pile tube base Plinth;
Emergency oil tank, described emergency oil tank floats on sea and is positioned at the lower section of described main transformer;
The oil outlet end relative set of accident oil pipe, the oil inlet end of described accident oil pipe and described collection oil pit, described The oil outlet end of accident oil pipe and the oil inlet end relative set of described emergency oil tank, described accident oil pipe is for by institute The accident oil extraction stated in collection oil pit guides in described emergency oil tank;
Cooling water tank, described cooling water tank is connected with described emergency oil tank and described cooling water tank is positioned at described Below emergency oil tank, described cooling water tank is provided with return pipe, outlet pipe and is arranged on described outlet pipe or described The pump housing on return pipe, described return pipe is communicated to the water side of described water-cooling system, and described outlet pipe connects To the water inlet end of described water-cooling system, wherein, described cooling water tank connects coil, described coil One end is connected with described return pipe, and the other end of described coil connects with described cooling water tank.
The cooling system of offshore wind farm main transformer the most according to claim 1, it is characterised in that institute State coil and have more than one, be connected in series between more than one described coil.
The cooling system of offshore wind farm main transformer the most according to claim 1, it is characterised in that institute State emergency oil tank or the connection of described cooling water tank has hawser, described hawser to be connected with described pipe pile foundation.
The cooling system of offshore wind farm main transformer the most according to claim 3, it is characterised in that institute State and on offshore boosting station platform, be additionally provided with rain collector and/or air conditioner water collection device, described rainwater-collecting Device and/or air conditioner water collection device are by pipeline communication to purifier, and described purifier is by pipeline even Pass to described return pipe or described cooling water tank.
The cooling system of offshore wind farm main transformer the most according to claim 4, it is characterised in that institute State water-cooling system and be provided with water quantity detector, be communicated in the water side of described purifier described return pipe or Moisturizing control valve, described water quantity detector and described moisturizing control valve it is provided with on the pipeline of described cooling water tank It is electrically connected with.
The cooling system of offshore wind farm main transformer the most according to claim 4, it is characterised in that institute State water-cooling system and be provided with level switch, be communicated in the water side of described purifier described return pipe or Moisturizing control valve, described level switch and described moisturizing control valve it is provided with on the pipeline of described cooling water tank It is electrically connected with.
The cooling system of offshore wind farm main transformer the most according to claim 1, it is characterised in that institute State cooling water tank and be connected to form integrated case with described emergency oil tank, be provided with in described integration case profit every Plate, described emergency oil tank is positioned at the top of described profit dividing plate, and described cooling water tank is positioned at described profit dividing plate Lower section.
CN201510299575.2A 2015-06-03 2015-06-03 A kind of cooling system of offshore wind farm main transformer Active CN104900380B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510299575.2A CN104900380B (en) 2015-06-03 2015-06-03 A kind of cooling system of offshore wind farm main transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510299575.2A CN104900380B (en) 2015-06-03 2015-06-03 A kind of cooling system of offshore wind farm main transformer

Publications (2)

Publication Number Publication Date
CN104900380A CN104900380A (en) 2015-09-09
CN104900380B true CN104900380B (en) 2016-08-10

Family

ID=54032990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510299575.2A Active CN104900380B (en) 2015-06-03 2015-06-03 A kind of cooling system of offshore wind farm main transformer

Country Status (1)

Country Link
CN (1) CN104900380B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105600208B (en) * 2016-02-26 2018-08-31 中国电建集团华东勘测设计研究院有限公司 A kind of accident oil collection device for offshore boosting station
CN107171212A (en) * 2017-07-13 2017-09-15 国网山东省电力公司平原县供电公司 A kind of distributed board outdoor
CN107424754B (en) * 2017-09-11 2023-04-07 广东粤电阳江海上风电有限公司 Transformer cooling system of offshore transformer substation
CN108336746B (en) * 2018-02-28 2024-03-19 山东天明电气技术有限公司 Dynamic reactive power compensation device of compact type offshore wind turbine generator
CN113035521B (en) * 2021-03-31 2022-05-31 中国能源建设集团广东省电力设计研究院有限公司 Transformer cooling device for offshore booster station

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6396162B1 (en) * 2000-10-24 2002-05-28 David Matthew Carrillo Underground hydroelectric plant
EP2570585A1 (en) * 2011-09-19 2013-03-20 Siemens Aktiengesellschaft Subsea transformer
CN103996498A (en) * 2014-06-11 2014-08-20 中国能建集团装备有限公司南京技术中心 Seawater cooling system for main transformer of offshore substation
CN104376971A (en) * 2014-11-11 2015-02-25 国家电网公司 Transformer chamber oil-immersed transformer accident fireproof oil storage pit with cover plates
CN204740934U (en) * 2015-06-03 2015-11-04 中国能源建设集团广东省电力设计研究院有限公司 Marine wind power offshore transformer water -cooling and accident oil extraction system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6396162B1 (en) * 2000-10-24 2002-05-28 David Matthew Carrillo Underground hydroelectric plant
EP2570585A1 (en) * 2011-09-19 2013-03-20 Siemens Aktiengesellschaft Subsea transformer
CN103996498A (en) * 2014-06-11 2014-08-20 中国能建集团装备有限公司南京技术中心 Seawater cooling system for main transformer of offshore substation
CN104376971A (en) * 2014-11-11 2015-02-25 国家电网公司 Transformer chamber oil-immersed transformer accident fireproof oil storage pit with cover plates
CN204740934U (en) * 2015-06-03 2015-11-04 中国能源建设集团广东省电力设计研究院有限公司 Marine wind power offshore transformer water -cooling and accident oil extraction system

Also Published As

Publication number Publication date
CN104900380A (en) 2015-09-09

Similar Documents

Publication Publication Date Title
CN104900380B (en) A kind of cooling system of offshore wind farm main transformer
EP2012366A2 (en) Photovoltaic system with improved efficiency and increment method of the electrical energy production of at least a thermo-photovoltaic solar module
CN209619470U (en) A kind of water electrolysis hydrogen producing cooling-cycle apparatus
CN209586604U (en) A kind of offshore boosting station platform configuring mixing circulation ocean temperature difference power generating system
CN104906725A (en) Main transformer fire extinguishing system of maritime booster station
CN113429049B (en) Clean energy power generation and seawater desalination system
CN204740934U (en) Marine wind power offshore transformer water -cooling and accident oil extraction system
CN211177478U (en) Single-well circulating efficient heat exchange system
CN205826213U (en) A kind of hydropower generator air cooler leakage inspector
CN104993408B (en) Offshore boosting station
CN209308881U (en) A kind of system improving power station technical water supply reliability
CN203810530U (en) Solar energy heating device
CN110085334A (en) Heat pipe-type passive residual heat removal system
CN115405477A (en) Wind turbine generator system cabin integrated air-water cooling system and control method
CN112992488A (en) Cooling method for flexible-direct transformer of internal circulation water cooling system
CN203035467U (en) Water-cooling system for offshore wind turbine generator
RU2652362C1 (en) Houseboat
CN206619467U (en) Transformer cooling system and the wind power generating set including the cooling system
RU2646684C1 (en) Houseboat
CN205332905U (en) Large -scale turbo generator set of power plant condenser glueballs cleaning system
CN205349597U (en) Cooling tower return water power generation facility
CN215794325U (en) River course environmental monitoring buoy of waterproof infiltration
CN105187001A (en) Evaporative cooling air conditioning system for photovoltaic power plant cooling and dust removing
CN217692683U (en) Stride across transmission tower microgrid system greatly
CN104930909A (en) Cooling water circulating system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant