CN104897936A - Junction box with load for replacing metering device - Google Patents

Junction box with load for replacing metering device Download PDF

Info

Publication number
CN104897936A
CN104897936A CN201510233022.7A CN201510233022A CN104897936A CN 104897936 A CN104897936 A CN 104897936A CN 201510233022 A CN201510233022 A CN 201510233022A CN 104897936 A CN104897936 A CN 104897936A
Authority
CN
China
Prior art keywords
live wire
zero line
measuring apparatus
wire conductive
binding post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510233022.7A
Other languages
Chinese (zh)
Inventor
葛俊杰
杨玉锐
张峰
杨元韬
晏翔
郑涛
冯跃亮
程杰
李勇
汤振罡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jiaxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Pinghu Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jiaxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Pinghu Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jiaxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, Pinghu Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510233022.7A priority Critical patent/CN104897936A/en
Publication of CN104897936A publication Critical patent/CN104897936A/en
Pending legal-status Critical Current

Links

Landscapes

  • Connections Arranged To Contact A Plurality Of Conductors (AREA)

Abstract

The invention provides a junction box with a load for replacing a metering device, and aims to solve the problem that power needs to be cut off when the metering device is replaced in the prior art. The junction box comprises a box body, a short-circuit plug, two live wire terminals and two null wire terminals; the live wire terminals are connected between a live wire and a corresponding live wire connector of the metering device, and the null wire terminals are connected between a null wire and a corresponding null wire connector of the metering device; the live wire terminals and the null wire terminals are arranged on the box body; and the box body is provided with a jack matched with the short-circuit plug, the two live wire terminals are turned on by the short-circuit plug, and the two null wire terminals are turned on by the short-circuit plug. The box body, the two live wire terminals and the two null wire terminals connect the live wire and the null wire with the metering device; when the short-circuit plug is plugged, the current of the live wire and the null wire passes through the short-circuit plug instead of the metering device, so when the metering device is replaced, a user does not need to cut off power; and more convenience is brought to power utilization of users.

Description

A kind of on-load changes measuring apparatus terminal box
Technical field
The present invention relates to a kind of on-load and change measuring apparatus terminal box.
Background technology
Along with socioeconomic fast development, Electricity customers is to the continuity of the quality of power supply, and the demand of stability constantly increases.Current staff, when changing metering outfit, due to the reason such as basic structure design and technology, forces staff first must cut off the normal electricity consumption of user before replacing, recovers after terminating again.Cause the power failure of user.Although the time is not long but light meeting causes user to reach phone to address inquires to, serious meeting causes customer complaint, and even in user family, electrical equipment is impaired.
Summary of the invention
The invention provides a kind of on-load and change measuring apparatus terminal box, being intended to solve the problem needing power-off in prior art when changing metering outfit.
In order to solve above technical matters, the present invention is achieved through the following technical solutions: a kind of on-load changes measuring apparatus terminal box, comprises box body, short circuit plug, two firewire binding posts, two zero line binding posts; Firewire binding post is connected between live wire and the live wire joint of corresponding measuring apparatus, and zero line binding post is connected between zero line and corresponding measuring apparatus zero line joint; Described firewire binding post is all arranged on box body, and zero line binding post is all arranged on box body; Described box body is provided with the jack matched with short circuit plug, and two firewire binding posts are by short circuit plug conducting, and two zero line binding posts are by short circuit plug conducting.
Further, described short circuit plug is made up of matrix, live wire conductive and neutral wire conductive, and described live wire conductive and neutral wire conductive are all connected on matrix; Structure is simple, is convenient to dismounting.
Further, described live wire conductive has two, is connected with electric power meter between two live wire conductive; Described jack has three, and neutral wire conductive to be plugged in a jack and all to touch with two zero line binding posts, and two live wire conductive are plugged in two other jacks respectively, and two live wire conductive touch with two firewire binding posts respectively; Electric power meter for measure change table during this period of time in the electricity that uses of user.
Further, described zero line binding post is made up of a body, the body of rod, an elastic clip; A described body of rod is arranged on front side of a body, and an elastic clip of one of them zero line binding post is connected in the left side wall of a body, and an elastic clip of another one zero line binding post is arranged on the right side wall of a body; Described neutral wire conductive is plugged between two elastic clips; The top of a body is provided with a threaded hole, and the rear of a body is provided with a wire connection hole.
Further, a described elastic clip is provided with interval trough; Be convenient to more effectively contact, increase electric conductivity.
Further, described firewire binding post is made up of No. two bodies, No. two bodies of rod, No. two elastic clips; Described No. two bodies of rod are arranged on front side of No. two bodies, and No. two elastic clips of firewire binding post are connected in the sidewall of No. two bodies; Described live wire conductive is plugged between No. two bodies and No. two elastic clips; The top of described No. two bodies is provided with No. two threaded holes, and the rear of No. two bodies is provided with No. two wire connection holes.
Further, described No. two elastic clips are provided with separation trough; Be convenient to more effectively contact, increase electric conductivity.
Compared with prior art advantage of the present invention is: in the present invention, live wire, zero line are connected with measuring apparatus with two zero line binding posts by box body, two firewire binding posts; After plugging short circuit plug, the electric current of live wire, zero line is through short circuit plug, and without measuring apparatus, when replacing measuring apparatus, user can not power-off; Make user power utilization convenient.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the invention will be further described:
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structural representation after the present invention removes box body;
Fig. 3 is structural representation when not installing plug in the present invention;
Fig. 4 is the structural representation of box body in the present invention;
Fig. 5 is the structural representation of zero line binding post in the present invention;
Fig. 6 is the structural representation of firewire binding post in the present invention.
Embodiment
Consult Fig. 1 to Fig. 6, a kind of on-load changes measuring apparatus terminal box, comprises box body 1, short circuit plug 4, two firewire binding posts 2, two zero line binding posts 3; Firewire binding post 2 is connected between live wire and the live wire joint of corresponding measuring apparatus, and zero line binding post 3 is connected between zero line and corresponding measuring apparatus zero line joint; Described firewire binding post 2 is all arranged on box body 1, and zero line binding post 3 is all arranged on box body 1; Described box body 1 is provided with jack 11, two firewire binding posts 2 matched with short circuit plug 4 and passes through short circuit plug 4 conducting, and two zero line binding posts 3 are by short circuit plug 4 conducting.Described short circuit plug 4 is made up of matrix 41, live wire conductive 42 and neutral wire conductive 43, and described live wire conductive 42 and neutral wire conductive 43 are all connected on matrix 41.Described live wire conductive 42 has two, is connected with electric power meter 5 between two live wire conductive 42; Described jack 11 has three, neutral wire conductive 43 to be plugged in a jack 11 and all to touch with two zero line binding posts 3, two live wire conductive 42 are plugged in two other jacks 11 respectively, and two live wire conductive 42 touch with two firewire binding posts 2 respectively.Described zero line binding post 3 is made up of a body 31, body of rod 32, elastic clip 33; A described body of rod 32 is arranged on front side of a body 31, and an elastic clip 33 of one of them zero line binding post 3 is connected in the left side wall of a body 31, and an elastic clip 33 of another one zero line binding post 3 is arranged on the right side wall of a body 31; Described neutral wire conductive 43 is plugged between two elastic clips 33; The rear that the top of a body 31 is provided with a threaded hole 34, body 31 is provided with a wire connection hole 35.A described elastic clip 33 is provided with interval trough 36.Described firewire binding post 2 is made up of No. two bodies 21, No. two bodies of rod 22, No. two elastic clips 23; Described No. two bodies of rod 22 are arranged on front side of No. two bodies 21, and No. two elastic clips 23 of firewire binding post 2 are connected in the sidewall of No. two bodies 21; Described live wire conductive 42 is plugged between No. two bodies 21 and No. two elastic clips 23; The rear that the top of described No. two bodies 21 is provided with No. two threaded holes 24, No. two bodies 21 is provided with No. two wire connection holes 25.Described No. two elastic clips 23 are provided with separation trough 26.Two bodies of rod 32 are semi-cylindrical copper post, and two No. two bodies of rod 22 are semi-cylindrical copper post.
Two firewire binding posts, 2, two zero line binding posts 3 are plugged in four pilot holes 12 on box body 1 respectively.Then be fixed by bolts on box body 1.
Box body 1, two firewire binding posts 2, two zero line binding posts 3, when normally using, are directly be plugged in measuring apparatus, are used for connecting wire and measuring apparatus; When measuring apparatus changed by needs, the neutral wire conductive 43 on short circuit plug 4 and two live wire conductive 42 are plugged in three corresponding jacks 11 respectively; Make measuring apparatus short circuit, thus while replacing measuring apparatus, user can not power-off.
The foregoing is only specific embodiments of the invention, but technical characteristic of the present invention is not limited thereto, any those skilled in the art is in the field of the invention, and the change done or modification are all encompassed among the scope of the claims of the present invention.

Claims (7)

1. on-load changes a measuring apparatus terminal box, it is characterized in that: comprise box body (1), short circuit plug (4), two firewire binding posts (2), two zero line binding posts (3); Firewire binding post (2) is connected between live wire and the live wire joint of corresponding measuring apparatus, and zero line binding post (3) is connected between zero line and corresponding measuring apparatus zero line joint; Described firewire binding post (2) is all arranged on box body (1), and zero line binding post (3) is all arranged on box body (1); Described box body (1) is provided with the jack (11) matched with short circuit plug (4), two firewire binding posts (2) are by short circuit plug (4) conducting, and two zero line binding posts (3) are by short circuit plug (4) conducting.
2. a kind of on-load according to claim 1 changes measuring apparatus terminal box, it is characterized in that: described short circuit plug (4) is made up of matrix (41), live wire conductive (42) and neutral wire conductive (43), described live wire conductive (42) and neutral wire conductive (43) are all connected on matrix (41).
3. a kind of on-load according to claim 2 changes measuring apparatus terminal box, it is characterized in that: described live wire conductive (42) has two, is connected with electric power meter (5) between two live wire conductive (42); Described jack (11) has three, neutral wire conductive (43) to be plugged in a jack (11) and all to touch with two zero line binding posts (3), two live wire conductive (42) are plugged in two other jacks (11) respectively, and two live wire conductive (42) touch with two firewire binding posts (2) respectively.
4. a kind of on-load according to claim 3 changes measuring apparatus terminal box, it is characterized in that: described zero line binding post (3) is made up of a body (31), the body of rod (32), an elastic clip (33); A described body of rod (32) is arranged on body (31) front side, an elastic clip (33) of one of them zero line binding post (3) is connected in the left side wall of a body (31), and an elastic clip (33) of another one zero line binding post (3) is arranged on the right side wall of a body (31); Described neutral wire conductive (43) is plugged between two No. one elastic clip (33); The top of a body (31) is provided with a threaded hole (34), and the rear of a body (31) is provided with a wire connection hole (35).
5. a kind of on-load according to claim 4 changes measuring apparatus terminal box, it is characterized in that: a described elastic clip (33) is provided with interval trough (36).
6. a kind of on-load according to claim 3 changes measuring apparatus terminal box, it is characterized in that: described firewire binding post (2) is made up of No. two bodies (21), No. two bodies of rod (22), No. two elastic clips (23); Described No. two bodies of rod (22) are arranged on No. two body (21) front sides, and No. two elastic clips (23) of firewire binding post (2) are connected in the sidewall of No. two bodies (21); Described live wire conductive (42) is plugged between No. two bodies (21) and No. two elastic clips (23); The top of described No. two bodies (21) is provided with No. two threaded holes (24), and the rear of No. two bodies (21) is provided with No. two wire connection holes (25).
7. a kind of on-load according to claim 6 changes measuring apparatus terminal box, it is characterized in that: described No. two elastic clips (23) are provided with separation trough (26).
CN201510233022.7A 2015-05-08 2015-05-08 Junction box with load for replacing metering device Pending CN104897936A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510233022.7A CN104897936A (en) 2015-05-08 2015-05-08 Junction box with load for replacing metering device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510233022.7A CN104897936A (en) 2015-05-08 2015-05-08 Junction box with load for replacing metering device

Publications (1)

Publication Number Publication Date
CN104897936A true CN104897936A (en) 2015-09-09

Family

ID=54030722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510233022.7A Pending CN104897936A (en) 2015-05-08 2015-05-08 Junction box with load for replacing metering device

Country Status (1)

Country Link
CN (1) CN104897936A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105301307A (en) * 2015-09-21 2016-02-03 国家电网公司 Electricity larceny prevention type junction box for power metering device
CN105548635A (en) * 2015-12-23 2016-05-04 宁波奥克斯高科技有限公司 Electric energy meter connector assembly
CN105807109A (en) * 2016-04-06 2016-07-27 威胜集团有限公司 Electric-energy-meter terminal base

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2685884Y (en) * 2004-03-12 2005-03-16 朱伟 Speical junction box for electric energy metering secondary loop
CN2824059Y (en) * 2005-09-23 2006-10-04 董建伦 Test connecting box for single phase electric energy meter with mutual inductor
CN201145702Y (en) * 2008-01-16 2008-11-05 朱伟 Electric energy metering combined wiring box
CN103698733A (en) * 2013-09-18 2014-04-02 国家电网公司 Test wiring terminal component for metering electric energy
CN203705633U (en) * 2013-12-18 2014-07-09 中国南方电网有限责任公司超高压输电公司贵阳局 Testing junction box of electric energy meter
CN104090138A (en) * 2014-07-16 2014-10-08 国家电网公司 Binding post enabling single-phase watt-hour meter to be replaced without power cut
CN204758659U (en) * 2015-05-08 2015-11-11 国家电网公司 Terminal box for metering device is changed to area load

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2685884Y (en) * 2004-03-12 2005-03-16 朱伟 Speical junction box for electric energy metering secondary loop
CN2824059Y (en) * 2005-09-23 2006-10-04 董建伦 Test connecting box for single phase electric energy meter with mutual inductor
CN201145702Y (en) * 2008-01-16 2008-11-05 朱伟 Electric energy metering combined wiring box
CN103698733A (en) * 2013-09-18 2014-04-02 国家电网公司 Test wiring terminal component for metering electric energy
CN203705633U (en) * 2013-12-18 2014-07-09 中国南方电网有限责任公司超高压输电公司贵阳局 Testing junction box of electric energy meter
CN104090138A (en) * 2014-07-16 2014-10-08 国家电网公司 Binding post enabling single-phase watt-hour meter to be replaced without power cut
CN204758659U (en) * 2015-05-08 2015-11-11 国家电网公司 Terminal box for metering device is changed to area load

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105301307A (en) * 2015-09-21 2016-02-03 国家电网公司 Electricity larceny prevention type junction box for power metering device
CN105548635A (en) * 2015-12-23 2016-05-04 宁波奥克斯高科技有限公司 Electric energy meter connector assembly
CN105807109A (en) * 2016-04-06 2016-07-27 威胜集团有限公司 Electric-energy-meter terminal base
CN105807109B (en) * 2016-04-06 2018-08-07 威胜集团有限公司 A kind of electric energy meter terminal seat

Similar Documents

Publication Publication Date Title
CN104897936A (en) Junction box with load for replacing metering device
CN201766195U (en) Expandable power socket
MY188381A (en) Copper-aluminium connector
CN204012621U (en) GIS miniaturization cable terminal structure
CN206148684U (en) Socket
CN204758659U (en) Terminal box for metering device is changed to area load
CN100578870C (en) Electronic device with socket fixing mechanism
CN203326186U (en) Novel cable reel
CN201576066U (en) Electrical insulation testing device
CN204649847U (en) Capacitance tester
CN104252216A (en) Anti-creeping USB (universal serial bus) power supply circuit
CN204088247U (en) A kind of fuse link
CN208189362U (en) A kind of 400 volts of Open Type Electric Current Mutual Inductor components
CN108020738B (en) Auxiliary control device for hard pressing plate calibration of transformer substation
CN205067619U (en) Quick test fixture of power plug
CN201289501Y (en) Wire holder of electric energy meter
CN204330952U (en) Multi-core wire inspection device
CN214280282U (en) PDU (Power distribution Unit) extension socket
CN212625347U (en) Installation structure of isolating switch conductive copper bar
CN214428815U (en) Pluggable plug
CN203434111U (en) Bridge connection fuse
CN203351098U (en) Electrical cabinet unit
CN218586425U (en) Industrial socket with rotatable jacks
CN203277903U (en) Power line for testing network video recorder
CN208078336U (en) A kind of power supply line device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150909