CN104895536B - A kind of method and injection-production column jacket for noting gas recovery well reducing completion - Google Patents

A kind of method and injection-production column jacket for noting gas recovery well reducing completion Download PDF

Info

Publication number
CN104895536B
CN104895536B CN201510239370.5A CN201510239370A CN104895536B CN 104895536 B CN104895536 B CN 104895536B CN 201510239370 A CN201510239370 A CN 201510239370A CN 104895536 B CN104895536 B CN 104895536B
Authority
CN
China
Prior art keywords
injection
column jacket
production column
pipe
sleeve pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510239370.5A
Other languages
Chinese (zh)
Other versions
CN104895536A (en
Inventor
贺梦琦
曲绍刚
孙振宇
马振
柏明星
王玲
赵吉成
马威
王昕�
伊宏亮
杨昕
刘德英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201510239370.5A priority Critical patent/CN104895536B/en
Publication of CN104895536A publication Critical patent/CN104895536A/en
Application granted granted Critical
Publication of CN104895536B publication Critical patent/CN104895536B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides a kind of method and injection-production column jacket for noting gas recovery well reducing completion, this method comprises the following steps:Step 1: installing the upper sleeve pipe (1) and setting of casing (2) for completion in well, the external diameter of upper sleeve pipe (1) is more than the external diameter of setting of casing (2);Step 2: in gas drive oil recovery stage injection-production column jacket of tripping in first into the sleeve pipe;Step 3: the external diameter for first taking out the oil pipe used in first injection-production column jacket injection-production column jacket of tripping in second into the sleeve pipe again, second injection-production column jacket out of this sleeve pipe in the gas storage stage is more than the external diameter of the oil pipe used in first injection-production column jacket.The method and injection-production column jacket of the note gas recovery well reducing completion can look after the low demand with fluence of gas drive early stage in the case where not digging a well again, and the high demand for matching somebody with somebody fluence of gas production stage completion can also be noted in the later stage.

Description

A kind of method and injection-production column jacket for noting gas recovery well reducing completion
Technical field
It is particularly a kind of to note gas recovery well reducing completion the present invention relates to oil field gas storage note gas recovery well completion technique field Method, a kind of or injection-production column jacket used in the method for the note gas recovery well reducing completion.
Background technology
During non-exhausted type oil-gas reservoir gas storage reconstruction, often in two stages:First stage is that gas drive is recovered the oil the stage, in order to The stable exploitation of gas drive oil recovery is realized, its gas drive gas injection rate at initial stage is relatively low, and durations are longer, for reduction cost of investment, general first Design uses small size sleeve pipe, and the gas injection productive completion tubing string of supporting reduced size ensures gas injection;Second stage is gas storage In the stage, to meet the demand of emergency peak regulation, it is typically designed using large scale sleeve pipe, and supporting large-size note gas production productive completion Tubing string ensures note gas production, and this design method is primarily present the shortcoming of following several respects:
If the 1, gas drive recovers the oil the stage directly using large scale oil pipe and sleeve pipe, higher and very long gas drive mistake is once put into Journey has made original gas injection oil pipe be damaged, and turns also to need to change a tubing string during exploitation of later stage gas storage, equally causes wave Take.
If the 2, gas drive recovers the oil the stage using large scale sleeve pipe, small size oil pipe is matched, then occurs that little oil pipe is supported the use Big packer design, around the stress problem such as dynamic deformation when can increase tubing string gas injection, it is necessary to use small size packer and correspondence note Gas and oil tubing string, then should use small size sleeve pipe.
Once it can not be changed in stage small casing lower going-into-well if 3, gas drive is recovered the oil, when the later stage switchs to gas storage well, individual well Certainly will significantly it be adjusted upward with yield, original gas injection oil pipe can not be met with production demand, then needs to dig a well again, Change large scale sleeve pipe.
In addition original small casing gas injection well needs shut-in well, that is, adds potential safety hazard, also result in waste.
The content of the invention
In order to solve that existing oil field gas storage note gas recovery well completion technique occurs in former and later two stages it is above-mentioned the problem of, The invention provides a kind of method and injection-production column jacket for noting gas recovery well reducing completion, the method for the note gas recovery well reducing completion can be with In the case where not digging a well again, that is, the low demand with fluence of gas drive early stage is looked after, can also be completed in the note gas production stage in later stage Height matches somebody with somebody the demand of fluence.
The technical solution adopted for the present invention to solve the technical problems is:A kind of method for noting gas recovery well reducing completion, bag Include following steps:
Step 1: install the sleeve pipe for completion in well, the sleeve pipe include the upper sleeve pipe being sequentially connected from the top down and Setting of casing, the external diameter of upper sleeve pipe is more than cased external diameter, and the area of passage of upper sleeve pipe is more than cased area of passage;
Step 2: in gas drive oil recovery stage injection-production column jacket of tripping in first into the sleeve pipe;
Step 3: first taking out first injection-production column jacket tripping in second into the sleeve pipe again out of this sleeve pipe in the gas storage stage The external diameter of the second oil pipe used in injection-production column jacket, second injection-production column jacket is more than the first oil used in first injection-production column jacket The area of passage of the second oil pipe used in the external diameter of pipe, second injection-production column jacket is more than the used in first injection-production column jacket The area of passage of one oil pipe.
The step of also including specially playing technology drilling well using oil reservoirs before step one.
Upper sleeve pipe is located at 50m~100m above well head to the top circle of oil reservoirs.
The external diameter of upper sleeve pipe is more than or equal to 177.8mm, and the wall thickness of upper sleeve pipe is 9mm~10mm, and cased external diameter is less than 177.8mm, cased wall thickness is 7mm~9mm.
Step 2 be gas drive recover the oil the stage initial stage into the sleeve pipe injection-production column jacket of tripping in first, first injection-production column jacket Circulation slide sleeve, retrievable packer, blocking including being sequentially connected from the top down by first oil pipe are located pipe nipple, test and sat Fall pipe nipple and horn mouth, retrievable packer is set in cased top.
The external diameter of first oil pipe used in first injection-production column jacket is 88.9mm, is used in first injection-production column jacket The wall thickness of first oil pipe is 6mm~8mm.
Second injection-production column jacket includes flowing pipe nipple, the downhole safety being sequentially connected from the top down by second oil pipe Valve, flowing pipe nipple, circulation slide sleeve, retrievable packer, blocking are located pipe nipple, test and are located pipe nipple and horn mouth, retrievable envelope Set every device in the bottom of upper sleeve pipe.
The external diameter of second oil pipe used in second injection-production column jacket is 114.3mm, is used in second injection-production column jacket Second oil pipe wall thickness be 6mm~13mm.
A kind of injection-production column jacket, the injection-production column jacket is the second above-mentioned injection-production column jacket, and second injection-production column jacket is included by oil Manage the flowing pipe nipple being sequentially connected from the top down, storm valve, flowing pipe nipple, circulation slide sleeve, retrievable packer, blocking seat Fall pipe nipple, test and be located pipe nipple and horn mouth.
Pipe nipple is located in blocking and test is located pipe nipple and connected by punching oil pipe.
The beneficial effects of the invention are as follows the method and injection-production column jacket of the note gas recovery well reducing completion can not dig a well again In the case of, that is, the low demand with fluence of gas drive early stage is looked after, the high need for matching somebody with somebody fluence of gas production stage completion can also be noted in the later stage Ask, improve the service life of note gas recovery well, taken into account oil reservoir gas drive demand in the demand of gas storage reconstruction, effectively reduced and build Kucheng's sheet.
Brief description of the drawings
The present invention is described in further detail below in conjunction with the accompanying drawings.
Fig. 1 is the schematic diagram in gas drive oil recovery stage injection-production column jacket of tripping in first into sleeve pipe.
Fig. 2 is the schematic diagram in gas storage stage injection-production column jacket of tripping in second into sleeve pipe.
Fig. 3 is bell-mouthed structural representation in the first injection-production column jacket and the second injection-production column jacket.
Sleeve pipe on wherein 1., 2. setting of casings, 3. oil reservoirs;
11. pipe nipple is located in circulation slide sleeve, 12. retrievable packers, 13. blockings, pipe nipple, 15. loudspeaker are located in 14. tests Mouthful.
21. pipe nipple is flowed, 22. storm valves, 23. circulation slide sleeves, 24. retrievable packers, 25. blockings are located short Pipe nipple, 28. horn mouths are located in section, 26. punching oil pipes, 27. tests.
Embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase Mutually combination.Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
A kind of method for noting gas recovery well reducing completion, comprises the following steps:
Step 1: installing the sleeve pipe for completion in well, the sleeve pipe includes the He of upper sleeve pipe 1 being sequentially connected from the top down Setting of casing 2, the area of passage that the external diameter of upper sleeve pipe 1 is more than in the external diameter of setting of casing 2, upper sleeve pipe 1 is more than in setting of casing 2 excessively stream Area;
Step 2: being recovered the oil thinner the first injection-production column jacket of stage tripping in into the sleeve pipe in gas drive, as shown in Figure 1;
Step 3: first taking out first injection-production column jacket out of this sleeve pipe in the gas storage stage, into the sleeve pipe, tripping in is thicker again The second injection-production column jacket, the external diameter of the second oil pipe used in second injection-production column jacket is more than what is used in first injection-production column jacket The area of passage in second oil pipe used in the external diameter of first oil pipe, second injection-production column jacket is more than first injection-production column jacket Area of passage in middle the first oil pipe used, as shown in Figure 2.
The external diameter of upper sleeve pipe 1 is more than the excessively stream that the area of passage in the external diameter of setting of casing 2, upper sleeve pipe 1 is more than in setting of casing 2 Area, is no longer changed after the upper sleeve pipe 1 of different-diameter and the tripping in of setting of casing 2, so can be in the set that is changed without of not digging a well again In the case of pipe, that is, the low demand with fluence of early stage is looked after, the high demand for matching somebody with somebody fluence of gas production stage completion can also be noted in the later stage, is carried The high service life of note gas recovery well, has taken into account oil reservoir gas drive demand in the demand of gas storage reconstruction, has reduced later stage shut-in well Potential safety hazard, it is therefore prevented that waste, effectively reduce and build Kucheng's sheet.
Also included drilling well specially beats technology during the drilling well to oil reservoirs 3 using reservoir before step one, should Reservoir is specially beaten technology and is no longer discussed in detail for prior art.
In the present embodiment, upper sleeve pipe 1 is located at 50m above well head to the top circle of oil reservoirs 3 (i.e. A is 50m in Fig. 1), under Sleeve pipe 2 is located at the lower section of upper sleeve pipe 1, i.e. setting of casing 2 and is located at below 50m above the top circle of the oil reservoirs 3 and the oil reservoirs 3.On The external diameter of sleeve pipe 1 is that more than or equal to 177.8mm, the wall thickness of upper sleeve pipe 1 is 9mm~10mm, the external diameter of setting of casing 2 be less than 177.8mm, the wall thickness of setting of casing 2 is 7mm~9mm.The setting of casing 2 of certain length minor diameter is left in cap rock bottom, before being easy to The demand of gas drive phase, workover treatment stage.
Step 2 be gas drive recover the oil the stage initial stage into the sleeve pipe injection-production column jacket of tripping in first, first injection-production column jacket Including the circulation slide sleeve 11 being sequentially connected from the top down by first oil pipe, retrievable packer 12, block be located pipe nipple 13, Pipe nipple 14 and horn mouth 15 are located in test, and retrievable packer 12 is set in the top in setting of casing 2, as shown in Figure 1.This first The external diameter of the oil pipe used in injection-production column jacket is 88.9mm, and the wall thickness of first oil pipe used in first injection-production column jacket is 6mm~8mm.
Second injection-production column jacket includes flowing pipe nipple 21, the downhole safety being sequentially connected from the top down by second oil pipe Valve 22, flowing pipe nipple 21, circulation slide sleeve 23, retrievable packer 24, blocking are located pipe nipple 25, test and are located pipe nipple 27 and loudspeaker Mouthfuls 28, retrievable packer 24 is set in the bottom in upper sleeve pipe 2, as shown in Fig. 2 used in second injection-production column jacket this The wall thickness of second oil pipe used in the external diameter 114.3mm of two oil pipes, second injection-production column jacket is 6mm~13mm.Horn mouth 28 structure can reduce gas injection erosion, if while testing tool tripping in is oily as shown in figure 3, have chamfering inside the horn mouth 28 When below pipeline section, facilitate bailing.
In the present embodiment, pipe nipple 25 is located in blocking and test is located pipe nipple 27 and connected by punching oil pipe 26.Punching oil Pipe 26 is the oil pipe that side wall contains through hole, and storm valve 22 is also associated with liquid controling pipe line.
Second injection-production column jacket, which contains, to be had the advantage that:
1st, it is simple in construction, deblocking is easy to using retrievable packer, deblocking workload is small, is easy to later stage operation to safeguard, no The normal operation of gas storage can be influenceed.
2nd, second injection-production column jacket considers the influence of storm valve necking down, and flowing short circuit is equipped with its upper and lower side, with The generation of erosion is prevented, it is safe.
3rd, second injection-production column jacket employs larger-diameter design of string pipe, can avoid under abnormal conditions to oil pipe completely Erosion adopted by force with injection, reduce gas well unloading risk, ensure gas storage gas supply capacity while, as far as possible increase oil The need for pipe diameter is to meet single well productivity.
4th, the injection-production column jacket body of second injection-production column jacket uses L8013Cr type stainless steel tubes, with stronger anticorrosive Property, extend the service life of tubing string.
5th, each connection member of second injection-production column jacket is threadedly coupled using hermetic seal, so as to ensure that each is connected Air-tightness between part.
It is described above, it is only the specific embodiment of the present invention, it is impossible to which the scope implemented is invented with its restriction, so it is equivalent The displacement of component, or the equivalent variations made according to scope of patent protection of the present invention and modification, should all still fall within what this patent was covered Category.In addition, between technical characteristic and technical characteristic in the present invention, between technical characteristic and technical scheme, technical scheme with It can be used between technical scheme with independent assortment.

Claims (5)

1. it is a kind of note gas recovery well reducing completion method, it is characterised in that the method for the note gas recovery well reducing completion include with Lower step:
Step 1: install the sleeve pipe for completion in well, the sleeve pipe include the upper sleeve pipe (1) being sequentially connected from the top down and under Sleeve pipe (2), the external diameter of upper sleeve pipe (1) is more than the external diameter of setting of casing (2), and the area of passage of upper sleeve pipe (1) is more than setting of casing (2) Area of passage, upper sleeve pipe (1) is located at 50m~100m above the top circle of oil reservoirs (3), and the upper sleeve pipe (1) is from oil reservoirs (3) 50m~100m extends to well head above top circle;
Step 2: in gas drive oil recovery stage injection-production column jacket of tripping in first into the sleeve pipe;
First injection-production column jacket includes circulation slide sleeve (11), the retrievable packer being sequentially connected from the top down by the first oil pipe (12), block and be located pipe nipple (13), test and be located pipe nipple (14) and horn mouth (15), the retrievable packing of first injection-production column jacket Device (12) is set in the top of setting of casing (2);
Step 3: first taking out first injection-production column jacket out of this sleeve pipe in the gas storage stage, into the sleeve pipe, the note of tripping in second is adopted again The external diameter of the second oil pipe used in tubing string, second injection-production column jacket is more than the first oil pipe used in first injection-production column jacket The area of passage of the second oil pipe used in external diameter, second injection-production column jacket is more than the first oil used in first injection-production column jacket The area of passage of pipe;
Second injection-production column jacket includes flowing pipe nipple (21), the storm valve being sequentially connected from the top down by second oil pipe (22), flowing pipe nipple (21), circulation slide sleeve (23), retrievable packer (24), blocking are located pipe nipple (25), test and are located pipe nipple (27) and horn mouth (28), the retrievable packer (24) of second injection-production column jacket is set in the bottom of upper sleeve pipe (1).
2. the method for note gas recovery well reducing completion according to claim 1, it is characterised in that also include before step one The step of specially technology drilling well being played using oil reservoirs (3).
3. the method for note gas recovery well reducing completion according to claim 1, it is characterised in that the external diameter of upper sleeve pipe (1) is big It is 9mm~10mm in the wall thickness equal to 177.8mm, upper sleeve pipe (1), the external diameter of setting of casing (2) is less than 177.8mm, setting of casing (2) Wall thickness be 7mm~9mm.
4. the method for note gas recovery well reducing completion according to claim 1, it is characterised in that make in first injection-production column jacket The external diameter of first oil pipe is 88.9mm, the wall thickness of first oil pipe used in first injection-production column jacket for 6mm~ 8mm。
5. the method for note gas recovery well reducing completion according to claim 1, it is characterised in that make in second injection-production column jacket The external diameter of second oil pipe is 114.3mm, the wall thickness of second oil pipe used in second injection-production column jacket for 6mm~ 13mm。
CN201510239370.5A 2015-05-12 2015-05-12 A kind of method and injection-production column jacket for noting gas recovery well reducing completion Active CN104895536B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510239370.5A CN104895536B (en) 2015-05-12 2015-05-12 A kind of method and injection-production column jacket for noting gas recovery well reducing completion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510239370.5A CN104895536B (en) 2015-05-12 2015-05-12 A kind of method and injection-production column jacket for noting gas recovery well reducing completion

Publications (2)

Publication Number Publication Date
CN104895536A CN104895536A (en) 2015-09-09
CN104895536B true CN104895536B (en) 2017-10-17

Family

ID=54028452

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510239370.5A Active CN104895536B (en) 2015-05-12 2015-05-12 A kind of method and injection-production column jacket for noting gas recovery well reducing completion

Country Status (1)

Country Link
CN (1) CN104895536B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112081534B (en) * 2019-06-14 2022-06-28 中国石油化工股份有限公司 Anti-erosion injection-production pipe column structure

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2431770C1 (en) * 2010-05-18 2011-10-20 Государственное образовательное учреждение высшего профессионального образования Военный инженерно-технический университет Underground storage of liquefied natural gas
DE102010024363A1 (en) * 2010-06-18 2011-12-22 Nasser Berg Energie Gmbh Method for natural and artificial underground storage of e.g. natural gas, involves utilizing carbon dioxide as sustained proportionate or entire base gas, where hydrocarbon is provided as process gas
CN202645521U (en) * 2012-06-25 2013-01-02 中国石油天然气股份有限公司 Horizontal well injecting and extracting pipe column of gas reservoir
CN103089199A (en) * 2011-11-03 2013-05-08 大港油田集团有限责任公司 Depleted oil-gas reservoir underground gas storage injection-production string and operating method thereof
CN203925434U (en) * 2014-05-15 2014-11-05 中国石油天然气股份有限公司 Underground natural gas storage tank horizontal well completion tubular pile
CN203959096U (en) * 2014-06-30 2014-11-26 中国石油天然气股份有限公司 Gas storage is observed well completion tubular column
CN104373053A (en) * 2014-11-28 2015-02-25 中国石油天然气集团公司 Underground natural gas storage injection-production pipe column designing method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2431770C1 (en) * 2010-05-18 2011-10-20 Государственное образовательное учреждение высшего профессионального образования Военный инженерно-технический университет Underground storage of liquefied natural gas
DE102010024363A1 (en) * 2010-06-18 2011-12-22 Nasser Berg Energie Gmbh Method for natural and artificial underground storage of e.g. natural gas, involves utilizing carbon dioxide as sustained proportionate or entire base gas, where hydrocarbon is provided as process gas
CN103089199A (en) * 2011-11-03 2013-05-08 大港油田集团有限责任公司 Depleted oil-gas reservoir underground gas storage injection-production string and operating method thereof
CN202645521U (en) * 2012-06-25 2013-01-02 中国石油天然气股份有限公司 Horizontal well injecting and extracting pipe column of gas reservoir
CN203925434U (en) * 2014-05-15 2014-11-05 中国石油天然气股份有限公司 Underground natural gas storage tank horizontal well completion tubular pile
CN203959096U (en) * 2014-06-30 2014-11-26 中国石油天然气股份有限公司 Gas storage is observed well completion tubular column
CN104373053A (en) * 2014-11-28 2015-02-25 中国石油天然气集团公司 Underground natural gas storage injection-production pipe column designing method

Also Published As

Publication number Publication date
CN104895536A (en) 2015-09-09

Similar Documents

Publication Publication Date Title
CN103015955B (en) Open-hole horizontal well multi-cluster sliding sleeve staged fracturing string and fracturing method thereof
CN102979495B (en) Many bunches of Limited entry fracturing tubing strings of open-hole horizontal well and fracturing process thereof
CN201212387Y (en) Gas injection, gas production and brine discharge integration process pipe column for underground gas storage
CN107489397A (en) A kind of solvable bridging plug and oil gas well shaft insulate method temporarily
CN105804680B (en) A kind of oil gas field workover operation device with pressure and method
CN204703876U (en) A kind of bridge-type concentric separated-injection tubing string
NO329656B1 (en) Coupling isolation device for use in multilateral well processing operation
CN102454381B (en) Oil-gas reservoir barefoot well cementing and completion method and device
CN107304661A (en) Single current valve module, gas lift valve, gaslift instrument and integrated pipe column
CN203308443U (en) Circulating gas injection pipe column
CN206668234U (en) A kind of ball-throwing type selective sand control process pipe string
CN109611061B (en) Method for floating and running sieve tube
CN104895536B (en) A kind of method and injection-production column jacket for noting gas recovery well reducing completion
CN205605156U (en) Workover device is pressed in oil gas field area
CN104989325B (en) A kind of method using two-tube gas well liquid loading tubing string gas production arranged side by side
CN205000922U (en) Built -in coiled tubing completion pipe string
CN104879098B (en) A kind of concentric double pipe gas well liquid loading tubing string
CN204703779U (en) A kind of injection-production column jacket
CN112081535A (en) Ultra-deep high-sulfur-content gas well completion pipe string and construction method thereof
CN112177581B (en) Repeated fracturing method for old well
CN104420841B (en) The method for removing flow string with pressure
CN111058792A (en) Coiled tubing perforation-free under-pressure operation-free well completion device and method
CN207686691U (en) Tubing string for being layered gas drive
EP3052750B1 (en) Flexible zone inflow control device
CN104265231A (en) Circulation blanking plug and application method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant