CN104895106A - Installing device and method for lower anchor plate for wind driven generator construction - Google Patents

Installing device and method for lower anchor plate for wind driven generator construction Download PDF

Info

Publication number
CN104895106A
CN104895106A CN201510276537.5A CN201510276537A CN104895106A CN 104895106 A CN104895106 A CN 104895106A CN 201510276537 A CN201510276537 A CN 201510276537A CN 104895106 A CN104895106 A CN 104895106A
Authority
CN
China
Prior art keywords
lower anchor
anchor slab
adjusting nut
anchor plate
driven generator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510276537.5A
Other languages
Chinese (zh)
Inventor
徐惠
杨兆林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201510276537.5A priority Critical patent/CN104895106A/en
Publication of CN104895106A publication Critical patent/CN104895106A/en
Pending legal-status Critical Current

Links

Landscapes

  • Wind Motors (AREA)

Abstract

The invention discloses an installing device for a lower anchor plate for wind driven generator construction. The installing device comprises a lower anchor plate supporting piece, an annular beam and a slope cushion layer. An installing method for the lower anchor plate for wind driven generator construction comprises the following steps that when wind driven generator foundation concrete construction is conducted, a level gage is used for conducting measuring, a foundation center point of a draught fan and an embedded position of an embedded part are determined; a hoisting machine is used for hoisting the lower anchor plate and then slowly moving the lower anchor plate to the position 300 mm above the embedded plate, two lower anchor plate supporting bolts correspondingly penetrate into an inner bolt installing hole and an outer bolt installing hole in the lower anchor plate, the level gage is used for measuring the levelness of the lower anchor plate, and the levelness of the lower anchor plate is required to be smaller than or equal to 3 mm. According to the installing device and method for the lower anchor plate for wind driven generator construction, the structure is simple, operation is convenient, the levelness of the lower anchor plate is guaranteed, the quality of wind driven generator foundation concrete construction is improved, and a stable guarantee is provided for normal work of a wind driven generator.

Description

The construction of a kind of the wind-driven generator erecting device of lower anchor slab and mounting method
Technical field
The invention belongs to wind-driven generator construction field of auxiliary, especially relate to erecting device and the mounting method of the lower anchor slab of a kind of wind-driven generator construction.
Background technology
First lower anchor slab to be installed during the foundation construction of wind-driven generator prestressed bolt, and the levelness of lower anchor slab is the CCP of foundation construction, require levelness≤3mm, otherwise bias will be there is in basis, affect foundation bearing capacity, and then affect blower fan superstructure installation quality.At present, the installation of lower anchor slab is generally first pre-buried some anchoring pieces in bed course, then lower anchor slab and anchoring piece is fixedly connected by welding, but each anchoring piece is difficult to guarantee and is in same level in practice of construction, thus to cast anchor the more difficult control of plate level degree, very easily occur deviation; Especially construct on soft foundation, often because the differential settlement of ground causes the mounted plate level degree that casts anchor overproof.
Summary of the invention
Technical problem to be solved by this invention is to provide erecting device and the mounting method of the lower anchor slab of a kind of wind-driven generator construction, ensure the levelness of lower anchor slab, thus improve the quality of wind driven generator base concrete construction, provide stable guarantee for wind-driven generator normally works.
For achieving the above object, the present invention proposes the erecting device of the lower anchor slab of a kind of wind-driven generator construction, it comprises the plate support that casts anchor, ring beam and domatic bed course, ringwise and the three center of circle is concentric, the radius of lower anchor slab, ring beam and domatic bed course increases successively for lower anchor slab, ring beam and domatic bed course expansion body; The described plate support that casts anchor comprises embedded board, carrying bolt and adjusting nut, embedded board is rectangular steel plates, on four angle points of embedded board bottom, symmetry is welded four pre-buried pin hooks respectively, pre-buried pin hook is that the round steel of Ф 10mm bends and forms, outwardly, pre-buried pin hook is fixedly installed in ring beam the crotch of pre-buried pin hook; Be fixedly installed two carrying bolts in described embedded board top symmetry, adjusting nut comprises the first adjusting nut and the second adjusting nut, and each carrying bolt arranges the first adjusting nut and the second adjusting nut; Described ring beam cylindrical is close at the bottom of the slope of domatic bed course, and ring beam is fixedly connected with domatic bed course.
A wind-driven generator construction mounting method for lower anchor slab, it comprises the steps:
One, during the construction of wind driven generator base concrete, first measure with level gauge, determine blower foundation central point and built-in fitting burial place, every Fans around under blower fan anchor slab install embedded board eight pieces, then with blower foundation central point for the center of circle, around mounted eight pieces of embedded boards, build the ring beam of width 600mm, make pre-buried pin hook be embedded in ring beam, it is domatic that next-door neighbour's ring beam offers annular, then builds domatic bed course;
Two, slowly move to 300mm place above embedded board after using lifting appliance to be sling by lower anchor slab to stop, two lower anchor slab carrying bolt correspondences are penetrated in the female screws installing hole on lower anchor slab, the long 200mm of lower anchor slab carrying bolt, Ф 20mm, on lower anchor slab, lower each installation adjusting nut, first adjusting nut is installed on lower anchor slab upper end, second adjusting nut is installed on anchor slab lower end, the centre of two pre-buried pin hooks of embedded board rectangular area minor face aimed at by two lower anchor slab carrying bolts, anchor slab carrying bolt is welded with corresponding built-in fitting, foot welding height >=6mm,
Three, to cast anchor plate level degree with level gauge measurement, require the levelness≤3mm of lower anchor slab, when levelness exceedes limit value 3mm, adopt jack by lower anchor slab jack-up, by regulating the planeness of the first adjusting nut on anchor slab carrying bolt, the lower anchor slab of the second adjusting nut adjustment, the plate level degree that makes to cast anchor reaches requirement.
Cast anchor and the annular concrete beam that Continuous Closed closes is set under plate support, effectively can prevent the differential settlement on basis, strengthen the globality of whole blower foundation, on ring beam limit, domatic bed course is set, conveniently can descend the adjustment of anchor slab first adjusting nut, the second adjusting nut and fastening, this construction method is particularly useful for carrying out blower foundation construction in soft foundation region.
A kind of wind-driven generator construction proposed by the invention erecting device of lower anchor slab and mounting method, structure is simple, easy to operate, has ensured the levelness of time anchor slab, thus improve the quality of wind driven generator base concrete construction, provide stable guarantee for wind-driven generator normally works.
Accompanying drawing explanation
Fig. 1 is the structural representation after lower anchor slab completes.
Fig. 2 is the rip cutting figure of Fig. 1.
Fig. 3 is cast anchor plate support and lower anchor slab annexation schematic diagram.
Fig. 4 is the plate support concrete structure schematic diagram that casts anchor.
Fig. 5 is the left view of Fig. 4.
Detailed description of the invention
See accompanying drawing, a kind of wind-driven generator construction erecting device of lower anchor slab, it comprises the plate support 10 that casts anchor, ring beam 20 and domatic bed course 30, and ringwise and the three center of circle is concentric, the radius of lower anchor slab, ring beam and domatic bed course increases successively for lower anchor slab 40, ring beam and domatic bed course expansion body; The described plate support that casts anchor comprises embedded board 1, carrying bolt 3 and adjusting nut, embedded board is rectangular steel plates, on four angle points of embedded board bottom, symmetry is welded four pre-buried pin hooks 2 respectively, pre-buried pin hook is that the round steel of Ф 10mm bends and forms, outwardly, pre-buried pin hook is fixedly installed in ring beam the crotch of pre-buried pin hook; Be fixedly installed two carrying bolts in described embedded board top symmetry, adjusting nut comprises the first adjusting nut 5 and the second adjusting nut 4, and each carrying bolt arranges the first adjusting nut and the second adjusting nut; Described ring beam cylindrical is close at the bottom of the slope of domatic bed course, and ring beam is fixedly connected with domatic bed course.
A wind-driven generator construction mounting method for lower anchor slab, it comprises the steps:
One, during the construction of wind driven generator base concrete, first measure with level gauge, determine blower foundation central point and built-in fitting burial place, every Fans around under blower fan anchor slab install embedded board eight pieces, then with blower foundation central point for the center of circle, around mounted eight pieces of embedded boards, build the ring beam of width 600mm, make pre-buried pin hook be embedded in ring beam, it is domatic that next-door neighbour's ring beam offers annular, then builds domatic bed course;
Two, slowly move to 300mm place above embedded board after using lifting appliance to be sling by lower anchor slab to stop, two lower anchor slab carrying bolt correspondences are penetrated in the female screws installing hole on lower anchor slab, the long 200mm of lower anchor slab carrying bolt, Ф 20mm, on lower anchor slab, lower each installation adjusting nut, first adjusting nut is installed on lower anchor slab upper end, second adjusting nut is installed on anchor slab lower end, the centre of two pre-buried pin hooks of embedded board rectangular area minor face aimed at by two lower anchor slab carrying bolts, anchor slab carrying bolt is welded with corresponding built-in fitting, foot welding height >=6mm,
Three, to cast anchor plate level degree with level gauge measurement, require the levelness≤3mm of lower anchor slab, when levelness exceedes limit value 3mm, adopt jack by lower anchor slab jack-up, by regulating the planeness of the first adjusting nut on anchor slab carrying bolt, the lower anchor slab of the second adjusting nut adjustment, the plate level degree that makes to cast anchor reaches requirement.
Cast anchor and the annular concrete beam that Continuous Closed closes is set under plate support, effectively can prevent the differential settlement on basis, strengthen the globality of whole blower foundation, on ring beam limit, domatic bed course is set, conveniently can descend the adjustment of anchor slab first adjusting nut, the second adjusting nut and fastening, this construction method is particularly useful for carrying out blower foundation construction in soft foundation region.
A kind of wind-driven generator construction proposed by the invention erecting device of lower anchor slab and mounting method, structure is simple, easy to operate, has ensured the levelness of time anchor slab, thus improve the quality of wind driven generator base concrete construction, provide stable guarantee for wind-driven generator normally works.

Claims (2)

1. a wind-driven generator is constructed with the erecting device of lower anchor slab, it is characterized in that it comprises the plate support that casts anchor, ring beam and domatic bed course, ringwise and the three center of circle is concentric, the radius of lower anchor slab, ring beam and domatic bed course increases successively for lower anchor slab, ring beam and domatic bed course expansion body; The described plate support that casts anchor comprises embedded board, carrying bolt and adjusting nut, embedded board is rectangular steel plates, on four angle points of embedded board bottom, symmetry is welded four pre-buried pin hooks respectively, pre-buried pin hook is that the round steel of Ф 10mm bends and forms, outwardly, pre-buried pin hook is fixedly installed in ring beam the crotch of pre-buried pin hook; Be fixedly installed two carrying bolts in described embedded board top symmetry, adjusting nut comprises the first adjusting nut and the second adjusting nut, and each carrying bolt arranges the first adjusting nut and the second adjusting nut; Described ring beam cylindrical is close at the bottom of the slope of domatic bed course, and ring beam is fixedly connected with domatic bed course.
2. a wind-driven generator construction mounting method for lower anchor slab, it comprises the steps:
One, during the construction of wind driven generator base concrete, first measure with level gauge, determine blower foundation central point and built-in fitting burial place, every Fans around under blower fan anchor slab install embedded board eight pieces, then with blower foundation central point for the center of circle, around mounted eight pieces of embedded boards, build the ring beam of width 600mm, make pre-buried pin hook be embedded in ring beam, it is domatic that next-door neighbour's ring beam offers annular, then builds domatic bed course;
Two, slowly move to 300mm place above embedded board after using lifting appliance to be sling by lower anchor slab to stop, two lower anchor slab carrying bolt correspondences are penetrated in the female screws installing hole on lower anchor slab, the long 200mm of lower anchor slab carrying bolt, Ф 20mm, on lower anchor slab, lower each installation adjusting nut, first adjusting nut is installed on lower anchor slab upper end, second adjusting nut is installed on anchor slab lower end, the centre of two pre-buried pin hooks of embedded board rectangular area minor face aimed at by two lower anchor slab carrying bolts, anchor slab carrying bolt is welded with corresponding built-in fitting, foot welding height >=6mm,
Three, to cast anchor plate level degree with level gauge measurement, require the levelness≤3mm of lower anchor slab, when levelness exceedes limit value 3mm, adopt jack by lower anchor slab jack-up, by regulating the planeness of the first adjusting nut on anchor slab carrying bolt, the lower anchor slab of the second adjusting nut adjustment, the plate level degree that makes to cast anchor reaches requirement.
CN201510276537.5A 2015-05-27 2015-05-27 Installing device and method for lower anchor plate for wind driven generator construction Pending CN104895106A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510276537.5A CN104895106A (en) 2015-05-27 2015-05-27 Installing device and method for lower anchor plate for wind driven generator construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510276537.5A CN104895106A (en) 2015-05-27 2015-05-27 Installing device and method for lower anchor plate for wind driven generator construction

Publications (1)

Publication Number Publication Date
CN104895106A true CN104895106A (en) 2015-09-09

Family

ID=54028035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510276537.5A Pending CN104895106A (en) 2015-05-27 2015-05-27 Installing device and method for lower anchor plate for wind driven generator construction

Country Status (1)

Country Link
CN (1) CN104895106A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105661953A (en) * 2016-03-16 2016-06-15 深圳市丰巢科技有限公司 Express delivery cabinet installing ground foot and express delivery cabinet fixing device
CN105661954A (en) * 2016-03-16 2016-06-15 深圳市丰巢科技有限公司 Express delivery cabinet fixing method
CN109356191A (en) * 2018-11-21 2019-02-19 中国水利水电第四工程局有限公司 A kind of construction method of high mountain wind-powered electricity generation prestressed bolt blower foundation
CN111962551A (en) * 2020-07-16 2020-11-20 大冶市新四方机械有限公司 Anchor plate mounting device of generator

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5578723A (en) * 1978-12-08 1980-06-13 Hitachi Ltd Construction of foundation for multi-base installation
CN103821676A (en) * 2014-02-12 2014-05-28 北京金风科创风电设备有限公司 Tower foundation of wind generating set
CN203783828U (en) * 2014-04-18 2014-08-20 北京金风科创风电设备有限公司 Tower foundation of wind generating set
CN104314101A (en) * 2014-09-15 2015-01-28 中国十七冶集团有限公司 Mounting method for foundation anchor bolt assembly of wind-driven generator

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5578723A (en) * 1978-12-08 1980-06-13 Hitachi Ltd Construction of foundation for multi-base installation
CN103821676A (en) * 2014-02-12 2014-05-28 北京金风科创风电设备有限公司 Tower foundation of wind generating set
CN203783828U (en) * 2014-04-18 2014-08-20 北京金风科创风电设备有限公司 Tower foundation of wind generating set
CN104314101A (en) * 2014-09-15 2015-01-28 中国十七冶集团有限公司 Mounting method for foundation anchor bolt assembly of wind-driven generator

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105661953A (en) * 2016-03-16 2016-06-15 深圳市丰巢科技有限公司 Express delivery cabinet installing ground foot and express delivery cabinet fixing device
CN105661954A (en) * 2016-03-16 2016-06-15 深圳市丰巢科技有限公司 Express delivery cabinet fixing method
CN109356191A (en) * 2018-11-21 2019-02-19 中国水利水电第四工程局有限公司 A kind of construction method of high mountain wind-powered electricity generation prestressed bolt blower foundation
CN111962551A (en) * 2020-07-16 2020-11-20 大冶市新四方机械有限公司 Anchor plate mounting device of generator

Similar Documents

Publication Publication Date Title
CN104895101B (en) The construction method of raft foundation high accuracy integral built-in large diameter bolt group structure
CN104895106A (en) Installing device and method for lower anchor plate for wind driven generator construction
CN104314101A (en) Mounting method for foundation anchor bolt assembly of wind-driven generator
CN104141318A (en) Installation and construction method of column base of large-diameter steel pipe column
CN204780983U (en) Whole pre -buried major diameter bolt crowd structure of raft board basis high accuracy
CN105220769A (en) Large area bolt-ball net frame integral top lifting construction method
CN104264902A (en) Steel pipe column disc positioning device and structure for connecting concrete filled steel tubular column with pile foundation
CN105350654A (en) Construction method for adjusting steel plate embedded parts to reach design and construction accuracy
KR101575858B1 (en) A recovering device and procedure for a differential settlement building
CN109322323B (en) Installation method of large-angle inclined equipment bottom plate
CN105317052A (en) Tower crane foundation bolt fixing method
CN203531027U (en) Precise leveling system of fan foundation ring with dedicated jacks for supporting and positioning
CN207392771U (en) A kind of guide type steel column locator
CN101748746A (en) Construction method of base of secondary cooling support oriented device of continuous casting machine
CN109179222B (en) Construction method for controlling inclination and levelness of embedded joint of tower crane
CN113756561A (en) Novel cantilever scaffold building method for high-assembly-rate building
CN103741603B (en) The large height of bridge raise after gapless to fall beam method and adjustable height device thereof
CN202381269U (en) Adjusting device of mounting levelness of basic ring of wind driven generator
CN110886332A (en) Wall foundation underpinning device and construction method thereof
CN216339647U (en) Novel pre-buried bolt structure of tower crane foundation location
CN214721835U (en) Welding jig frame for H-shaped steel crane beam with super-large section
KR101665071B1 (en) Bridge bearing replacement device and replacement method
CN215053064U (en) Lattice column verticality correction device
CN211080288U (en) Adjusting device for mounting anchor bolt cage of wind driven generator
CN110144927B (en) Device for embedding foundation bolt group

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150909