CN104895075B - A kind of target station accurate installation method of sealing drum anchor pole - Google Patents

A kind of target station accurate installation method of sealing drum anchor pole Download PDF

Info

Publication number
CN104895075B
CN104895075B CN201510177253.0A CN201510177253A CN104895075B CN 104895075 B CN104895075 B CN 104895075B CN 201510177253 A CN201510177253 A CN 201510177253A CN 104895075 B CN104895075 B CN 104895075B
Authority
CN
China
Prior art keywords
anchor pole
steel plate
fan ring
location
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510177253.0A
Other languages
Chinese (zh)
Other versions
CN104895075A (en
Inventor
麦国文
黄秋筠
蓝志强
单国威
钟生
刘炳扬
谢云建
林顺添
黄健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Guangdong Construction Engineering Group Co Ltd
Original Assignee
Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Guangdong Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd, Guangdong Construction Engineering Group Co Ltd filed Critical Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Priority to CN201510177253.0A priority Critical patent/CN104895075B/en
Publication of CN104895075A publication Critical patent/CN104895075A/en
Application granted granted Critical
Publication of CN104895075B publication Critical patent/CN104895075B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to building field, more particularly relate to a kind of target station accurate installation method of sealing drum anchor pole, comprise the steps of a. and make base location stock (5);B. base location stock reinforcing bar diagonal brace (10) and anchor pole angle steel (11) are pre-buried;C. bottom concrete is poured;D. mounting seat location stock (5) and anchor pole (7);E. anchor pole lower end setting-out;F. the round steel (52) of wounded in the battle orchid is welded;G. the plan-position between anchor pole (7) is adjusted to accurate location.The invention enables base location stock installation more convenient and be prone to adjust to ensure installation accuracy;Make anchor pole adjusts plan-position that is convenient and that ensure between anchor pole.

Description

A kind of target station accurate installation method of sealing drum anchor pole
Technical field
The present invention relates to building field, more particularly relate to a kind of target station accurate installation method of sealing drum anchor pole.
Background technology
The target station at neutron bombardment station is formed around a sealing drum, its structure is as depicted in figs. 1 and 2, sealing drum 0 is centrally located at Ba Zhan center, sealing drum 0 is reinforced concrete structure, it is internally provided with many with anchor pole, bombardment station is higher to anchor pole required precision, owing to its anchor pole quantity is more, common anchor pole adjusts location mode during adjusting anchor pole the unknown, after the adjustment side anchor bar time be easily caused the anchor pole adjusted in front shift in position, thus affect its positional precision, it is difficult to ensure the positional precision of anchor pole.
Summary of the invention
The present invention is to overcome at least one defect (not enough) described in above-mentioned prior art, it is provided that a kind of target station accurate installation method of sealing drum anchor pole.
It is contemplated that solve above-mentioned technical problem the most to a certain extent.
For solving above-mentioned technical problem, technical scheme is as follows:
A kind of target station accurate installation method of sealing drum anchor pole, comprises the steps of
A. make base location stock: base location stock ringwise, is assembled by polylith doughnut-shaped steel plate, every piece of doughnut-shaped steel plate is all drilled with hole, multiple anchor pole location;
B. base location stock reinforcing bar diagonal brace and anchor pole angle steel are pre-buried: base location stock reinforcing bar diagonal brace is with the horizontal 60 °~70 ° of angles, and the uniform decile of annulus girth along sealing drum place is arranged, and stretches into bottom concrete and carries out pre-buried;Anchor pole angle steel, in the position surrounding pre-buried four respectively of predetermined anchor pole, stretches into bottom concrete and carries out pre-buried;
C. bottom concrete is poured: pour bottom concrete;
D. mounting seat location stock and anchor pole: first installing the fixing steel plate of a piece in anchor pole lower end, have a circular hole in the middle of described fixing steel plate, described anchor pole penetrates in circular hole;Then slinging doughnut-shaped steel plate, and by rockbolt installation on hole, anchor pole location, use double nut to fix between anchor pole and hole, anchor pole location, wherein lower nut is stop nut, and top nut is fixing nut;Again doughnut-shaped steel plate and anchor pole one are lifted on pre-buried good base location stock reinforcing bar diagonal brace, and adjust doughnut-shaped steel plate to accurate location;Remaining doughnut-shaped steel plate being installed the most in the same way, carries out splicing with bolt between doughnut-shaped steel plate fixing, installing until completing whole doughnut-shaped steel plates;
E. setting-out on the fixing steel plate of anchor pole lower end, makes position and the absolute altitude of anchor pole, and by firm with fixing steel plate spot welding for anchor pole, point on the basis of the target center of target station, the position of all anchor pole lower ends is checked, anchor pole is adjusted to accurate location, then use reinforcing bar to be connected by each fixing steel plate;
F. the round steel being tangentially and radially respectively welded wounded in the battle orchid of annularly steel plate in the top nut of each anchor pole, described round steel the first end is welded on doughnut-shaped steel plate, and the second end is welded on the nut of anchor pole;
G. on the basis of the target center of target station, point turns the orchid of spending of round steel, adjusts the plan-position between anchor pole to accurate location.
Further, described doughnut-shaped steel plate being welded with many reinforcing bars, annularly the first end of the round steel of the tangential welding of steel plate is welded on reinforcing bar.
Further, after described step g, also include that step h. checks the plan-position adjusted between anchor pole, when it does not meets status requirement, repeat step g.
Compared with prior art, technical solution of the present invention provides the benefit that:
By doughnut-shaped steel plate package technique make base location stock installation more convenient and be prone to adjust to ensure installation accuracy;By the way of embedded bar diagonal brace so that the adjustment of anchor pole is convenient;The plan-position between anchor pole is adjusted by the round steel of wounded in the battle orchid, its simple operation and be prone to the plan-position between fixing adjusted anchor pole, and in time checking afterwards, readjust the plan-position between anchor pole.
Accompanying drawing explanation
Fig. 1 is the plan structure schematic diagram of sealing drum.
Fig. 2 is the sectional structure schematic diagram of sealing drum.
Fig. 3 is base location stock reinforcing bar diagonal brace and anchor pole angle steel pre-buried structure schematic diagram.
Fig. 4 is base location stock and rockbolt installation structural representation.
Fig. 5 is base location stock plan structure and the round steel mounting structure schematic diagram of wounded in the battle orchid.
Fig. 6 is fixing steel plate mounting structure schematic diagram.
Detailed description of the invention
Accompanying drawing being merely cited for property explanation, it is impossible to be interpreted as the restriction to this patent;In order to the present embodiment is more preferably described, some parts of accompanying drawing have omission, zoom in or out, and do not represent the size of actual product;To those skilled in the art, in accompanying drawing, some known features and explanation thereof may will be understood by omission;The corresponding same or analogous parts of same or analogous label;Term the being merely cited for property explanation of position relationship described in accompanying drawing, it is impossible to be interpreted as the restriction to this patent.
With embodiment, technical scheme is described further below in conjunction with the accompanying drawings.
Embodiment 1
A kind of target station accurate installation method of sealing drum anchor pole, comprises the steps of
A. base location stock 5 is made: as shown in Figure 5, base location stock 5 is ringwise, assembled by eight pieces of (can also be the polylith of other quantity) doughnut-shaped steel plates 51, every piece of doughnut-shaped steel plate 51 is all drilled with hole 53, nine (can also be the multiple of other quantity) anchor pole location;
B. base location stock reinforcing bar diagonal brace 10 and anchor pole angle steel 11 are pre-buried: as shown in Figure 3, base location stock reinforcing bar diagonal brace 10 is with the horizontal 65 ° of angles (can also be between 60 °~70 ° arbitrarily angled), the uniform decile of annulus girth along sealing drum 0 place is arranged, and stretches into bottom concrete 12 and carries out pre-buried;Anchor pole angle steel 11, in the position surrounding pre-buried four respectively of predetermined anchor pole 7, stretches into bottom concrete 12 and carries out pre-buried;
C. bottom concrete is poured: as it is shown on figure 3, pour bottom concrete 12;
D. mounting seat location stock 5 and anchor pole 7: as shown in Figure 4, first installs the fixing steel plate 13 of a piece, has a circular hole in the middle of described fixing steel plate 13 in anchor pole 7 lower end, and described anchor pole 7 penetrates in circular hole;Then slinging the doughnut-shaped steel plate 51 being numbered 1., and be installed on by anchor pole 7 on hole 53, anchor pole location, use double nut to fix between anchor pole and hole 53, anchor pole location, wherein lower nut is stop nut, and top nut is fixing nut;Again doughnut-shaped steel plate 51 and anchor pole 7 one are lifted on pre-buried good base location stock reinforcing bar diagonal brace 7, and adjust doughnut-shaped steel plate 51 to accurate location;Remaining doughnut-shaped steel plate 51 being numbered 2.~8. being installed the most in the same way, carries out splicing with bolt between doughnut-shaped steel plate 51 fixing, installing until completing whole doughnut-shaped steel plates;
E. setting-out on the fixing steel plate 13 of anchor pole lower end, make position and the absolute altitude of anchor pole 7, and by firm with fixing steel plate 13 spot welding for anchor pole 7, point on the basis of the target center of target station, the position of all anchor pole lower ends is checked, anchor pole is adjusted to accurate location, then uses reinforcing bar 14 to be connected, as shown in Figure 6 by each fixing steel plate 13;
The most as shown in Figure 5, the round steel 52 being tangentially and radially respectively welded wounded in the battle orchid of annularly steel plate in the top nut of each anchor pole 7, it is welded with many with reinforcing bar 54 on doughnut-shaped steel plate 51, annularly the first end of the round steel 52 of the tangential welding of steel plate is welded on reinforcing bar 54, and the second end is welded on the nut of anchor pole 7;
G. on the basis of the target center of target station, point turns the orchid of spending of round steel 52, adjusts the plan-position between anchor pole 7 to accurate location;
H. check the plan-position adjusted between anchor pole, when it does not meets status requirement, repeat step g.
Obviously, the above embodiment of the present invention is only for clearly demonstrating example of the present invention, and is not the restriction to embodiments of the present invention.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.Here without also cannot all of embodiment be given exhaustive.All any amendment, equivalent and improvement etc. made within the spirit and principles in the present invention, within should be included in the protection domain of the claims in the present invention.

Claims (3)

1. the target station accurate installation method of sealing drum anchor pole, it is characterised in that comprise the steps of
A. make base location stock (5): base location stock (5) ringwise, is assembled by polylith fan ring steel plate (51), every piece of fan ring steel plate (51) is all drilled with multiple anchor pole hole, location (53);
B. base location stock reinforcing bar diagonal brace (10) and anchor pole angle steel (11) are pre-buried: base location stock reinforcing bar diagonal brace (10) is with the horizontal 60 °~70 ° of angles, the uniform decile of annulus girth along sealing drum (0) place is arranged, and stretches into bottom concrete (12) and carries out pre-buried;Anchor pole angle steel (11), in the position surrounding pre-buried four respectively of predetermined anchor pole (7), stretches into bottom concrete (12) and carries out pre-buried;
C. bottom concrete is poured: pour bottom concrete (12);
D. mounting seat location stock (5) and anchor pole (7): first install the fixing steel plate (13) of a piece in anchor pole (7) lower end, having a circular hole in the middle of described fixing steel plate (13), described anchor pole (7) penetrates in circular hole;Then sling and fan ring steel plate (51), and anchor pole (7) is installed on anchor pole hole, location (53), using double nut to fix between anchor pole and anchor pole hole, location (53), wherein lower nut is stop nut, and top nut is fixing nut;Again fan ring steel plate (51) is lifted on pre-buried good base location stock reinforcing bar diagonal brace (10) with anchor pole (7), and adjusts fan ring steel plate (51) to accurate location;Remaining fan ring steel plate (51) being installed the most in the same way, carries out splicing with bolt between fan ring steel plate (51) fixing, installing until completing whole fan ring steel plates;
E. the upper setting-out of fixing steel plate (13) in anchor pole lower end, make position and the absolute altitude of anchor pole (7), and by firm with fixing steel plate (13) spot welding for anchor pole (7), point on the basis of the target center of target station, the position of all anchor pole lower ends is checked, anchor pole is adjusted to accurate location, then uses reinforcing bar (14) to be connected by each fixing steel plate (13);
F. along the round steel (52) being tangentially and radially respectively welded wounded in the battle orchid of fan ring steel plate in the top nut of each anchor pole (7), described round steel (52) first end is welded on fan ring steel plate, and the second end is welded on the nut of anchor pole (7);
G. on the basis of the target center of target station, point turns the orchid of spending of round steel (52), adjusts the plan-position between anchor pole (7) to accurate location.
The target station the most according to claim 1 accurate installation method of sealing drum anchor pole, it is characterized in that, being welded with many reinforcing bars (54) on described fan ring steel plate (51), the first end along the round steel (52) of the radial direction welding of fan ring steel plate is welded on reinforcing bar (54).
The target station the most according to claim 1 accurate installation method of sealing drum anchor pole, it is characterised in that also include after described step g that step h. checks the plan-position adjusted between anchor pole, when it does not meets status requirement, repeats step g.
CN201510177253.0A 2015-04-15 2015-04-15 A kind of target station accurate installation method of sealing drum anchor pole Active CN104895075B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510177253.0A CN104895075B (en) 2015-04-15 2015-04-15 A kind of target station accurate installation method of sealing drum anchor pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510177253.0A CN104895075B (en) 2015-04-15 2015-04-15 A kind of target station accurate installation method of sealing drum anchor pole

Publications (2)

Publication Number Publication Date
CN104895075A CN104895075A (en) 2015-09-09
CN104895075B true CN104895075B (en) 2016-08-17

Family

ID=54028004

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510177253.0A Active CN104895075B (en) 2015-04-15 2015-04-15 A kind of target station accurate installation method of sealing drum anchor pole

Country Status (1)

Country Link
CN (1) CN104895075B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008303583A (en) * 2007-06-06 2008-12-18 Public Works Research Institute Structure of artificial ground
CN202073095U (en) * 2011-05-17 2011-12-14 四川省交通运输厅公路规划勘察设计研究院 Combination anchor structure
CN102395738A (en) * 2009-04-16 2012-03-28 阿戈斯蒂诺·博莱蒂 Anchoring system
CN202688994U (en) * 2012-07-17 2013-01-23 中交第二公路工程局有限公司 Precise positioning device of anchor rods

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9133594B2 (en) * 2012-08-23 2015-09-15 James Hurley Ground anchor system and method of installation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008303583A (en) * 2007-06-06 2008-12-18 Public Works Research Institute Structure of artificial ground
CN102395738A (en) * 2009-04-16 2012-03-28 阿戈斯蒂诺·博莱蒂 Anchoring system
CN202073095U (en) * 2011-05-17 2011-12-14 四川省交通运输厅公路规划勘察设计研究院 Combination anchor structure
CN202688994U (en) * 2012-07-17 2013-01-23 中交第二公路工程局有限公司 Precise positioning device of anchor rods

Also Published As

Publication number Publication date
CN104895075A (en) 2015-09-09

Similar Documents

Publication Publication Date Title
EP2458094A1 (en) Installing method for anchor cage and installing method for industrial equipment
CN104018514A (en) Inverted installation method of embedded foundation bolts of large tower-type equipment foundation
CN203625921U (en) Precision control device for pre-embedded mounting of foundation bolts
US10913638B2 (en) Device for fixing gantry crane rails in factory buildings and gantry crane system using the same
MX2018003859A (en) Method for installing a support structure for a passenger transport system in a construction.
CN105091742A (en) Method for establishing helicopter jig measuring system coordinate system by using enhanced reference point
CN104895075B (en) A kind of target station accurate installation method of sealing drum anchor pole
CN102485628B (en) Passenger transporting device without metal truss structure as well as installation method and installation tool thereof
US20180142490A1 (en) Pinned Monopole Splice Assembly and Methods
CN104727307B (en) For the non-uniform pile column construction method of underground
CN103276909B (en) The assembled moulding bed of rack of arch-shaped space truss assembling method and use thereof
EP2710206A1 (en) Frame support
CN208117669U (en) A kind of foundation of iron tower bolt fixture
KR101235758B1 (en) Plate jig for installing anchor bolts
CN102392540A (en) High-precision method and structure for positioning high-precision precast beam
JP4700980B2 (en) How to replace the Gangway Tower
CN104831745B (en) A kind of target center substrate and sealing drum base high accuracy installation method
JP5345238B1 (en) Construction method of base-isolated base structure and base-isolated base structure
CN204551517U (en) Round equipment is foot bolt positioning disk fundamentally
JP5693372B2 (en) Seismic isolation structure and its construction method
CN204258086U (en) A kind of power distribution cabinet assembly being easy to locate based on fan-shaped and annular splice plate
CN205475256U (en) Control is less than device of ground lattice column direction and elevation
CN202403639U (en) Detection fixture
CN103982037B (en) The adjustable drag-line bracing means of thin-walled circle concrete blinding reinforcing and control method thereof
CN104600602A (en) Fan-shaped and annular splice plate-based easily positioned power distribution cabinet component

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Dong Heng Lu, Guangzhou city of Guangdong province Tianhe District 510000 martyrs No. 11

Patentee after: Guangdong Provincial Architectural Engineering Machinery Construction Co., Ltd.

Patentee after: Guangdong Construction Engineering Group Co., Ltd.

Address before: 510000 Guangdong Province, Guangzhou Tianhe Tianrun Road No. 87 wide building

Patentee before: Guangdong Construction Engineering Group Co., Ltd.

Patentee before: Guangdong Provincial Architectural Engineering Machinery Construction Co., Ltd.