CN104895067A - 搅拌成墙机 - Google Patents

搅拌成墙机 Download PDF

Info

Publication number
CN104895067A
CN104895067A CN201510368834.2A CN201510368834A CN104895067A CN 104895067 A CN104895067 A CN 104895067A CN 201510368834 A CN201510368834 A CN 201510368834A CN 104895067 A CN104895067 A CN 104895067A
Authority
CN
China
Prior art keywords
auger spindle
engine
eccentric disc
slip cap
cutting arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510368834.2A
Other languages
English (en)
Other versions
CN104895067B (zh
Inventor
张永忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Boshi Intellectual Property Service Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510368834.2A priority Critical patent/CN104895067B/zh
Publication of CN104895067A publication Critical patent/CN104895067A/zh
Application granted granted Critical
Publication of CN104895067B publication Critical patent/CN104895067B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

一种搅拌成墙机,第一钻轴的下部固定有一个第一偏心盘,第二钻轴的下部固定有一个第二偏心盘,第三钻轴的下部固定有一个第三偏心盘,第四钻轴的下部固定有一个第四偏心盘;第一偏心盘、第二偏心盘、第三偏心盘、第四偏心盘的前部设有一个第一切削臂,其后部设有第二切削臂;第一偏心盘上设有第一滑动套,第一滑动套用一个第二连臂固定于第二切削臂,第二偏心盘上设有第二滑动套,第二滑动套用一个第二连臂固定于第一切削臂,第三偏心盘上设有第三滑动套,第三滑动套用一个第二连臂固定于第二切削臂,第四偏心盘上设有第四滑动套,第四滑动套用一个第二连臂固定于第一切削臂;第一切削臂下部设有多把削刀,第二切削臂下部设有多把削刀。

Description

搅拌成墙机
技术领域
本发明涉及一种成墙机,特别是一种建筑基础工程中使用的搅拌成墙机。
背景技术
目前,建筑基础工程中使用的别的形式的搅拌成墙机,是用多个钻削头与水泥浆搅拌成多个圆搭接的桩体,搭接部分的厚度小于圆的直径,因此墙体不规则、不平整。
发明内容
本发明弥补了以上缺点,提供了一种搅拌成墙机。
本发明是通过如下技术方案实现的:
一种搅拌成墙机,上部并排设有第一动力机、第二动力机、第三动力机、第四动力机,第一动力机和第二动力机之间、第二动力机和第三动力机之间、第三动力机和第四动力机之间分别用一个第一连臂固定;第一动力机下端设有第一钻轴,第一钻轴下端设有第一钻削头,第二动力机下端设有第二钻轴,第二钻轴下端设有第二钻削头,第三动力机下端设有第三钻轴,第三钻轴下端设有第三钻削头,第四动力机下端设有第四钻轴,第四钻轴下端设有第四钻削头;第一钻轴的下部固定有一个第一偏心盘,第二钻轴的下部固定有一个第二偏心盘,第三钻轴的下部固定有一个第三偏心盘,第四钻轴的下部固定有一个第四偏心盘;第一偏心盘、第二偏心盘、第三偏心盘、第四偏心盘的前部设有一个第一切削臂,其后部设有第二切削臂;第一偏心盘上设有第一滑动套,第一滑动套用一个第二连臂固定于第二切削臂,第二偏心盘上设有第二滑动套,第二滑动套用一个第二连臂固定于第一切削臂,第三偏心盘上设有第三滑动套,第三滑动套用一个第二连臂固定于第二切削臂,第四偏心盘上设有第四滑动套,第四滑动套用一个第二连臂固定于第一切削臂;第一切削臂下部设有多把削刀,第二切削臂下部设有多把削刀。
本发明具有以下的特点:
本发明第一切削臂和第二切削臂在相互反向摆动中第一切削臂下部的多个削刀以及第二切削臂下部的多个削刀将第一钻削头、第二钻削头、第三钻削头、第四钻削头搭接区域没有搅拌的泥土搅拌,成规则平整的墙体。
附图说明
下面结合附图对本发明作进一步的说明:
图1为本发明的前视图;
图2为本发明的后视图;
图3为图1的A—A视图;
图中:1、第一钻轴,2、第二钻轴,3、第三钻轴,4、第四钻轴,5、第一钻削头,6、第二钻削头,7、第三钻削头,8、第四钻削头,9、第一动力机,10、第二动力机,11、第三动力机,12、第四动力机,13、第一连臂,14、第一偏心盘,15、第二偏心盘,16、第三偏心盘,17、第四偏心盘,18、第一切削臂,19、削刀,20、第二切削臂,21、第一滑动套,22、第二滑动套,23、第三滑动套,24、第四滑动套,25、第二连臂。
具体实施方式
附图为本发明的一种具体实施例,该实施例上部并排设有第一动力机9、第二动力机10、第三动力机11、第四动力机12,第一动力机和第二动力机之间、第二动力机和第三动力机之间、第三动力机和第四动力机之间分别用一个第一连臂13固定;第一动力机下端设有第一钻轴1,第一钻轴下端设有第一钻削头5,第二动力机下端设有第二钻轴2,第二钻轴下端设有第二钻削头6,第三动力机下端设有第三钻轴3,第三钻轴下端设有第三钻削头7,第四动力机下端设有第四钻轴4,第四钻轴下端设有第四钻削头8;第一钻轴的下部固定有一个第一偏心盘14,第二钻轴的下部固定有一个第二偏心盘15,第三钻轴的下部固定有一个第三偏心盘16,第四钻轴的下部固定有一个第四偏心盘17;第一偏心盘、第二偏心盘、第三偏心盘、第四偏心盘的前部设有一个第一切削臂18,其后部设有第二切削臂20;第一偏心盘上设有第一滑动套21,第一滑动套用一个第二连臂25固定于第二切削臂,第二偏心盘上设有第二滑动套22,第二滑动套用一个第二连臂固定于第一切削臂,第三偏心盘上设有第三滑动套23,第三滑动套用一个第二连臂固定于第二切削臂,第四偏心盘上设有第四滑动套24,第四滑动套用一个第二连臂固定于第一切削臂;第一切削臂下部设有多把削刀19,第二切削臂下部设有多把削刀。
本发明还设有供浆系统,供给的水泥浆分别从第一钻轴下端、第二转轴下端、第三钻轴下端、第四钻轴下端喷出;工作时,第一动力机、第三动力机分别通过第一钻轴、第三转轴分别带动第一钻削头、第三钻削头同步正转钻削搅拌,第二动力机、第四动力机分别通过第二钻轴、第四转轴分别带动第二钻削头、第四钻削头同步反转钻削搅拌;第一钻轴、第三钻轴在正转过程中分别驱动第一偏心盘以第一钻轴的轴线为圆心、第三偏心盘以第三钻轴的轴线为圆心正转,第二钻轴、第四钻轴在反转过程中分别驱动第二偏心盘以第二钻轴的轴线为圆心、第四偏心盘以第四钻轴的轴线为圆心反转;第一偏心盘在正转过程中通过第一滑动套以及第一滑动套上的第二连臂、第三偏心盘在正转过程中通过第三滑动套以及第三滑动套上的第二连臂共同驱动第二切削臂摆动,第二偏心盘在反转过程中通过第二滑动套以及第二滑动套上的第二连臂、第四偏心盘在反转过程中通过第四滑动套以及第四滑动套上的第二连臂共同驱动第一切削臂摆动,第一切削臂和第二切削臂在相互反向摆动中第一切削臂下部的多个削刀以及第二切削臂下部的多个削刀将第一钻削头、第二钻削头、第三钻削头、第四钻削头搭接区域没有搅拌的泥土搅拌,成规则平整的墙体。

Claims (1)

1.一种搅拌成墙机,上部并排设有第一动力机(9)、第二动力机(10)、第三动力机(11)、第四动力机(12),第一动力机和第二动力机之间、第二动力机和第三动力机之间、第三动力机和第四动力机之间分别用一个第一连臂(13)固定;第一动力机下端设有第一钻轴(1),第一钻轴下端设有第一钻削头(5),第二动力机下端设有第二钻轴(2),第二钻轴下端设有第二钻削头(6),第三动力机下端设有第三钻轴3,第三钻轴下端设有第三钻削头7,第四动力机下端设有第四钻轴(4),第四钻轴下端设有第四钻削头(8);第一钻轴的下部固定有一个第一偏心盘(14),第二钻轴的下部固定有一个第二偏心盘(15),第三钻轴的下部固定有一个第三偏心盘(16),第四钻轴的下部固定有一个第四偏心盘(17);第一偏心盘、第二偏心盘、第三偏心盘、第四偏心盘的前部设有一个第一切削臂(18),其后部设有第二切削臂(20);第一偏心盘上设有第一滑动套(21),第一滑动套用一个第二连臂(25)固定于第二切削臂,第二偏心盘上设有第二滑动套(22),第二滑动套用一个第二连臂固定于第一切削臂,第三偏心盘上设有第三滑动套(23),第三滑动套用一个第二连臂固定于第二切削臂,第四偏心盘上设有第四滑动套(24),第四滑动套用一个第二连臂固定于第一切削臂;第一切削臂下部设有多把削刀(19),第二切削臂下部设有多把削刀;其特征在于:搅拌成墙机还设有供浆系统,供给的水泥浆分别从第一钻轴下端、第二转轴下端、第三钻轴下端、第四钻轴下端喷出;工作时,第一动力机、第三动力机分别通过第一钻轴、第三转轴分别带动第一钻削头、第三钻削头同步正转钻削搅拌,第二动力机、第四动力机分别通过第二钻轴、第四转轴分别带动第二钻削头、第四钻削头同步反转钻削搅拌;第一钻轴、第三钻轴在正转过程中分别驱动第一偏心盘以第一钻轴的轴线为圆心、第三偏心盘以第三钻轴的轴线为圆心正转,第二钻轴、第四钻轴在反转过程中分别驱动第二偏心盘以第二钻轴的轴线为圆心、第四偏心盘以第四钻轴的轴线为圆心反转;第一偏心盘在正转过程中通过第一滑动套以及第一滑动套上的第二连臂、第三偏心盘在正转过程中通过第三滑动套以及第三滑动套上的第二连臂共同驱动第二切削臂摆动,第二偏心盘在反转过程中通过第二滑动套以及第二滑动套上的第二连臂、第四偏心盘在反转过程中通过第四滑动套以及第四滑动套上的第二连臂共同驱动第一切削臂摆动,第一切削臂和第二切削臂在相互反向摆动中第一切削臂下部的多个削刀以及第二切削臂下部的多个削刀将第一钻削头、第二钻削头、第三钻削头、第四钻削头搭接区域没有搅拌的泥土搅拌,成规则平整的墙体。
CN201510368834.2A 2015-06-30 2015-06-30 搅拌成墙机 Active CN104895067B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510368834.2A CN104895067B (zh) 2015-06-30 2015-06-30 搅拌成墙机

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510368834.2A CN104895067B (zh) 2015-06-30 2015-06-30 搅拌成墙机

Publications (2)

Publication Number Publication Date
CN104895067A true CN104895067A (zh) 2015-09-09
CN104895067B CN104895067B (zh) 2016-12-07

Family

ID=54027996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510368834.2A Active CN104895067B (zh) 2015-06-30 2015-06-30 搅拌成墙机

Country Status (1)

Country Link
CN (1) CN104895067B (zh)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4095098B2 (ja) * 2006-07-27 2008-06-04 住友金属工業株式会社 基礎杭施工用掘削機の拡大翼拡径状態確認方法
CN102628271B (zh) * 2012-04-26 2014-12-03 日照阳光电力设计有限公司 五轴smw工法桩机
CN104612178B (zh) * 2014-12-31 2016-04-20 卢兴耐 水泥土搅拌成墙机
CN104727313A (zh) * 2015-04-12 2015-06-24 张璐 四头钻搅拌钻机

Also Published As

Publication number Publication date
CN104895067B (zh) 2016-12-07

Similar Documents

Publication Publication Date Title
CN104831718A (zh) 一种菱形复合搅拌成桩机的实施方法
CN104532830B (zh) 水泥土搅拌成桩机
CN104863142A (zh) 五棱柱复合土桩机
CN104863138A (zh) 六棱柱复合水泥土桩机
CN104612138A (zh) 五轴smw工法桩机
CN105064340B (zh) V字头搅拌成桩机的一种用法
CN105178305A (zh) π形挡桩成桩机的一种用法
CN104895067A (zh) 搅拌成墙机
CN104912058B (zh) 搅拌成墙机
CN104912059B (zh) 搅拌成墙机的一种用法
CN105155529B (zh) 异型桩搅拌钻机
CN105464089A (zh) T形插扣桩搅拌钻机
CN106193024A (zh) 凹凸接合钻机
CN104878755A (zh) 腰圆成桩机
CN105178306B (zh) 圆角三角形成桩设备的一种用法
CN105484235A (zh) 楔形插扣t形桩钻搅机
CN105421373A (zh) 梯形钻搅机
CN105442579A (zh) H形插扣桩钻搅机
CN104831719B (zh) 五棱柱复合土桩机
CN104929107B (zh) 等宽成墙设备
CN105002900A (zh) V字形成桩机
CN105672260A (zh) 插接桩钻搅机
CN105133588B (zh) 椭圆形桩成桩机
CN104863136A (zh) 一种椭圆桩制作设备的实施方法
CN105625389A (zh) 圆角三角形钻搅机

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Tang Ke

Inventor before: Zhang Yongzhong

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20161010

Address after: 401320, No. 113 South Main Road, Banan District, Chongqing

Applicant after: CHONGQING HUANDE TECHNOLOGY Co.,Ltd.

Address before: Tianhe District Tong East Road Guangzhou city Guangdong province 510665 B-101 No. 5, room B-118

Applicant before: GUANGDONG GAOHANG INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

Effective date of registration: 20161010

Address after: Tianhe District Tong East Road Guangzhou city Guangdong province 510665 B-101 No. 5, room B-118

Applicant after: GUANGDONG GAOHANG INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

Address before: Ji'nan road 276800 in Shandong Province, Rizhao City Donggang District No. 277 Belvedere Garden

Applicant before: Zhang Yongzhong

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200421

Address after: 401320 No. 249 Yunan Avenue, Banan District, Chongqing, 8-29

Patentee after: Chongqing Boshi Intellectual Property Service Co.,Ltd.

Address before: 401320, No. 113 South Main Road, Banan District, Chongqing

Patentee before: CHONGQING HUANDE TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201125

Address after: No.99, Zhongwu group, Huangsha Pian, Chang'an village, Zhonghe Town, Liuyang City, Changsha City, Hunan Province

Patentee after: Liuyang Huarui Intellectual Property Operation Co.,Ltd.

Address before: 401320 No. 249 Yunan Avenue, Banan District, Chongqing, 8-29

Patentee before: Chongqing Boshi Intellectual Property Service Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211223

Address after: 401320 Banan District, Banan District, Chongqing, No. 8-29, Yu Nan Road, No. 8-29

Patentee after: Chongqing Boshi Intellectual Property Service Co.,Ltd.

Address before: 410300 No.99, Zhongwu group, huangshatuan, Chang'an village, Zhonghe Town, Liuyang City, Changsha City, Hunan Province

Patentee before: Liuyang Huarui Intellectual Property Operation Co.,Ltd.