CN104878961A - Psychological protection shelter - Google Patents

Psychological protection shelter Download PDF

Info

Publication number
CN104878961A
CN104878961A CN201510320421.7A CN201510320421A CN104878961A CN 104878961 A CN104878961 A CN 104878961A CN 201510320421 A CN201510320421 A CN 201510320421A CN 104878961 A CN104878961 A CN 104878961A
Authority
CN
China
Prior art keywords
unit
psychological
psychotherapy
shelter
intervention
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510320421.7A
Other languages
Chinese (zh)
Inventor
牛福
赵秀国
苏琛
高振海
刘志国
谭树林
崔向东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Medical Equipment Chinese Academy of Military Medical Sciences
Original Assignee
Institute of Medical Equipment Chinese Academy of Military Medical Sciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Medical Equipment Chinese Academy of Military Medical Sciences filed Critical Institute of Medical Equipment Chinese Academy of Military Medical Sciences
Priority to CN201510320421.7A priority Critical patent/CN104878961A/en
Publication of CN104878961A publication Critical patent/CN104878961A/en
Pending legal-status Critical Current

Links

Landscapes

  • Measurement Of The Respiration, Hearing Ability, Form, And Blood Characteristics Of Living Organisms (AREA)

Abstract

The invention discloses a psychological protection shelter. According to the technical scheme, a consulting unit, a small group intervention unit and a psychotherapy unit are arranged in the shelter, wherein a notebook computer, a foldable worktable, foldable chairs and a psychology wall map are configured in the consulting unit; psychological intervention chairs, a mobile television and a server are arranged in the small group intervention unit, and each psychological intervention chair is equipped with a tablet computer; a psychotherapy chair, a biological feedback training therapeutic apparatus, a brain wave therapeutic apparatus and an apparatus table are arranged in the psychotherapy unit. The psychological protection shelter has the advantages as follows: the defects of the conventional equipment can be overcome, the problem of psychological stress disorder of field personnel can be solved effectively, and the psychological intervention and protection capacity of the personnel can be improved.

Description

Psychology protection shelter
Technical field
The present invention relates to motor-driven diagnostic equipment field, more particularly, relate to a kind of psychology protection shelter.
Background technology
The various accident such as earthquake can make a large amount of wounded and rescue personnel form psychic trauma, causes psychological stress obstacle.Particularly various rescue personnel, often in the face of the challenge of various unexpected incidents.These accidents can be summarized as three classes.The first kind is relevant with professional nature, and as outbreak of war, anti-terrorism attack, calm down social unrest, perform special assignment etc., this kind of accident has significantly dangerous and arduous; Equations of The Second Kind is the accident all members of society being caused to psychological impact, and as extensive communicable disease, nuclear leakage, flood, financial crisis etc., this kind of event has unpredictability and probabilistic feature; 3rd class is the assistance sex work of catastrophic event, as events such as aviation accident, tsunami, mine disaster, earthquake, major traffic accidents, these events are for the wounded and rescue personnel, and abnormal scene makes its psychology be impacted and injure, and this kind of event has urgent and shocking usually.But no matter any accident, all can bring out the wounded and rescue personnel's abnormal mind stress reaction, have a negative impact to personnel's individual mind and group mind.Therefore, research can the psychology protection shelter of rapid deployment at the scene, and carries out psychological intervention and associated treatment to related personnel, and formulates psychological intervention scheme targetedly, have realistic meaning to the crisis of Prevention with reply personnel psychology.
Summary of the invention
Technical problem to be solved by this invention overcomes the deficiencies in the prior art, provides a kind of psychology protection shelter.
The present invention's psychology protection shelter, is achieved by following technical proposals, and shelter inside arranges consulting unit, groupuscule intervention unit and psychotherapy unit, described consulting cell location notebook computer, Foldable workbench, folding seat and psychological wall chart; Described groupuscule is intervened unit inside and is arranged psychological intervention chair, mobile TV and server, and each psychological intervention chair is equipped with panel computer; Described psychotherapy unit inside arranges psychotherapy chair, biofeedback training therapeutic equipment, E.E.G therapeutic equipment and instrument table.
Described consulting unit arranges illuminating lamp and air-conditioning, warm braw supply and exhaust mouth.
Compared with prior art, the invention has the beneficial effects as follows:
Arranging a consulting unit in shelter of the present invention, is separate space.Consulting unit can a personnel psychology work of consultation.Consulting cell location notebook computer, Foldable workbench, folding seat and psychological wall chart, and illuminating lamp and air-conditioning, warm braw supply and exhaust mouth are set.
A groupuscule is set in shelter of the present invention and intervenes unit, be separate space, carry out the group mind intervention of personnel, realize telephone communication between the data management of psychology protection shelter and each unit.Inside arranges the information equipments such as psychological intervention chair, mobile TV and server, and each psychological intervention chair is equipped with panel computer, and panel computer installs field operation mental protection systems soft ware.
A psychotherapy unit is set in shelter of the present invention, is separate space, psychotherapy is carried out to mental dysfunction personnel.Inside arranges psychotherapy chair, the equipment such as biofeedback training therapeutic equipment, E.E.G therapeutic equipment and instrument table.
Shelter of the present invention can make up the deficiency lacking existing weaponry and equipment, successfully manages Field Force's psychological stress problem on obstacle, improves personnel psychology tampering protection ability.
Accompanying drawing explanation
Fig. 1 is that schematic diagram is launched in the present invention inside;
Fig. 2 is that the present invention launches rear outside schematic diagram.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention.
As shown in Figure 1, shelter inside arranges consulting unit I, groupuscule intervention unit II and psychotherapy unit III, described consulting cell location notebook computer 1, Foldable workbench, folding seat 2 and psychological wall chart; Described groupuscule is intervened unit inside and is arranged psychological intervention chair 3, mobile TV 4 and server, and each psychological intervention chair is equipped with panel computer; Described psychotherapy unit inside arranges psychotherapy chair 5, biofeedback training therapeutic equipment 6, E.E.G therapeutic equipment and instrument table.
As shown in Figure 2, the both sides external after shelter expansion arranges wait to see the doctor classification district and large Group intervention district respectively; The outside side of shelter arranges classification district of waiting to see the doctor, and tests and assesses to personnel psychology state, classifies.To wait to see the doctor the classification district configuration equipment such as personnel psychology condition detecting system and LCD TV; The outside opposite side of shelter arranges large Group intervention district, mainly carries out the group mind intervention of large crowd, organizes psychological training, mental accommodation training.Large Group intervention district configuration LCD TV and notebook computer.
The above is only the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (2)

1. a psychology protection shelter, is characterized in that, described shelter inside arranges consulting unit, groupuscule intervenes unit and psychotherapy unit, described consulting cell location notebook computer, Foldable workbench, folding seat and psychological wall chart; Described groupuscule is intervened unit inside and is arranged psychological intervention chair, mobile TV and server, and each psychological intervention chair is equipped with panel computer; Described psychotherapy unit inside arranges psychotherapy chair, biofeedback training therapeutic equipment, E.E.G therapeutic equipment and instrument table.
2. psychology protection shelter according to claim 1, it is characterized in that, described consulting unit arranges illuminating lamp and air-conditioning, warm braw supply and exhaust mouth.
CN201510320421.7A 2015-06-11 2015-06-11 Psychological protection shelter Pending CN104878961A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510320421.7A CN104878961A (en) 2015-06-11 2015-06-11 Psychological protection shelter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510320421.7A CN104878961A (en) 2015-06-11 2015-06-11 Psychological protection shelter

Publications (1)

Publication Number Publication Date
CN104878961A true CN104878961A (en) 2015-09-02

Family

ID=53946617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510320421.7A Pending CN104878961A (en) 2015-06-11 2015-06-11 Psychological protection shelter

Country Status (1)

Country Link
CN (1) CN104878961A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975266A (en) * 2017-11-22 2018-05-01 漯河职业技术学院 A kind of music for promoting College Students'Mental Health teaches room
CN108392349A (en) * 2018-04-17 2018-08-14 江苏海事职业技术学院 A kind of psychology protection shelter

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012031306A2 (en) * 2010-09-01 2012-03-08 Hermanus Adriaan Van Zyl Bodily psychological and physical rejuvenation equipment
CN202724178U (en) * 2012-05-17 2013-02-13 马志昌 Field operation psychology protecting shelter
CN103479495A (en) * 2012-06-12 2014-01-01 赵建华 Field operation psychology protecting shelter
CN103530727A (en) * 2013-10-11 2014-01-22 中国人民解放军第九十一中心医院 Management platform system for field operation mental protection shelter
CN204703558U (en) * 2015-06-11 2015-10-14 中国人民解放军军事医学科学院卫生装备研究所 Psychology protection shelter

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012031306A2 (en) * 2010-09-01 2012-03-08 Hermanus Adriaan Van Zyl Bodily psychological and physical rejuvenation equipment
CN202724178U (en) * 2012-05-17 2013-02-13 马志昌 Field operation psychology protecting shelter
CN103479495A (en) * 2012-06-12 2014-01-01 赵建华 Field operation psychology protecting shelter
CN103530727A (en) * 2013-10-11 2014-01-22 中国人民解放军第九十一中心医院 Management platform system for field operation mental protection shelter
CN204703558U (en) * 2015-06-11 2015-10-14 中国人民解放军军事医学科学院卫生装备研究所 Psychology protection shelter

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975266A (en) * 2017-11-22 2018-05-01 漯河职业技术学院 A kind of music for promoting College Students'Mental Health teaches room
CN108392349A (en) * 2018-04-17 2018-08-14 江苏海事职业技术学院 A kind of psychology protection shelter
CN108392349B (en) * 2018-04-17 2019-09-06 江苏海事职业技术学院 A kind of psychology protection shelter

Similar Documents

Publication Publication Date Title
Hisamuddin et al. Prehospital emergency medical services in Malaysia
CN204703558U (en) Psychology protection shelter
CN104878961A (en) Psychological protection shelter
Suryanto et al. The pre-hospital and healthcare system in Malang, Indonesia
Cheng et al. Mobile emergency (surgical) hospital: Development and application in medical relief of" 4.20" Lushan earthquake in Sichuan Province, China
Rossi et al. The response by South Korea to the COVID-19 pandemic: lessons learned and recommendations for policymakers
RU129285U1 (en) MOBILE PUBLIC EDUCATION TRAINING SYSTEM UNDER CONDITIONS OF EMERGENCY SITUATIONS
CN206306914U (en) Portable quick response psychological consultation therapeutic vehicle
Hilton et al. Disaster preparedness: An indictment for action by nursing educators
Babhulkar et al. Trauma care systems in India and China: A grim past and an evolving future
Lowry et al. Reflections on the Response to Mass Terrorist Attacks: An Elaboration on Everly and Mitchell's 10 Commandments.
Kingdon et al. Successful resuscitation: novel partnership between paramedics and US Coast Guard
Lei et al. Retrospective on the construction and practice of a state-level emergency medical rescue team
CN218352565U (en) Computer network invigilates device
Saadatmand et al. Emergency medical services preparedness in mass casualty incidents: A qualitative study
Andrewartha Protesters stand with teacher who spoke out for Palestine
McIlroy NSW removes public sector wages cap
Dugas Active Shooter Training: A Recommended Addition to the Basic Peace Officer Course
Long Psychological support in civil emergencies: The national emergency behavior management system of Singapore
Vukotich et al. Prairie North: a joint civilian/military mass casualty exercise highlights the role of the National Guard in community disaster response
Jia Construction of Emergency Support Mode for Clinical Medical Engineering in Medical Rescue
Cagliuso Sr et al. Coordinated Attack
Koyama et al. Government systems for disaster management
CN113871030A (en) Information system for air transportation and later delivery of wounded person and working method
Rocca Scientists on Trial for What They Said

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150902