CN104878849B - 多层斜拉索和钢抗弯框架的自复位减震方法 - Google Patents

多层斜拉索和钢抗弯框架的自复位减震方法 Download PDF

Info

Publication number
CN104878849B
CN104878849B CN201510140968.9A CN201510140968A CN104878849B CN 104878849 B CN104878849 B CN 104878849B CN 201510140968 A CN201510140968 A CN 201510140968A CN 104878849 B CN104878849 B CN 104878849B
Authority
CN
China
Prior art keywords
self
suspension cable
brb
steel moment
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510140968.9A
Other languages
English (en)
Other versions
CN104878849A (zh
Inventor
李春祥
蓝声宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Shanghai for Science and Technology
Original Assignee
University of Shanghai for Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Shanghai for Science and Technology filed Critical University of Shanghai for Science and Technology
Priority to CN201510140968.9A priority Critical patent/CN104878849B/zh
Publication of CN104878849A publication Critical patent/CN104878849A/zh
Application granted granted Critical
Publication of CN104878849B publication Critical patent/CN104878849B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明提供一种多层斜拉索和钢抗弯框架的自复位减震方法,其包括以下步骤:步骤一,确定斜拉索、钢抗弯框架和BRB为抗侧力构件,BRB为主要耗能减震构件;步骤二,确定任意层的斜拉索、BRB和钢抗弯框架的抗侧刚度和自复位减震体系的总抗侧刚度;步骤三,在水平荷载作用下,通过自复位减震体系的总抗侧刚度计算出水平位移;步骤四,在横向或纵向的同一楼层斜拉索对称施加预应力。本发明可以有效地提高结构抗侧力性能,使结构具有良好的耗能减震和自复位性能。

Description

多层斜拉索和钢抗弯框架的自复位减震方法
技术领域
本发明涉及建筑技术领域,特别涉及一种多层斜拉索和钢抗弯框架的自复位减震方法。
背景技术
传统钢框架结构的水平抗侧刚度偏小,为满足在水平荷载作用下的位移要求,采取了加大结构截面尺寸或者增加其他装置等措施,使工程造价提高明显。在地震作用下,钢框架结构可能产生较大的水平位移,同时使结构产生较大残余位移而无法复位;更严重的会导致结构坍塌,危及生命及财产安全。因此寻求在现有的钢框架基础上增加某些装置(耗能减震、加强结构复位等构件)以减小水平位移和残余位移并同时使结构具有多道抗震防线越来越受到社会的广泛关注。
发明内容
本发明的目的在于提供一种多层斜拉索和钢抗弯框架的自复位减震方法,其可以有效地提高结构抗侧力性能,使结构具有良好的耗能减震和自复位性能。
为解决上述技术问题,本发明提供一种多层斜拉索和钢抗弯框架的自复位减震方法,其特征在于,其包括以下步骤:
步骤一,确定斜拉索、抗弯框架和BRB为抗侧力构件,BRB为主要耗能减震构件;抗弯框架为多层钢抗弯框架,斜拉索为多层斜拉索;斜拉索在体系的横向、纵向或者横纵向都要对称布置;斜拉索、抗弯框架和BRB组成一个自复位减震体系;
步骤二,确定任意层的斜拉索、BRB和钢抗弯框架的抗侧刚度和自复位减震体系的总抗侧刚度,并给出任意层的斜拉索、钢抗弯框架和BRB抗侧刚度计算公式;
步骤三,在水平荷载作用下,通过自复位减震体系的总抗侧刚度计算出水平位移,确定结构抗侧刚度是否满足的要求;
步骤四,在横向或纵向的同一楼层斜拉索对称施加预应力,顺序从低楼层到高楼层;先从一层对斜拉索对称施加预应力,然后对二层斜拉索对称施加预应力,依此顺序,逐层施加预应力。
优选地,所述步骤二的斜拉索、钢抗弯框架和BRB抗侧刚度计算公式如下:
式中,EL为斜拉索的弹性模量,EB为BRB的弹性模量,ALj为某斜拉索的截面面积,ABj为某BRB的截面面积,Hj为某层离地面的高度,hj为某层的层高,θj为某斜拉索与水平方向的夹角,φj为某BRB与水平方向的夹角,为某层钢抗弯框架的抗侧刚度(按D值法计算, 为任意层斜拉索抗侧刚度,为任意层BRB抗侧刚度,KFj为任意层的钢抗弯框架抗侧刚度。
优选地,所述自复位减震体系的抗侧刚度计算公式如下:
Kj=KLj+KBj+KFj
优选地,所述自复位减震体系的楼层位移以及层间位移表达式如下式:
uj=Δu1+Δu2+...+Δuj-1+Δuj
式中,Fj为作用在体系某层上的水平力,为某层及其以上的斜拉索水平分力之和,uj为该自复位减震体系的任意层楼层位移,Δuj为该自复位减震体系的任意层层间位移。
本发明具有以下有益效果:本发明可以有效地提高结构抗侧力性能,使结构具有良好的耗能性能和自复位性能,达到减震效果明显和实现结构复位目标。
附图说明
图1是本发明采用的自复位减震体系的结构布置示意图;
图2是本发明中BRB(防屈曲支撑件)构件角度示意图。
图3是本发明中斜拉索构件角度示意图。
具体实施方式
以下结合附图和以三层为例对本发明提出的多层斜拉索和钢抗弯框架的自复位减震方法作进一步详细说明。根据下面说明和权利要求书,本发明的优点和特征将更清楚。需说明的是,附图均采用非常简化的形式且均使用非精准的比例,仅用以方便、明晰地辅助说明本发明实施例的目的。
如图1至图3,本发明以三层为例说明,具体步骤如下:
步骤一,确定斜拉索1、钢抗弯框架3和BRB(防屈曲支撑件)2为抗侧力构件,BRB为主要耗能减震构件;钢抗弯框架为三层钢抗弯框架,斜拉索为三层斜拉索;斜拉索上端和钢抗弯框架铰接,斜拉索下端和地面铰接;BRB两端和钢抗弯框架铰接;斜拉索在体系的横向、纵向或者横纵向都要对称布置;斜拉索、钢抗弯框架和BRB(防屈曲支撑件)组成一个自复位减震体系。
步骤二,确定任意层的斜拉索、BRB和抗弯框架的抗侧刚度和自复位减震体系的总抗侧刚度,并给出任意层各构件(斜拉索、抗弯框架和BRB)抗侧刚度计算公式;
步骤三,在水平荷载作用(尤其是水平地震作用)下,通过自复位减震体系的总抗侧刚度计算出水平位移,确定结构抗侧刚度是否满足的要求;如结构抗侧刚度满足要求,则该体系布置合理;如结构抗侧刚度不满足要求,则需要提高多层斜拉索抗侧刚度或BRB刚度、钢抗弯框架的抗侧刚度,直至结构抗侧刚度满足要求。弹性阶段:抗侧刚度和复位由多层斜拉索、BRB和钢抗弯框架共同提供;弹塑性阶段:抗侧刚度和复位主要由多层斜拉索和钢抗弯框架提供,BRB为主要耗能减震构件。
步骤四,在横向或纵向的同一楼层斜拉索对称施加预应力,顺序从低楼层到高楼层;先从一层对斜拉索对称施加预应力,然后对二层斜拉索对称施加预应力,最后对三层斜拉索对称施加预应力。施加预应力使斜拉索保持绷紧状态以便及时有效发挥斜拉索的抗侧性能以及提高斜拉索抗侧刚度。
各构件和自复位减震体系的抗侧刚度表达式如下式(1)至(4):
Kj=KLj+KBj+KFj…………………………(4)
式中,EL为斜拉索的弹性模量,EB为BRB的弹性模量,ALj为某斜拉索的截面面积,ABj为某BRB的截面面积,Hj为某层离地面的高度,hj为某层的层高,θj为某斜拉索与水平方向的夹角,φj为某BRB与水平方向的夹角,为某层钢抗弯框架的抗侧刚度(按D值法计算, 为任意层斜拉索抗侧刚度,为任意层BRB抗侧刚度,KFj为任意层的钢抗弯框架抗侧刚度,任意层的自复位减震体系的抗侧刚度为Kj
自复位减震体系的楼层位移以及层间位移表达式如下式(5)至(7):
uj=Δu1+Δu2+...+Δuj-1+Δuj…………………………(6)
式中,Fj为作用在体系某层上的水平力,为某层及其以上的斜拉索水平分力之和,uj为该自复位减震体系的任意层楼层位移,Δuj为该自复位减震体系的任意层层间位移。将Δuj代入以及uj可以求得每层的层间位移和楼层位移。
本发明把多层斜拉索和BRB引入钢抗弯框架中,具有较好的抗侧刚度、耗能能力和复位能力,建立了抗侧刚度计算方法和在水平荷载作用下体系位移计算方法。

Claims (4)

1.一种多层斜拉索和钢抗弯框架的自复位减震方法,其特征在于,其包括以下步骤:
步骤一,确定斜拉索、钢抗弯框架和BRB为抗侧力构件,BRB为主要耗能减震构件;抗弯框架为多层钢抗弯框架,斜拉索为多层斜拉索;斜拉索在体系的横向、纵向或者横纵向都要对称布置;斜拉索、钢抗弯框架和BRB组成一个自复位减震体系;
步骤二,确定任意层的斜拉索、BRB和钢抗弯框架的抗侧刚度和自复位减震体系的总抗侧刚度,并给出任意层的斜拉索、钢抗弯框架和BRB抗侧刚度计算公式;
步骤三,在水平荷载作用下,通过自复位减震体系的总抗侧刚度计算出水平位移,确定结构抗侧刚度是否满足的要求;
步骤四,在横向或纵向的同一楼层斜拉索对称施加预应力,顺序从低楼层到高楼层;先从一层对斜拉索对称施加预应力,然后对二层斜拉索对称施加预应力,依此顺序,逐层施加预应力。
2.根据权利要求1所述的多层斜拉索和钢抗弯框架的自复位减震方法,其特征在于,所述步骤二的斜拉索、钢抗弯框架和BRB抗侧刚度计算公式如下:
K L j = E L A L j cos 2 θ j sinθ j H j
K B j = E B A B j cos 2 φ j sinφ j h j
K F j = Σ k = 1 m D j k
式中,EL为斜拉索的弹性模量,EB为BRB的弹性模量,ALj为某斜拉索的截面面积,ABj为某BRB的截面面积,Hj为某层离地面的高度,hj为某层的层高,θj为某斜拉索与水平方向的夹角,φj为某BRB与水平方向的夹角,为某层钢抗弯框架的抗侧刚度,KLj为任意层斜拉索抗侧刚度,KBj为任意层BRB抗侧刚度,KFj为任意层的钢抗弯框架抗侧刚度。
3.根据权利要求2所述的多层斜拉索和钢抗弯框架的自复位减震方法,其特征在于,所述自复位减震体系的抗侧刚度计算公式如下:
Kj=KLj+KBj+KFj
4.根据权利要求3所述的多层斜拉索和钢抗弯框架的自复位减震方法,其特征在于,所述自复位减震体系的楼层位移以及层间位移表达式如下式:
Σ i = j n F i = Σ i = j n T j x + Σ k = 1 m D j k u j
uj=Δu1+Δu2+...+Δuj-1+Δuj
Δu j = ( Σ k = 1 m D ( j - 1 ) k + K L ( j - 1 ) ) Δu j - 1 - F j - 1 Σ k = 1 m D j k
式中,Fj为作用在体系某层上的水平力,为某层及其以上的斜拉索水平分力之和,uj为该自复位减震体系的任意层楼层位移,Δuj为该自复位减震体系的任意层层间位移。
CN201510140968.9A 2015-03-27 2015-03-27 多层斜拉索和钢抗弯框架的自复位减震方法 Expired - Fee Related CN104878849B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510140968.9A CN104878849B (zh) 2015-03-27 2015-03-27 多层斜拉索和钢抗弯框架的自复位减震方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510140968.9A CN104878849B (zh) 2015-03-27 2015-03-27 多层斜拉索和钢抗弯框架的自复位减震方法

Publications (2)

Publication Number Publication Date
CN104878849A CN104878849A (zh) 2015-09-02
CN104878849B true CN104878849B (zh) 2017-04-12

Family

ID=53946510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510140968.9A Expired - Fee Related CN104878849B (zh) 2015-03-27 2015-03-27 多层斜拉索和钢抗弯框架的自复位减震方法

Country Status (1)

Country Link
CN (1) CN104878849B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108517956A (zh) * 2018-05-09 2018-09-11 苏州科技大学 一种带保险丝的索支撑-框架结构及其制作方法
CN112031195A (zh) * 2020-09-01 2020-12-04 华东交通大学 一种钢框架-tj型软钢阻尼器-拉索减震系统

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002155640A (ja) * 2000-11-20 2002-05-31 Takenaka Komuten Co Ltd ケーブル制震構造
CN101787732B (zh) * 2010-02-11 2011-08-17 清华大学 一种斜拉多层框架结构及其施工控制方法
CN203361393U (zh) * 2013-07-11 2013-12-25 上海大学 钢框架结构的自动复位装置
CN103643738B (zh) * 2013-11-18 2016-06-22 同济大学建筑设计研究院(集团)有限公司 一种带柔性拉索的框架-核心筒结构
CN204001197U (zh) * 2014-06-16 2014-12-10 同济大学 一种体外预应力自复位框架结构
CN204151899U (zh) * 2014-09-26 2015-02-11 黄振宇 钢索-框架抗震耗能结构构件

Also Published As

Publication number Publication date
CN104878849A (zh) 2015-09-02

Similar Documents

Publication Publication Date Title
Sahoo et al. Design and evaluation of seismic strengthening techniques for reinforced concrete frames with soft ground story
Wijesundara et al. Direct displacement-based seismic design of steel concentric braced frame structures
Patil et al. Seismic behaviour of outrigger braced systems in high rise 2-D steel buildings
Heshmati et al. Seismic performance assessment of tubular diagrid structures with varying angles in tall steel buildings
Junda et al. Cyclic testing and performance evaluation of buckling-restrained knee-braced frames
Zahrai et al. Ductile end-diaphragms for seismic retrofit of slab-on-girder steel bridges
Javidan et al. Steel hysteretic column dampers for seismic retrofit of soft-first-story structures
Kim et al. Seismic retrofit of special truss moment frames using viscous dampers
Zhang et al. Experimental study on seismic performance of rocking buckling-restrained brace steel frame with liftable column base
Xie et al. Parametric analysis and direct displacement-based design method of self-centering energy-dissipative steel-braced frames
Razavi et al. Earthquake resistance frames with combination of rigid and semi-rigid connections
Hoffman et al. Behavior of multi-story steel buildings under dynamic column loss scenarios
Lian et al. Experimental study and simplified analysis of EBF fabricated with high strength steel
Mashhadiali et al. Analytical evaluation of the vulnerability of framed tall buildings with steel plate shear wall to progressive collapse
CN104878849B (zh) 多层斜拉索和钢抗弯框架的自复位减震方法
CN103074948A (zh) 一种抗拉拔装置
Al-Dwaik et al. Analytical case study of seismic performance of retrofit strategies for reinforced concrete frames: steel bracing with shear links versus column jacketing
CN112727220B (zh) 自复位增效隔震柱及其地下空间结构体系
Tabaeye Izadi et al. Investigation on a mitigation scheme to resist the progressive collapse of reinforced concrete buildings
Meisuh et al. Comparison of seismic responses of a jumbo-size container crane retrofitted with braces, dampers, and isolation systems
Kanitkar et al. Seismic performance of conventional multi-storey buildings with open ground floors for vehicular parking
Dong et al. Self-centering mechanism and seismic response of steel tension-only concentrically braced beam-through frames
Kurata et al. Minimal‐disturbance seismic rehabilitation of steel moment‐resisting frames using light‐weight steel elements
Yu et al. Seismic behaviour of steel plate shear wall with non-welded oblique multi-ribs
Hashemi et al. Study of a semi-rigid steel braced building damaged in the Bam earthquake

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170412

Termination date: 20210327

CF01 Termination of patent right due to non-payment of annual fee