CN104878718A CN201510282470.6A CN201510282470A CN104878718A CN 104878718 A CN104878718 A CN 104878718A CN 201510282470 A CN201510282470 A CN 201510282470A CN 104878718 A CN104878718 A CN 104878718A
Authority
CN
China
Prior art keywords
concavo
building block
convex building
retaining wall
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510282470.6A
Other languages
English (en)
Other versions
CN104878718B (zh
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Qingyu Road And Bridge Engineering Co ltd
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201510282470.6A priority Critical patent/CN104878718B/zh
Publication of CN104878718A publication Critical patent/CN104878718A/zh
Application granted granted Critical
Publication of CN104878718B publication Critical patent/CN104878718B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Retaining Walls (AREA)
  • Revetment (AREA)

Abstract

一种生态挡土墙结构的施工方法,其步骤包括:拆除破损的挡墙及基础,打设基础桩并在基础桩上浇筑新基础,新基础包裹住漏出的原基础,同时在岸堤边坡后方一定距离内打设刚柔组合桩,在坡面上喷射高强透水混凝土,然后在坡面预定位置上钻孔至刚性桩的固定环为止,将锚索和环扣固定连接,并串在套管中,套管顶端顶压环扣至刚性桩的固定环上,完成锚索与刚性桩的连接,之后在新基础上开始安装凹凸砌块,并在凹凸砌块后方设置支撑,安装到预定高度后,在凹凸砌块后方浇筑生态混凝土,最后在施工完成的岸堤顶面上设置种植孔,然后将植被种植在种植孔中,完成生态挡土墙的施工。

Description

一种生态挡土墙结构的施工方法
技术领域
本发明涉及一种挡土墙施工方法,特别涉及一种用于河道整治中对破损挡墙的进行拆除修缮的生态挡土墙的施工方法。
背景技术
挡土墙的应用已有很久的历史,传统的挡土墙结构只考虑了挡土功能的主要作用,而忽略了诸如柔性、美观、施工方便和更加经济等附加效果。随着国民素质的提高,环保意识的增强,人类对于人与自然的认识不断升华,对挡土结构在景观、环保等方面提出了更高的要求。当前,河道护岸挡墙主要有3种形式:砌石挡墙、现浇混凝土挡墙和预制砌块挡墙。随着环保和生态保护意识的提高,绿化技术越来越受到人们关注。生态挡墙兼有结构性防护功能和美化生态环境功能,近年来,越来越为工程界所关注。生态工法源于德国,1938年德国工程师Seifer首先提出了近自然河溪整治概念,并于20世纪50年代创建了近自然河道治理工程的理论与工法。之后,挡墙生态工法在欧美、日本、港台等地区取得了不断的丰富和发展,基于自然、安全、经济、适用、施工便利且美观的理念,从工程技术日渐发展成为融合工程学、美学、生态和文化于一体的治理方法。
发明内容
本发明的目的是克服现有技术中的不足,提供一种方法科学合理的生态挡土墙的施工方法。
这种生态挡土墙结构的施工方法,包括以下步骤:
(1)拆除破损的挡墙基础,挖除部分原基础对应的岸堤,挖除的岸堤呈稳定的边坡状,并应漏出一定长度的原基础,并在漏出的原基础上设置连接筋;
(2)打设基础桩并在基础桩上浇筑新基础,新基础包裹住漏出的原基础,新基础上部设置种植孔和与凹凸砌块相应对的凹槽,同时在岸堤边坡后方一定距离内打设刚柔组合桩,并按照预定要求在刚性桩中设置带有固定环的桩接头;
(3)清理、整平开挖的岸堤边坡,同时在坡面预定位置上设置钻孔预留标志,之后在坡面上铺设钢筋网,喷射高强透水混凝土;
(4)待高强透水混凝土的强度达到要求后,在孔预留标志上按照预定角度和深度进行钻孔,钻至刚性桩桩接头的固定环为止;
(5)将锚索和环扣固定连接,并串在套管中,套管顶端顶压环扣至刚性桩桩接头的固定环上,环扣与固定环接触后自动卡入相连,然后拔出套管,切断多余的锚索,并设置锚固头固定在高强透水混凝土上;
(6)在新基础预设位置上开始安装凹凸砌块,将凹凸砌块的凸头依次插入到下方凹凸砌块的凹槽内即可,并相隔一定距离在凹凸砌块后方设置支撑,依次撑在高强透水混凝土坡面上,并避开与锚固头接触;
(7)待凹凸砌块安装到预定高度后,在凹凸砌块后方浇筑生态混凝土,不拆除支撑,边浇筑边适当振捣均匀即可;
(8)在施工完成的岸堤顶面上设置种植孔,同时清理凹凸砌块和新基础上的种植孔,然后将植被种植在种植孔中,适当浇水施肥,完成生态挡土墙的施工。
本发明的有益效果是:
本发明采用的凹凸砌块采用凹槽和凸头相互嵌固连接,无需水泥砌筑,节省了人力物力,另外,通过在凹凸砌块设置种植孔,简化了生态系统的布置工作,既节约了施工费用,又形成了环保生态系统,美化了岸堤。
本发明将原基础包裹在新基础中,实现了新老基础的共同工作共同变形,解决了新老岸堤结合时出现不均匀沉降的现象。
本发明将锚索固定于刚柔组合桩上,从根本保证了锚索的锚固质量,并减少了锚索的使用长度。
附图说明
图1是生态挡土墙结构示意图;
图2是凹凸砌块示意图;
图3是锚索与刚性桩连接过程示意图;
图4是锚索与刚性桩连接图;
图5是生态挡墙结构施工示意图。
附图标记说明:1-凹凸砌块;2-种植孔;3-凹槽;4-凸榫;5-凸头;6-植被;7-新基础;8-基础桩;9-连接筋;10-原基础;11-刚性桩;12-岸堤;13-柔性水泥桩;14-固定环;15-钻孔;16-锚索;17-生态混凝土;18-锚固头;19-高强透水混凝土;20-环扣;21-桩接头;22-套管;23-支撑。
具体实施方式
下面结合附图和实施例对本发明做进一步描述。虽然本发明将结合较佳实施例进行描述,但应知道,并不表示本发明限制在所述实施例中。相反,本发明将涵盖可包含在由权利要求书限定的本发明的范围内的替换物、改进型和等同物。
参照图1~5,根据现场调查结果,拆除100m长的破损严重的挡墙和原基础10,挖除4.5m厚的岸堤12,挖除的岸堤12呈稳定的边坡状,坡度为60°,并简单的进行挂网防护,原基础10应超出开挖后的岸堤12约1.5m长,并在超出的原基础10上设置18根直径为18mm、长度为25cm的连接筋9,分别布设在原基础10的上侧、外侧和下侧。
在原基础10外侧开始打设直径为0.5m、长度为15m的预制基础桩8,基础桩8采用双排布设,桩间距纵向5m,横向2.5m,基础桩8打设完毕,进行清理地表铺设垫层后,在基础桩8上浇筑厚度为40cm的新基础7,浇筑新基础7时,应包裹住漏出的原基础10,新基础7上部设置深度为40cm、上长50cm、下长3cm的种植孔2和与凹凸砌块1相应对的尺寸为25cm×25cm的凹槽3,同时在岸堤12边坡顶部后方10m处打设刚柔组合桩,柔性水泥桩13的打设深度为16m、直径为1m,刚性桩11的打设深度为26m,直径为0.5m,并在刚性桩11上部16m范围内,每隔4m设置桩接头21,并在桩接头21上设置直径10cm固定环14。
清理、整平开挖的岸堤12边坡,同时在坡面预定位置上设置钻孔15预留标志,之后在坡面上铺设钢筋网,喷射20cm后的高强透水混凝土19,待高强透水混凝土19的强度达到要求后,在孔预留标志上按照预定角度和深度进行钻孔15施工,钻孔15的直径为15cm,钻至刚性桩11桩接头21的固定环14为止,然后将直径为8cm锚索16端部连接直径为12cm的环扣20,之后将锚索16串在直径为10cm的套管22中,套管22顶端顶压环扣20至刚性桩11桩接头21的固定环14上,环扣20与固定环14接触后自动卡入相连,然后拔出套管22,切断多余的锚索16,并在锚索16首端设置锚固头18固定在高强透水混凝土19上。
在新基础7预设位置上开始安装如图2所示的长×宽×高分别为160×100×100cm的凹凸砌块1,其中,凸榫4、凸头5和凹槽3尺寸为25cm×25cm,种植孔2的深度为40cm、上长50cm、下长3cm,将凹凸砌块1的凸头5依次插入到下方凹凸砌块1的凹槽3内即可,并相隔4m的高度在凹凸砌块1后方设置直径为18cm、长度为1m支撑23,依次撑在高强透水混凝土19坡面上,并避开与锚固头18的接触,待凹凸砌块1安装到16m高度后,在凹凸砌块1后方浇筑生态混凝土17,不拆除支撑23,边浇筑边适当振捣均匀即可。
最后,在施工完成的岸堤12顶面上设置深度为40cm、上长50cm、下长3cm的种植孔2,同时清理凹凸砌块1和新基础7上的种植孔2,然后将植被6种植在种植孔2中,适当浇水施肥,完成生态挡土墙的施工。
上述具体实施方式不以任何形式限制本发明的技术方案,凡是采用等同替换或等效变换的方式所获得的技术方案均落在本发明的保护范围。

Claims (1)

1.一种生态挡土墙结构的施工方法,其特征在于包括以下步骤:
1)拆除破损的挡墙基础,挖除部分原基础(10)对应的岸堤(12),挖除的岸堤呈稳定的边坡状,并应漏出一定长度的原基础(10),并在漏出的原基础(10)上设置连接筋(9);
2)打设基础桩并在基础桩(8)上浇筑新基础(7),新基础(7)包裹住漏出的原基础(10),新基础(7)上部设置种植孔(2)和与凹凸砌块(1)相应对的凹槽(3),同时在岸堤(12)边坡后方一定距离内打设刚柔组合桩,并按照预定要求在刚性桩中设置带有固定环的桩接头(21);
3)清理、整平开挖的岸堤(12)边坡,同时在坡面预定位置上设置钻孔(15)预留标志,之后在坡面上铺设钢筋网,喷射高强透水混凝土(19);
4)待高强透水混凝土(19)的强度达到要求后,在孔预留标志上按照预定角度和深度进行钻孔(15),钻至刚性桩(11)桩接头(21)的固定环(14)为止;
5)将锚索(16)和环扣(20)固定连接,并串在套管(22)中,套管(22)顶端顶压环扣(20)至刚性桩(11)桩接头(21)的固定环(14)上,环扣(20)与固定环(14)接触后自动卡入相连,然后拔出套管(22),切断多余的锚索(16),并设置锚固头(18)固定在高强透水混凝土(19)上;
6)在新基础(7)预设位置上开始安装凹凸砌块(1),将凹凸砌块(1)的凸头(5)依次插入到下方凹凸砌块(1)的凹槽(3)内即可,并相隔一定距离在凹凸砌块(1)后方设置支撑(23),依次撑在高强透水混凝土(19)坡面上,并避开与锚固头(18)接触;
7)待凹凸砌块(1)安装到预定高度后,在凹凸砌块(1)后方浇筑生态混凝土(17),不拆除支撑(23),边浇筑边适当振捣均匀即可;
8)在施工完成的岸堤(12)顶面上设置种植孔(2),同时清理凹凸砌块(1)和新基础(7)上的种植孔(2),然后将植被种植在种植孔(2)中,适当浇水施肥,完成生态挡土墙的施工。
CN201510282470.6A 2015-05-28 2015-05-28 一种生态挡土墙结构的施工方法 Active CN104878718B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510282470.6A CN104878718B (zh) 2015-05-28 2015-05-28 一种生态挡土墙结构的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510282470.6A CN104878718B (zh) 2015-05-28 2015-05-28 一种生态挡土墙结构的施工方法

Publications (2)

Publication Number Publication Date
CN104878718A true CN104878718A (zh) 2015-09-02
CN104878718B CN104878718B (zh) 2016-11-02

Family

ID=53946380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510282470.6A Active CN104878718B (zh) 2015-05-28 2015-05-28 一种生态挡土墙结构的施工方法

Country Status (1)

Country Link
CN (1) CN104878718B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887760A (zh) * 2016-04-14 2016-08-24 东南大学 一种生态型的破损护岸修复结构
CN107268641A (zh) * 2017-02-28 2017-10-20 衡阳市金泓建筑装饰设计有限公司 一种生态斜孔砌块、用其建造的生态护墙及其建造方法
CN107299646A (zh) * 2016-04-15 2017-10-27 中交第三航务工程勘察设计院有限公司 生态挡墙结构及其建造方法
CN107642097A (zh) * 2017-08-18 2018-01-30 西北矿冶研究院 一种轻型排土场支挡结构
CN111188359A (zh) * 2020-02-24 2020-05-22 中铁第四勘察设计院集团有限公司 一种挡土墙及其施工方法
CN114892710A (zh) * 2022-05-17 2022-08-12 湖北工业大学 一种树承式挡土墙及其施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2221611Y (zh) * 1995-02-10 1996-03-06 林进财 蜂巢式挡土墙
KR20100053270A (ko) * 2008-11-12 2010-05-20 이희철 인장재와 프리캐스트 패널 및 프리캐스트 보강구를 구비한 절토부 옹벽 및 그 시공방법
CN102619229A (zh) * 2012-04-13 2012-08-01 孙涛 柔性面层土钉墙联合加筋土生态支护体系及其施工方法
CN103437321A (zh) * 2013-08-15 2013-12-11 江苏山水环境建设集团股份有限公司 现浇反滤植生型混凝土生态护坡系统及其施工方法
CN203603105U (zh) * 2013-11-27 2014-05-21 浙江大学城市学院 一种壁板式生态挡墙护岸结构
CN204238177U (zh) * 2014-11-11 2015-04-01 河海大学 一种组合式几字形砌块的生态土工结构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2221611Y (zh) * 1995-02-10 1996-03-06 林进财 蜂巢式挡土墙
KR20100053270A (ko) * 2008-11-12 2010-05-20 이희철 인장재와 프리캐스트 패널 및 프리캐스트 보강구를 구비한 절토부 옹벽 및 그 시공방법
CN102619229A (zh) * 2012-04-13 2012-08-01 孙涛 柔性面层土钉墙联合加筋土生态支护体系及其施工方法
CN103437321A (zh) * 2013-08-15 2013-12-11 江苏山水环境建设集团股份有限公司 现浇反滤植生型混凝土生态护坡系统及其施工方法
CN203603105U (zh) * 2013-11-27 2014-05-21 浙江大学城市学院 一种壁板式生态挡墙护岸结构
CN204238177U (zh) * 2014-11-11 2015-04-01 河海大学 一种组合式几字形砌块的生态土工结构

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887760A (zh) * 2016-04-14 2016-08-24 东南大学 一种生态型的破损护岸修复结构
CN107299646A (zh) * 2016-04-15 2017-10-27 中交第三航务工程勘察设计院有限公司 生态挡墙结构及其建造方法
CN107268641A (zh) * 2017-02-28 2017-10-20 衡阳市金泓建筑装饰设计有限公司 一种生态斜孔砌块、用其建造的生态护墙及其建造方法
CN107642097A (zh) * 2017-08-18 2018-01-30 西北矿冶研究院 一种轻型排土场支挡结构
CN111188359A (zh) * 2020-02-24 2020-05-22 中铁第四勘察设计院集团有限公司 一种挡土墙及其施工方法
CN114892710A (zh) * 2022-05-17 2022-08-12 湖北工业大学 一种树承式挡土墙及其施工方法
CN114892710B (zh) * 2022-05-17 2024-04-19 湖北工业大学 一种树承式挡土墙及其施工方法

Also Published As

Publication number Publication date
CN104878718B (zh) 2016-11-02

Similar Documents

Publication Publication Date Title
CN104878718A (zh) 一种生态挡土墙结构的施工方法
CN205134340U (zh) 一种用于高陡岩质边坡生态护坡的结构系统
CN105421470B (zh) 装配式锚杆拱形骨架复合式生态护坡施工方法
CN104206064A (zh) 一种盐碱地地下排盐方法
CN103114643B (zh) 大口径排水管道施工组件及其施工方法
CN204098043U (zh) 留土后开挖结合内支撑双排桩支护结构
CN107905796B (zh) 一种土层隧道管棚工作室施工方法
CN108716219A (zh) 边坡生态防护结构及其施工方法
CN205012284U (zh) 建于覆盖层上的大坝坝基防渗结构
CN101622931B (zh) 岩质边坡护面墙的绿化坡面及施工方法
CN204780764U (zh) 环境友好型生态带肋壁板式挡墙护岸
CN104878719A (zh) 互嵌加筋式生态挡墙施工方法
CN203866858U (zh) 一种河道驳岸植生挡土墙
CN109594567A (zh) 一种锚喷防护岩石边坡生态防护结构布置及其方法
CN109024458A (zh) 一种采煤沉陷地景观护岸及水底防渗的构建方法
CN211446792U (zh) 一种水利工程生态护坡墙
CN104904469A (zh) 一种滨海盐碱地分域式控排盐的绿化方法
CN204252164U (zh) 一种沉管式工作井
CN106120822B (zh) 一种防止泥岩滑坡的支护方法及装置
CN105155472A (zh) 深厚覆盖层土石坝坝基防渗结构及其施工方法
CN202509509U (zh) 一种新型护坡结构
CN107178021B (zh) 一种增强蓄水的海绵城市生态广场雨水利用结构
CN102704437A (zh) 一种适用复杂山区的采煤塌陷区耕作水源再造方法
CN206143783U (zh) 一种防止泥岩滑坡的支护装置
CN205421303U (zh) 一种高水位粉砂土地基的降水处理装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181229

Address after: No. 66 Shanquan Road, Zhangdian District, Zibo City, Shandong Province

Patentee after: SHANDONG HENGXIANG MUNICIPAL HIGHWAY ENGINEERING Co.,Ltd.

Address before: 310015 office room 1901, block C, Wanda Plaza, intersection of Gongshu District Shi Xiang Road and Hang Hang Road, Hangzhou, Zhejiang.

Patentee before: HANGZHOU JIANGRUN TECHNOLOGY Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230420

Address after: 820, 8th Floor, Building 26, Shangwenyuan Community, Xincun West Road, Zhangdian District, Zibo City, Shandong Province, 255000

Patentee after: Shandong Qingyu Road and Bridge Engineering Co.,Ltd.

Address before: No. 66 Shanquan Road, Zhangdian District, Zibo City, Shandong Province

Patentee before: SHANDONG HENGXIANG MUNICIPAL HIGHWAY ENGINEERING Co.,Ltd.

TR01 Transfer of patent right