CN1048739A - 崩落采矿法 - Google Patents

崩落采矿法 Download PDF

Info

Publication number
CN1048739A
CN1048739A CN 90105539 CN90105539A CN1048739A CN 1048739 A CN1048739 A CN 1048739A CN 90105539 CN90105539 CN 90105539 CN 90105539 A CN90105539 A CN 90105539A CN 1048739 A CN1048739 A CN 1048739A
Authority
CN
China
Prior art keywords
tunnel
drift
haulageway
ore body
loop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN 90105539
Other languages
English (en)
Other versions
CN1015123B (zh
Inventor
周骥
龙利中
吴爱祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Original Assignee
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University filed Critical Central South University
Priority to CN 90105539 priority Critical patent/CN1015123B/zh
Publication of CN1048739A publication Critical patent/CN1048739A/zh
Publication of CN1015123B publication Critical patent/CN1015123B/zh
Expired legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

一种采场结构简单的崩落采矿法,沿矿体边界挖 有环形运输巷道1;在矿体的上盘或下盘开挖切割巷 道2形成切割空间,在堑沟中向上凿钻扇形炮孔进行 爆破,后退回采,其特征在于运输巷道3和堑沟巷道 4,通过切割槽2连通环形运输巷道1和装矿巷道5, 简化了采场结构,实现了一巷道多种用途,减少了采 掘工作量,降低了采矿成本,和科学管理地压的一种 新方法。

Description

本发明属于采矿领域的各种有用矿物的地下开采方法。
SU  752005中公开了一种“矿块底柱的采准方法”,它设有专门的通风道,整个采场结构巷道均只具有单一功能,不能综合利用,故采场结构复杂,采准切割量大,采矿成本高。
本发明的目的在于克服上述现有技术中的不足,即提供一种采场结构简单,各巷道利用率高,采场成本低的开采方法。
本发明目的达到的措施是沿矿体的边界掘进环形运输巷道;平行环形运输巷道开切割巷道;垂直矿体等距,交错布置运输巷道和堑沟巷道;此两巷道连通环形运输巷道和装矿巷道,在矿体的分段上下对应使用,应本发明实施的不同步骤的需要可作运输、凿岩、爆破、人行、通风五种巷道使用;在堑沟巷道中向上凿钻扇形炮孔,以切割槽为自由面进行爆破;以12米长度为一个回采单元,后退进行回采;首层的回采,崩落的矿石部分留下形成缓冲层。
本发明的实施步骤结合附图作进一步的描述:
图1:采场结构主视图;
图2:采场结构的综合平面图。
图1和图2描述了本发明的采场结构形式。首先沿矿体的边界掘进环形运输巷道1,继而在矿体的上盘或下盘,距环形运输巷道1的6米处,且平行环形运输巷道1,开挖一条切割巷道2,采用工序简单的无切井拉槽法,开切割空间。再从矿体的一端起,垂直矿体等距,交错布置运输巷道3和堑沟巷道4,并通过切割巷道2与环形运输巷道1相通。然后,从运输巷道3以24米的间距掘进错位布置的装矿巷道5。
上述采场结构中的运输巷道3和堑沟巷道4随着本发明实施进程的需要可作运输凿岩爆破、人行、通风五种巷道使用,实现了一巷道多种用途。此外这两种巷道的使用在矿体分段上下作用不同,即在上分段上作运输巷道3使用,在下分段上作堑沟巷道4使用;在上分段上作堑沟巷道4的巷道,在下分段上作运输巷道3。这样使矿体两个分段上的切割、回采实现了在一个分段上完成。从而减少了一个分段的采掘工程量。
回采:回采之前在堑沟巷道4中向上凿钻扇形炮孔,以切割槽2为自由面进行爆破;以12米长度为一个回采单元,后退进行回采;首层的回采,留下崩落的矿石60-70%,作缓冲层6。以解除顶板突然崩落所产生的冲击地压的危害,以保证能顺利进行回采。
本发明与现有技术相比,具有如下优点:
本发明垂直矿体交错布置的运输巷道3和堑沟巷道4通过切割巷道2连通环形运输巷道1和装矿巷5简化了采场结构,实现了一巷道多种用途;从分段上来看,运输巷道3和堑沟巷道4是交错使用,同时在不同时期又作运输、堑沟和凿岩巷道之用,这就提高了分段高度,减少了采掘工作量,降低了采矿成本,万吨采掘比为29米,和科学管理地压的新方法,刷新了通常的采矿方法难以达到的指标。

Claims (3)

1、一种采场结构简单的崩落采矿法,包括下述步骤:
1).沿矿体边界掘进环形运输巷道1;
2).在矿体的上盘或下盘,平行环形运输巷道1,并距其6米开挖切割巷道2,形成切割空间;
3).在堑沟巷道4和运输巷道3中,向上凿钻扇形炮孔,以切割槽2为自由面进行爆破;
4).首层回采,留下部分矿石形成缓冲层。
其特征在于:
5).垂直矿体、等距、交错布置运输巷道3和堑沟巷道4;
6).从运输巷道4以24米间距,掘进装矿巷道5;
7).一个回采单元的长度为12米。
2、根据权利要求1所述的崩落采矿法,其特征在于所述的运输巷道3和堑沟巷道4,通过切割槽2连通环形运输巷道1和装矿巷道5。
3、根据权利要求1所述的崩落采矿法,其特征在于所述的运输巷道3和堑沟巷道4在分段上交错使用,不同时期不同用途。
CN 90105539 1990-08-30 1990-08-30 崩落采矿法 Expired CN1015123B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 90105539 CN1015123B (zh) 1990-08-30 1990-08-30 崩落采矿法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 90105539 CN1015123B (zh) 1990-08-30 1990-08-30 崩落采矿法

Publications (2)

Publication Number Publication Date
CN1048739A true CN1048739A (zh) 1991-01-23
CN1015123B CN1015123B (zh) 1991-12-18

Family

ID=4879353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 90105539 Expired CN1015123B (zh) 1990-08-30 1990-08-30 崩落采矿法

Country Status (1)

Country Link
CN (1) CN1015123B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1047428C (zh) * 1991-06-03 1999-12-15 北京矿冶研究总院 一种适用于倾斜缓倾斜中厚矿体的采矿及回填方法
CN101737050B (zh) * 2008-11-25 2012-10-24 宝钢集团上海梅山有限公司 一种采矿中深孔布置方法
CN104533415A (zh) * 2014-11-25 2015-04-22 北京科技大学 一种阶段强制崩落法与自然崩落法耦合的采矿方法
CN108458634A (zh) * 2017-04-24 2018-08-28 中交公局厦门工程有限公司 一种隧道掏扩槽区等距扇形布孔爆破施工方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100504028C (zh) * 2006-04-11 2009-06-24 云南锡业集团有限责任公司 一种w堑沟型有底部结构受矿巷道以及形成工艺

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1047428C (zh) * 1991-06-03 1999-12-15 北京矿冶研究总院 一种适用于倾斜缓倾斜中厚矿体的采矿及回填方法
CN101737050B (zh) * 2008-11-25 2012-10-24 宝钢集团上海梅山有限公司 一种采矿中深孔布置方法
CN104533415A (zh) * 2014-11-25 2015-04-22 北京科技大学 一种阶段强制崩落法与自然崩落法耦合的采矿方法
CN104533415B (zh) * 2014-11-25 2017-01-11 北京科技大学 一种阶段强制崩落法与自然崩落法耦合的采矿方法
CN108458634A (zh) * 2017-04-24 2018-08-28 中交公局厦门工程有限公司 一种隧道掏扩槽区等距扇形布孔爆破施工方法

Also Published As

Publication number Publication date
CN1015123B (zh) 1991-12-18

Similar Documents

Publication Publication Date Title
CN103089266B (zh) 露天转地下过渡期无底柱分段空场崩落采矿方法
CN107905834A (zh) 一种低渗高突煤层体系化瓦斯开采方法
CN100557194C (zh) 综放工作面高抽巷下返钻孔初采瓦斯抽放方法
CN106761757A (zh) 一种全阶段组合凿爆落矿高效采矿方法
CN109252862A (zh) 超大规模采场大直径深孔高阶段空场嗣后充填采矿法
CN100560936C (zh) 一种煤矿井下复采回采煤的方法
CN101302931B (zh) 一种仓房采煤后的复采和边角煤回采的方法
CN101338674A (zh) 直接装运矿石的无底柱分段崩落采矿法
CN105221179A (zh) 一种高瓦斯矿井y型通风方法
CN106089205A (zh) 一种适用于水体下极薄矿体的房柱法充填采矿方法
CN102086765A (zh) 一种极薄铜矿体高分段多分层采矿法
CN102261248A (zh) 一种挑檐式结构的无底柱阶段崩落采矿法
CN109403986A (zh) Tbm掘进施工的平行导坑同步扩建为复线隧道的施工方法
CN111550244A (zh) 缓倾斜矿体分层条带开采方法
CN101598031A (zh) 废石就地回填并能提高矿石回收率的采矿方法
CN106761902A (zh) 一种适用于软岩保护层开采的立体综合卸压瓦斯抽采方法
CN106089209A (zh) 柔性隔离层充当假顶的分段崩落协同采矿方法
CN110173238A (zh) 厚煤层立体化巷道布置网络化爆破增透抽采全厚瓦斯方法
CN108825237A (zh) 一种特厚煤连采机与充填相结合的分层分采工艺
CN103147759B (zh) 一种倾斜小矿体探矿—浅孔留矿采矿方法
CN109252860A (zh) 一种薄煤层连采机高度机械化开采方法
CN108222940A (zh) 一种锰矿的开采方法
CN106121649A (zh) 采用阶段矿房法回采矿房的存窿矿石的回采方法
CN102031972B (zh) 露井联采的l型开采方法
CN101042051B (zh) 无底柱分段崩落法首采分段回采进路的布置方法

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C13 Decision
GR02 Examined patent application
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee