CN104863634A - Performance detecting method of tunnel fire-fighting equipment - Google Patents

Performance detecting method of tunnel fire-fighting equipment Download PDF

Info

Publication number
CN104863634A
CN104863634A CN201510188993.4A CN201510188993A CN104863634A CN 104863634 A CN104863634 A CN 104863634A CN 201510188993 A CN201510188993 A CN 201510188993A CN 104863634 A CN104863634 A CN 104863634A
Authority
CN
China
Prior art keywords
fire
tunnel
fighting
performance
cause
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510188993.4A
Other languages
Chinese (zh)
Inventor
蒋亚强
李乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Fire Research Institute of Ministry of Public Security
Original Assignee
Sichuan Fire Research Institute of Ministry of Public Security
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Fire Research Institute of Ministry of Public Security filed Critical Sichuan Fire Research Institute of Ministry of Public Security
Priority to CN201510188993.4A priority Critical patent/CN104863634A/en
Publication of CN104863634A publication Critical patent/CN104863634A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F5/00Means or methods for preventing, binding, depositing, or removing dust; Preventing explosions or fires

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Fire Alarms (AREA)

Abstract

The embodiment of the invention provides a performance detecting method of tunnel fire-fighting equipment. The method comprises the following steps: determining a tunnel fire-fighting performance detecting zone; setting a fire detection and alarm system, a smoke control system, a personnel evacuation and guidance system and an automatic fire extinguishing system in the tunnel fire-fighting performance detecting zone and setting different test fire sources at the tunnel fire-fighting performance detecting zone according to the designed fire scales of corresponding different developmental stages in tunnel detecting; firing the test fire sources and collecting the fire-fighting performance parameters of the fire detection and alarm system, the smoke control system, the personnel evacuation and guidance system and the automatic fire extinguishing system; obtaining the tunnel fire-fighting performance detecting results according to the actual fire-fighting performance parameters and the preset fire-fighting performance parameters of the fire detection and alarm system, the smoke control system, the personnel evacuation and guidance system and the automatic fire extinguishing system. The performance detecting method of tunnel fire-fighting equipment provided by the invention can accurately reflect the tunnel fire-fighting and safety performance and provides scientific gist for the design, performance evaluation and debugging of tunnel fire-fighting equipment.

Description

The method for testing performance of tunnel fire fighting device
Technical field
The present invention relates to technical field of fire hazard safety, particularly relate to the method for testing performance of a kind of tunnel fire fighting device.
Background technology
China's traffic tunnel is built fast-developing in recent ten years, newly-built highway tunnel in a large number, subaqueous tunnel and city tunnel.Total institute is known, and tunnel fire hazard has that fire scale is large, fire development speed fast, flue gas toxity concentration is high and the feature such as evacuating personnel is difficult.If the performance of tunnel fire fighting device does not meet setting requirement, during fire, great casualties and property loss may be caused.Therefore checking and appraising is carried out to tunnel fire-fighting performance, there is very important realistic meaning.
The method for testing performance of existing tunnel fire fighting device mainly contains following two kinds:
One, Computer Numerical Simulation is relied on to detect, namely mainly through Fluid Mechanics Computation (Computational Fluid Dynamics, CFD) software is simulated specific fire scenario, and the indexs such as wind speed, flue-gas temperature, visibility are examined, judge whether the standard meeting setting.
Two, setting up reduced scale degree experiment porch, verifying Performance-based fire in tunnel by carrying out model fire test.Model experiment requires that a reduced scale cun tunnel model must be built in strict accordance with certain similarity criterion, so just can guarantee that its experimental result is applicable to full-scale tunnel.
But all there is obvious limitation in these two kinds of modes above-mentioned:
(1) when using Computer Numerical Simulation, needing to carry out simplification and assumption to burning things which may cause a fire disaster and tunnel fringe conditions, between result of calculation and natural fire, just will inevitably produce error.Therefore the deviation of Numerical simulation results whether between correct and natural fire has much, and these key issues are all difficult to judge.
(2) for reduced scale cun model experiment, due to along with tunnel form day by day complicated, tunnel model is difficult to embody this complicated situation on space form.Convection heat transfer' heat-transfer by convection mechanism simultaneously in contracting scale experiment is simulated by using Fu Luode similarity criterion (Froude Scaling), and radiant heat transfer is not simulated by which, therefore contracting scale experiment can not evaluate the parameters such as the radiant heat flux density in full-scale tunnel.
Therefore the method for testing performance of existing tunnel fire fighting device cannot the Performance-based fire in accurate response tunnel.Therefore be necessary the method for testing performance that a kind of reliable tunnel fire fighting device is provided, to solve the problem existing for prior art.
Summary of the invention
The embodiment of the present invention provide a kind of can the method for testing performance of tunnel fire fighting device of Performance-based fire in accurate response tunnel; The technical problem of the Performance-based fire in tunnel accurately cannot be reflected with the method for testing performance solving existing tunnel fire fighting device.
The embodiment of the present invention provides the method for testing performance of a kind of tunnel fire fighting device, and it comprises:
Determine tunnel fire-fighting Performance Detection section; Wherein said tunnel fire-fighting Performance Detection section comprises the region with predetermined tunneling features;
At described tunnel fire-fighting Performance Detection section, fire detection alarm system, fume control system, evacuating personnel guidance system and automatic fire extinguishing system are set, and according to the difference of detection-phase, different test burning things which may cause a fire disaster is set at described tunnel fire-fighting Performance Detection section; Wherein said fire detection alarm system is used for triggering fire alarm according to the situation of described test burning things which may cause a fire disaster; Described fume control system is for discharging the fire smoke in described tunnel fire-fighting Performance Detection section; Described evacuating personnel guidance system is used for when described tunnel fire-fighting Performance Detection section breaking out of fire, and instruction personnel carry out safe escape; Described automatic fire extinguishing system and described fire detecting system link, for carrying out self-extinguishing operation;
Trigger described test burning things which may cause a fire disaster, collect the fire-fighting performance parameter of described fire detecting system, described fume control system, described evacuating personnel guidance system and described automatic fire extinguishing system; And according to the actual fire-fighting performance parameter of described fire detecting system, described fume control system, described evacuating personnel guidance system and described automatic fire extinguishing system and default fire-fighting performance parameter, obtain the performance test results of the fire fighting device in described tunnel.
In the method for testing performance of tunnel of the present invention fire fighting device, described in there is the region of predetermined tunneling features turning radius be less than the first setting value or tunnel longitudinal grade is greater than the second setting value.
In the method for testing performance of tunnel of the present invention fire fighting device, described fire detecting system, described fume control system, the fire-fighting performance parameter of described evacuating personnel guidance system and described automatic fire extinguishing system comprises alert locations and the time of fire alarming of described fire detecting system, the flue gas layer form that described fume control system detects, smoke layer temperature, smoke layer height, the radiant heat flux density at flue gas layer rate of propagation and described test burning things which may cause a fire disaster place, the start-up time of described evacuating personnel guidance system, and the start-up time of described automatic fire extinguishing system and perseveration time.
In the method for testing performance of tunnel of the present invention fire fighting device, detect described smoke layer temperature by the thermocouple tree be arranged on around described test burning things which may cause a fire disaster; Described flue gas layer rate of propagation is detected by the hot-wire anemometer be arranged on around described test burning things which may cause a fire disaster; Described flue gas layer form is detected by the laser sheet optical instrument be arranged on around described test burning things which may cause a fire disaster; The radiant heat flux density at described test burning things which may cause a fire disaster place is detected by the radiant heat flux densometer be arranged on around described test burning things which may cause a fire disaster.
In the method for testing performance of tunnel of the present invention fire fighting device, described thermocouple tree, described hot-wire anemometer, described laser sheet optical instrument and described radiant heat flux densometer all adopt waterproofing work.
In the method for testing performance of tunnel of the present invention fire fighting device, the described difference according to detection-phase, the step arranging different test burning things which may cause a fire disaster at described tunnel fire-fighting Performance Detection section comprises:
As detection-phase be as described in test burning things which may cause a fire disaster power be less than the 3rd setting value, then described test burning things which may cause a fire disaster is alcohol pool fire;
As detection-phase be as described in test burning things which may cause a fire disaster power be greater than the 3rd setting value, then described test burning things which may cause a fire disaster be diesel pool fire.
In the method for testing performance of tunnel of the present invention fire fighting device, above described alcohol pool fire or described diesel pool fire, be provided with obstacle.
In the method for testing performance of tunnel of the present invention fire fighting device, the both sides of described test burning things which may cause a fire disaster are provided with fire wall, and the height of described fire wall is greater than 0.1 meter.
In the method for testing performance of tunnel of the present invention fire fighting device, the length of described tunnel fire-fighting Performance Detection section is greater than 600 meters.
In the method for testing performance of tunnel of the present invention fire fighting device, comprise start-up time of described evacuating personnel guidance system emergency lighting start-up time, fire broadcast start-up time and Evacuation Indicatory Sign start-up time.
Compared to the method for testing performance of the tunnel fire fighting device of prior art, the method for testing performance of tunnel of the present invention fire fighting device, by collecting the fire-fighting performance parameter of fire detection alarm system, fume control system, evacuating personnel guidance system and automatic fire extinguishing system, determines the fire-fighting performance test results in tunnel; The method for testing performance solving existing tunnel fire fighting device accurately cannot reflect the technical problem of the Performance-based fire in tunnel.
Accompanying drawing explanation
Fig. 1 is the flow chart of the preferred embodiment of the method for testing performance of tunnel of the present invention fire fighting device;
Fig. 2 is the position view of the setting device of the preferred embodiment of the method for testing performance of tunnel of the present invention fire fighting device;
Fig. 3 is the structural representation of the obstacle in the method for testing performance of tunnel of the present invention fire fighting device;
Fig. 4 is the flow chart of the specific embodiment of the method for testing performance of tunnel of the present invention fire fighting device.
Detailed description of the invention
Please refer to Fig. 1, Fig. 1 is the flow chart of the preferred embodiment of the method for testing performance of tunnel of the present invention fire fighting device.The method for testing performance of the tunnel fire fighting device of this preferred embodiment comprises:
Step S101, determines tunnel fire-fighting Performance Detection section, and wherein this tunnel fire-fighting Performance Detection section comprises the region with predetermined tunneling features;
Step S102, at tunnel fire-fighting Performance Detection section, fire detection alarm system, fume control system, evacuating personnel guidance system and automatic fire extinguishing system are set, and according to the difference of detection-phase, different detection burning things which may cause a fire disaster is set at tunnel fire-fighting Performance Detection section;
Step S103, triggers test burning things which may cause a fire disaster, collects the fire-fighting performance parameter of fire detection alarm system, fume control system, evacuating personnel guidance system and automatic fire extinguishing system;
Step S104, according to fire-fighting performance parameter and the default fire-fighting performance parameter of fire detection alarm system, fume control system, evacuating personnel guidance system and automatic fire extinguishing system, obtains the fire-fighting performance test results in tunnel.
The following detailed description of the idiographic flow of each step of the method for testing performance of the tunnel fire fighting device of this preferred embodiment.
In step S101, first set tunnel fire-fighting Performance Detection section, namely in this tunnel fire-fighting Performance Detection section, carry out tunnel fire-fighting Performance Detection.In order to ensure the detection accuracy of fire-fighting performance, the length of this tunnel fire-fighting Performance Detection section should be greater than 600 meters.This tunnel fire-fighting Performance Detection section comprises the region with predetermined tunneling features, the region of this predetermined tunneling features is be less than the first setting value (namely taking a sudden turn) as the turning radius in region or the tunnel longitudinal grade in region is greater than the second setting value (i.e. the high gradient) etc., comparatively more easily there is tunnel accident in other regions in the region with above-mentioned predetermined tunneling features, therefore select above-mentioned zone as fire-fighting Performance Detection region, tunnel, so that the fire-fighting performance level in this tunnel better can be reflected.Forward step S102 to subsequently.
In step s 102, fire detection alarm system, fume control system, evacuating personnel guidance system and automatic fire extinguishing system are set in the tunnel fire-fighting Performance Detection section that step S101 determines; Wherein fire detection alarm system is used for triggering fire alarm according to the situation of test burning things which may cause a fire disaster 25; Fume control system is for discharging the fire smoke in tunnel fire-fighting Performance Detection section; Evacuating personnel guidance system is used to indicate fire escape and evacuates direction; Automatic fire extinguishing system for detecting the situation of test burning things which may cause a fire disaster 25, and carries out fire-extinguishing operations.And according to the difference of detection-phase, different test burning things which may cause a fire disaster 25 is set in tunnel fire-fighting Performance Detection section, is specially:
The power being test burning things which may cause a fire disaster 25 as detection-phase is less than setting value, i.e. the lower-powered initial fire disaster of simulation fire source, then test burning things which may cause a fire disaster 25 can be set to alcohol pool fire.Temperature during alcohol pool fire burning is lower, and combustion product is without obvious carbon soot particles.Tracer can be added near burning things which may cause a fire disaster, so that observed and recorded fire and smoke spread characteristic during concrete operations.
The power being test burning things which may cause a fire disaster 25 as detection-phase is greater than setting value, i.e. the fire of the abundant period of expansion that simulation fire source power is larger, test burning things which may cause a fire disaster 25 can be set to diesel pool fire.The temperature during burning of diesel pool fire is higher, and smoke-producing amount is also larger.A small amount of gasoline can be added in diesel pool, to contribute to the test burning things which may cause a fire disaster that ignites during concrete operations.
Owing to needing the performance of testing automatic fire extinguishing system, obstacle 26 can be set above alcohol pool fire or diesel pool fire, with better simulated automotive burning things which may cause a fire disaster (car body in automobile burning things which may cause a fire disaster play certain block effect), automatic fire extinguishing system is made not easily to directly act on test burning things which may cause a fire disaster 25.As shown in Figure 3, Fig. 3 is the structural representation of the obstacle in the method for testing performance of tunnel of the present invention fire fighting device.This obstacle 26 is made up of incombustible material, and its size and the car category of simulating are consistent, and are provided with opening 27, for simulated automotive window in its relative both sides.Simultaneously because above-mentioned test burning things which may cause a fire disaster 25 is liquid fuel burning things which may cause a fire disaster, in order to prevent the generation occurring trickling combustion case in test process, can arrange fire wall on the tunnel road surface of test burning things which may cause a fire disaster 25 both sides, the height of this fire wall is greater than 0.1 meter, and the material of fire wall is incombustible material.
Preferably, for the ease of to the observation of test process and record, also can in tunnel fire-fighting Performance Detection section or two ends fire protection control room is set, to monitor and record test process.
The following detailed description of in tunnel fire-fighting Performance Detection section, how fire detection alarm system, fume control system, evacuating personnel guidance system and automatic fire extinguishing system are set.Please refer to Fig. 2, Fig. 2 is the position view of the setting device of the preferred embodiment of the method for testing performance of tunnel of the present invention fire fighting device.Wherein fire detection alarm system triggers fire alarm by alert locations and time of fire alarming; Fume control system reflects flue gas control effects in tunnel fire-fighting Performance Detection section by the radiant heat flux density at flue gas layer form, smoke layer temperature, smoke layer height, flue gas layer translational speed and test burning things which may cause a fire disaster place; Evacuating personnel guidance system is by detecting the instruction situation of fire escape start-up time; Automatic fire extinguishing system detects situation and the fire-extinguishing operations situation of test burning things which may cause a fire disaster 25 by start-up time and duration.
Wherein detect smoke layer temperature by the thermocouple tree 21 be arranged on around test burning things which may cause a fire disaster 25, this thermocouple tree 21 can be arranged on top and the upstream and downstream of test burning things which may cause a fire disaster 25, temperature acquisition is carried out by multiple temperature collect module, and use the communications cable to carry out parallel connection, by sense terminals display also storage of collected result.
Flue gas layer rate of propagation is detected by the hot-wire anemometer 22 be arranged on around test burning things which may cause a fire disaster 25, this hot-wire anemometer 22 also can be arranged on the upstream and downstream of test burning things which may cause a fire disaster 25, each measuring wind speed tree (it having multiple hot-wire anemometer 22) can arrange at least three test points, to obtain the mean wind speed of this section part, testing result is also sent to sense terminals display by the communications cable and stores.
Flue gas layer form is detected by the laser sheet optical instrument 23 be arranged on around test burning things which may cause a fire disaster 25.Laser sheet optical instrument 23 can be arranged on the upstream and downstream of test burning things which may cause a fire disaster 25, and vertical scale in the middle of integrating tunnel and longitudinal scale of being positioned at the one-sided wall in tunnel carry out data record.Wherein the power of laser sheet optical instrument 23 should be greater than 300 milliwatts, and light source is the green glow of wavelength 532 nanometer.Normal lighting in testing process in closure of a tunnel fire-fighting Performance Detection section, and use video camera to carry out record to the flue gas layer form under laser sheet optical instrument 23 irradiation.
For the fume control system using central exhaust mode, also need to observe smoke evacuation, whether correctly to mend wind pattern, measure the wind speed of smoke vent opening, wind-supplying mouth, and record is along the fire and smoke spread scope of tunnel longitudinal direction.
The radiant heat flux density at test burning things which may cause a fire disaster place is detected by the radiant heat flux densometer 24 be arranged on around test burning things which may cause a fire disaster 25.This radiant heat flux densometer 24 can be arranged on, 5 meters, upstream of test burning things which may cause a fire disaster, and rational height is preferably 2 meters, and is just gathered the direction of test burning things which may cause a fire disaster 25 by sensor.
By directly observing, recording the start-up time of the evacuating personnel guidance system obtaining tunnel fire-fighting Performance Detection section, as emergency lighting start-up time, fire broadcast start-up time, Evacuation Indicatory Sign start-up time, and with the interlock situation of fire detection alarm system, fume control system.
By directly observing, recording the start-up time obtaining automatic fire extinguishing system, the duration, with interlock situation and the extinguishing effect of fire detection alarm system, fume control system.
When tap water will be adopted during as put out a fire to operate, all can adopt waterproofing work, so that fire-extinguishing operations is on the reusable impact of said apparatus to above-mentioned thermocouple tree 21, hot-wire anemometer 22, laser sheet optical instrument 23 and radiant heat flux densometer 24.Forward step S103 to subsequently.
In step s 103, trigger test burning things which may cause a fire disaster, and collect the fire-fighting performance parameter of fire detection alarm system, fume control system, evacuating personnel guidance system and automatic fire extinguishing system.Wherein the fire-fighting performance parameter of detection detecting and warning system, fume control system, evacuating personnel guidance system and automatic fire extinguishing system comprises alert locations and the time of fire alarming of fire detection alarm system, the flue gas layer form that fume control system is corresponding, smoke layer temperature, smoke layer height, fire and smoke spread speed and test burning things which may cause a fire disaster 25 place radiant heat flux density, the start-up time of evacuating personnel guidance system, and the start-up time of automatic fire extinguishing system and duration etc.Forward step S104 to subsequently.
In step S104, according to the fire-fighting performance parameter of fire detection alarm system, fume control system, evacuating personnel guidance system and automatic fire extinguishing system that step S103 obtains, compare with the fire-fighting performance parameter preset, thus obtain the fire-fighting performance test results in tunnel.As there is the underproof situation of index, then relevant fire fighting device is adjusted or reset, and re-start the detection method of tunnel fire-fighting performance.
The testing process of the method for testing performance of the tunnel fire fighting device of this preferred embodiment ends at step S104.
Be compared with the prior art, the detection scheme that this preferred embodiment proposes can be simulated the most close to the environment of true tunnel fire hazard, and can test performance and the interlock situation of fire detection alarm system, fume control system, evacuating personnel guidance system and the automatic fire extinguishing system in actual tunnel.Can adopt different test burning things which may cause a fire disaster according to different fiery conditions, the fire-fighting performance parameter of acquisition is more true and reliable simultaneously.
The concrete implementing procedure of the method for testing performance of tunnel of the present invention fire fighting device is described below by a specific embodiment.Please refer to Fig. 4, Fig. 4 is the flow chart of the specific embodiment of the method for testing performance of tunnel of the present invention fire fighting device.This specific embodiment comprises:
Step S401, determines tunnel fire-fighting Performance Detection section; Forward step S402 to subsequently;
Step S402, determines to test burning things which may cause a fire disaster, and this test burning things which may cause a fire disaster can be alcohol pool fire or diesel pool fire; Forward step S403 to subsequently;
Step S403, arranges, debugs fire detecting system, fume control system, evacuating personnel guidance system and automatic fire extinguishing system; Forward step S404 to subsequently;
Step S404, collects the fire-fighting performance parameter of fire detecting system, fume control system, evacuating personnel guidance system and automatic fire extinguishing system; Forward step S405 to subsequently;
Step S405, judge that whether the fire-fighting performance test results in tunnel is qualified, the fire-fighting performance test results as tunnel is qualified, then terminate and complete the testing process of tunnel fire-fighting performance; Fire-fighting performance test results as tunnel is defective, then forward step S406 to;
Step S406, because the fire-fighting performance test results in tunnel is defective, therefore step S403 is forwarded to after relevant fire services installations being adjusted, again fire detection alarm system, fume control system, evacuating personnel guidance system and automatic fire extinguishing system are arranged, and the above-mentioned fire-fighting performance parameter for whole system is measured again.
So namely, complete the testing process of the method for testing performance of the tunnel fire fighting device of this specific embodiment.
The method for testing performance of tunnel of the present invention fire fighting device, by collecting the fire-fighting performance parameter of fire detection alarm system, fume control system, evacuating personnel guidance system and automatic fire extinguishing system, determines the fire-fighting performance test results in tunnel; The method for testing performance solving existing tunnel fire fighting device cannot the technical problem of Performance-based fire in accurate response tunnel.
In sum; although the present invention discloses as above with preferred embodiment; but above preferred embodiment is also not used to limit the present invention; those of ordinary skill in the art; without departing from the spirit and scope of the present invention; all can do various change and retouching, the scope that therefore protection scope of the present invention defines with claim is as the criterion.

Claims (10)

1. a method for testing performance for tunnel fire fighting device, is characterized in that, comprising:
Determine tunnel fire-fighting Performance Detection section; Wherein said tunnel fire-fighting Performance Detection section comprises the region with predetermined tunneling features;
At described tunnel fire-fighting Performance Detection section, fire detection alarm system, fume control system, evacuating personnel guidance system and automatic fire extinguishing system are set, and according to the difference of detection-phase, different test burning things which may cause a fire disaster is set at described tunnel fire-fighting Performance Detection section; Wherein said fire detection alarm system is used for triggering fire alarm according to the situation of described test burning things which may cause a fire disaster; Described fume control system is for discharging the fire smoke in described tunnel fire-fighting Performance Detection section; Described evacuating personnel guidance system is used for when described tunnel fire-fighting Performance Detection section breaking out of fire, and instruction personnel carry out safe escape; Described automatic fire extinguishing system and described fire detecting system link, for carrying out self-extinguishing operation;
Trigger described test burning things which may cause a fire disaster, collect the fire-fighting performance parameter of described fire detecting system, described fume control system, described evacuating personnel guidance system and described automatic fire extinguishing system; And according to the actual fire-fighting performance parameter of described fire detecting system, described fume control system, described evacuating personnel guidance system and described automatic fire extinguishing system and default fire-fighting performance parameter, obtain the performance test results of the fire fighting device in described tunnel.
2. the method for testing performance of tunnel according to claim 1 fire fighting device, is characterized in that, described in there is the region of predetermined tunneling features turning radius be less than the first setting value or tunnel longitudinal grade is greater than the second setting value.
3. the method for testing performance of tunnel according to claim 1 fire fighting device, it is characterized in that, described fire detecting system, described fume control system, the fire-fighting performance parameter of described evacuating personnel guidance system and described automatic fire extinguishing system comprises alert locations and the time of fire alarming of described fire detecting system, the flue gas layer form that described fume control system detects, smoke layer temperature, smoke layer height, the radiant heat flux density at flue gas layer rate of propagation and described test burning things which may cause a fire disaster place, the start-up time of described evacuating personnel guidance system, and the start-up time of described automatic fire extinguishing system and perseveration time.
4. tunnel according to claim 3 fire fighting device method for testing performance, is characterized in that, detects described smoke layer temperature by the thermocouple tree be arranged on around described test burning things which may cause a fire disaster; Described flue gas layer rate of propagation is detected by the hot-wire anemometer be arranged on around described test burning things which may cause a fire disaster; Described flue gas layer form is detected by the laser sheet optical instrument be arranged on around described test burning things which may cause a fire disaster; The radiant heat flux density at described test burning things which may cause a fire disaster place is detected by the radiant heat flux densometer be arranged on around described test burning things which may cause a fire disaster.
5. the method for testing performance of tunnel according to claim 4 fire fighting device, is characterized in that, described thermocouple tree, described hot-wire anemometer, described laser sheet optical instrument and described radiant heat flux densometer all adopt waterproofing work.
6. the method for testing performance of tunnel according to claim 1 fire fighting device, is characterized in that, the described difference according to detection-phase, and the step arranging different test burning things which may cause a fire disaster at described tunnel fire-fighting Performance Detection section comprises:
As detection-phase be as described in test burning things which may cause a fire disaster power be less than the 3rd setting value, then described test burning things which may cause a fire disaster is alcohol pool fire;
As detection-phase be as described in test burning things which may cause a fire disaster power be greater than the 3rd setting value, then described test burning things which may cause a fire disaster be diesel pool fire.
7. the method for testing performance of tunnel according to claim 6 fire fighting device, is characterized in that, is provided with obstacle above described alcohol pool fire or described diesel pool fire.
8. the method for testing performance of tunnel according to claim 6 fire fighting device, is characterized in that, the both sides of described test burning things which may cause a fire disaster are provided with fire wall, and the height of described fire wall is greater than 0.1 meter.
9. the method for testing performance of tunnel according to claim 1 fire fighting device, is characterized in that, the length of described tunnel fire-fighting Performance Detection section is greater than 600 meters.
10. the method for testing performance of tunnel according to claim 1 fire fighting device, is characterized in that, comprises start-up time of described evacuating personnel guidance system emergency lighting start-up time, fire broadcast start-up time and Evacuation Indicatory Sign start-up time.
CN201510188993.4A 2015-04-20 2015-04-20 Performance detecting method of tunnel fire-fighting equipment Pending CN104863634A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510188993.4A CN104863634A (en) 2015-04-20 2015-04-20 Performance detecting method of tunnel fire-fighting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510188993.4A CN104863634A (en) 2015-04-20 2015-04-20 Performance detecting method of tunnel fire-fighting equipment

Publications (1)

Publication Number Publication Date
CN104863634A true CN104863634A (en) 2015-08-26

Family

ID=53909757

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510188993.4A Pending CN104863634A (en) 2015-04-20 2015-04-20 Performance detecting method of tunnel fire-fighting equipment

Country Status (1)

Country Link
CN (1) CN104863634A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105976116A (en) * 2016-05-09 2016-09-28 重庆和航物联网技术研究院有限公司 IoT based fire safety dynamic evaluation method and system
CN106523022A (en) * 2016-12-27 2017-03-22 同济大学 Tunnel fire extinguishing system based on water curtain shielding effects
CN106770983A (en) * 2017-03-01 2017-05-31 西安科技大学 A kind of mine laneway flow of flue gas simulated testing system and method
WO2018073660A1 (en) * 2016-10-18 2018-04-26 Tong Gar Lung Bethune Systems and methods for alert and advisory broadcast
CN113730861A (en) * 2021-09-06 2021-12-03 河南省平安消防工程有限公司 Detection method for fire safety facilities
CN114488936A (en) * 2022-01-26 2022-05-13 哈尔滨工程大学 Performance verification platform of fire alarm system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1332021A (en) * 2000-06-28 2002-01-23 西门子建筑技术公司 Fire system for vehicular tunnel
CN203465801U (en) * 2013-04-03 2014-03-05 昆明联诚科技有限公司 Highway tunnel fire-protection linkage system
CN203950405U (en) * 2014-01-20 2014-11-19 中铁十八局集团隧道工程有限公司 Rock tunnel(ling) machine security against fire early warning system
CN203978495U (en) * 2013-12-23 2014-12-03 宁波智天档案管理咨询有限公司 A kind of highway tunnel fire fighting system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1332021A (en) * 2000-06-28 2002-01-23 西门子建筑技术公司 Fire system for vehicular tunnel
CN203465801U (en) * 2013-04-03 2014-03-05 昆明联诚科技有限公司 Highway tunnel fire-protection linkage system
CN203978495U (en) * 2013-12-23 2014-12-03 宁波智天档案管理咨询有限公司 A kind of highway tunnel fire fighting system
CN203950405U (en) * 2014-01-20 2014-11-19 中铁十八局集团隧道工程有限公司 Rock tunnel(ling) machine security against fire early warning system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张崇: "公路隧道火灾致灾机理及消防安全评估方法研究", 《中国优秀硕士学位论文全文数据库工程科技II辑》 *
李权威: "狭长空间纵向通风条件下细水雾抑制油池火的实验研究", 《中国优秀博硕士学位论文全文数据库(博士)工程科技I辑》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105976116A (en) * 2016-05-09 2016-09-28 重庆和航物联网技术研究院有限公司 IoT based fire safety dynamic evaluation method and system
CN105976116B (en) * 2016-05-09 2022-07-26 重庆和航科技股份有限公司 Fire safety dynamic evaluation method and system based on Internet of things
WO2018073660A1 (en) * 2016-10-18 2018-04-26 Tong Gar Lung Bethune Systems and methods for alert and advisory broadcast
CN106523022A (en) * 2016-12-27 2017-03-22 同济大学 Tunnel fire extinguishing system based on water curtain shielding effects
CN106523022B (en) * 2016-12-27 2019-06-11 同济大学 Tunnel fire extinguishing system based on water curtain shielding action
CN106770983A (en) * 2017-03-01 2017-05-31 西安科技大学 A kind of mine laneway flow of flue gas simulated testing system and method
CN113730861A (en) * 2021-09-06 2021-12-03 河南省平安消防工程有限公司 Detection method for fire safety facilities
CN114488936A (en) * 2022-01-26 2022-05-13 哈尔滨工程大学 Performance verification platform of fire alarm system
CN114488936B (en) * 2022-01-26 2024-05-17 哈尔滨工程大学 Performance verification platform for fire alarm system

Similar Documents

Publication Publication Date Title
CN104863634A (en) Performance detecting method of tunnel fire-fighting equipment
CN106530578B (en) A kind of thresholding method of temperature sensing fire alarm system
CN203535890U (en) Fire simulation testing platform for charging and replacing station of electric automobiles
CN102929276B (en) Method for evaluating performance of large space building smoke controlling system
CN102117528B (en) Dynamic feedback type tunnel fire intelligent evacuating and rescuing system based on digitizing technique
CN105805556A (en) Distributed optical fiber leakage monitoring system
CN101571983B (en) Method for alarming and positioning fire disaster automatically in fiber gating tunnel
CN110135638B (en) Method for calculating risk of gas explosion accident lethal injury and structural damage uncertainty
CN104750949A (en) Gas leakage poisoning individual risk quantitative evaluation and characterization method
CN105957293A (en) Fire monitoring method and system for containment vessel of nuclear power station during bulge test
CN115952926B (en) Dangerous gas diffusion range prediction method, system, electronic equipment and storage medium
CN209387568U (en) It is a kind of with cigarette is close and the flame retardant cable horizontal firing test device of temperature-monitoring function
CN114201873A (en) LNG pool fire 3D accident scene construction and consequence display method
CN110501452A (en) Based on set barrier under the conditions of Long-distance Transmission Pipeline jet bubble reactor study experimental method and system
CN105651695B (en) Simulating test device and analog detection method for endangering gas detector
KR20120070088A (en) 10mw type large scale calorimeter
KR20120070087A (en) 10mw type large scale calorimeter
CN117841028A (en) Comprehensive pipe gallery inspection robot based on artificial intelligence
Su et al. Measurement of the neutral plane of an internal fire whirl using the background-oriented Schlieren technique for a vertical shaft model of a high-rise building
KR101170641B1 (en) Method for verification tests of longitudinal smoke control facilities in a tunnel and the apparatus of the same
CN115859582A (en) Method and equipment for predicting height of gas horizontal leakage injection fire
CN104698888B (en) vehicle fire accident information processing method and system
Kostenko et al. Dynamics of motion of gases from a source of spontaneous combustion of coal in mine workings
Liu et al. Investigation on the performance of fire detection systems for tunnel applications––part 1: full-scale experiments at a laboratory tunnel
CN208937690U (en) A kind of battery anti-explosion chamber safety monitoring system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150826