CN104852402A - System and method for adjusting unit feedforward quantity - Google Patents

System and method for adjusting unit feedforward quantity Download PDF

Info

Publication number
CN104852402A
CN104852402A CN201510142682.4A CN201510142682A CN104852402A CN 104852402 A CN104852402 A CN 104852402A CN 201510142682 A CN201510142682 A CN 201510142682A CN 104852402 A CN104852402 A CN 104852402A
Authority
CN
China
Prior art keywords
power
unit
feedforward amount
larger
power deviation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510142682.4A
Other languages
Chinese (zh)
Other versions
CN104852402B (en
Inventor
王兰忠
王斌
穆凤库
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Zhuozhou Jingyuan Thermal Electricity Co ltd
Beijing Jingneng Power Co Ltd
Original Assignee
Shijingshan Thermoeletric Plant Beijing Jingneng Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shijingshan Thermoeletric Plant Beijing Jingneng Power Co Ltd filed Critical Shijingshan Thermoeletric Plant Beijing Jingneng Power Co Ltd
Priority to CN201510142682.4A priority Critical patent/CN104852402B/en
Publication of CN104852402A publication Critical patent/CN104852402A/en
Application granted granted Critical
Publication of CN104852402B publication Critical patent/CN104852402B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Turbines (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a system and method for adjusting a unit feedforward quantity. The method includes: a preset load is differentiated; the differentiated preset load is multiplied by a power deviation factor, and a feedforward quantity of a unit is adjusted according to actual power of the unit; and the power of the preset load is preset power required by a power grid. The method multiplies the differentiated preset load by the power deviation factor, and adjusts the feedforward quantity of the unit according to actual power of the unit, designs a steam turbine feedforward soft landing logic to enable the feedforward amount to be flexible, the feedforward quantity is changed with a load variation, and the load rapidly and stably follows an instruction to change.

Description

A kind of regulating system of unit feedforward amount and method
Technical field
The invention belongs to power grid control technical field, be specifically related to a kind of regulating system and method for unit feedforward amount.
Background technology
In pool, automatic generation control (AGC) requires that power plants generating electricity unit carries out fast electrical network AGC instruction, stationary response, controls to maintain system frequency for rated value the numerical value that the exchange power on this area and other interval interconnections specifies for agreement simultaneously.
In order to allow unit fast and stationary response dispatching of power netwoks AGC instruction, each power plant generally increases the feedforward of steam turbine pitch in logical design, allows steam turbine pitch with load instruction change response fast.Current each power plant steam turbine pitch adopts fixing feedforward, because load variations amount is indefinite, so use fixing feedforward amount easily to cause load overshoot or concussion, is difficult to stablize.
Summary of the invention
For defect of the prior art, the invention provides a kind of regulating system and method for unit feedforward amount, the method design steam turbine feedforward soft landing logic, to make feedforward amount " work ", changes feedforward amount size with load variations amount size, makes load fast and stable follow instruction change.
First aspect, the invention provides a kind of control method of unit feedforward amount, comprising:
Differential is carried out to default load;
By the default load after differential and power deviation multiplication, regulate according to the real feedforward amount of power to unit of sending out of unit;
Wherein, the predetermined power of described default load needed for electrical network.
Optionally, the predetermined power of described power deviation coefficient needed for electrical network and described reality send out the difference coefficient of power.
Optionally, describedly to regulate according to the real feedforward amount of power to unit of sending out of unit, comprising:
Described feedforward amount changes with power deviation size.
Optionally, described feedforward amount changes with power deviation size, comprising:
Described power deviation is larger, and described feedforward amount is larger; Described power deviation is less, and described feedforward amount is less.
Optionally, described feedforward amount is larger, and the porthole aperture of described unit is larger; Described feedforward amount is less, and the porthole aperture of described unit is less.
Second aspect, present invention also offers a kind of regulating system of unit feedforward amount, described system comprises:
Differential module, for carrying out differential to default load;
Adjustment module, for by the default load after differential and power deviation multiplication, regulates according to the real feedforward amount of power to unit of sending out of unit;
Wherein, the predetermined power of described default load needed for electrical network.
Optionally, the predetermined power of described power deviation coefficient needed for electrical network and described reality send out the difference coefficient of power.
Optionally, described adjustment module, specifically for:
Described feedforward amount changes with power deviation size.
Optionally, described adjustment module, specifically for:
Described power deviation is larger, and described feedforward amount is larger; Described power deviation is less, and described feedforward amount is less.
Optionally, described feedforward amount is larger, and the porthole aperture of described unit is larger; Described feedforward amount is less, and the porthole aperture of described unit is less.
As shown from the above technical solution, the regulating system of a kind of unit feedforward amount provided by the invention and method, the method is by the default load after differential and power deviation multiplication, regulate according to the real feedforward amount of power to unit of sending out of unit, design steam turbine feedforward soft landing logic is to make feedforward amount " work ", change feedforward amount size with load variations amount size, make load fast and stable follow instruction change.
In specification of the present invention, describe a large amount of detail.But can understand, embodiments of the invention can be put into practice when not having these details.In some instances, be not shown specifically known method, structure and technology, so that not fuzzy understanding of this description.
Last it is noted that above each embodiment is only in order to illustrate technical scheme of the present invention, be not intended to limit; Although with reference to foregoing embodiments to invention has been detailed description, those of ordinary skill in the art is to be understood that: it still can be modified to the technical scheme described in foregoing embodiments, or carries out equivalent replacement to wherein some or all of technical characteristic; And these amendments or replacement, do not make the essence of appropriate technical solution depart from the scope of various embodiments of the present invention technical scheme, it all should be encompassed in the middle of the scope of claim of the present invention and specification.
Accompanying drawing explanation
The schematic flow sheet of the control method of a kind of unit feedforward amount that Fig. 1 provides for one embodiment of the invention;
The structural representation of the regulating system of a kind of unit feedforward amount that Fig. 2 provides for one embodiment of the invention;
The structural representation of the regulating system of a kind of unit feedforward amount that Fig. 3 provides for another embodiment of the present invention.
Embodiment
Below in conjunction with accompanying drawing, the embodiment of invention is further described.Following examples only for technical scheme of the present invention is clearly described, and can not limit the scope of the invention with this.
Fig. 1 shows the schematic flow sheet of the control method of a kind of unit feedforward amount that the embodiment of the present invention provides, and as shown in Figure 1, the method comprises the steps:
101, differential is carried out to default load;
102, by the default load after differential and power deviation multiplication, regulate according to the real feedforward amount of power to unit of sending out of unit;
Wherein, the predetermined power of described default load needed for electrical network.
The predetermined power of above-mentioned power deviation coefficient needed for electrical network and described reality send out the difference coefficient of power.
In above-mentioned steps 102, describedly to regulate according to the real feedforward amount of power to unit of sending out of unit, comprising:
Described feedforward amount changes with power deviation size.
Wherein, described feedforward amount changes with power deviation size, comprising:
Described power deviation is larger, and described feedforward amount is larger; Described power deviation is less, and described feedforward amount is less.
As shown in table 1 is the corresponding relation of power deviation and power deviation coefficient:
Table 1
Power deviation Power deviation coefficient
-220 1
-2 1
-1 0.5
0 0
1 0.5
2 1
220 1
Concrete, described feedforward amount is larger, and the porthole aperture of described unit is larger; Described feedforward amount is less, and the porthole aperture of described unit is less.
As shown in Figure 2, wherein as figure is multiplied by power deviation (actual load instruction and the real difference sending out power) coefficient on the basis that 2. original actual load instruction differential feedovers, when power deviation is larger, feedforward amount is large, real power of sending out reduces gradually close to feedforward amount during load instruction, reach the object of " soft landing ", prevent power toning.
Namely 1. 2. original feedforward be multiplied with picture frame and make feedforward reach soft landing effect, when slowing down gradually close to feedforward during desired value.
Fig. 3 shows the structural representation of the regulating system of a kind of unit feedforward amount that the embodiment of the present invention provides, and as shown in Figure 3, described system comprises: differential module 31 and adjustment module 32.
Differential module 31, for carrying out differential to default load;
Adjustment module 32, for by the default load after differential and power deviation multiplication, regulates according to the real feedforward amount of power to unit of sending out of unit;
Wherein, the predetermined power of described default load needed for electrical network.
The predetermined power of described power deviation coefficient needed for electrical network and described reality send out the difference coefficient of power.
Described adjustment module, specifically for:
Described feedforward amount changes with power deviation size.
Described adjustment module, specifically for:
Described power deviation is larger, and described feedforward amount is larger; Described power deviation is less, and described feedforward amount is less.
Concrete, described feedforward amount is larger, and the porthole aperture of described unit is larger; Described feedforward amount is less, and the porthole aperture of described unit is less.

Claims (10)

1. a control method for unit feedforward amount, is characterized in that, comprising:
Differential is carried out to default load;
By the default load after differential and power deviation multiplication, regulate according to the real feedforward amount of power to unit of sending out of unit;
Wherein, the predetermined power of described default load needed for electrical network.
2. method according to claim 1, is characterized in that, the predetermined power of described power deviation coefficient needed for electrical network and described reality send out the difference coefficient of power.
3. method according to claim 1, is characterized in that, describedly regulates according to the real feedforward amount of power to unit of sending out of unit, comprising:
Described feedforward amount changes with power deviation size.
4. method according to claim 3, is characterized in that, described feedforward amount changes with power deviation size, comprising:
Described power deviation is larger, and described feedforward amount is larger; Described power deviation is less, and described feedforward amount is less.
5. method according to claim 4, is characterized in that, described feedforward amount is larger, and the porthole aperture of described unit is larger; Described feedforward amount is less, and the porthole aperture of described unit is less.
6. a regulating system for unit feedforward amount, is characterized in that, described system comprises:
Differential module, for carrying out differential to default load;
Adjustment module, for by the default load after differential and power deviation multiplication, regulates according to the real feedforward amount of power to unit of sending out of unit;
Wherein, the predetermined power of described default load needed for electrical network.
7. system according to claim 6, is characterized in that, the predetermined power of described power deviation coefficient needed for electrical network and described reality send out the difference coefficient of power.
8. system according to claim 6, is characterized in that, described adjustment module, specifically for:
Described feedforward amount changes with power deviation size.
9. system according to claim 8, is characterized in that, described adjustment module, specifically for:
Described power deviation is larger, and described feedforward amount is larger; Described power deviation is less, and described feedforward amount is less.
10. system according to claim 9, is characterized in that, described feedforward amount is larger, and the porthole aperture of described unit is larger; Described feedforward amount is less, and the porthole aperture of described unit is less.
CN201510142682.4A 2015-03-27 2015-03-27 A kind of regulating system and method for unit feedforward amount Active CN104852402B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510142682.4A CN104852402B (en) 2015-03-27 2015-03-27 A kind of regulating system and method for unit feedforward amount

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510142682.4A CN104852402B (en) 2015-03-27 2015-03-27 A kind of regulating system and method for unit feedforward amount

Publications (2)

Publication Number Publication Date
CN104852402A true CN104852402A (en) 2015-08-19
CN104852402B CN104852402B (en) 2019-09-06

Family

ID=53851841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510142682.4A Active CN104852402B (en) 2015-03-27 2015-03-27 A kind of regulating system and method for unit feedforward amount

Country Status (1)

Country Link
CN (1) CN104852402B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110513158A (en) * 2019-09-04 2019-11-29 黑龙江苑博信息技术有限公司 The Multirate adjusting method of steam turbine feedforward
CN113446073A (en) * 2021-08-11 2021-09-28 内蒙古京隆发电有限责任公司 Fault diagnosis method for high-pressure adjusting valve of steam turbine

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101788809A (en) * 2009-08-17 2010-07-28 杭州和利时自动化有限公司 Coordinated control system (CCS) of large-size circulating fluidized bed boiler (CFBB) unit
CN102255311A (en) * 2011-08-05 2011-11-23 辽宁省电力有限公司 Method for controlling automatic gain control (AGC) set
CN102748080A (en) * 2012-07-03 2012-10-24 山东电力研究院 Main steam pressure change-based thermal power generating unit load control method
CN103174471A (en) * 2013-04-19 2013-06-26 国家电网公司 Parameter-varying load optimization control method of thermal power generating unit
GB2518339A (en) * 1988-11-30 2015-03-25 Stc Submarine Systems Ltd Multi-function adaptive processor

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2518339A (en) * 1988-11-30 2015-03-25 Stc Submarine Systems Ltd Multi-function adaptive processor
CN101788809A (en) * 2009-08-17 2010-07-28 杭州和利时自动化有限公司 Coordinated control system (CCS) of large-size circulating fluidized bed boiler (CFBB) unit
CN102255311A (en) * 2011-08-05 2011-11-23 辽宁省电力有限公司 Method for controlling automatic gain control (AGC) set
CN102748080A (en) * 2012-07-03 2012-10-24 山东电力研究院 Main steam pressure change-based thermal power generating unit load control method
CN103174471A (en) * 2013-04-19 2013-06-26 国家电网公司 Parameter-varying load optimization control method of thermal power generating unit

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
朱剑英: "330MW供热机组AGC和一次调频控制策略分析及优化", 《电力与能源》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110513158A (en) * 2019-09-04 2019-11-29 黑龙江苑博信息技术有限公司 The Multirate adjusting method of steam turbine feedforward
CN113446073A (en) * 2021-08-11 2021-09-28 内蒙古京隆发电有限责任公司 Fault diagnosis method for high-pressure adjusting valve of steam turbine
CN113446073B (en) * 2021-08-11 2023-03-24 内蒙古京隆发电有限责任公司 Fault diagnosis method for high-pressure adjusting valve of steam turbine

Also Published As

Publication number Publication date
CN104852402B (en) 2019-09-06

Similar Documents

Publication Publication Date Title
CN103208803B (en) Reactive voltage optimal control method for wind electricity and photo-electricity integrated grid connection
CN107276096B (en) A kind of distribution network voltage control method of photovoltaic and air conditioner load coordination optimization
CN102361330B (en) Active power optimizing and distributing method for wind generator unit of wind power station
CN105978043B (en) Photovoltaic plant multi-inverter active power controller method
CN105135409B (en) Supercritical unit boiler master controller control method based on primary frequency modulation action amplitude
CN104124714B (en) A kind of grid-connected Poewr control method of distributed power source, Apparatus and system
CN104637557A (en) Feedforward-feedback composite control method and system for pressure and liquid level of nuclear power station voltage stabilizer
CN107171368A (en) The wind-power electricity generation primary frequency function implementation method controlled based on wind power
CN110854935B (en) Photovoltaic power station active power automatic control method with sample plate inverter
CN105226700B (en) Primary frequency modulation control method and device based on valve flow characteristic dynamic adjustment
CN103713613A (en) Method for achieving optimizing control of load of thermal power generating unit in PROPR mode
CN108336768B (en) Wind power plant active power optimization control method
CN104993502A (en) Primary frequency modulation realization method in power closed loop mode and device thereof
CN104852402A (en) System and method for adjusting unit feedforward quantity
CN104319783A (en) System and method for two-level distribution network coordination control based on load forecasting
CN105978031A (en) Method and system for conducting active and reactive coordinated control on photovoltaic device
US11262713B2 (en) Method for calculating control parameters of heating supply power of heating network
CN107968442A (en) A kind of power forecasting method in the new energy region based on Rolling optimal strategy
CN108808713B (en) Industrial heat load control system and method for improving new energy power generation absorption capacity
CN104852391B (en) Photovoltaic plant reactive-load compensation method, device, photovoltaic DC-to-AC converter and photovoltaic plant
CN104967127A (en) Rapid voltage adjusting method of microgrid in off-network state
CN105974800B (en) A kind of feedback feedforward control system
CN105356496B (en) A kind of real-time generation schedule preparation method considering security constraint
CN105429181A (en) Automatic photovoltaic power station active power control method
CN108054777B (en) Wind power hydrogen production control strategy generation method and device, storage medium and computing equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Wang Bin

Inventor after: Li Gang

Inventor after: Liang Guojie

Inventor after: Mu Fengku

Inventor after: Wang Lanzhong

Inventor after: Cheng Gang

Inventor before: Wang Lanzhong

Inventor before: Wang Bin

Inventor before: Mu Fengku

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20180411

Address after: 072750 Zhuozhou City, Hebei Province, East Xian Po Town

Applicant after: HEBEI ZHUOZHOU JINGYUAN THERMAL ELECTRICITY CO., LTD.

Address before: 100041 Guangning Road, Shijingshan District, Shijingshan District, Beijing

Applicant before: SHIJINGSHAN THERMOELETRIC PLANT, BEIJING JINGNENG POWER CO., LTD.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200805

Address after: 072750, Baoding, Hebei province Zhuozhou City East cents slope town

Co-patentee after: Beijing Jingneng Electric Power Co.,Ltd.

Patentee after: HEBEI ZHUOZHOU JINGYUAN THERMAL ELECTRICITY Co.,Ltd.

Address before: 072750 Zhuozhou City, Hebei Province, East Xian Po Town

Patentee before: HEBEI ZHUOZHOU JINGYUAN THERMAL ELECTRICITY Co.,Ltd.

TR01 Transfer of patent right