Ventilator impeller embedment ceramic manufacturing method Download PDFInfo
- Publication number
- CN104847693A CN104847693A CN201510139784.0A CN201510139784A CN104847693A CN 104847693 A CN104847693 A CN 104847693A CN 201510139784 A CN201510139784 A CN 201510139784A CN 104847693 A CN104847693 A CN 104847693A
- Authority
- CN
- China
- Prior art keywords
- ceramic
- steel clamp
- steel
- embedded
- fan
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
Disclosed is a ventilator impeller embedment ceramic manufacturing method. Compared with metal materials, ceramic materials have the performance advantages of being high in hardness and strength, and resistant to high temperature, abrasion, corrosion and oxidation and the like. According to the traditional ceramic sticking technology, due to the fact that an adhesive loses efficacy when aged at high temperature and ceramic chips are affected by medium impact loads, the ceramic chips are likely to be disengaged, and the wear resistance of a fan is lowered. The invention provides wear-resisting ceramic embedded on the working face of a fan impeller and the manufacturing method thereof so as to solve the problems and achieve the better using effect. Special embedded ceramic blocks are obtained according to the structural design of the fan, and an embedment ceramic steel clamp is designed. By means of plug welding of the steel clamp, the ceramic blocks are embedded and stuck through an adhesive, the composite material of the wear-resisting ceramic embedded on the working face of the fan is obtained, and the technical requirements for abrasion resistance, high temperature resistance, impact resistance and disengagement prevention are met, so that the service life of the ventilator is greatly prolonged, the cost is lowered, and benefits are created.
Description
Technical field
The invention belongs to composite abrasion resistance material field, be specifically related to a kind of preparation method inlaying wear-resistant ceramic on industrial centrifugal fan impeller working surface.
Background technique
A kind of main power equipment that the industries such as industrial centrifugal ventilator (hereinafter referred to as blower fan) is building materials, metallurgy, cement are commonly used, due in working medium containing a certain amount ofly differing in size, different consubstantiality particle, these blower fans work in various medium stream, medium in air-flow carries out serious wearing and tearing to blower fan, and the nonuniformity of wearing and tearing, the dynamic balancing of fan rotor group is destroyed, fan casing is caused to vibrate, thus shortening the service life of blower fan, severe patient can cause the improper running of blower fan.In order to realize the Effec-tive Function of blower fan, eliminating the potential safety hazard existed, extending the working life of blower fan, the abrasion mechanism of research blower fan, selects rational process technology scheme to seem particularly important.
Main employing various surface abrasion resistance technology, such as composite board welding connection technology, base material technique for overlaying, plasma spray technology, pasted with ceramic veneer chip technology etc. during current blower fan manufactures.There is composite sheet and gain in weight in above-mentioned wear-proof technique, the built-up welding life-span is short, and thermal spraying wears no resistance, and pasted with ceramic veneer cannot be high temperature resistant.Therefore develop new blower fan wear-proof technique, in ventilator industry, seem particularly important.
Along with the harshness day by day of blower fan applying working condition, urgent to high temperature resistant, corrosion-resistant, anti abrasive ventilation fan working surface treatment technology demand.
Summary of the invention
For the problems referred to above, the invention provides one and there is high hardness, high strength, high temperature resistant, wear-resistant, corrosion-resistant, the anti-oxidant ceramic embedded preparation method of fan impeller waiting feature performance benefit.
Object of the present invention is realized by following technical proposals.
The ceramic embedded preparation method of a kind of fan impeller, comprising:
(1) blower fan working surface is inlayed steel clamp and is designed and produced, and blower fan working surface steel clamp is wedge plug weld groove stamping-out standard piece; Fan blade head steel clamp is I shape splicing weldering processing criterion part;
(2) ceramic embedded blocks design makes, and impeller uses ceramic embedded piece be designed to four classes by citation form, i.e. basic ceramic block, the ceramic clamp of blade head, weld seam protection dedicated ceramic block, extended type ceramic block;
(3) the sub-frock making of Weldable Steel fabrication, location steel fabrication is at the relative position of draught fan impeller working surface;
(4) steel clamp welding, comprises
1. adopt isoamyl acetate C7H14O2 soaking and washing before the welding of steel clamp, with wash with;
2. strictly by mosaic arrangements flow sheet combination steel clamp, adopt special tooling location during combination, the intercepting of steel clamp length direction, adopt angular grinding wheel cutting;
3. the spreading of steel clamp on mosaic surface, when joint alignment tolerance is lower than 1mm, reconditioning is concordant; When alignment tolerance is greater than 1mm, dismounting reconfigures;
4. before the welding of steel clamp, with δ 1 ~ 3mm, the asbestos sliver of wide about 14mm embeds between steel clamp and prevents from splashing; Gas is adopted to protect weldering welding plug welding groove.
Whether 5. steel clamp upper surface is polished by postwelding, and check between draw-in groove clean;
(5) ceramic embedded piece install and bonding, comprise
1. allocate binder, binder is scraped be put between steel clamp with steel clamp surface;
2. assemble ceramic block by ceramic embedded technology arrangement figure, requiring should be tight between ceramic block;
3. mosaic surface local (as wedge angle, the place such as to turn round) is pasted by repair extended type ceramic block;
4. the solidification of ceramic embedded piece, under 25 DEG C of environment, 8 ~ 12h completes the basic solidification of binder;
5. regelate, after substantially having solidified, has carried out regelate, leaves standstill 1 ~ 2 day under normal temperature condition, or adopts the way of heating to shorten the regelate time, and the temperature of heating controls within the scope of 100 DEG C, and the time is not less than 4h;
6. binder is selected, and ceramic embedded piece of special bonding agent has two kinds, and less than 160 DEG C adopt DB8180 to make binder; 160 ~ 320 DEG C of scopes then select FSN-12 coating to make binder.
Preferably, blower fan working surface steel clamp passes through design specialized punch die and machine shaping, and blower fan working surface steel clamp materials require that single rolled steel plate thickness difference must meet category-B tolerance, continuous-milling steel plate thickness meets PT.A class precision (GB T709-2006) in employing.
Preferably, abrasion-proof ceramic block adopts Al2O3 corundum ceramic, and its Al2O3 content must not lower than 95%.
Preferably, in basic solidification process, adopt iodine tungste filament lamp or other large-power lamp to irradiate and heat.
The present invention has the following advantages and beneficial effect compared to existing technology:
1, ceramic embedded can to meet operating mode wear-resisting for blower fan, and high temperature resistant (temperature is lower than 320 DEG C), shock-resistant requirement, can solve again the caducous bottleneck of pasted with ceramic veneer.
2, ceramic embedded piece and steel pottery clamp wedge-shaped design, install easily, even if use binder aging, ceramic block is also not easy to come off, and safety reliability is good.
3, add service life of fan largely, facilitate the repair process of ventilator later stage and blower fan to manufacture again.
Accompanying drawing explanation
Fig. 1 of the present inventionly inlays steel clamp punch die schematic diagram;
Fig. 2 is wedge shape steel clamp first embodiment partial view of the present invention;
Fig. 3 is wedge shape steel clamp second embodiment partial view of the present invention;
Fig. 4 is ceramic embedded block of extended type ceramic plate of the present invention configuration design;
Fig. 5 is ceramic embedded piece of basic ceramic plate configuration design of the present invention;
Fig. 6 is ceramic embedded build portion pottery clamp configuration design of the present invention;
Fig. 7 is ceramic embedded piece of weld seam protection configuration design of the present invention;
Fig. 8 is Weldable Steel fabrication of the present invention sub-special tooling design diagram;
Fig. 9 is the sub-partial illustrations of blower fan working surface Weldable Steel fabrication of the present invention;
Figure 10 is that fan impeller blade of the present invention inlays wear-resistant ceramic partial illustrations.
Drawing reference numeral
Steel clamp 1 asbestos slate 2
Embodiment
Below in conjunction with embodiment and accompanying drawing, the present invention is described in further detail, but the specific embodiment of the present invention is not limited thereto.
Object of the present invention is exactly that stupalith is compared with metallic material, there is high hardness, high strength, high temperature resistant, wear-resistant, corrosion-resistant, anti-oxidant feature performance benefit such as grade, tradition pasted with ceramic veneer technology, lost efficacy because of binder high temperature ageing and be subject to the effect of media impingement load, ceramic plate easily comes off, and reduces the wear resistance of blower fan.Now provide one on draught fan impeller working surface, inlay wear-resistant ceramic and preparation method thereof can solve the problem, reach good using effect.
The present invention gives chapter and verse specific ceramic embedded piece of blower fan structure design, and designs ceramic embedded steel clamp.By the plug welding of steel clamp, ceramic block adopts alite paste mosaic bonding, obtains the composite inlaying wear-resistant ceramic at blower fan working surface, reaches technical requirements that is wear-resistant, high temperature resistant, shock-resistant, Drop-proof.Thus greatly promote the working life of ventilator, reduce costs, create beneficial result.
For achieving the above object, the present invention adopts following technological scheme:
A kind of on draught fan impeller working surface, inlay wear-resistant ceramic and preparation method thereof, comprise blower fan working surface and inlay steel clamp and design and produce, ceramic embedded blocks design makes, the sub-frock making of Weldable Steel fabrication, and the welding of steel clamp and ceramic embedded piece are installed and bonding.
(1) inlay the design of steel clamp: blower fan working surface steel clamp is wedge plug weld groove stamping-out standard piece; Fan blade head steel clamp is I shape splicing weldering processing criterion part, refers to accompanying drawing 1.Blower fan working surface steel clamp passes through design specialized punch die and machine shaping, and blower fan working surface steel clamp materials require that single rolled steel plate thickness difference must meet category-B tolerance, continuous-milling steel plate thickness meets PT.A class precision (GB T709-2006) in employing
(2) ceramic embedded blocks design: impeller uses ceramic embedded piece be designed to four classes by citation form: basic ceramic block, the ceramic clamp of blade head, weld seam protection dedicated ceramic block, extended type ceramic block, refers to accompanying drawing 2.Abrasion-proof ceramic block adopts Al2O3 corundum ceramic, and its Al2O3 content must not lower than 95%, and its main performance index is in shown in Table.
(3) the sub-special tooling design of Weldable Steel fabrication: the design of special welding steel clamp frock, greatly enhance manufacturing schedule, of location steel fabrication is more accurately at the relative position of draught fan impeller working surface, and avoid relative error to cause the installation of ceramic embedded piece, Fixture Design refers to accompanying drawing 3.
(4) the welding of steel clamp refers to accompanying drawing 4, comprises the following steps:
1. steel clamp welding before adopt banana oil (isoamyl acetate C7H14O2) soaking and washing, with wash with.
2. strictly by mosaic arrangements flow sheet combination steel clamp, special tooling location is adopted during combination, clamp point postwelding.Note the gang welding of steel clamp and the assembling sequence of ceramic block.When steel clamp length direction needs to intercept, angular grinding wheel can only be adopted to cut, forbid to intercept at clamp plug welding groove place.
3. steel clamp needs on mosaic surface during spreading, when joint alignment tolerance is lower than 1mm, allows reconditioning concordant; When alignment tolerance is greater than 1mm, dismounting reconfigures.
4. before the welding of steel clamp, with δ 1 ~ 3mm, the asbestos sliver of wide about 14mm embeds between steel clamp and prevents from splashing.Adopt gas to protect weldering welding plug welding groove, plug welding groove is as the criterion admittedly to weld, and allows plug weld lower than clamp upper surface 1mm.
Whether 5. steel clamp upper surface should be polished by postwelding, and check between draw-in groove clean.
(5) install and bondingly refer to accompanying drawing 5 for ceramic embedded piece, comprising the following steps:
1. allocate binder, binder is scraped be put between steel clamp with steel clamp surface.
2. assemble ceramic block by ceramic embedded technology arrangement figure, require should try one's best between ceramic block closely.
3. mosaic surface local places such as (wedge angle) turning round is pasted by repair extended type ceramic block.
4. the solidification of ceramic embedded piece: under 25 DEG C of environment, 8 ~ 12h can complete the basic solidification of binder, for accelerating the speed of basic solidification in practical operation, iodine tungste filament lamp or other large-power lamp can be adopted to irradiate and heat.
5. regelate: after substantially having solidified, should regelate be carried out.Leave standstill 1 ~ 2 day under normal temperature condition, the way of heating also can be adopted to shorten curing time, and temperature controls within the scope of 100 DEG C, and the time is not less than 4h.
Binder is selected: ceramic embedded piece of special bonding agent has two kinds.Less than 160 DEG C adopt DB8180 to make binder; 160 ~ 320 DEG C of scopes then select FSN-12 coating to make binder.
Introduce the technical process that blower fan is ceramic embedded below:
Draught fan impeller fine finishing → surface treatment → steel clamp welding → overall cleaning → assembling pasted with ceramic veneer block
1. draught fan impeller fine finishing
Draught fan impeller carries out overall school type and fine finishing by drawing technical requirements.
2. draught fan impeller surface treatment
Draught fan impeller, before gang welding steel clamp, adopts the methods such as sanding, shot-peening, spray banana oil to need the various dirts at ceramic embedded position to clean out in impeller.
3. inlay steel clamp combination and weld
Inlaying steel clamp adopts positioning tool to carry out combination plug welding by layout chart.
4. the assembling of ceramic embedded piece is pasted
Select FSN-12 to make binder, allotment binder, and even being scraped by binder is put between adjacent steel fabrication and steel clamp surface.Be slidably installed by each specification type wedge shape ceramic block, adjacent two row's ceramic blocks misplace.
Blower fan of the present invention is ceramic embedded preparation method have the following advantages:
1. ceramic embedded can to meet operating mode wear-resisting for blower fan, and high temperature resistant (temperature is lower than 320 DEG C), shock-resistant requirement, can solve again the caducous bottleneck of pasted with ceramic veneer.
2. ceramic embedded piece and steel pottery clamp wedge-shaped design, install easily, even if use binder aging, ceramic block is also not easy to come off, and safety reliability is good.
3. add service life of fan largely, facilitate the repair process of ventilator later stage and blower fan to manufacture again.
Above-described embodiment is the present invention's preferably mode of execution; but embodiments of the present invention are not restricted to the described embodiments; change, the modification done under other any does not deviate from Spirit Essence of the present invention and principle, substitute, combine, simplify; all should be the substitute mode of equivalence, be included within protection scope of the present invention.
Claims (4)
1. the ceramic embedded preparation method of fan impeller, comprising:
(1) blower fan working surface is inlayed steel clamp and is designed and produced, and blower fan working surface steel clamp is wedge plug weld groove stamping-out standard piece; Fan blade head steel clamp is I shape splicing weldering processing criterion part;
(2) ceramic embedded blocks design makes, and impeller uses ceramic embedded piece be designed to four classes by citation form, i.e. basic ceramic block, the ceramic clamp of blade head, weld seam protection dedicated ceramic block, extended type ceramic block;
(3) the sub-frock making of Weldable Steel fabrication, location steel fabrication is at the relative position of draught fan impeller working surface;
(4) steel clamp welding, comprises
1. adopt isoamyl acetate C7H14O2 soaking and washing before the welding of steel clamp, with wash with;
2. strictly by mosaic arrangements flow sheet combination steel clamp, adopt special tooling location during combination, the intercepting of steel clamp length direction, adopt angular grinding wheel cutting;
3. the spreading of steel clamp on mosaic surface, when joint alignment tolerance is lower than 1mm, reconditioning is concordant; When alignment tolerance is greater than 1mm, dismounting reconfigures;
4. before the welding of steel clamp, with δ 1 ~ 3mm, the asbestos sliver of wide about 14mm embeds between steel clamp and prevents from splashing; Gas is adopted to protect weldering welding plug welding groove.
Whether 5. steel clamp upper surface is polished by postwelding, and check between draw-in groove clean;
(5) ceramic embedded piece install and bonding, comprise
1. allocate binder, binder is scraped be put between steel clamp with steel clamp surface;
2. assemble ceramic block by ceramic embedded technology arrangement figure, requiring should be tight between ceramic block;
3. mosaic surface local (as wedge angle, the place such as to turn round) is pasted by repair extended type ceramic block;
4. the solidification of ceramic embedded piece, under 25 DEG C of environment, 8 ~ 12h completes the basic solidification of binder;
5. regelate, after substantially having solidified, has carried out regelate, leaves standstill 1 ~ 2 day under normal temperature condition, or adopts the way of heating to shorten the regelate time, and the temperature of heating controls within the scope of 100 DEG C, and the time is not less than 4h;
6. binder is selected, and ceramic embedded piece of special bonding agent has two kinds, and less than 160 DEG C adopt DB8180 to make binder; 160 ~ 320 DEG C of scopes then select FSN-12 coating to make binder.
2. the ceramic embedded preparation method of a kind of fan impeller according to claim 1, it is characterized in that: blower fan working surface steel clamp passes through design specialized punch die and machine shaping, blower fan working surface steel clamp materials require that single rolled steel plate thickness difference must meet category-B tolerance, continuous-milling steel plate thickness meets PT.A class precision (GB T709-2006) in employing.
3. the ceramic embedded preparation method of a kind of fan impeller according to claim 1, is characterized in that: abrasion-proof ceramic block adopts Al2O3 corundum ceramic, and its Al2O3 content must not lower than 95%.
4. the ceramic embedded preparation method of a kind of fan impeller according to claim 1, is characterized in that: in basic solidification process, adopts iodine tungste filament lamp or other large-power lamp to irradiate and heats.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510139784.0A CN104847693B (en) | 2015-03-28 | 2015-03-28 | Ventilator impeller embedment ceramic manufacturing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510139784.0A CN104847693B (en) | 2015-03-28 | 2015-03-28 | Ventilator impeller embedment ceramic manufacturing method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104847693A true CN104847693A (en) | 2015-08-19 |
CN104847693B CN104847693B (en) | 2017-02-01 |
Family
ID=53847584
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510139784.0A Active CN104847693B (en) | 2015-03-28 | 2015-03-28 | Ventilator impeller embedment ceramic manufacturing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104847693B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113864247A (en) * | 2021-08-30 | 2021-12-31 | 华能秦煤瑞金发电有限责任公司 | Auxiliary mounting equipment for wear-resistant ceramic wafers |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6445999A (en) * | 1987-08-17 | 1989-02-20 | Mitsubishi Heavy Ind Ltd | Wear resisting use trapezoidal ceramics |
CN2371373Y (en) * | 1999-05-09 | 2000-03-29 | 依凤鸣 | Special ceramic wear-resisting fan |
CN2670638Y (en) * | 2003-06-11 | 2005-01-12 | 冯万春 | Ceramic metal composite impeller |
CN2760307Y (en) * | 2004-12-08 | 2006-02-22 | 株洲电力机械技术公司 | An antiwear device for quick wearing face of material handling equipment |
CN201615085U (en) * | 2010-01-11 | 2010-10-27 | 湖南精城特种陶瓷有限公司 | Fan impeller |
CN202510415U (en) * | 2012-01-10 | 2012-10-31 | 朱正芳 | Embedded and pasted anti-abrasion ceramic chip |
-
2015
- 2015-03-28 CN CN201510139784.0A patent/CN104847693B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6445999A (en) * | 1987-08-17 | 1989-02-20 | Mitsubishi Heavy Ind Ltd | Wear resisting use trapezoidal ceramics |
CN2371373Y (en) * | 1999-05-09 | 2000-03-29 | 依凤鸣 | Special ceramic wear-resisting fan |
CN2670638Y (en) * | 2003-06-11 | 2005-01-12 | 冯万春 | Ceramic metal composite impeller |
CN2760307Y (en) * | 2004-12-08 | 2006-02-22 | 株洲电力机械技术公司 | An antiwear device for quick wearing face of material handling equipment |
CN201615085U (en) * | 2010-01-11 | 2010-10-27 | 湖南精城特种陶瓷有限公司 | Fan impeller |
CN202510415U (en) * | 2012-01-10 | 2012-10-31 | 朱正芳 | Embedded and pasted anti-abrasion ceramic chip |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113864247A (en) * | 2021-08-30 | 2021-12-31 | 华能秦煤瑞金发电有限责任公司 | Auxiliary mounting equipment for wear-resistant ceramic wafers |
CN113864247B (en) * | 2021-08-30 | 2023-06-20 | 华能秦煤瑞金发电有限责任公司 | Auxiliary installation equipment for wear-resistant ceramic plates |
Also Published As
Publication number | Publication date |
---|---|
CN104847693B (en) | 2017-02-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU756894B2 (en) | Brake shoe with insert bonded to backing plate | |
CN104439952B (en) | Machining technology for brake discs of motorcycles and electric vehicles | |
CN204935411U (en) | The emery wheel of the easy chip removal of easy heat radiation | |
CN109233553A (en) | A kind of the abrasion repair coating and restorative procedure of desulfurization slurry pump | |
CN106736232A (en) | A kind of desulfurization slurry circulating pump impeller restorative procedure | |
CN105149360A (en) | Method for rapidly repairing bearing hole of on-line gear box | |
CN103433684A (en) | Online repairing method for bearing position abrasion of main shaft of fan | |
CN202623395U (en) | Inner dovetail type abrasion-resistant ceramic construction member | |
CN204226509U (en) | A kind of Novel powder metallurgy brake lining | |
CN104841626A (en) | Repairing method of metal workpiece | |
CN105750821A (en) | Machining technique for impeller of ventilator | |
CN105773057A (en) | Repair process for bearing base shaft hole | |
CN104847693A (en) | Ventilator impeller embedment ceramic manufacturing method | |
CN106044103A (en) | Quick-replaceable carrier roller | |
CN103056083A (en) | Method for adhering coating to substrate structure | |
CN106002080A (en) | Method for repairing abraded end face of arrester | |
CN104498864A (en) | Repair and refabrication method of coal cutting pick | |
CN105750809A (en) | Repairing technique for impeller of circulating pump | |
CN106334714B (en) | A kind of finishing mill high temperature wear resistant alloy deflector roll and preparation method thereof | |
CN103302444A (en) | Repairing agent and repairing method for mechanical wear | |
CN106089318B (en) | A kind of sealing retaining ring applied to combustion engine | |
CN104308757A (en) | Superhard material metal bond framework type high-speed heavy load grinding wheel | |
CN103692144A (en) | Method for repairing components by aid of mixtures of tungsten carbide particles and resin | |
CN206347055U (en) | Friction piece and automobile brake sheet | |
CN105081685A (en) | Machining method and manufacturing method of air suction grooves of corrugated roller |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |