CN104847060B - Roof long gutter system - Google Patents

Roof long gutter system Download PDF

Info

Publication number
CN104847060B
CN104847060B CN201510172153.9A CN201510172153A CN104847060B CN 104847060 B CN104847060 B CN 104847060B CN 201510172153 A CN201510172153 A CN 201510172153A CN 104847060 B CN104847060 B CN 104847060B
Authority
CN
China
Prior art keywords
long gutter
heating
temperature
permanent magnet
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510172153.9A
Other languages
Chinese (zh)
Other versions
CN104847060A (en
Inventor
肖睿书
李华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Wilson Environmental Protection Science And Technology Development Co Ltd
Original Assignee
Guangxi Wilson Environmental Protection Science And Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Wilson Environmental Protection Science And Technology Development Co Ltd filed Critical Guangxi Wilson Environmental Protection Science And Technology Development Co Ltd
Priority to CN201510172153.9A priority Critical patent/CN104847060B/en
Publication of CN104847060A publication Critical patent/CN104847060A/en
Application granted granted Critical
Publication of CN104847060B publication Critical patent/CN104847060B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention discloses a roof long gutter system. The system comprises a plurality of main grooves with upward openings, and the main grooves are in a head and tail seamless connection to form a long gutter; each main groove is composed of a bottom plate and a pair of side plates which are arranged on two opposite sides of the bottom plate; circular arcs of 20 degrees to 45 degrees are arranged at the connecting positions of the bottom plates and the side plates; a sealing cover is arranged at the draining end of the long gutter, and the shape of the sealing cover is matched with that of the cross section of the draining end of the long gutter; one end, away from the openings, of the long gutter is connected with the sealing cover in contact with the long gutter are connected through a ring, and a first permanent magnet is fixed to the edge of the draining end of the long gutter; a second permanent magnet is fixed to the portion, opposite to the first permanent magnet, of the sealing cover; and two opposite ends of the first permanent magnet and the second permanent magnet are different in magnetism. Smoothness of a pipeline connected with the long gutter is protected, manual slag removing can be achieved, the phenomenon that the long gutter is blocked by ice and snow in winter, and consequently the water flow is not smooth is avoided; the automation control is adopted, the manual adjusting cost is saved, and use is convenient and rapid.

Description

A kind of long gutter system in roof
Technical field
A kind of the present invention relates to industrial delivery room auxiliary equipment, it is more particularly related to the long gutter system in roof.
Background technology
Roof drainage is divided into functional in organized water drainage and free drainage, functional in organized water drainage be usually rainwater collection in groove again by Under rainwater bank of tubes, the groove gathering rainwater is referred to as gutter, and the bottom of trench of gutter is designed with connecting the discharge outlet of rain pipe, gutter Capping closing is all used at two ends, is leaked with rainwater-proof.
Long gutter is usually used in the building such as industrial premises, workshop, warehouse and exhibition center, is the bridge of indoor and outdoor communication Beam, the draining for roof is significant.The effect of heat insulation of long gutter, sealing performance and for winter ice and snow Timely exclusion all particularly significant.
Design a kind of gutter can to there is the long gutter of certain slag removing function there is important meaning according to roof shape combination in any Justice.Meanwhile, sleet can block long gutter in the winter time, a kind of heatable long gutter of invention, accelerates ice dissolution so as to quick flow Logical.
Content of the invention
It is an object of the invention to solving at least the above and/or defect, and provide at least will be described later excellent Point.
It is a still further object of the present invention to provide a kind of long gutter system in roof, prevent winter ice and snow from blocking long gutter, make Current are not smooth, using Automated condtrol, save the expense of manual adjustment, easy to use.
A further object of the invention is to arrange capping in the water side of long gutter, has and necessarily gathers dregs, can be regular The effect cleared up manually, prevents life-time service blocking pipeline.
In order to realize according to object of the present invention and further advantage, there is provided a kind of long gutter system in roof, including The major trough of several opening upwards, passes through head and the tail and is seamlessly connected the long gutter of composition between major trough and major trough,
Described major trough is arranged at described base plate by base plate and a pair and constitutes relative to the side plate on both sides, described base plate and described side Plate junction is in 20 ° of -45 ° of circular arcs;
Vast of heaven ditch water discharge end is provided with capping, the cross section phase at the shape of described capping and described vast of heaven ditch water discharge end Join, described long gutter passes through an annulus and connects away from one end of opening and the capping contacting, described vast of heaven ditch water discharge end Edge is fixed with the first permanent magnet, and the cover portion relative with the first permanent magnet is fixed with the second permanent magnet, described first permanent magnetism The ferrum two ends magnetic relative with described second permanent magnet is different.
Preferably, wherein, also include heating system, described heating system includes:
Control device;
Zone of heating, it is laid on described major trough inwall, is connected with described control device, and described zone of heating is by the first zone of heating Constitute with the second zone of heating;
Temperature detector, it is connected with described zone of heating and control device, and described temperature detector is arranged at described length Gutter discharge ends.
Preferably, wherein, described heating system surface is equipped with proof and electric leakage-proof safety layer.
Preferably, wherein, the proof and electric leakage-proof safety layer surface of described major trough is provided with emulsified asphalt layer.
Preferably, wherein, described emulsified asphalt layer surface is provided with heat-insulation layer, and described heat-insulation layer wraps from inside to outside successively Include thickness than the froth bed for 1:2:1, rubber layer and cement expanded perlite layer.
A kind of heating means of the long gutter system in roof, comprise the following steps:
1) set the critical temperature of long gutter;
2) temperature at detection vast of heaven ditch water discharge end:
When temperature is higher than critical temperature, close heating power supply;
When temperature is less than or equal to critical temperature, starts the first zone of heating, be heated to the first Preset Time, when reaching first After Preset Time, close heating power supply, detect the temperature at vast of heaven ditch water discharge end in the second Preset Time, when presetting according to second The temperature at the vast of heaven ditch water discharge end of interior detection judges whether to continue to heat:
When the long gutter temperature of detection in the second Preset Time is higher than described critical temperature, stop heating;When second is pre- If when the long gutter temperature of time interior detection is less than or equal to described critical temperature, starting the first zone of heating, starting second simultaneously and adding Thermosphere, continues heating to long gutter, until the temperature of long gutter is higher than critical temperature.
Preferably, wherein, described critical temperature is 0 DEG C.
Preferably, wherein, described first Preset Time is 15-30 minute, and described second Preset Time is 1-3 minute.
The present invention at least includes following beneficial effect:
1st, the base plate of major trough is arranged to 20 ° of -45 ° of circular arcs, facilitates rainwater to accelerate its flow velocity when falling in major trough;
2nd, vast of heaven ditch water discharge end setting capping, by the first permanent magnet and the attracting principle of the second permanent magnet heteropole, in rainwater When flow is little, capping and discharge ends are in closed, and in closed, rainwater is stored in long gutter, can through precipitation Manually remove the garbage in long gutter, protect the unobstructed of the pipeline being connected with long gutter;
3rd, intelligent heating system is set, by control device, the first zone of heating, the second zone of heating and temperature detector, can The temperature of the long gutter of Intelligent Recognition, when temperature is less than or equal to critical temperature, is heated to long gutter by control device, plus The thawing of fast ice and snow;
4th, the second zone of heating is set, post bake can be carried out to the ice and snow in long gutter, and add with the first zone of heating simultaneously Heat, shortens heat time heating time.
Part is embodied by the further advantage of the present invention, target and feature by description below, and part also will be by this Invention research and practice and be understood by the person skilled in the art.
Brief description
Fig. 1 is the structural representation of the long gutter system in roof of the present invention;
Fig. 2 is the sectional view of major trough of the present invention.
Specific embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings, to make those skilled in the art with reference to description literary composition Word can be implemented according to this.
It should be appreciated that used herein such as " have ", "comprising" and " inclusion " term do not allot one or many The presence of individual other element or a combination thereof or interpolation.
Fig. 1-Fig. 2 illustrates a kind of way of realization according to the present invention, there is provided a kind of long gutter system in roof, including number The major trough of individual opening upwards, passes through head and the tail and is seamlessly connected to constitute long gutter, the shape according to roof is setting between major trough and major trough Put the connection shape between major trough.
Described major trough is arranged at described base plate by base plate 111 with a pair and constitutes relative to the side plate 110 on both sides, described base plate 111 and described side plate 110 junction be in 30 ° of circular arc;
Vast of heaven ditch water discharge end is provided with capping 130, the shape of described capping 130 and the cross section at described vast of heaven ditch water discharge end Match, described long gutter is connected by an annulus 140 away from one end of opening and the capping contacting, described long gutter Draining end margin is fixed with the first permanent magnet 120, and the cover portion relative with the first permanent magnet 120 is fixed with the second permanent magnet 121, the described first permanent magnet 120 two ends magnetic relative with described second permanent magnet 121 is different.In the little situation of discharge Under, so that current is precipitated in long gutter, can precipitate in the long gutter of labor cleaning, prevent the pipeline being connected with long gutter from blocking up Plug.
Wherein, also include heating system, described heating system includes:
Control device;
Zone of heating, it is laid on described major trough inwall, is connected with described control device, and described zone of heating is by the first zone of heating 152 and second zone of heating 151 constitute.In the present embodiment, the second zone of heating 151 is arranged at the inwall of described major trough, and first adds Thermosphere 152 is arranged on described second zone of heating 151.
Temperature detector 150, it is connected with described zone of heating and control device, and described temperature detector 150 is arranged at Described vast of heaven ditch water discharge end.
Using heating system, after ice and snow enters long gutter, long gutter can be blocked, and unnecessary ice and snow can overflow the vast of heaven Ditch, using heating system, can automatically control the heating of long gutter.
Wherein, described heating system surface is equipped with proof and electric leakage-proof safety layer 153, and setting proof and electric leakage-proof safety layer 153 can be isolated The contact with water for the heating system, prevents electric leakage from causing danger, and can extend the service life of heating system.
Wherein, proof and electric leakage-proof safety layer 153 surface of described major trough is provided with emulsified asphalt layer 112, and emulsified asphalt layer 112 has Effect of waterproof, prevents water immersion heating system as double shielding.
Wherein, described emulsified asphalt layer surface is provided with heat-insulation layer 113, and described heat-insulation layer includes thickness from inside to outside successively Than the froth bed for 1:2:1, rubber layer and cement expanded perlite layer.It is cellular knot inside described cement expanded perlite layer Structure, nontoxic, tasteless, be stale-proof, do not fire, acidproof, alkaline-resisting, it is lightweight, adiabatic and sound absorption qualities are good, and abundant raw materials, valency Lattice are cheap, use safety, easy construction.Long gutter not only can be incubated when using cement expanded perlite layer, makees in factory Also there is in industry certain sound-absorbing effect.It is especially excellent, under dynamic load that rubber has tolerance to cold, wearability, water proofing property and elasticity Heating is few, the good advantage of ageing-resistant performance.
A kind of heating means of the long gutter system in roof, comprise the following steps:
1) set the critical temperature of long gutter;
2) temperature at detection vast of heaven ditch water discharge end:
When temperature is higher than critical temperature, close heating power supply;
When temperature is less than or equal to critical temperature, starts the first zone of heating, be heated to the first Preset Time, when reaching first After Preset Time, close heating power supply, detect the temperature at vast of heaven ditch water discharge end in the second Preset Time, when presetting according to second The temperature at the vast of heaven ditch water discharge end of interior detection judges whether to continue to heat:
When the long gutter temperature of detection in the second Preset Time is higher than described critical temperature, stop heating;When second is pre- If when the long gutter temperature of time interior detection is less than or equal to described critical temperature, starting the first zone of heating, starting second simultaneously and adding Thermosphere, continues heating to long gutter, until the temperature of long gutter is higher than critical temperature.
Wherein, described critical temperature is 0 DEG C.
Wherein, described first Preset Time is 20 minutes, and described second Preset Time is 1 minute.
Although embodiment of the present invention is disclosed as above, it is not restricted to listed in description and embodiment With, it can be applied to various suitable the field of the invention completely, for those skilled in the art, can be easily Realize other modification, therefore under the general concept being limited without departing substantially from claim and equivalency range, the present invention does not limit In specific details with shown here as the legend with description.

Claims (8)

1. the long gutter system in a kind of roof, including the major trough of several opening upwards, passes through the seamless company of head and the tail between major trough and major trough Connect composition long gutter it is characterised in that
Described major trough is arranged at described base plate by base plate and a pair and constitutes relative to the side plate on both sides, and described base plate and described side plate are even Meeting place is in 20 ° of -45 ° of circular arcs;
Vast of heaven ditch water discharge end is provided with capping, and the shape of described capping is matched with the cross section at described vast of heaven ditch water discharge end, institute State and pass through an annulus and connect away from one end of opening and the capping contacting on long gutter, described vast of heaven ditch water discharge end margin is solid Surely there is the first permanent magnet, the cover portion relative with the first permanent magnet is fixed with the second permanent magnet, described first permanent magnet and institute State the relative two ends magnetic of the second permanent magnet different.
2. the long gutter system in roof as claimed in claim 1 is it is characterised in that also include heating system, described heating system Including:
Control device;
Zone of heating, it is laid on described major trough inwall, is connected with described control device, and described zone of heating is by the first zone of heating and Two zones of heating are constituted;
Temperature detector, it is connected with described zone of heating and control device, and described temperature detector is arranged at described long gutter Discharge ends.
3. the long gutter system in roof as claimed in claim 2 it is characterised in that described heating system surface be equipped with anticreep Protective layer.
4. the long gutter system in roof as claimed in claim 3 is it is characterised in that the proof and electric leakage-proof safety layer surface of described major trough sets There is emulsified asphalt layer.
5. the long gutter system in roof as claimed in claim 4 is it is characterised in that described emulsified asphalt layer surface is provided with insulation Layer, described heat-insulation layer includes thickness from inside to outside successively than the froth bed for 1: 2: 1, rubber layer and cement expanded perlite layer.
6. a kind of heating means of the long gutter system in roof as claimed in claim 5 are it is characterised in that comprise the following steps:
1) set the critical temperature of long gutter;
2) temperature at detection vast of heaven ditch water discharge end:
When temperature is higher than critical temperature, close heating power supply;
When temperature is less than or equal to critical temperature, starts the first zone of heating, be heated to the first Preset Time, preset when reaching first After time, close heating power supply, detect the temperature at vast of heaven ditch water discharge end in the second Preset Time, according in the second Preset Time The temperature at the vast of heaven ditch water discharge end of detection judges whether to continue to heat:
When the long gutter temperature of detection in the second Preset Time is higher than described critical temperature, stop heating;When second is default When the long gutter temperature of interior detection is less than or equal to described critical temperature, starts the first zone of heating, start the second zone of heating simultaneously, Heating is continued to long gutter, until the temperature of long gutter is higher than critical temperature.
7. the heating means of the long gutter system in roof as claimed in claim 6 are it is characterised in that described critical temperature is 0 DEG C.
8. the heating means of the long gutter system in roof as claimed in claim 6 are it is characterised in that described first Preset Time is 15-30 minute, described second Preset Time is 1-3 minute.
CN201510172153.9A 2015-04-11 2015-04-11 Roof long gutter system Active CN104847060B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510172153.9A CN104847060B (en) 2015-04-11 2015-04-11 Roof long gutter system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510172153.9A CN104847060B (en) 2015-04-11 2015-04-11 Roof long gutter system

Publications (2)

Publication Number Publication Date
CN104847060A CN104847060A (en) 2015-08-19
CN104847060B true CN104847060B (en) 2017-01-25

Family

ID=53847007

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510172153.9A Active CN104847060B (en) 2015-04-11 2015-04-11 Roof long gutter system

Country Status (1)

Country Link
CN (1) CN104847060B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107989288B (en) * 2017-11-28 2020-10-09 安徽环瑞电热器材有限公司 House heating type snow melting system and using method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1609355A (en) * 2003-10-20 2005-04-27 梁彬 Drainage pipeline outlet non-return closure
JP2005180098A (en) * 2003-12-22 2005-07-07 Matsushita Electric Works Ltd Gutter structure
CN201460057U (en) * 2009-09-09 2010-05-12 徐谦 Metal downpipe system
CN101851988A (en) * 2010-05-18 2010-10-06 刘树伟 Gutter snow melting plate
CN201817982U (en) * 2010-07-02 2011-05-04 天津市建工工程总承包有限公司 Shield for spillway of outer wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1609355A (en) * 2003-10-20 2005-04-27 梁彬 Drainage pipeline outlet non-return closure
JP2005180098A (en) * 2003-12-22 2005-07-07 Matsushita Electric Works Ltd Gutter structure
CN201460057U (en) * 2009-09-09 2010-05-12 徐谦 Metal downpipe system
CN101851988A (en) * 2010-05-18 2010-10-06 刘树伟 Gutter snow melting plate
CN102080430A (en) * 2010-05-18 2011-06-01 刘树伟 Gutter snow melting system and snow melting control method thereof
CN201817982U (en) * 2010-07-02 2011-05-04 天津市建工工程总承包有限公司 Shield for spillway of outer wall

Also Published As

Publication number Publication date
CN104847060A (en) 2015-08-19

Similar Documents

Publication Publication Date Title
US20070205308A1 (en) Snow removal device
CN103114685A (en) Automatic snow removing device of roof
CN201433776Y (en) Dual-source heat supply type back-pasting drainable water-stop
CN101566073B (en) Dual-source heat-supply water-drainage antifreezing method for construction joint of tunnel in cold area
CN104847060B (en) Roof long gutter system
CN102297490A (en) Roof wind-sheltering adjustable lighting ventilator
CA1206394A (en) Method and device for reducing the risk of freezing of surface-water pipe-line systems
CN208329394U (en) A kind of roof drainage of the green plant of band
CN108193707A (en) A kind of comprehensive pipe gallery structure
CN208396162U (en) A kind of thermal isolation by water storage roofing
CN204691103U (en) A kind of roof vast of heaven trench system
CN206723658U (en) A kind of air conditioning wind pipe transformed by industrial smoke discharging pipe
JPH10160089A (en) Antifreezing device for pipe
CN213234045U (en) Energy-saving snow melting device
CN104005503A (en) Plane roof modularized structure
CN211525813U (en) Natural gas emptying riser rainproof device
CN206428901U (en) A kind of compound heat insulation house surface of upside-down waterproof layer
CN112962913A (en) Pipe ditch structure of ice rink
US20170051509A1 (en) Ice Concentration Prevention Mechanism
CN212248504U (en) Building water supply and drainage pipeline protector
CN110409620A (en) A kind of bicircular arcs curved walls go along with sb. to guard him node and dividing method
RU2375529C2 (en) Device for protecting water outlet systems of roofs against ice formation
KR100404377B1 (en) A bottom insulating material having a draining function
CN209779687U (en) Public toilet system under high and cold open air
CN202194314U (en) Drainage channel structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant