CN104843606A - 安装提示灯的电力铁塔维护用设备及其使用方法 - Google Patents

安装提示灯的电力铁塔维护用设备及其使用方法 Download PDF

Info

Publication number
CN104843606A
CN104843606A CN201510210348.8A CN201510210348A CN104843606A CN 104843606 A CN104843606 A CN 104843606A CN 201510210348 A CN201510210348 A CN 201510210348A CN 104843606 A CN104843606 A CN 104843606A
Authority
CN
China
Prior art keywords
installation portion
box
equipment
vertical post
warning light
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510210348.8A
Other languages
English (en)
Inventor
李常明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510210348.8A priority Critical patent/CN104843606A/zh
Publication of CN104843606A publication Critical patent/CN104843606A/zh
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F7/00Lifting frames, e.g. for lifting vehicles; Platform lifts
    • B66F7/06Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported by levers for vertical movement
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F7/00Lifting frames, e.g. for lifting vehicles; Platform lifts
    • B66F7/28Constructional details, e.g. end stops, pivoting supporting members, sliding runners adjustable to load dimensions

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Wind Motors (AREA)

Abstract

一种安装提示灯的电力铁塔维护用设备(8)及其使用方法,用于在维护电力铁塔(9)时沿着所述电力铁塔(9)的竖直柱(91)而升降式运送维护器材,包括:上箱体(7)以及下箱体(6),上箱体(7)和下箱体(6)靠近所述竖直柱(91)的一侧分别为上紧固安装部(73)和下紧固安装部(63),用以可拆卸地与所述竖直柱(91)固定连接,上箱体(7)和下箱体(6)与各自的紧固安装部相对的另一侧分别为上器材储存空腔(71)和下器材储存空腔(61)。

Description

安装提示灯的电力铁塔维护用设备及其使用方法
技术领域
本发明涉及电力输电用铁塔领域,具体涉及安装提示灯的电力铁塔维护用设备及其使用方法。
背景技术
输电用铁塔在使用过程中需要工人攀爬进行各种维护作业。在铁塔的建造阶段以及后期拆除阶段也可能需要工人攀爬进行各种作业。但是,工人攀爬过程中,不便携带重量较重的维护用器材。而且,携带的器材也容易造成作业过程中的不安全隐患。
发明内容
本发明的目的在于提供一种安装提示灯的电力铁塔维护用设备及其使用方法,能够克服现有技术的上述缺陷。
根据本发明,一种安装提示灯的电力铁塔维护用设备,用于在维护电力铁塔时沿着所述电力铁塔的竖直柱而升降式运送维护器材,包括:上箱体以及下箱体,上箱体和下箱体靠近所述竖直柱的一侧分别为上紧固安装部和下紧固安装部,用以可拆卸地与所述竖直柱固定连接,上箱体和下箱体与各自的紧固安装部相对的另一侧分别为上器材储存空腔和下器材储存空腔,用于储存所述维护器材;所述上箱体和下箱体在各自的紧固安装部与器材储存空腔之间分别为上驱动部和下驱动部,其中,所述上驱动部在靠近上器材储存空腔处安装有驱动电机,下驱动部在靠近下器材储存空腔处安装有驱动螺母,所述驱动电机与驱动丝杠动力连接,所述驱动丝杠与所述驱动螺母螺纹配合,所述上驱动部在靠近上紧固安装部处固定安装有排状导向杆,所述排状导向杆由多根竖直取向的导向杆排列而成,所述下驱动部在靠近下紧固安装部处设置有与所述排状导向杆对应的孔组,用以与所述排状导向杆滑动配合;所述驱动丝杠在靠近所述驱动电机处通过双向推力轴承而与上驱动部的壳体连接;所述上箱体和下箱体右端面上分别安装有上提示灯和下提示灯,所述下箱体上端面上安装有提示灯触碰开关,所述上箱体下端面安装有触发开关,所述触发开关与所述提示灯触碰开关接触后,所述上提示灯和下提示灯便会亮起,以提示电力工作人员对上紧固安装部和下紧固安装部进行调节。
如上述安装提示灯的电力铁塔维护用设备的使用方法,其中,首先维护工人将上紧固安装部与所述竖直柱紧固连接,将下紧固安装部松开,由此,所述驱动电机驱动所述驱动丝杠旋转,以通过与所述驱动螺母的螺纹配合而使得所述下箱体沿着所述排状导向杆上升;之后,将上紧固安装部与所述竖直柱的连接松开,将下紧固安装部与所述竖直柱之间紧固连接,所述驱动电机驱动所述驱动丝杠旋转,以通过与所述驱动螺母的螺纹配合而使得所述上箱体上升并一同带动所述排状导向杆在所述孔组的导向下上升。
通过本发明,由于采用了一拉一顶两种模式的上述方式,能够在无需其他起重设备的条件下沿着铁塔的竖直柱行走,因此能够节省起重设备的成本。而通过排状导向柱的设置,其能够最大限度保证上箱体和下箱体之间的相对稳固性,在防止电机启动时反作用力导致的旋转的同时,能够起到抵抗由于所存储的器材的重量而导致的倾覆力矩。整个设备运行可靠,结构稳固,而且降低了成本。
附图说明
图1是本发明的电力铁塔以及维护用设备的整体结构示意图;
图2是图1中的维护用设备的具体结构示意图,其中,上箱体处于紧固状态,下箱体处于松开状态;此时下箱体可被螺杆旋转造成的拉力而提升;
图3是图2中的维护用设备在上箱体处于松开状态而下箱体处于紧固状态的示意图;此时,下箱体已被提升到位,并且上箱体可被螺旋旋转造成的顶力而推升。
图4示出了排状导向杆的结构示意图。
图5示出了螺杆处的双向推力轴承处的示意图。
具体实施方式
下面结合图1-5对本发明进行详细说明。
参照图1,安装提示灯的电力铁塔维护用设备8,用于在维护电力铁塔9时沿着所述电力铁塔9的竖直柱91而升降式运送维护器材。
参照图2,所述设备8包括:上箱体7以及下箱体6,上箱体7和下箱体6靠近所述竖直柱91的一侧分别为上紧固安装部73和下紧固安装部63,用以可拆卸地与所述竖直柱91固定连接,上箱体7和下箱体6与各自的紧固安装部相对的另一侧分别为上器材储存空腔71和下器材储存空腔61,用于储存所述维护器材;所述上箱体7和下箱体6在各自的紧固安装部与器材储存空腔之间分别为上驱动部和下驱动部,其中,所述上驱动部在靠近上器材储存空腔71处安装有驱动电机72,下驱动部在靠近下器材储存空腔61处安装有驱动螺母62,所述驱动电机72与驱动丝杠76动力连接,所述驱动丝杠76与所述驱动螺母62螺纹配合。
所述上驱动部在靠近上紧固安装部73处固定安装有排状导向杆77,所述排状导向杆77由多根竖直取向的导向杆77排列而成,所述下驱动部在靠近下紧固安装部63处设置有与所述排状导向杆77对应的孔组,用以与所述排状导向杆77滑动配合;所述驱动丝杠76在靠近所述驱动电机72处通过双向推力轴承74而与上驱动部的壳体连接;所述上箱体7和下箱体6右端面上分别安装有上提示灯78和下提示灯68,所述下箱体6上端面上安装有提示灯触碰开关79,所述上箱体7下端面安装有触发开关69,所述触发开关69与所述提示灯触碰开关79接触后,所述上提示灯78和下提示灯68便会亮起,以提示电力工作人员对上紧固安装部73和下紧固安装部63进行调节。
根据实施例,上述的安装提示灯的电力铁塔维护用设备8的使用方法,再次参照图2,其中,首先维护工人将上紧固安装部73与所述竖直柱91紧固连接,将下紧固安装部63松开,由此,所述驱动电机72驱动所述驱动丝杠76旋转,以通过与所述驱动螺母62的螺纹配合而使得所述下箱体6沿着所述排状导向杆77上升,,直至下箱体6上升到位,参照图3;之后,参照图3,将上紧固安装部73与所述竖直柱91的连接松开,将下紧固安装部63与所述竖直柱91之间紧固连接,所述驱动电机72驱动所述驱动丝杠76旋转,以通过与所述驱动螺母62的螺纹配合而使得所述上箱体7上升并一同带动所述排状导向杆77在所述孔组的导向下上升。如此循环,以最终使得设备8在使用过程中到达需要高度。在需要将设备8下降时,进行相反步骤的操作,从而使得设备8下降需要的高度。
有益地,螺杆与推力轴承接合处设置有两个分开的固定环761和762,以与轴承在双方向上承载地接合。

Claims (2)

1.一种安装提示灯的电力铁塔维护用设备(8),用于在维护电力铁塔(9)时沿着所述电力铁塔(9)的竖直柱(91)而升降式运送维护器材,包括:上箱体(7)以及下箱体(6),上箱体(7)和下箱体(6)靠近所述竖直柱(91)的一侧分别为上紧固安装部(73)和下紧固安装部(63),用以可拆卸地与所述竖直柱(91)固定连接,上箱体(7)和下箱体(6)与各自的紧固安装部相对的另一侧分别为上器材储存空腔(71)和下器材储存空腔(61),用于储存所述维护器材;所述上箱体(7)和下箱体(6)在各自的紧固安装部与器材储存空腔之间分别为上驱动部和下驱动部,其中,所述上驱动部在靠近上器材储存空腔(71)处安装有驱动电机(72),下驱动部在靠近下器材储存空腔(61)处安装有驱动螺母(62),所述驱动电机(72)与驱动丝杠(76)动力连接,所述驱动丝杠(76)与所述驱动螺母(62)螺纹配合,所述上驱动部在靠近上紧固安装部(73)处固定安装有排状导向杆(77),所述排状导向杆(77)由多根竖直取向的导向杆(77)排列而成,所述下驱动部在靠近下紧固安装部(63)处设置有与所述排状导向杆(77)对应的孔组,用以与所述排状导向杆(77)滑动配合;所述驱动丝杠(76)在靠近所述驱动电机(72)处通过双向推力轴承(74)而与上驱动部的壳体连接;所述上箱体(7)和下箱体(6)右端面上分别安装有上提示灯(78)和下提示灯(68),所述下箱体(6)上端面上安装有提示灯触碰开关(79),所述上箱体(7)下端面安装有触发开关(69),所述触发开关(69)与所述提示灯触碰开关(79)接触后,所述上提示灯(78)和下提示灯(68)便会亮起,以提示电力工作人员对上紧固安装部(73)和下紧固安装部(63)进行调节。
2.如权利要求1所述的安装提示灯的电力铁塔维护用设备(8)的使用方法,其中,首先维护工人将上紧固安装部(73)与所述竖直柱(91)紧固连接,将下紧固安装部(63)松开,由此,所述驱动电机(72)驱动所述驱动丝杠(76)旋转,以通过与所述驱动螺母(62)的螺纹配合而使得所述下箱体(6)沿着所述排状导向杆(77)上升;之后,将上紧固安装部(73)与所述竖直柱(91)的连接松开,将下紧固安装部(63)与所述竖直柱(91)之间紧固连接,所述驱动电机(72)驱动所述驱动丝杠(76)旋转,以通过与所述驱动螺母(62)的螺纹配合而使得所述上箱体(7)上升并一同带动所述排状导向杆(77)在所述孔组的导向下上升。
CN201510210348.8A 2015-04-29 2015-04-29 安装提示灯的电力铁塔维护用设备及其使用方法 Pending CN104843606A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510210348.8A CN104843606A (zh) 2015-04-29 2015-04-29 安装提示灯的电力铁塔维护用设备及其使用方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510210348.8A CN104843606A (zh) 2015-04-29 2015-04-29 安装提示灯的电力铁塔维护用设备及其使用方法

Publications (1)

Publication Number Publication Date
CN104843606A true CN104843606A (zh) 2015-08-19

Family

ID=53843668

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510210348.8A Pending CN104843606A (zh) 2015-04-29 2015-04-29 安装提示灯的电力铁塔维护用设备及其使用方法

Country Status (1)

Country Link
CN (1) CN104843606A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108163777A (zh) * 2016-03-23 2018-06-15 蒋红娟 基于驱动电机的电力铁塔维护用设备及其使用方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005055638A1 (de) * 2005-11-22 2007-06-06 Hiwin Technologies Corp. Spindeleinheit für einen Aufzug
CN201038657Y (zh) * 2007-03-13 2008-03-19 国网北京电力建设研究院 一种输电线路铁塔攀爬机
CN101950939A (zh) * 2010-09-17 2011-01-19 浙江工业大学 铁塔除冰机
CN102407004A (zh) * 2011-10-21 2012-04-11 沈阳建筑大学 多功用自动爬升装置
CN104129447A (zh) * 2014-07-08 2014-11-05 南京工程学院 一种输电塔攀爬机器人及其对输电塔巡检方式
US20150014095A1 (en) * 2013-06-17 2015-01-15 Sky Climber Access Solutions Atlanta Llc Magnetic anchor system for suspension work equipment, method of remotely attaching a suspended work platform to a work structure, and a system and device for same
CN204237531U (zh) * 2014-11-06 2015-04-01 国家电网公司 一种轻型组合式载人登塔装备

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005055638A1 (de) * 2005-11-22 2007-06-06 Hiwin Technologies Corp. Spindeleinheit für einen Aufzug
CN201038657Y (zh) * 2007-03-13 2008-03-19 国网北京电力建设研究院 一种输电线路铁塔攀爬机
CN101950939A (zh) * 2010-09-17 2011-01-19 浙江工业大学 铁塔除冰机
CN102407004A (zh) * 2011-10-21 2012-04-11 沈阳建筑大学 多功用自动爬升装置
US20150014095A1 (en) * 2013-06-17 2015-01-15 Sky Climber Access Solutions Atlanta Llc Magnetic anchor system for suspension work equipment, method of remotely attaching a suspended work platform to a work structure, and a system and device for same
CN104129447A (zh) * 2014-07-08 2014-11-05 南京工程学院 一种输电塔攀爬机器人及其对输电塔巡检方式
CN204237531U (zh) * 2014-11-06 2015-04-01 国家电网公司 一种轻型组合式载人登塔装备

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108163777A (zh) * 2016-03-23 2018-06-15 蒋红娟 基于驱动电机的电力铁塔维护用设备及其使用方法
CN108163778A (zh) * 2016-03-23 2018-06-15 蒋红娟 一种电力铁塔维护用设备

Similar Documents

Publication Publication Date Title
CN103633581B (zh) 一种多功能电力输电线路用高空作业工作台及使用方法
CN104192729A (zh) 支腿可调节、升降单锁止、吊钩式转动型变电所机电设备安装机构
CN104291223A (zh) 支腿可调节吊钩式升降双锁止变电所机电设备安装机构
CN206318658U (zh) 一种建筑工程用物料提升设备
CN104843606A (zh) 安装提示灯的电力铁塔维护用设备及其使用方法
CN104860160A (zh) 带照明灯功能的电力铁塔维护用设备及其使用方法
CN104773673A (zh) 自清洁且松紧可调的电力铁塔维护用设备及其使用方法
CN104767152A (zh) 带有警示灯的电力铁塔维护用设备及其使用方法
CN204624961U (zh) 高空吊装钢柱梁的自动脱钩吊具
CN104828751A (zh) 使用限位开关的电力铁塔维护用设备及其使用方法
CN209701507U (zh) 一种智能运输系统的水平滑移装置
CN104828675A (zh) 具有限位功能的电力铁塔维护用设备及其使用方法
CN104828739A (zh) 通过风扇散热的电力铁塔维护用设备及其使用方法
CN104828673B (zh) 可自清洁的电力铁塔维护用设备及其使用方法
CN104860159A (zh) 电力铁塔维护用设备及其使用方法
CN104860227A (zh) 具有限位和防震功能的电力铁塔维护用设备及其使用方法
CN104828677A (zh) 运行稳固的电力铁塔维护用设备及其使用方法
CN104925708A (zh) 具有散热功能的电力铁塔维护用设备及其使用方法
CN104201589A (zh) 支腿可调节、升降单锁止、斗篮式转动型变电所机电设备安装机构
CN104261273A (zh) 支腿可调节、升降双锁止、吊钩式转动型变电所机电设备安装机构
CN104779557A (zh) 散热性能良好的电力铁塔维护用设备及其使用方法
CN204079310U (zh) 支腿可调节、升降双锁止、吊钩式转动型变电所机电设备安装机构
CN106884546A (zh) 一种便于润滑的电力铁塔维护用设备的使用方法
CN204046013U (zh) 支腿可调节、升降单锁止、斗篮式转动型变电所机电设备安装机构
CN104828676A (zh) 低噪音的电力铁塔维护用设备及其使用方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150819