CN104842471A - Impregnating vessel and FRP (Fiber Reinforced Plastic) bar preparation device with same - Google Patents

Impregnating vessel and FRP (Fiber Reinforced Plastic) bar preparation device with same Download PDF

Info

Publication number
CN104842471A
CN104842471A CN201510274858.1A CN201510274858A CN104842471A CN 104842471 A CN104842471 A CN 104842471A CN 201510274858 A CN201510274858 A CN 201510274858A CN 104842471 A CN104842471 A CN 104842471A
Authority
CN
China
Prior art keywords
frp muscle
impregnating vessel
thermosetting resin
frp
heating device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510274858.1A
Other languages
Chinese (zh)
Inventor
高丹盈
房栋
赵军
谷泓学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University
Original Assignee
Zhengzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University filed Critical Zhengzhou University
Priority to CN201510274858.1A priority Critical patent/CN104842471A/en
Publication of CN104842471A publication Critical patent/CN104842471A/en
Pending legal-status Critical Current

Links

Abstract

The invention provides an impregnating vessel and an FRP (Fiber Reinforced Plastic) bar preparation device with the same. The impregnating vessel comprises an impregnating vessel body for containing thermosetting resin and a constant-temperature heating device for heating the impregnating vessel body; the impregnating vessel body is formed in the constant-temperature heating device. According to the impregnating vessel provided by the invention, the impregnating vessel body is heated by the constant-temperature heating device, the temperature of the thermosetting resin is kept constant in the impregnating vessel body and the thermosetting resin is kept having good liquidity for long time at a proper temperature, so that fiber bundles are sufficiently impregnated with glue and a small volume of glue is coated on the fiber bundles and the glue is uniformly coated on the fiber bundles, and thus, fiber content of an FRP bar and a curing speed of a resin matrix are improved, a stacking speed of the thermosetting resin in a heating passage is reduced, tensile resistance of the FRP bar is ensured, the problem of excessively large performance standard deviation is solved and performance and quality of the FRP bar are improved. The invention also relates to the FRP bar preparation device with the impregnating vessel adopting the structure.

Description

Steeping vat and there is the FRP muscle preparation facilities of this steeping vat
Technical field
The present invention relates to a kind of processing unit (plant) of fibrous composite, especially a kind of preparation facilities of civil engineering FRP muscle.
Background technology
Reinforcing bar, as a kind of important construction material, is widely used in Structural Engineering.But a large amount of engineering practices shows, change the use of cryosel, harsh climate condition and other factors and easily cause reinforcing bar and steel strand wires corrosion, durability declines to cause xoncrete structure to occur.Fiber-reinforced polymer (Fiber Reinforced Polymer, being called for short FRP) muscle has the advantages such as high-strength light, corrosion-resistant, underrelaxation and anti-fatigue performance are good, using FRP muscle as vertical muscle, abdomen muscle or presstressed reinforcing steel be used in xoncrete structure, the durability of xoncrete structure can be improved, there is good economic and social benefit.
FRP muscle is made up of with the polymeric matrix two parts with cementation the fiber with drawing-resistant function.Wherein, adopt the FRP muscle of thermosetting resin matrix due to features such as its production equipment are simple, energy consumption is low, be progressively widely applied in civil engineering.The traditional processing technology adopting the FRP muscle of thermosetting resin matrix mainly to adopt pultrusion to be wound around, comprise send yarn, impregnation, shaping, be wound in the process such as rib and heat hardening.Traditional FRP muscle preparation facilities comprises creel, steeping vat, threading board, mould, roll, heat tunnel, hauling machine and the cutting machine that the direction of transfer along FRP muscle sets gradually.But, in the FRP muscle product adopting traditional FRP muscle preparation facilities to produce, part FRP muscle tensile strength is low, and standard deviation is larger, the design of restriction FRP muscle in xoncrete structure and application, simultaneously in the process of producing, in heat tunnel, often easily pile up a large amount of thermosetting resins, affect normally carrying out of FRP muscle production.
In order to solve above Problems existing, people are seeking a kind of desirable technical solution always.
Summary of the invention
Technical staff is through large quantitative analysis, recognize and cause part FRP muscle tensile property deficiency, one of reason that tensile strength standard deviation is larger is the on the low side and skewness of the fiber content in product, a large amount of research and experiment shows, the origin cause of formation of this phenomenon is caused to be: the thermosetting resin mobility in steeping vat is lower and along with the growth of production time, mobility constantly reduces, make thermosetting resin that fibre bundle wraps up too much and degree of steeping is different, thus cause in finished product occur fiber content reduce and problem pockety, simultaneously, after entering heat tunnel, the mobility of thermosetting resin increases fast, before heat cure, lower of a large amount of thermosetting resin, be deposited in heat tunnel, affect the distribution normally carried out with fiber in FRP muscle and matrix that FRP muscle is produced.Therefore, the mobility of the thermosetting resin ensured in steeping vat remains on higher level and keeps constant is the key of dealing with problems.
The object of the invention is for the deficiencies in the prior art, provide a kind of steeping vat, the present invention simultaneously also provides the FRP muscle preparation facilities with this steeping vat.
To achieve these goals, the technical solution adopted in the present invention is: steeping vat, comprise for holding the impregnation cell body of thermosetting resin matrix and the constant temperature heating device for heating impregnation cell body, described impregnation cell body is located in described constant temperature heating device.
Preferably, described constant temperature heating device comprises water tank and heating control system, the electric heater that described heating control system comprises controller, is located at the temperature sensor in described water tank and is located in described water tank, described controller is connected with described temperature sensor sampling, described controller and described electric heater control connection.
Preferably, the described water tank heat-insulation layer that comprises skin, internal layer and be located between inside and outside layer.
Preferably, described heat-insulation layer is asbestos layer or vacuum layer.
Steeping vat hinge structure of the present invention has substantive distinguishing features and progress, specifically, pass through constant temperature heating device, impregnation cell body is heated, thermosetting resin keeps constant temperature in impregnation cell body, thermosetting resin is made to keep good mobility for a long time at a proper temperature, make fibre bundle impregnation abundant, evenly and kiss-coating is less, improve the fiber content of FRP muscle, the uniformity coefficient of fiber and resin distribution and the curing rate with thermosetting resin matrix, reduce the stackeding speed of thermosetting resin in heat tunnel, solve the problem that FRP muscle tensile strength standard deviation is bigger than normal, improve the Performance and quality of FRP muscle.
Further, adopt heating water bath, constant temperature heating device structure is simple, and cost is low and effective.Heating control system can Real-Time Monitoring water temperature, and occurs that change Time Controller is intervened in time by controlling electric heater in water temperature, and automaticity is high, easy to use.
Further, the heat-insulation layer between the inside and outside layer of water tank, can reduce heat loss, economize energy.
FRP muscle preparation facilities, this FRP muscle preparation facilities has the steeping vat of said structure.
Preferably, the heat tunnel of this FRP muscle preparation facilities comprises the low-temperature setting passage, hot setting passage and the shaping drying channel that set gradually along FRP muscle direction of transfer.
FRP muscle preparation facilities of the present invention, owing to having the steeping vat of said structure, therefore, the pull resistance solving part FRP muscle in prior art is poor, the problem that FRP muscle performance standard difference is bigger than normal, and concrete effect foregoing describes, and does not repeat them here.
Further, the heat tunnel of this FRP muscle preparation facilities comprises the low-temperature setting passage, hot setting passage and the shaping drying channel that set gradually along FRP muscle direction of transfer, because thermosetting resin matrix solidifies slowly in low-temperature setting passage, the comparison in difference of the inside and outside solidification of thermosetting resin matrix is little, reinforcedathermoset matrices through to a certain degree solidifying enters in hot setting passage and carries out rapid curing, then dry in shaping drying channel, this curing mode improves the uniformity coefficient of solidification, further increases the performance of the Performance and quality of FRP.
Accompanying drawing explanation
Fig. 1 is the structural representation of steeping vat in the embodiment of the present invention.
Fig. 2 is the structural representation of FRP muscle preparation facilities in the embodiment of the present invention.
In figure: 1, creel; 2, fibre bundle; 3, steeping vat; 4, threading board; 5, mould; 6, roll; 7, heat tunnel; 8, hauling machine; 9, cutting machine; 301, impregnation cell body; 302, water tank; 303, temperature sensor; 304, electric heater; 701, low-temperature setting passage; 702, hot setting passage; 703, shaping drying channel.
Detailed description of the invention
Below by detailed description of the invention, technical scheme of the present invention is described in further detail.
The embodiment of steeping vat, as shown in Figure 1, comprise for holding the impregnation cell body 301 of thermosetting resin and the constant temperature heating device for heating impregnation cell body 301, impregnation cell body 301 is located in constant temperature heating device, constant temperature heating device comprises water tank 302 and heating control system, the electric heater 304 that heating control system comprises controller (not shown in FIG.), is located at the temperature sensor 303 in water tank and is located in water tank, controller is sampled with temperature sensor 303 and is connected, controller and electric heater 304 control connection.Time, controller controls the water in electric heater 304 heating water tank 302, and monitor water temperature by temperature sensor 303, water temperature is kept by controlling electric heater 304, water level in water tank 302 is higher than the height of the liquid level of thermosetting resin in impregnation cell body 301, and then keep the temperature of thermosetting resin in impregnation cell body 301, make thermosetting resin keep good mobility for a long time at a proper temperature.In order to reduce heat loss, economize energy, the heat-insulation layer that water tank comprises skin, internal layer and is located between inside and outside layer, in the present embodiment, heat-insulation layer is asbestos layer.
The steeping vat of the present embodiment, pass through constant temperature heating device, impregnation cell body is heated, thermosetting resin keeps constant temperature in impregnation cell body, thermosetting resin is made to keep good mobility for a long time at a proper temperature, such fibre bundle impregnation is abundant, kiss-coating is less and kiss-coating is even, improve the fiber content of FRP muscle and the curing rate of resin matrix, decrease the stackeding speed of thermosetting resin in heat tunnel, ensure that the pull resistance of FRP muscle, solve the problem that FRP muscle performance standard difference is bigger than normal, improve the Performance and quality of FRP muscle.
In other embodiments of steeping vat of the present invention, with above-described embodiment unlike, described constant temperature heating device also can be infrared heating device etc., as long as meet and the thermosetting resin in impregnation cell body kept certain temperature, avoid reducing its mobility, heat-insulation layer can also be froth bed or vacuum layer etc.
The embodiment of FRP muscle preparation facilities, as shown in Figure 1 and Figure 2, for the FRP muscle preparation facilities of FRP muscle preparation technology, as shown in Figure 1, creel 1, steeping vat 3, threading board 4, mould 5, roll 6, heat tunnel 7, hauling machine 8 and cutting machine 9 is set gradually along FRP muscle direction of transfer.Wherein, the structure of steeping vat, as described in above-described embodiment, repeats no more herein.
When using, under the traction of hauling machine 8, fibre bundle 2 on creel 1 enters impregnation cell body 301 impregnation, impregnation cell body 301 keeps a higher temperature to avoid mobility to reduce under the effect of interior thermosetting resin at constant temperature heating device, then to be made in order by fibre bundle 1 by threading board 4 and tentatively scrapes off unnecessary thermosetting resin; The fibre bundle 2 of preliminary combing enters mould 5 and is squeezed, and extrudes unnecessary thermosetting resin, and preliminary molding bonded, become the FRP muscle of light circle; FRP muscle becomes FRP muscle with ribbing through the winding of roll 6, and enters in heat tunnel 7 and be cured, and after then being cut by cutting machine 9, can obtain the FRP muscle of Len req.
The FRP muscle preparation facilities of the present embodiment, due to the constant temperature heating device of steeping vat in new departure, can heat impregnation cell body, thermosetting resin keeps constant temperature in impregnation cell body, thermosetting resin is made to keep good mobility for a long time at a proper temperature, such fibre bundle impregnation is abundant, kiss-coating is less and kiss-coating is even, improve the fiber content of FRP muscle and the curing rate of resin matrix, decrease the stackeding speed of thermosetting resin in heat tunnel, ensure that the pull resistance of FRP muscle, solve the problem that performance standard difference is bigger than normal, improve the Performance and quality of FRP muscle.The pull resistance solving part FRP muscle in prior art is well poor, the problem that FRP muscle performance standard difference is bigger than normal.
It is pointed out that the heat tunnel 7 of this FRP muscle preparation facilities comprises low-temperature setting passage 701, hot setting passage 702 and the shaping drying channel 703 set gradually along FRP muscle direction of transfer.FRP muscle becomes FRP muscle with ribbing through the winding of roll 6, successively enter low-temperature setting passage 701, hot setting passage 702, shaping drying channel 703 carries out low-temperature setting reaction, hot setting reacts and drying forming, owing to being mixed with crosslinked at low temperature reaction initiator and high-temperature cross-linking reaction initiator in thermosetting resin, in low-temperature setting passage, solidification slowly, the comparison in difference of the inside and outside solidification of thermosetting resin matrix is little, reinforcedathermoset matrices through to a certain degree solidifying enters in hot setting passage and carries out rapid curing, then dries in shaping drying channel; Becoming with ribbing with existing winding directly carries out compared with mode that hot setting passage is cured afterwards, and the heat tunnel of this programme improves the uniformity coefficient of solidification, further increases the performance of product.
Finally should be noted that: above embodiment is only in order to illustrate that technical scheme of the present invention is not intended to limit; Although with reference to preferred embodiment to invention has been detailed description, those of ordinary skill in the field are to be understood that: still can modify to the specific embodiment of the present invention or carry out equivalent replacement to portion of techniques feature; And not departing from the spirit of technical solution of the present invention, it all should be encompassed in the middle of the technical scheme scope of request of the present invention protection.

Claims (6)

1. steeping vat, is characterized in that: comprise for holding the impregnation cell body of thermosetting resin and the constant temperature heating device for heating impregnation cell body, described impregnation cell body is located in described constant temperature heating device.
2. steeping vat according to claim 1, it is characterized in that: described constant temperature heating device comprises water tank and heating control system, the electric heater that described heating control system comprises controller, is located at the temperature sensor in described water tank and is located in described water tank, described controller is connected with described temperature sensor sampling, described controller and described electric heater control connection.
3. steeping vat according to claim 2, is characterized in that: the heat-insulation layer that described water tank comprises skin, internal layer and is located between inside and outside layer.
4. steeping vat according to claim 3, is characterized in that: described heat-insulation layer is asbestos layer or vacuum layer.
5.FRP muscle preparation facilities, is characterized in that: this FRP muscle preparation facilities has the steeping vat described in Claims 1 to 4.
6. FRP muscle preparation facilities according to claim 5, is characterized in that: the heat tunnel of this FRP muscle preparation facilities comprises the low-temperature setting passage, hot setting passage and the shaping drying channel that set gradually along FRP muscle direction of transfer.
CN201510274858.1A 2015-05-27 2015-05-27 Impregnating vessel and FRP (Fiber Reinforced Plastic) bar preparation device with same Pending CN104842471A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510274858.1A CN104842471A (en) 2015-05-27 2015-05-27 Impregnating vessel and FRP (Fiber Reinforced Plastic) bar preparation device with same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510274858.1A CN104842471A (en) 2015-05-27 2015-05-27 Impregnating vessel and FRP (Fiber Reinforced Plastic) bar preparation device with same

Publications (1)

Publication Number Publication Date
CN104842471A true CN104842471A (en) 2015-08-19

Family

ID=53842643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510274858.1A Pending CN104842471A (en) 2015-05-27 2015-05-27 Impregnating vessel and FRP (Fiber Reinforced Plastic) bar preparation device with same

Country Status (1)

Country Link
CN (1) CN104842471A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107458003A (en) * 2017-08-11 2017-12-12 南京诺尔泰复合材料设备制造有限公司 A kind of composite material pultrusion consolidation zone intelligent controlling device and control method
CN108243611A (en) * 2016-10-24 2018-07-03 (株)先进真空材料技术 The composite material bar and its manufacturing method of weaving mode

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101376736A (en) * 2008-09-28 2009-03-04 中材科技股份有限公司 Carbon fibre bar containing super fine and preparation thereof
CN202321815U (en) * 2011-11-23 2012-07-11 四川航天五源复合材料有限公司 Dip tank insulator
CN102615841A (en) * 2012-04-23 2012-08-01 南京诺尔泰复合材料设备制造有限公司 Sealing type glue supply system for thermosetting continuous fiber pultrusion process
CN204977129U (en) * 2015-05-27 2016-01-20 郑州大学 Steeping vat and have FRP muscle preparation facilities of this steeping vat

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101376736A (en) * 2008-09-28 2009-03-04 中材科技股份有限公司 Carbon fibre bar containing super fine and preparation thereof
CN202321815U (en) * 2011-11-23 2012-07-11 四川航天五源复合材料有限公司 Dip tank insulator
CN102615841A (en) * 2012-04-23 2012-08-01 南京诺尔泰复合材料设备制造有限公司 Sealing type glue supply system for thermosetting continuous fiber pultrusion process
CN204977129U (en) * 2015-05-27 2016-01-20 郑州大学 Steeping vat and have FRP muscle preparation facilities of this steeping vat

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孙曼灵: "《环氧树脂应用原理与技术》", 30 September 2002 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108243611A (en) * 2016-10-24 2018-07-03 (株)先进真空材料技术 The composite material bar and its manufacturing method of weaving mode
CN107458003A (en) * 2017-08-11 2017-12-12 南京诺尔泰复合材料设备制造有限公司 A kind of composite material pultrusion consolidation zone intelligent controlling device and control method

Similar Documents

Publication Publication Date Title
CN104960211B (en) FRP muscle preparation technology and FRP muscle preparation facilities
CN101295564B (en) Production method and equipment for carbon fiber multi-use compound stranded wire
CN109176962A (en) A kind of pre-dispersed and surface treatment continuous fiber reinforced thermoplastic resin base impregnates the moulding integrated device of band and its forming method
CN108372667A (en) A kind of fibre reinforced composites twine molded technique and device
CN102198730B (en) Pultrusion process and pultrusion device of phenolic resin composite
CN205255540U (en) Compound FRP muscle preparation equipment
CN104842569B (en) Composite FRP bar, preparation process and preparation device
CN103413629A (en) Electric transmission line carbon fiber composite core manufacturing method
CN102039681A (en) System and process for manufacturing carbon fiber composite core of electric transmission line
CN106182816B (en) The method that pultrusion winding composite molding laser curing prepares composite material hollow profile
CN102233669B (en) A kind of preparation method of FRP muscle and the FRP muscle be prepared from by the method
CN103921455B (en) A kind of double flute body cement dipping machine being suitable to long-term production
CN104130393A (en) Continuous fiber enhanced thermoplastic composite material prepreg tape preparation method and device for realizing the method
CN103413630A (en) Electric transmission line carbon fiber composite core manufacturing device
CN101494092A (en) Aramid fiber fabric and carbon fibre composite core for overhead transmission line conductor
CN106739016A (en) A kind of complete set of equipments that production glass fiber-reinforced polymer connector is wound by steel wire rope pultrusion
CN203559250U (en) Carbon fiber sizing device for thermoplastic resin
CN105415712B (en) Compound FRP muscle Preparation equipment
CN104842471A (en) Impregnating vessel and FRP (Fiber Reinforced Plastic) bar preparation device with same
CN103539999B (en) A kind of preparation method strengthening composite band and composite band thereof
CN203600603U (en) Surface treatment device for fiber reinforced composite material plain bar for structural engineering
CN105500734A (en) Gum dipping technology and special gum dipping device for quick pultrusion of composite core
CN204977129U (en) Steeping vat and have FRP muscle preparation facilities of this steeping vat
CN104325653B (en) The method for continuous production of a kind of GRP pipe and prepared GRP pipe
CN103956217B (en) The compound core molding process of assorted fibre and composite core manufacture device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150819

RJ01 Rejection of invention patent application after publication