CN104832707B - Penstock pre-buried structure - Google Patents

Penstock pre-buried structure Download PDF

Info

Publication number
CN104832707B
CN104832707B CN201510173978.2A CN201510173978A CN104832707B CN 104832707 B CN104832707 B CN 104832707B CN 201510173978 A CN201510173978 A CN 201510173978A CN 104832707 B CN104832707 B CN 104832707B
Authority
CN
China
Prior art keywords
penstock
grouting pipe
rockfill grouting
penstocks
rockfill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510173978.2A
Other languages
Chinese (zh)
Other versions
CN104832707A (en
Inventor
刘亚峰
李衍宁
朱祖岭
曹彪
李晓鹤
周旭光
冯亚东
郭钦伟
衡家磊
胡翔宇
陈魁
刘殿旭
蒋希猛
王博文
张国瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cao Biao
Chen Kui
Feng Yadong
Guo Qinwei
Heng Jialei
Hu Xiangyu
Jiang Ximeng
Li Xiaohe
Li Yanning
Liu Dianxu
Liu Yafeng
Wang Bowen
Zhang Guorui
Zhou Xuguang
Zhu Zuling
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510173978.2A priority Critical patent/CN104832707B/en
Publication of CN104832707A publication Critical patent/CN104832707A/en
Application granted granted Critical
Publication of CN104832707B publication Critical patent/CN104832707B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Building Environments (AREA)
  • Sewage (AREA)

Abstract

The invention discloses a kind of penstock pre-buried structure, including penstock, penstock is two, buffer board is provided between two penstocks, buffer board is fixed between two penstocks, rockfill grouting pipe is additionally provided between two penstocks, rockfill grouting pipe is vertically provided between two penstocks, and rockfill grouting pipe is arranged through buffer board, and at the top of rockfill grouting pipe and bottom is extended in penstock, wherein a penstock lower surface is provided with draining board, rhone is provided with draining board correspondence rockfill grouting pipe, draining board passes through fixing card and liaison of penstock.This penstock pre-buried structure can preferably carry out plugging grouting, without wanting plugging grouting hole after the completion of grouting construction, and with good drainage performance, there is good shock-absorbing capacity simultaneously, pressure can preferably be born, the problem of coming to nothing between fill concrete and steel pipe can be preferably solved in addition, be increased the safety of steel pipe operation, further increased pre-buried property.

Description

Penstock pre-buried structure
Technical field
The present invention relates to a kind of pre-buried structure, more particularly to a kind of penstock pre-buried structure.
Background technology
When architecture construction is carried out, can be constructed using various Architectural Equipments, after screw-thread steel, anchor built-in fitting is exactly which In one kind.As many pipelines and steel plate are needed in construction, if be not protected by work progress, carry out rational Construction, is easy for, because vibration frequency is too high or vibration amplitude is excessive and drawing crack pipe welding seam, causing serosity outflow in pipeline The problem of worker safety is threatened even, if while good pre-buried protection can not be carried out to steel plate.General steel pipe is pre- Bury structure and clogging easily occur, can thus affect later stage grouting effect, and cause long construction period, complex process, blind Mesh is big, construction investment is also higher, while reducing security performance.Therefore, how a kind of short construction period, safe and reliable is provided Steel pipe pre-buried structure, be problem demanding prompt solution in current technical field of construction.
The content of the invention
The technical problem to be solved in the present invention is:Overcome the problems referred to above, there is provided one kind can preferably carry out plugging grouting, fill Without wanting plugging grouting hole, and the penstock pre-buried structure with good drainage performance after the completion of slurry construction.
To achieve these goals, the technical solution used in the present invention is such:The pre-buried knot of penstock of the present invention Structure, including penstock, penstock are two, and buffer board is provided between two penstocks, and buffer board is fixed on two pressure steel Between pipe, rockfill grouting pipe between two penstocks, is additionally provided with, rockfill grouting pipe is vertically provided between two penstocks, and is returned Fill out grout pipe to arrange through buffer board, and at the top of rockfill grouting pipe and bottom is extended in penstock, wherein a pressure steel Pipe lower surface is provided with draining board, is provided with rhone at draining board correspondence rockfill grouting pipe, and draining board passes through fixing card and pressure Fastener for connection, draining board are provided with osculum at lower surface, and draining board lower surface is provided with built-in fitting, built-in fitting and draining board Between be detachably connected.
Further, as a kind of specific version, the diameter of rockfill grouting pipe of the present invention is in five to ten millis Between rice.
Further, as a kind of specific version, rockfill grouting pipe of the present invention adopts polyethylene hard tube.
Further, as a kind of specific version, draining board Surface coating of the present invention has protective facing.
Further, as a kind of specific version, rockfill grouting pipe top center of the present invention is provided with back Fill out grout hole.
Further, as a kind of specific version, length of the rockfill grouting hole of the present invention along rockfill grouting pipe Spend direction equally cross structure.
Further, as a kind of specific version, the built-in buffer screw of buffer board of the present invention.
Further, as a kind of specific version, built-in fitting of the present invention is steel structural embedded parts.
Compared with prior art, it is an advantage of the current invention that:This penstock pre-buried structure can preferably carry out closure filling Slurry, without wanting plugging grouting hole after the completion of grouting construction, and with good drainage performance, while with good resiliency Can, pressure can be preferably born, the problem of coming to nothing between fill concrete and steel pipe can be preferably solved in addition, be increased steel pipe The safety of operation, further increases pre-buried property.
Description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is the structural representation of the present invention;In figure:1. penstock;2. rockfill grouting pipe;3. draining board;4. pre-buried Part;5. osculum;6. buffer board.
Specific embodiment
In conjunction with the accompanying drawings, the present invention is further detailed explanation.These accompanying drawings are simplified schematic diagram, only with The basic structure of the illustration explanation present invention, therefore which only shows the composition relevant with the present invention.
The preferred embodiment of penstock pre-buried structure of the present invention as shown in Figure 1, including penstock 1, penstock 1 For two, between two penstocks 1, be provided with buffer board 6, buffer board 6 is fixed between two penstocks 1, two penstocks 1 it Between be additionally provided with rockfill grouting pipe 2, rockfill grouting pipe 2 is vertically provided between two penstocks 1, and rockfill grouting pipe 2 is through slow Punching 6 is arranged, and at the top of rockfill grouting pipe 2 and bottom is extended in penstock 1, wherein 1 lower surface of penstock peace Equipped with draining board 3, rhone at 3 corresponding rockfill grouting pipe 2 of draining board, is provided with, draining board 3 is connected with penstock 1 by fixing card Connect, draining board 3 is provided with osculum 5 at lower surface, 3 lower surface of draining board is provided with built-in fitting 4, built-in fitting 4 and draining board 3 Between be detachably connected, between five to ten millimeters, the rockfill grouting pipe 2 adopts poly- second for the diameter of the rockfill grouting pipe 2 Alkene hard tube, 3 Surface coating of the draining board have protective facing, and 2 top center of the rockfill grouting pipe is provided with rockfill grouting hole, Length direction equally cross structure of the rockfill grouting hole along rockfill grouting pipe 2,6 built-in buffering spiral shell of the buffer board Nail, the built-in fitting 4 are steel structural embedded parts.
The penstock pre-buried structure of the present invention can preferably carry out plugging grouting, without will seal after the completion of grouting construction Stifled grout hole, and with good drainage performance, while with good shock-absorbing capacity, can preferably bear pressure, in addition can The problem of coming to nothing between fill concrete and steel pipe is preferably solved, the safety of steel pipe operation is increased, is further increased Pre-buried property.Between five to ten millimeters, the rockfill grouting pipe 2 adopts polyethylene hard tube to the diameter of the rockfill grouting pipe 2, no Charging efficiency is improve only, and hardness is high, enhances durable performance;3 Surface coating of the draining board has protective facing, can be more The usability of good protection draining board 3;2 top center of the rockfill grouting pipe is provided with rockfill grouting hole, the rockfill grouting Hole further increases grouting efficiency along the length direction equally cross structure of rockfill grouting pipe 2, will not produce blocking existing As;6 built-in buffer screw of the buffer board, self structure are higher;The built-in fitting 4 is steel structural embedded parts, in certain journey The service life of built-in fitting 4 is improve on degree.
With the above-mentioned desirable embodiment according to the present invention as enlightenment, by above-mentioned description, relevant staff is complete Various change and modification can be carried out in the range of without departing from this invention technological thought entirely.The technology of this invention Property scope is not limited to the content in description, it is necessary to its technical scope is determined according to right.

Claims (1)

1. a kind of penstock pre-buried structure, including penstock, it is characterised in that:Penstock is two, two penstocks Between be provided with buffer board, buffer board is fixed between two penstocks, and rockfill grouting pipe is additionally provided between two penstocks, backfill Grout pipe is vertically provided between two penstocks, and rockfill grouting pipe through buffer board arrange, and at the top of rockfill grouting pipe and Bottom is extended in penstock, wherein a penstock lower surface is provided with draining board, draining board correspondence rockfill grouting pipe Place is provided with rhone, and draining board passes through fixing card and liaison of penstock, and draining board is provided with osculum, draining at lower surface Plate lower surface is provided with built-in fitting, is detachably connected between built-in fitting and draining board, the diameter of the rockfill grouting pipe five to Between ten millimeters, the rockfill grouting pipe adopts polyethylene hard tube, the draining board Surface coating to have protective facing, the backfill Grout pipe top center is provided with rockfill grouting hole, and the rockfill grouting hole is equally handed over along the length direction of rockfill grouting pipe Wrong structure, the built-in buffer screw of the buffer board, the built-in fitting are steel structural embedded parts.
CN201510173978.2A 2015-04-14 2015-04-14 Penstock pre-buried structure Expired - Fee Related CN104832707B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510173978.2A CN104832707B (en) 2015-04-14 2015-04-14 Penstock pre-buried structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510173978.2A CN104832707B (en) 2015-04-14 2015-04-14 Penstock pre-buried structure

Publications (2)

Publication Number Publication Date
CN104832707A CN104832707A (en) 2015-08-12
CN104832707B true CN104832707B (en) 2017-03-29

Family

ID=53810791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510173978.2A Expired - Fee Related CN104832707B (en) 2015-04-14 2015-04-14 Penstock pre-buried structure

Country Status (1)

Country Link
CN (1) CN104832707B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5018286B1 (en) * 1969-10-16 1975-06-27
AT305152B (en) * 1970-12-21 1973-02-12 Voest Ag Tunnel armor
CN203307785U (en) * 2013-06-06 2013-11-27 中国水电顾问集团华东勘测设计研究院 Buried pressure pipe exterior drainage structure of hydropower station
CN204023526U (en) * 2014-05-19 2014-12-17 中国水电顾问集团贵阳勘测设计研究院有限公司 A kind of discharge structure that reduces embedded penstock external water pressure
CN104018475B (en) * 2014-05-19 2015-12-16 中国水电顾问集团贵阳勘测设计研究院有限公司 A kind of embedded penstock backfill grouting structure and grouting process thereof

Also Published As

Publication number Publication date
CN104832707A (en) 2015-08-12

Similar Documents

Publication Publication Date Title
WO2016206617A1 (en) Anti-collapse structure beside roadway based on 110 construction method for breaking roof
CN104832707B (en) Penstock pre-buried structure
CN102182481B (en) Anchor rope grouting-stop plug
CN104564130B (en) A kind of resistance to deformation fast-escape pipe
CN103850251B (en) A kind of Model analysis
CN206204974U (en) A kind of device for plugging for concrete pipe base core-drawing hole water burst
CN202644531U (en) Pressure-preloading pile sealing device for static pressure pile of anchor rod
CN204098232U (en) Girder steel built-in fitting in a kind of beam
CN204739317U (en) Pre -buried structure of pressure steel pipe
CN203188949U (en) safe sand discharge manifold for gas drilling
CN201649082U (en) Device for preventing sand gushing at construction porthole of anchor wire drilling hole
CN104141286A (en) Construction adit blocking structure
CN101476336B (en) Deep imbedded underground water-permeable passage plugging method
CN204626420U (en) A kind of flag-shaped foundation pit enclosure structure
CN210134411U (en) Steel-pipe pile diversion guiding device that divides water
CN203641763U (en) Pressure pipe grouting hole completely-waterproof sealing device
CN203569565U (en) Anti-vibration foundation spiral ground pile
CN205537374U (en) Hole device is settleed fast in presplit blasting hole
CN204780960U (en) Structure is restoreed fast in artesian well damage
CN202039360U (en) Grout-stopping plug for anchorage cables
CN211524727U (en) Water-detecting and draining drilling orifice pipe device
CN204327185U (en) A kind of filling in mine boring intubate
CN103452116A (en) Grouting device
CN204344004U (en) A kind of impact holing drilling slurry spacer assembly based on many residue outlets and Grouting Pipe
CN203701081U (en) Grouting type antiskid pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Liu Yafeng

Inventor after: Hu Xiangyu

Inventor after: Chen Kui

Inventor after: Liu Dianxu

Inventor after: Jiang Ximeng

Inventor after: Wang Bowen

Inventor after: Zhang Guorui

Inventor after: Li Yanning

Inventor after: Zhu Zuling

Inventor after: Cao Biao

Inventor after: Li Xiaohe

Inventor after: Zhou Xuguang

Inventor after: Feng Yadong

Inventor after: Guo Qinwei

Inventor after: Heng Jialei

Inventor before: Wen Guodong

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20170222

Address after: Yang Ping town residents Lingbao City of Sanmenxia Henan province 472500 City Group No. 302

Applicant after: Liu Yafeng

Applicant after: Hu Xiangyu

Applicant after: Chen Kui

Applicant after: Liu Dianxu

Applicant after: Jiang Ximeng

Applicant after: Wang Bowen

Applicant after: Zhang Guorui

Applicant after: Li Yanning

Applicant after: Zhu Zuling

Applicant after: Cao Biao

Applicant after: Li Xiaohe

Applicant after: Zhou Xuguang

Applicant after: Feng Yadong

Applicant after: Guo Qinwei

Applicant after: Heng Jialei

Address before: Jinjiang District Jinhua Road Chengdu City, Sichuan province 610000 section of No. 8 Building 1 11 unit 23 floor No. 2301

Applicant before: CHENGDU JUZHI INDUSTRIAL DESIGN CO., LTD.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170329

Termination date: 20180414

CF01 Termination of patent right due to non-payment of annual fee