CN104831933B - Pipeline installation adjusting device and pipeline installation method - Google Patents

Pipeline installation adjusting device and pipeline installation method Download PDF

Info

Publication number
CN104831933B
CN104831933B CN201410805156.7A CN201410805156A CN104831933B CN 104831933 B CN104831933 B CN 104831933B CN 201410805156 A CN201410805156 A CN 201410805156A CN 104831933 B CN104831933 B CN 104831933B
Authority
CN
China
Prior art keywords
adjusting device
pipeline installation
central tube
pipeline
installation adjusting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410805156.7A
Other languages
Chinese (zh)
Other versions
CN104831933A (en
Inventor
舒柱兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Leisa Heavy Construction Machinery Co., Ltd
Original Assignee
Beiqi Foton Motor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beiqi Foton Motor Co Ltd filed Critical Beiqi Foton Motor Co Ltd
Priority to CN201410805156.7A priority Critical patent/CN104831933B/en
Publication of CN104831933A publication Critical patent/CN104831933A/en
Application granted granted Critical
Publication of CN104831933B publication Critical patent/CN104831933B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The invention provides a kind of pipeline installation adjusting device and pipeline installation method, pipeline installation adjusting device includes:Base;Central tube, the height adjustable of central tube protrusion base saves land to be connected with base.Apply the technical scheme of the present invention, the height that central tube protrudes from base can be adjusted, therefore, it is possible to adjust distance of the upper surface apart from base of central tube according to actual use situation, to coordinate the setting of pipeline, pipeline is avoided to cause not smooth, the problem of causing to suppress strength of circulating because setting is unreasonable.

Description

Pipeline installation adjusting device and pipeline installation method
Technical field
The present invention relates to engineering machinery field, in particular to a kind of pipeline installation adjusting device and pipeline installation side Method.
Background technology
Concrete mixer is during pumping, cloth, and its arm support rotates partially around the centre of gyration.As shown in figure 1, turning Pipeline 100 in platform 200 is fixed together with turntable 200, as turntable 200 is rotated, pipeline 100 and supporting table in support 300 are fixed together, and are not rotated with turntable 200, and the meander sections 120 of the pipeline 100 in such turntable 200 can be around supporting table The canned paragraph 110 of pipeline 100 in 300 is rotated.Turntable 200 is fixed with the outer ring of pivoting support 400, is driven by rotary motor outer Circle is rotated, and the rotation of turntable 200 is realized, so the meander sections 120 of turntable 200 and the inside are in pivoting support 400 What the heart was rotated.In the design process, center of the center of meander sections 120 and canned paragraph 110 with pivoting support 400 Overlap, but the position during currently manufactured enterprise practical entrucking typically by support Design, and pipeline 100 itself chi Very little to position, support welding error and pipeline 100 scale error can cause center culvert installation center not weighed with the centre of gyration Close (bias), so as to cause arm support in rotary course, the situation for racking middle pipe clamp and pipeline 100 occurs.
Height dimension H of the end face of central tube 20 away from plane on revolving support determined when designing in addition pipeline 100, and Angular Dimension θ is critical size, if the two sizes it cannot be guaranteed that, the installation difficulty of pipeline 100 can be caused, and can produce and suppress Strength, can cause pipeline 100, pipe clamp and the cracking damage failure of fixed support in pumping procedure.
The content of the invention
It is existing to solve it is a primary object of the present invention to provide a kind of pipeline installation adjusting device and pipeline installation method Be difficult in technology plane on determination center end surfaces and revolving support apart from the problem of.
To achieve these goals, according to an aspect of the invention, there is provided a kind of pipeline installation adjusting device, bag Include:Base;Central tube, the height adjustable of central tube protrusion base saves land to be connected with base.
Further, base also includes:Fixed part;Rotating part, rotating part is pivotly connected with fixed part, rotating part with Pivoting axis parallel between fixed part is in the axis of central tube;Central tube is adjustably connected with rotating part.
Further, fixed part and rotating part are connected by fastener, and the avoidance for avoiding fastener is provided with rotating part Opening, avoids the arc opening being opened in centered on opening is the pivotal axis between rotating part and fixed part on rotating part.
Further, offered on rotating part and the second centring hole is offered on the first centring hole, fixed part, the second centring hole And first centring hole to the pivotal axis between rotating part and fixed part distance it is equal.
Further, passing straight through between rotating part and fixed part where centering bar, centering bar is provided with rotating part Pivotal axis.
Further, it is provided with angle index on rotating part or fixed part.
Further, pipeline installation adjusting device also includes Fixing clamp-seat, and Fixing clamp-seat is arranged on base, and central tube leads to Fixing clamp-seat is crossed adjustably to be connected with base.
Further, Fixing clamp-seat include centre bore and shackle member, radially adjustable save land setting of the shackle member along centre bore, In the centrally disposed hole of central tube.
Further, it is provided with altitude scale on the outer wall of central tube.
According to another aspect of the present invention, a kind of pipeline installation method is additionally provided, for pipeline to be installed to On revolving structure, revolving structure includes pivoting support, and pipeline installation method includes:Above-mentioned pipeline installation adjusting device is provided; Pipeline installation adjusting device is installed on the rotary disk of pivoting support;The central tube of pipeline installation adjusting device is adjusted, in making The height that heart rostrum goes out the base of pipeline installation adjusting device is preset height H;By consolidating for a part for pipeline and pivoting support Price fixing is relatively fixed, and another part of pipeline through central tube is passed through into central tube and relative with the rotary disk of pivoting support solid It is fixed;Detaching pipelines installation adjusting device.
Apply the technical scheme of the present invention, the height that central tube protrudes from base can be adjusted, therefore, it is possible to according to reality Service condition adjusts distance of the upper surface apart from base of central tube, to coordinate the setting of pipeline, it is to avoid pipeline does not conform to because of setting Reason causes not smooth, the problem of causing to suppress strength of circulating.
Brief description of the drawings
The Figure of description for constituting the part of the application is used for providing a further understanding of the present invention, and of the invention shows Meaning property embodiment and its illustrate be used for explain the present invention, do not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 shows the sectional view of pumping equipment of the prior art;
Fig. 2 shows the top view of the pipeline installation adjusting device in the present invention;
Fig. 3 shows the schematic diagram that the pipeline installation adjusting device in the present invention coordinates with pivoting support and pipe clamp;And
Fig. 4 shows the schematic diagram that the pipeline installation adjusting device in the present invention coordinates with pipeline.
Embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase Mutually combination.Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
According to an aspect of the invention, there is provided a kind of pipeline installation adjusting device, as shown in Figures 2 to 4, pipeline peace Debuging engagement positions includes:Base 10;Central tube 20, the height adjustable of the protrusion base 10 of central tube 20 saves land to be connected with base 10.
As can be seen from the above description, the above embodiments of the present invention realize following technique effect:Central tube 20 Protruding from the height of base 10 can be adjusted, therefore, it is possible to adjust the upper surface of central tube 20 according to actual use situation the bottom of apart from The distance of seat 10, to coordinate the setting of pipeline 100, it is to avoid pipeline 100 causes circulation not smooth because setting is unreasonable, causes to suppress strength Problem.
Preferably, base 10 also includes:Fixed part 11;Rotating part 12, rotating part 12 is pivotly connected with fixed part 11, Pivoting axis parallel between rotating part 12 and fixed part 11 is in the axis of central tube 20;Central tube 20 adjustably connects with rotating part 12 Connect.Wherein rotating part 12 is overlapped with the pivotal axis between fixed part 11 with the axis of central tube 20, to avoid because central tube 20 is pacified Dress center is misaligned (bias) with the centre of gyration, so as to cause in the rotary course of pipeline 100, racks central tube 20 and pipeline 100 situation occurs.
Preferably, as shown in Fig. 2 fixed part 11 and rotating part 12 are connected by fastener, it is provided with and keeps away on rotating part 12 Allow the avoidance opening 121 of fastener, avoid centered on opening 121 is the pivotal axis between rotating part 12 and fixed part 11 and be opened in Arc opening on rotating part 12.
Preferably, offered on rotating part 12 and the second centring hole 111 is offered on first centring hole 122, fixed part 11, the Two centring hole 111 and the distance of the first centring hole 122 to the pivotal axis between rotating part 12 and fixed part 11 are equal.It is highly preferred that The pivotal axis passed straight through between rotating part 12 and fixed part 11 where centering bar, centering bar is provided with rotating part 12.Center Hole can play a part of calibrating rotating part 12 with centering bar, for example, rotating part 12 is turned into original position.
Preferably, pipeline installation adjusting device also includes Fixing clamp-seat 30, and Fixing clamp-seat 30 is arranged on base 10, center Pipe 20 is adjustably connected by Fixing clamp-seat 30 with base 10.It is highly preferred that Fixing clamp-seat 30 includes centre bore and shackle member, In the radially adjustable setting that saves land of the shackle member along centre bore, the centrally disposed hole of central tube 20.Central tube 20 is solid by fastener Determine onto Fixing clamp-seat 30, so as to realize the distance that can control to protrude base 10.
Preferably, it is provided with angle index on rotating part 12 or fixed part 11.
Preferably, as shown in figure 3, being provided with altitude scale on the outer wall of central tube 20.
The frock mainly includes central tube 20 and base 10 with altitude scale line, and wherein base 10 includes band angle index The fixed part 11 of line and the rotating part 12 with Fixing clamp-seat 30.The installation of the inner ring of fixed part 11 passes through spiral shell with the mounting hole of rotating part 12 Bolt is fixed together, it is ensured that with one heart, the center weld of rotating base 10 has Fixing clamp-seat 30, Fixing clamp-seat 30 and rotation to two bases 10 With one heart, the center of Fixing clamp-seat 30 is equipped with central tube 20, by the installation spiral shell for tightening Fixing clamp-seat 30 for transfer part 12 and fixed part 11 Bolt can fix central tube 20.Unclamp Fixing clamp-seat 30 and can adjust the height of central tube 20, and pass through the scale on central tube 20 Line ensures height dimension H, by after centering bar and transporting elbow centering, by rotating part 12 rotate adjustable bend pipe angle so as to Ensure θ Angular Dimensions.
According to another aspect of the present invention, a kind of pipeline installation method is additionally provided, for pipeline 100 to be installed to back On rotation structure, revolving structure includes pivoting support 400, and pipeline installation method includes:Above-mentioned pipeline installation adjusting device is provided; On the rotary disk that pipeline installation adjusting device is installed to pivoting support 400;The central tube 20 of pipeline installation adjusting device is adjusted, The height for making central tube 20 protrude the base 10 of pipeline installation adjusting device is preset height H;By a part for pipeline 100 with returning The fixed disk for turning supporting 400 is relatively fixed, and by pipeline 100 through another part of central tube 20 through central tube 20 and with returning The rotary disk for turning supporting 400 is relatively fixed;Detaching pipelines installation adjusting device.
As shown in Figure 3 and Figure 4, in pump truck center delivery pipe installation process is carried out, first by pipeline installation adjusting device Plane on pivoting support 400 is arranged on by bolt, at this time the central tube 20 of pipeline installation adjusting device and pivoting support 400 With one heart, unclamp the shackle member of Fixing clamp-seat 30 and adjust up and down and lock shackle member to design size H values, then in central tube 20 Bottom installs delivery pipe pipe clamp 500, and installs the mounting bracket of pipe clamp 500, then installation pipeline 100, and by pipeline 100 Center is alignd with the center line 112 of rotating base 10, unclamps the fixation spiral shell between the fixed part 11 and rotating part 12 of rotating base 10 Bolt, rotates rotating part 12, center line is tightened bolt again after reaching design angle size θ, in the canned paragraph of installation pipeline 100 110 and support after, remove frock.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (10)

1. a kind of pipeline installation adjusting device, it is characterised in that including:
Base (10);
Central tube (20), the height adjustable of the prominent base (10) of the central tube (20) saves land with the base (10) even Connect.
2. pipeline installation adjusting device according to claim 1, it is characterised in that the base (10) also includes:
Fixed part (11);
Rotating part (12), the rotating part (12) is pivotly connected with the fixed part (11), the rotating part (12) and institute The pivoting axis parallel between fixed part (11) is stated in the axis of the central tube (20);
The central tube (20) is adjustably connected with the rotating part (12).
3. pipeline installation adjusting device according to claim 2, it is characterised in that the fixed part (11) and the rotation Portion (12) is connected by fastener, and the avoidance opening (121) for avoiding the fastener is provided with the rotating part (12), described Avoid centered on opening (121) is the pivotal axis between the rotating part (12) and the fixed part (11) and be opened in the rotation Arc opening in portion (12).
4. pipeline installation adjusting device according to claim 2, it is characterised in that is offered on the rotating part (12) Offer the second centring hole (111) on one centring hole (122), the fixed part (11), second centring hole (111) and described The distance of first centring hole (122) to the pivotal axis between the rotating part (12) and the fixed part (11) is equal.
5. pipeline installation adjusting device according to claim 2, it is characterised in that be provided with the rotating part (12) pair The pivotal axis passed straight through between the rotating part (12) and the fixed part (11) where middle bar, the centering bar.
6. pipeline installation adjusting device according to claim 2, it is characterised in that the rotating part (12) or the fixation Portion is provided with angle index on (11).
7. pipeline installation adjusting device according to claim 1, it is characterised in that the pipeline installation adjusting device is also wrapped Fixing clamp-seat (30) is included, the Fixing clamp-seat (30) is arranged on the base (10), and the central tube (20) passes through described solid Determine deck (30) to be adjustably connected with the base (10).
8. pipeline installation adjusting device according to claim 7, it is characterised in that the Fixing clamp-seat (30) includes center Hole and shackle member, radially adjustable save land setting of the shackle member along the centre bore, the central tube (20) is arranged on described In centre bore.
9. pipeline installation adjusting device according to claim 1, it is characterised in that set on the outer wall of the central tube (20) It is equipped with altitude scale.
10. a kind of pipeline installation method, for pipeline (100) to be installed into revolving structure, the revolving structure includes revolution Support (400), it is characterised in that the pipeline installation method includes:
Pipeline installation adjusting device any one of claim 1 to 9 is provided;
The pipeline installation adjusting device is installed on the rotary disk of the pivoting support (400);
The central tube (20) of the pipeline installation adjusting device is adjusted, makes the prominent pipeline mounting and adjusting of the central tube (20) The height of the base (10) of device is preset height H;
A part for the pipeline (100) and the fixed disk of the pivoting support (400) are relatively fixed, and by the pipeline (100) through the central tube (20) another part through the central tube (20) and with the pivoting support (400) return Rotating disk is relatively fixed;
Dismantle the pipeline installation adjusting device.
CN201410805156.7A 2014-12-19 2014-12-19 Pipeline installation adjusting device and pipeline installation method Active CN104831933B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410805156.7A CN104831933B (en) 2014-12-19 2014-12-19 Pipeline installation adjusting device and pipeline installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410805156.7A CN104831933B (en) 2014-12-19 2014-12-19 Pipeline installation adjusting device and pipeline installation method

Publications (2)

Publication Number Publication Date
CN104831933A CN104831933A (en) 2015-08-12
CN104831933B true CN104831933B (en) 2017-09-15

Family

ID=53810091

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410805156.7A Active CN104831933B (en) 2014-12-19 2014-12-19 Pipeline installation adjusting device and pipeline installation method

Country Status (1)

Country Link
CN (1) CN104831933B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105081721B (en) * 2015-08-24 2017-03-22 北汽福田汽车股份有限公司 Positioning tool for core penetrating pipe
CN110370195B (en) * 2019-08-14 2020-11-13 江苏欧朗汽车管路系统有限公司 Clamping and adjusting device for automobile pipeline machining

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202117915U (en) * 2011-05-30 2012-01-18 中国一冶集团有限公司 Rotating joint of concrete delivery pump pipe
CN202831646U (en) * 2012-09-28 2013-03-27 徐工集团工程机械股份有限公司 Concrete pump truck rotary table and concrete pump truck

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11270137A (en) * 1998-03-26 1999-10-05 Taisei Corp Concrete transport pipe branching unit
KR20050096887A (en) * 2005-09-14 2005-10-06 최재학 An apparatus for exhausting concontrete in the pipe of a pump car
CN102039877B (en) * 2010-09-25 2012-06-27 中联重科股份有限公司 Supporting leg structure, concrete pump truck and oil pipe assembling method
CN202810218U (en) * 2012-10-12 2013-03-20 成都市新筑路桥机械股份有限公司 Precise swing mechanism

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202117915U (en) * 2011-05-30 2012-01-18 中国一冶集团有限公司 Rotating joint of concrete delivery pump pipe
CN202831646U (en) * 2012-09-28 2013-03-27 徐工集团工程机械股份有限公司 Concrete pump truck rotary table and concrete pump truck

Also Published As

Publication number Publication date
CN104831933A (en) 2015-08-12

Similar Documents

Publication Publication Date Title
CN104831933B (en) Pipeline installation adjusting device and pipeline installation method
US10907756B2 (en) Clamp apparatus and method for joining pipeline segments
CN210549427U (en) Pipeline flange centering adjusting device
CN104674904B (en) A kind of water tap bindiny mechanism be convenient to table top and installed
CN205817186U (en) Complex pipeline welding universal rotational fast-assembling support means
CN105729027A (en) Welding part fixing device
KR20170091255A (en) Organization auxiliary equipment for welding of the horizontal pipe flanges
CN104785998A (en) Barrel locating frame and welding tool comprising same
CN104481190B (en) Equipment is installed and is accurately positioned with the fixed support of baseline
CN106964935A (en) A kind of prewelding positioner of air-conditioning four-way valve module
US20200062556A1 (en) Automated cargo transfer system
CN107919174B (en) Insulating layer installation method in the middle part of AP1000 reactor pressure vessel
CN206373556U (en) A kind of flange group is to servicing unit
CN203907075U (en) Rotary joint and crane with same
CN207273055U (en) A kind of flange is pre-positioned clamping device
CN108772730A (en) The processing and positioning device of high-precision ring flange
CN209280124U (en) Base mounting structure for scale
CN209103654U (en) A kind of welding tooling taken an examination for facing upward plate docking
CN105773055A (en) Pipeline axis setting-out device and setting-out method
CN204053367U (en) The welding machine auxiliary equipment of angle adjustable
JPH0749194Y2 (en) Fitting mounting jig
CN206105278U (en) Pipeline welding is with adjusting frock
CN207109613U (en) Bridge Rotation Construction Technique large-tonnage Rotary ball hinge
CN215623985U (en) Pressure vessel conveyer
CN206857661U (en) Guide rack

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200928

Address after: No.202 Xuanfu street, Xuanhua District, Zhangjiakou, Hebei Province

Patentee after: Hebei Leisa Heavy Construction Machinery Co., Ltd

Address before: 102206 Beijing, Shahe, Changping District Town, Sha Yang Road, Beiqi Futian Motor Company Limited law and Intellectual Property Department

Patentee before: BEIQI FOTON MOTOR Co.,Ltd.