CN104831917A - Plug structure of disk type scaffold - Google Patents
Plug structure of disk type scaffold Download PDFInfo
- Publication number
- CN104831917A CN104831917A CN201510176371.XA CN201510176371A CN104831917A CN 104831917 A CN104831917 A CN 104831917A CN 201510176371 A CN201510176371 A CN 201510176371A CN 104831917 A CN104831917 A CN 104831917A
- Authority
- CN
- China
- Prior art keywords
- circular plate
- grip block
- semi
- type scaffold
- scaffold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a plug structure of a disk type scaffold. The plug structure is characterized in that the plug structure comprises a first fixed semi-circular plate and a second fixed semi-circular plate; and the first fixed semi-circular plate and the second fixed semi-circular plate are connected by a bolt. A first clamping plate is arranged at the first fixed semi-circular plate and a second clamping plate is arranged at the second fixed semi-circular plate; and through holes for penetration of a pin roll are formed in the first clamping plate and the second clamping plate. According to the technical scheme, the adaptability of the plug can be enhanced on the condition that the scaffold security is guaranteed; and the application range of the disk type scaffold is also enlarged.
Description
Technical field
The present invention relates to engineering scaffold field, especially relate to a kind of plug construction of disc type scaffold.
Background technology
Scaffold is at the construction field (site) for operative and the various supports solving vertical and horizontal transport and set up.Constantly perfect along with China's construction market, the management of safe operation of construction operation brings up to very high position, and much traditional scaffold, owing to not meeting safety needs, exits building stage gradually.In present construction operation, conventional scaffold has design of coupler scaffold, door-type scaffold, disc type scaffold etc.
In prior art, disc type scaffold is simple, easy for installation and have very strong bearing capacity due to structure, is widely used in engineer operation.But when using disc type scaffold, need the part of steel pipe to be connected with plug, the structural requirement for steel pipe is higher, and the steel pipe that namely must meet certain condition just can match with plug, greatly reduces the scope of application of disc type scaffold.
Summary of the invention
In view of the defect that above-mentioned prior art exists, the object of the invention is the plug construction proposing a kind of disc type scaffold.
Object of the present invention will be achieved by the following technical programs: a kind of plug construction of disc type scaffold, described plug construction comprises the first fixing semi-circular plate and the second fixing semi-circular plate, described first fixing semi-circular plate and the described second fixing semi-circular plate are bolted, described first fixing semi-circular plate is provided with the first grip block, described second fixing semi-circular plate is provided with the second grip block, and described first grip block and described second grip block are respectively provided with the through hole passed for bearing pin.
Preferably, the plug construction of above-mentioned a kind of disc type scaffold, is connected with chain between the described first fixing semi-circular plate and the described second fixing semi-circular plate.
Preferably, the plug construction of above-mentioned a kind of disc type scaffold, described first grip block is corresponding with the through hole of described second grip block, and is distributed in the chuck both sides of described disc type scaffold.
Preferably, the plug construction of above-mentioned a kind of disc type scaffold, described first fixes between semi-circular plate with described first grip block as integral type is connected; Described second fixes between semi-circular plate with described second grip block as integral type is connected.
Outstanding effect of the present invention is: be specifically designed to by arranging the circular meniscus be connected with grip block by steel pipe, steel pipe indirectly can be interconnected with grip block, thus the assembling of the scaffold that grip block and dish interfixed by bearing pin, meeting security requirement, adding the scope of application of this disc type scaffold simultaneously, can making equally for connecting for level and smooth steel pipe.
Below just accompanying drawing in conjunction with the embodiments, is described in further detail the specific embodiment of the present invention, is easier to understand, grasp to make technical solution of the present invention.
Accompanying drawing explanation
Fig. 1 is the plug construction schematic diagram of the scaffold of embodiment.
Detailed description of the invention
As shown in Figure 1, the plug construction of a kind of disc type scaffold of the present embodiment, comprise the first fixing semicircle 1 plate and the fixing semi-circular plate 1 of the second fixing semi-circular plate 2, first and second to fix semi-circular plate 2 and be connected by bolt 3, both can form columniform space for fixing steel pipe; First fixing semi-circular plate 1 is provided with the first grip block 4, the second fixing semi-circular plate 2 is provided with the second grip block 5, first grip block 4 and the second grip block 5 and is respectively provided with the through hole (not marking in accompanying drawing) that confession bearing pin passes.
Concrete, be connected with chain 6 between the first fixing semi-circular plate 1 and the second fixing semi-circular plate 2.Chain 6, for when the first fixing semi-circular plate 1 and the second fixing semi-circular plate 2 are in released state, can use at any time, be unlikely to go in use to find and pairing again.
Concrete, the first grip block 4 is corresponding with the through hole of the second grip block 5, and is distributed in the chuck both sides of disc type scaffold.First grip block 4, chuck and the second grip block 5 three distribute successively, when passing three with bearing pin, can be fixed on disc type scaffold.
Concrete, first fixes between semi-circular plate 1 with the first grip block 4 as integral type is connected; Second fixes between semi-circular plate 2 with described second grip block 5 as integral type is connected.Be convenient to when the first fixing semi-circular plate 1 and the second fixing semi-circular plate 2 step up mutually, the first grip block 4 and the second grip block 5 can tighten up simultaneously, are fixed on chuck.
The present invention still has numerous embodiments, all employing equivalents or equivalent transformation and all technical schemes formed, and all drops within protection scope of the present invention.
Claims (1)
1. the plug construction of a disc type scaffold, it is characterized in that, described plug construction comprises the first fixing semi-circular plate and the second fixing semi-circular plate, described first fixing semi-circular plate and the described second fixing semi-circular plate are bolted, described first fixing semi-circular plate is provided with the first grip block, described second fixing semi-circular plate is provided with the second grip block, described first grip block and described second grip block are respectively provided with the through hole passed for bearing pin, chain is connected with between described first fixing semi-circular plate and the described second fixing semi-circular plate, described first grip block is corresponding with the through hole of described second grip block, and be distributed in the chuck both sides of described disc type scaffold, described first fixes between semi-circular plate with described first grip block as integral type is connected, described second fixes between semi-circular plate with described second grip block as integral type is connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510176371.XA CN104831917A (en) | 2015-04-15 | 2015-04-15 | Plug structure of disk type scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510176371.XA CN104831917A (en) | 2015-04-15 | 2015-04-15 | Plug structure of disk type scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104831917A true CN104831917A (en) | 2015-08-12 |
Family
ID=53810075
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510176371.XA Pending CN104831917A (en) | 2015-04-15 | 2015-04-15 | Plug structure of disk type scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104831917A (en) |
-
2015
- 2015-04-15 CN CN201510176371.XA patent/CN104831917A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204738525U (en) | Plug structure of disk scaffold | |
CN203820287U (en) | Composite steel carrying pole for hoisting roof tiles of steel structure workshops | |
CN202949195U (en) | Pipeline segment connecting joint of cable protection pipe | |
CN203531483U (en) | Tower body connection structure of single-pipe tower and single-pipe tower | |
CN203486756U (en) | Lifting tool suitable for I-shaped steel | |
CN104831917A (en) | Plug structure of disk type scaffold | |
CN103225412A (en) | Vertical connector for workside guard rails | |
CN203403665U (en) | Anti-falling scaffold with annular sleeve | |
CN203569974U (en) | Door lock handle fixing structure | |
MX2016002431A (en) | Support crossbeam for a work platform. | |
CN203006796U (en) | Embrace hoop type wall-attached connecting piece used for tower crane | |
CN204112706U (en) | A kind of Inner expands formula to clasp | |
CN204044391U (en) | A kind of fiber coupler | |
CN205742969U (en) | A kind of construction site scaffold clasp | |
CN204059929U (en) | A kind of civil engineering connects with steel tube device | |
CN203514632U (en) | Middle-connected steel beam | |
CN204022292U (en) | The connection structure of bridging crane main beam and end carriage | |
CN204152175U (en) | Sizing railroad track shaped steel Mobile operating platform | |
CN203905832U (en) | Supporting base for escape sliding way of drilling rig | |
CN204212397U (en) | A kind of building site scaffold fastenings | |
CN202925880U (en) | A safe and steady multifunctional scaffold | |
CN204778382U (en) | Hoist draw beam group with adjustable it is two -way | |
CN202675323U (en) | Boiler flue truss node device | |
CN205531281U (en) | Tool connecting tube of building scaffold | |
CN204370821U (en) | The large-scale rectangular slab of stone fixture of a kind of tower crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150812 |
|
RJ01 | Rejection of invention patent application after publication |