CN104826970A - Flange disc forging and molding process - Google Patents

Flange disc forging and molding process Download PDF

Info

Publication number
CN104826970A
CN104826970A CN201510241315.XA CN201510241315A CN104826970A CN 104826970 A CN104826970 A CN 104826970A CN 201510241315 A CN201510241315 A CN 201510241315A CN 104826970 A CN104826970 A CN 104826970A
Authority
CN
China
Prior art keywords
raw material
diameter
hydraulic press
pier
butt end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510241315.XA
Other languages
Chinese (zh)
Inventor
吴光英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510241315.XA priority Critical patent/CN104826970A/en
Publication of CN104826970A publication Critical patent/CN104826970A/en
Pending legal-status Critical Current

Links

Landscapes

  • Forging (AREA)

Abstract

The invention provides a flange disc forging and molding process. The flange disc forging and molding process comprises the following steps: putting a raw material into a pre-molding mold; pressing to a maximum route by using a molding punch of a first oil press to roughly ram one end of the raw material; setting a movable punch on the end face of the rammed end of the raw material; the diameter of the first end of the movable punch is equal to the designed diameter of the rammed end of the raw material, and the end face is a plane used for being matched with the rammed end of the raw material; the diameter of the second end of the movable punch is greater than the designed diameter of the rammed end of the raw material; a groove matched with the molding punch of the first oil press is formed in the end face; the inner diameter of the groove is equal to the diameter of the molding punch of the first oil press. According to the flange disc forging and molding process provided by the invention, a half shaft with the greater diameter of the flange disc is pressed by using the oil press with a smaller tonnage, so that the production cost of a half shaft part is reduced and the whole vehicle cost is reduced.

Description

A kind of ring flange forging molding process
Technical field
The present invention relates to a kind of ring flange forging molding process, belong to casting technology field.
Background technology
The greatest diametrical dimension of ring flange can be subject to the restriction of device structure, tonnage.For 200 tons of pendulum mills, its ring flange maximum gauge that can have put is φ 240mm, and piece weight is at about 35Kg.When ring flange diameter is more than φ 240, when such as certain model needs φ 370mm, by theoretical demand equipment tonnage at least 3000 tons, and our factory only has the hydraulic press of maximum tonnage 1250 tons, and this is just considerably beyond existing equipment limit tonnage, when putting mill and being shaping, by pendulum mill tonnage, the pressure restriction that yaw bearing can bear, ring flange is shaping bad, ring flange cylindrical sharp corner can not put, misrun.Select large-tonnage equipment cost higher, with yaw bearing for 200 tons of pendulum mills, two mouthfuls of bearings are bearing designation 29364 (price 7000 yuan) and 29352 (prices 4000 yuan) respectively, if more than 30,000 yuan, import type 29364 bearing, within bearing 2-3 month, just change once; If directly purchase finished product large-diameter flange plates semiaxis (at present all for by imported from America), cost is also high, and and then increased integral vehicle cost.For above-mentioned situation, how to improve semiaxis forging molding process, realize the semiaxis utilizing the equipment forging molding ring flange diameter of less tonnage larger, reduce production cost, become the important technological problems that those skilled in the art are urgently to be resolved hurrily.
Summary of the invention
The invention provides a kind of ring flange forging molding process, the above defect can be overcome.
For solving above technical problem, the invention provides following technical scheme: a kind of crankshaft forging moulding process, comprises the steps:
Raw material is put into preforming tool, utilizes the forming punching head of the first hydraulic press to be pressed into range by thick for one end pier of raw material; Arrange movable ram at the end face of raw material pier butt end, the diameter of this movable ram first end equals the intended diameter of raw material pier butt end, and its end face is the plane coordinated for same raw material pier butt end; The diameter of the second end is greater than the intended diameter of raw material pier butt end, its end face offers the groove for the cooperation with the first hydraulic press forming punching head, the internal diameter of this groove equals the diameter of the first hydraulic press forming punching head, and the bottom land of groove is the plane for coordinating with the first hydraulic press forming punching head; Adopt the first hydraulic press to be pressed into its range, make the pier butt end of raw material shaping; The lower part of preformed die holder has downward projection, for holding the non-pier butt end of raw material; Preformed die holder lower part has the mounting plane contacting with hydraulic press operating platform and coordinate around projection, and the installation site of this projection is lower than the upper surface of hydraulic press operating platform; The length 1270mm of raw material, diameter 110, the intended diameter 370mm of ring flange; First hydraulic press adopts 500 tons of hydraulic presses, its maximum shut height 2050mm, range 900mm, the installation site hydraulic press operating platform 400mm of the lower lobes of preformed die holder; Second hydraulic press adopts 1250 tons of hydraulic presses.
Ring flange forging molding process provided by the invention, the larger semiaxis of ring flange diameter suppressed by the hydraulic press of the less tonnage of this technology utilization, reduces the production cost of semiaxis part, and then reduces integral vehicle cost.
Detailed description of the invention
A kind of crankshaft forging moulding process, comprises the steps:
Raw material is put into preforming tool, utilizes the forming punching head of the first hydraulic press to be pressed into range by thick for one end pier of raw material; Arrange movable ram at the end face of raw material pier butt end, the diameter of this movable ram first end equals the intended diameter of raw material pier butt end, and its end face is the plane coordinated for same raw material pier butt end; The diameter of the second end is greater than the intended diameter of raw material pier butt end, its end face offers the groove for the cooperation with the first hydraulic press forming punching head, the internal diameter of this groove equals the diameter of the first hydraulic press forming punching head, and the bottom land of groove is the plane for coordinating with the first hydraulic press forming punching head; Adopt the first hydraulic press to be pressed into its range, make the pier butt end of raw material shaping; The lower part of preformed die holder has downward projection, for holding the non-pier butt end of raw material; Preformed die holder lower part has the mounting plane contacting with hydraulic press operating platform and coordinate around projection, and the installation site of this projection is lower than the upper surface of hydraulic press operating platform; The length 1270mm of raw material, diameter 110, the intended diameter 370mm of ring flange; First hydraulic press adopts 500 tons of hydraulic presses, its maximum shut height 2050mm, range 900mm, the installation site hydraulic press operating platform 400mm of the lower lobes of preformed die holder; Second hydraulic press adopts 1250 tons of hydraulic presses.
Ring flange forging molding process provided by the invention, the larger semiaxis of ring flange diameter suppressed by the hydraulic press of the less tonnage of this technology utilization, reduces the production cost of semiaxis part, and then reduces integral vehicle cost.
Detailed description of the invention of the present invention does not form the restriction to the application's scope; within every spirit in the present invention's design and principle, any amendment that one of skill in the art can make, equivalent to replace and improvement etc. all should be included within protection scope of the present invention.

Claims (1)

1. a ring flange forging molding process, is characterized in that, comprises the steps:
Raw material is put into preforming tool, utilizes the forming punching head of the first hydraulic press to be pressed into range by thick for one end pier of raw material; Arrange movable ram at the end face of raw material pier butt end, the diameter of this movable ram first end equals the intended diameter of raw material pier butt end, and its end face is the plane coordinated for same raw material pier butt end; The diameter of the second end is greater than the intended diameter of raw material pier butt end, its end face offers the groove for the cooperation with the first hydraulic press forming punching head, the internal diameter of this groove equals the diameter of the first hydraulic press forming punching head, and the bottom land of groove is the plane for coordinating with the first hydraulic press forming punching head; Adopt the first hydraulic press to be pressed into its range, make the pier butt end of raw material shaping; The lower part of preformed die holder has downward projection, for holding the non-pier butt end of raw material; Preformed die holder lower part has the mounting plane contacting with hydraulic press operating platform and coordinate around projection, and the installation site of this projection is lower than the upper surface of hydraulic press operating platform; The length 1270mm of raw material, diameter 110, the intended diameter 370mm of ring flange; First hydraulic press adopts 500 tons of hydraulic presses, its maximum shut height 2050mm, range 900mm, the installation site hydraulic press operating platform 400mm of the lower lobes of preformed die holder; Second hydraulic press adopts 1250 tons of hydraulic presses.
CN201510241315.XA 2015-05-13 2015-05-13 Flange disc forging and molding process Pending CN104826970A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510241315.XA CN104826970A (en) 2015-05-13 2015-05-13 Flange disc forging and molding process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510241315.XA CN104826970A (en) 2015-05-13 2015-05-13 Flange disc forging and molding process

Publications (1)

Publication Number Publication Date
CN104826970A true CN104826970A (en) 2015-08-12

Family

ID=53805370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510241315.XA Pending CN104826970A (en) 2015-05-13 2015-05-13 Flange disc forging and molding process

Country Status (1)

Country Link
CN (1) CN104826970A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1095651A (en) * 1993-12-30 1994-11-30 王向阳 The forging method of semiaxis and split-die thereof behind the full-plastic automotive
JPH11254079A (en) * 1998-03-16 1999-09-21 Mitsubishi Motors Corp Forging die device
CN101947634A (en) * 2010-09-03 2011-01-19 东风汽车有限公司 Forging process for flange of half shaft of automobile rear axle
CN102284669A (en) * 2011-06-19 2011-12-21 江苏森威精锻有限公司 Precise forming process of flange shaft
CN104084514A (en) * 2014-07-10 2014-10-08 吉林圆方机械集团有限公司 Half axle forging forming technology

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1095651A (en) * 1993-12-30 1994-11-30 王向阳 The forging method of semiaxis and split-die thereof behind the full-plastic automotive
JPH11254079A (en) * 1998-03-16 1999-09-21 Mitsubishi Motors Corp Forging die device
CN101947634A (en) * 2010-09-03 2011-01-19 东风汽车有限公司 Forging process for flange of half shaft of automobile rear axle
CN102284669A (en) * 2011-06-19 2011-12-21 江苏森威精锻有限公司 Precise forming process of flange shaft
CN104084514A (en) * 2014-07-10 2014-10-08 吉林圆方机械集团有限公司 Half axle forging forming technology

Similar Documents

Publication Publication Date Title
CN204396767U (en) Bullet train wheel forging and molding mold
CN102350616B (en) Machining process of high-accuracy flanged bearing bush
CN103962456A (en) Automobile air-conditioner sucking cup punch forming die
CN104084514B (en) A kind of semiaxis forging molding process
CN105057556A (en) Forging molding process of bearing ring
CN104826970A (en) Flange disc forging and molding process
CN204307929U (en) For interior frock of establishing high annular boss ring forging to forge
CN204308124U (en) For the assembling die of motor-car high gear ring blank forging
CN205798138U (en) Numerical control press multiple-hole die structure
CN202516930U (en) Stamping die for convex hull structure of rear panel of light-emitting diode (LED) display
CN104128764A (en) End socket machining process
CN203863025U (en) Rocking-rolling mold for making iron-copper dual-metal sealing nut
CN104475454B (en) For interior frock of establishing high annular boss ring forging to forge
CN207787662U (en) A kind of Split mold for cast aluminum alloy wheel
CN104368735A (en) Tool used for forging blank of heavy mining truck wheel hub
CN102000823A (en) Process for manufacturing powder metallurgy pump shell
CN204308112U (en) For the frock of heavy mine car hub for vehicle wheel blank forging
CN105522109A (en) Zinc-copper-aluminum-magnesium alloy mold manufacturing method
CN204449166U (en) Hydraulic valve valve cover die
CN208261616U (en) A kind of chamfer punch
CN205165704U (en) An interior T shape ring blank is upset and is crowded fashioned mould
CN209902157U (en) Forming die of C style of calligraphy section annular forging
CN204867266U (en) Bearing ring forges finishing mould among forming technology
CN202824386U (en) Stamping die capable of reducing forming stress
CN110842121A (en) Forging die for wind power bearing ring

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150812

RJ01 Rejection of invention patent application after publication