CN104816542B - A kind of conduction band washing equipment of circular screen printer - Google Patents

A kind of conduction band washing equipment of circular screen printer Download PDF

Info

Publication number
CN104816542B
CN104816542B CN201510243823.1A CN201510243823A CN104816542B CN 104816542 B CN104816542 B CN 104816542B CN 201510243823 A CN201510243823 A CN 201510243823A CN 104816542 B CN104816542 B CN 104816542B
Authority
CN
China
Prior art keywords
water tank
water
main
sewage
washing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510243823.1A
Other languages
Chinese (zh)
Other versions
CN104816542A (en
Inventor
陈永林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Kuntai Environmental Protection Technology Co., Ltd.
Original Assignee
Huzhou Youchuang Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huzhou Youchuang Technology Co Ltd filed Critical Huzhou Youchuang Technology Co Ltd
Priority to CN201510243823.1A priority Critical patent/CN104816542B/en
Publication of CN104816542A publication Critical patent/CN104816542A/en
Application granted granted Critical
Publication of CN104816542B publication Critical patent/CN104816542B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices For Medical Bathing And Washing (AREA)
  • Cleaning In General (AREA)

Abstract

The present invention provides a kind of conduction band washing equipment of circular screen printer, including supply tank, prewashing device and main cleaning device;Prewashing device includes pre- water tank, prewashing is sprayed head, prewash slop accepts water tank;Main cleaning device includes main water tank, main washing and spraying syringe pipe, main sewage of washing and accepts water tank, hairbrush;Main wash in sewage undertaking water tank is provided with slagging-off grid basket, and main sewage undertaking water tank of washing connects with pre- water tank.By above-mentioned technical proposal, prewashing device carries out prerinse to conduction band;Afterwards, the conduction band after prerinse is cleaned by main cleaning device.Wherein, the sewage after main washing and spraying syringe pipe is rinsed to conduction band falls into main sewage of washing and accepted in water tank, and slagging-off grid basket carries out filter residue to falling into the main sewage washed in sewage undertaking water tank, with except the debris in decontaminated water.Sewage after the grid basket filter residue that removes the gred is flowed into pre- water tank, for the prerinse to conduction band.In this way, the present invention improves the cleaning effect of prewashing on the premise of saving water resource.

Description

A kind of conduction band washing equipment of circular screen printer
Technical field:
The present invention relates to circular screen printer technical field, the conduction band washing in particular to a kind of circular screen printer is set It is standby.
Background technology:
The print guide belt of circular screen printer need to be drawn after a stamp is completed and suddenly be attached to the loose thread on conduction band surface, residual slurry Deng dirt, patch stamp next time can be carried out.
Application No. CN 103832069A patent application discloses a kind of conductive band washing device of circular screen printer, bag Include prewashing part and master washes part, the prewashing part is located at the top of pre- water tank, including two prewashing are sprayed head, one Flat scraper and a sponge are cleaned block, the prewashing part is cleaned using the water in pre- water tank to conduction band;It is described The main top washed part and be located at main water tank, including two main washing and spraying syringe pipes, a brush roll and the spaced T of twice Type scraper, described two main washing and spraying syringe pipes are located at the front and rear sides of brush roll respectively, and the T-shaped scraper of twice is located at two The rear side of main washing and spraying syringe pipe, the master are washed part and conduction band are cleaned using the water in main water tank.
The first purpose of foregoing invention application is by the design of the position and structure of main water tank and pre- water tank, to water Resource is reused, saving water resource.
The content of the invention:
Technical problem solved by the invention:Although foregoing invention application by the position of main water tank and pre- water tank and The design of structure, is reused to water resource, with saving water resource, still, is flowed into from main water tank in pre- water tank Water in be mingled with some loose threads not soluble in water or other impurities unavoidably, in this way, using such a water to print guide belt carry out prewashing, It is difficult to the cleaning effect for improving prewashing.
The present invention provides following technical scheme:
A kind of conduction band washing equipment of circular screen printer, including supply tank, prewashing device and main cleaning device;
The prewashing device includes pre- water tank, prewashing is sprayed head, prewash slop accepts water tank, the pre- washing and spraying Syringe pipe draws the water in pre- water tank by water pipe and water pump and conduction band is rinsed, and prewash slop accepts water tank and is located at prewashing It is sprayed the lower section of head;
The main cleaning device includes main water tank, main washing and spraying syringe pipe, main sewage of washing and accepts water tank, hairbrush;The confession Water tank connects main water tank, and the water that the main washing and spraying syringe pipe is drawn by water pipe and water pump in main water tank is carried out to conduction band Rinse, main sewage of washing accepts the lower section that water tank is located at main washing and spraying syringe pipe, and the master washes in sewage undertaking water tank and is provided with slagging-off Grid basket, main sewage undertaking water tank of washing connect with pre- water tank;
Press the traffic direction of conduction band, the prewashing be sprayed head and main washing and spraying syringe pipe respectively positioned at hairbrush rear and Front, the hairbrush are scrubbed to conduction band in rotary manner close to main washing and spraying syringe pipe, hairbrush.
By above-mentioned technical proposal, the prewashing in prewashing device is sprayed head and carries out prerinse to conduction band first;Afterwards, pass through Conduction band after prerinse is run to main cleaning device, and hairbrush is brushed to conduction band surface in rotary manner under the driving of motor Wash;Afterwards, main washing and spraying syringe pipe is rinsed to the conduction band scrubbed through hairbrush.Wherein, prewashing spray irrigation head enters to conduction band The prewashed sewage of row falls into prewash slop and accepted in water tank, and accepting water tank by prewash slop discharges it this equipment;Master washes spray Sewage after leaching syringe pipe is rinsed to conduction band falls into main sewage of washing and accepted in water tank, and slagging-off grid basket washes sewage to falling into master The sewage accepted in water tank carries out filter residue, with except the debris in decontaminated water.Sewage after the grid basket filter residue that removes the gred flows into prewashing In water tank, for the prerinse to conduction band.
Pass through above-mentioned technical proposal, the present invention are removed by the grid basket that removes the gred to the main sewage washed in sewage undertaking water tank Prerinse is used it for after slag, in this way, the present invention improves the cleaning effect of prewashing on the premise of saving water resource.
As the present invention to a kind of main explanation washed sewage and accept water tank, the master, which washes sewage and accepts water tank and open up, to slag tap Mouthful, slag notch is positioned at the lower section of slagging-off grid basket.Above-mentioned slag notch, which is used to discharging some, to be deposited on main sewage of washing and accepts water tank bottom The tiny residue in portion.
As a modification of the present invention, conduction band washing equipment of the present invention also includes filtering foreign case, the debris Rose Box with it is main wash sewage accept water tank and pre- water tank be set up in parallel and positioned at it is main wash sewage accept water tank and pre- water tank it Between;Water inlet and delivery port are respectively equipped with the relative two side of the filtering foreign case, water inlet accepts water with main sewage of washing Case connects, and delivery port connects with pre- water tank;The height of the delivery port is less than the height of water inlet, and filtering foreign case is provided with out The madial wall at the mouth of a river is provided with the case of up/down perforation, and the delivery port is located in case.
By above-mentioned improvement, the sewage after the grid basket filter residue that removes the gred flows into filtering foreign case by water inlet, due to going out The height at the mouth of a river is less than the height of water inlet, and the case for having up/down perforation is shrouded on delivery port, therefore, flows into filtering foreign case Sewage in, the small debris of density ratio water floats on the surface under the stop of case, sewage through case lower openings flow into case It is interior, then flow into pre- water tank through delivery port.To sum up, debris of the not soluble in water and density less than water can be trapped in by filtering foreign case In filtering foreign case.If need to remove the debris being trapped in filtering foreign case, operating personnel can be from the top of filtering foreign case Debris is drawn out.
Based on above-mentioned improvement, further improved as of the invention, the filtering foreign case, main sewage of washing accept water tank, pre- Water tank is structure as a whole.
One kind of pre- water tank is illustrated as the present invention, is provided with suction pump in the pre- water tank, suction pump sets ball float Switch, the delivery port of suction pump are accepted water tank with prewash slop by water pipe and connected;Liquid-level switch is provided with the pre- water tank, Pre- water tank connects with supply tank, is provided with supply tank and extracts water in supply tank to the water pump in pre- water tank, the water pump with Liquid-level switch connects, and when the water level in pre- water tank be less than liquid-level switch, water pump in supply tank acts, and supply tank is to prewashing Cistern water supply.
By the above-mentioned explanation for pre- water tank, when the water in pre- water tank constantly accumulates, when the water surface reach a certain height, Float switch drives suction pump to act, and the water in pre- water tank is drawn into prewash slop and accepted in water tank by suction pump, by prewashing Sewage accepts water tank and water is exported into this equipment;When the water surface in pre- water tank is less than certain altitude, liquid-level switch drives water supply Water pump action in case, from supply tank directly to prewashing cistern water supply.
As a modification of the present invention, conduction band washing equipment of the present invention also includes water cover, and the water cover includes master Sewage diversion cavity and prewash slop diversion cavity are washed, the top that the prewash slop accepts water tank is provided with prewash slop undertaking funnel, Funnel is accepted provided with main sewage of washing in the top that the master washes sewage undertaking water tank;The water cover is arranged on prewash slop and accepts funnel Accepted with main sewage of washing on funnel, prewash slop diversion cavity is accepted funnel with prewash slop and connected, and master washes sewage diversion cavity and master Wash sewage and accept funnel connection;The prewashing is sprayed head and is located in prewash slop diversion cavity, the main washing and spraying syringe pipe Washed with hairbrush positioned at master in sewage diversion cavity.By above-mentioned improvement, prewash slop flows into prewash slop through prewash slop diversion cavity and held Funnel is connect, then flows into prewash slop and accepts water tank;Main sewage of washing accepts funnel through the main main sewage of washing of sewage diversion cavity inflow of washing, then Flow into main sewage of washing and accept water tank.
Brief description of the drawings:
The present invention is described further below in conjunction with the accompanying drawings:
Fig. 1 is a kind of general structure schematic diagram of the conduction band washing equipment of circular screen printer of the present invention;
Fig. 2 accepts water tank, the top view of pre- water tank for the filtering foreign case of integrative-structure, main sewage of washing in Fig. 1;
Fig. 3 is Fig. 2 left view;
Fig. 4 is the structural representation of Fig. 1 reclaimed water covers.
Embodiment:
Such as Fig. 1, a kind of conduction band washing equipment of circular screen printer, including it is supply tank 10, prewashing device and main cleaning device, miscellaneous Thing Rose Box 40, water cover 50.
Such as Fig. 1, the prewashing device includes pre- water tank 21, prewashing is sprayed first 22, prewash slop and accepts water tank 23. The prewashing is sprayed the water that head is drawn by water pipe and water pump in pre- water tank and conduction band A is rinsed.Prewash slop is held Water receiving case is located at the lower section that prewashing is sprayed head.
In above-mentioned prewashing device, such as Fig. 1, the pre- water tank 21 is interior to be provided with suction pump 24, and suction pump sets float switch 240, the delivery port of suction pump is accepted water tank 23 with prewash slop by water pipe and connected;Opened in the pre- water tank provided with liquid level Close, pre- water tank connects with supply tank 10, is provided with supply tank and extracts water in supply tank to the water pump in pre- water tank, the water Pump is connected with liquid-level switch, when the water level in pre- water tank is less than liquid-level switch, the action of water pump in supply tank, supply tank to Prewashing cistern water supply.
Such as Fig. 1, the main cleaning device, which includes main water tank 31, main washing and spraying syringe pipe 32, hairbrush 33, main sewage of washing, to be accepted Water tank 34.The supply tank connects main water tank, and the main washing and spraying syringe pipe is drawn in main water tank by water pipe and water pump Water conduction band is rinsed.With reference to Fig. 2, Fig. 3, main sewage of washing accepts the lower section that water tank is located at main washing and spraying syringe pipe, described Main wash in sewage undertaking water tank is provided with slagging-off grid basket 342, and main sewage undertaking water tank of washing connects with pre- water tank.The master washes dirt Water accepts water tank 34 and opens up slag notch 341, and slag notch is positioned at the lower section of slagging-off grid basket 342.
Such as Fig. 1, by conduction band A traffic direction, the prewashing is sprayed head and main washing and spraying syringe pipe is located at hair respectively Brush rear and front, the hairbrush are scrubbed to conduction band in rotary manner close to main washing and spraying syringe pipe, hairbrush.
Such as Fig. 2, the filtering foreign case 40 washes that sewage accepts water tank 34 and pre- water tank 21 is set up in parallel and is located at main Main sewage of washing is accepted between water tank and pre- water tank;The filtering foreign case 40, main sewage of washing accept water tank 34, pre- water tank 21 It is structure as a whole.With reference to Fig. 2, the filtering foreign case is respectively equipped with water inlet 41 and delivery port 42 on relative two side, enters The mouth of a river connects with main sewage undertaking water tank of washing, and delivery port connects with pre- water tank;The height of the delivery port is less than water inlet Highly, filtering foreign case is provided with case 43 of the madial wall provided with up/down perforation of delivery port, and the delivery port is located in case.
With reference to Fig. 1, Fig. 2, the water cover 50 includes master and washes sewage diversion cavity 51 and prewash slop diversion cavity 52, the prewashing The top that sewage accepts water tank 23 is provided with prewash slop undertaking funnel 230, and the top that the master washes sewage undertaking water tank 34 is provided with Main sewage of washing accepts funnel 340;The water cover is arranged on prewash slop undertaking funnel and main sewage of washing is accepted on funnel, and prewashing is dirty Water diversion cavity is accepted funnel with prewash slop and connected, and main sewage diversion cavity of washing connects with main sewage undertaking funnel of washing;The prewashing First 22 are sprayed in prewash slop diversion cavity, the main washing and spraying syringe pipe 32 and hairbrush 33 wash sewage water conservancy diversion positioned at master Intracavitary.
In practical operation, the prewashing in prewashing device is sprayed first 22 and carries out prerinse, prewash slop to conduction band A first Prewash slop, which is flowed into, through water cover 50 accepts water tank 23.Conduction band A after prerinse is run to main cleaning device, and hairbrush 33 is in motor Driving under conduction band A surfaces are scrubbed in rotary manner;Afterwards, main washing and spraying syringe pipe 32 is to scrubbing through hairbrush 33 Conduction band A is rinsed, and main sewage of washing accepts water tank 34 through the main sewage of washing of the inflow of water cover 50.342 pairs of slagging-off grid basket falls into master and washed The sewage that sewage is accepted in water tank 34 carries out filter residue, with except the debris in decontaminated water;Again density ratio is removed through filtering foreign case 40 The small debris of water.Afterwards, sewage is flowed into pre- water tank 21, for the prerinse to conduction band A.
Above content is only the better embodiment of the present invention, for one of ordinary skill in the art, according to the present invention Thought, there will be changes, this specification content should not be construed as to this hair in specific embodiments and applications Bright limitation.

Claims (1)

1. a kind of conduction band washing equipment of circular screen printer, including supply tank (10), prewashing device and main cleaning device;The prewashing Device includes pre- water tank (21) and prewashing is sprayed head (22), and the prewashing is sprayed head (22) and passes through water pipe and water pump The water drawn in pre- water tank (21) is rinsed to conduction band (A);The main cleaning device includes main water tank (31), main washing and spraying Syringe pipe (32), hairbrush (33);The supply tank (10) connects main water tank (31), and main washing and spraying (32) syringe pipe passes through The water that water pipe and water pump are drawn in main water tank (31) is rinsed to conduction band;Press the traffic direction of conduction band, the pre- washing and spraying Syringe pipe (22) and main washing and spraying syringe pipe (32) are located at hairbrush (33) rear and front respectively, and the hairbrush (33) is washed close to master Head (32) is sprayed, hairbrush (33) is scrubbed to conduction band in rotary manner;It is characterized in that:The prewashing device also wraps Include prewash slop and accept water tank (23), the main cleaning device also includes main sewage of washing and accepts water tank (34), and prewash slop accepts water Case (23) is located at the lower section that prewashing is sprayed head (22), and main sewage undertaking water tank (34) of washing is located at main washing and spraying syringe pipe (32) Lower section, the master, which washes sewage and accepted, is provided with slagging-off grid basket (342) in water tank (34), it is main wash sewage accept water tank (34) with it is pre- Water tank (21) connects;
The master washes sewage undertaking water tank (34) and opens up slag notch (341), and slag notch is positioned at the lower section of slagging-off grid basket (342);
Also include filtering foreign case (40), the filtering foreign case (40) accepts water tank (34) and pre- water tank with main sewage of washing (21) it is set up in parallel and is accepted positioned at main sewage of washing between water tank (34) and pre- water tank (21);Filtering foreign case (40) phase To two side on be respectively equipped with water inlet (41) and delivery port (42), water inlet (41) accepts water tank (34) even with main sewage of washing Logical, delivery port (42) connects with pre- water tank (21);The height of the delivery port (42) is less than the height of water inlet (41), debris Rose Box (40) is provided with case (43) of the madial wall provided with up/down perforation of delivery port (42), and the delivery port (42) is positioned at cover In shell (43);
The filtering foreign case (40), master wash sewage undertaking water tank (34), pre- water tank (21) is structure as a whole;
Suction pump (24) is provided with the pre- water tank (21), suction pump sets float switch (240), the delivery port of suction pump (24) Water tank (23) is accepted by water pipe with prewash slop to connect;Liquid-level switch, pre- water tank are provided with the pre- water tank (21) (21) connected with supply tank (10), be provided with supply tank (10) and extract water in supply tank to the water pump in pre- water tank (21), The water pump is connected with liquid-level switch, when the water level in pre- water tank (21) is less than liquid-level switch, the water pump in supply tank (10) Action, supply tank (10) supply water to pre- water tank (21);
Also include water cover (50), the water cover includes master and washes sewage diversion cavity (51) and prewash slop diversion cavity (52), described pre- The top for washing sewage undertaking water tank (23) is provided with prewash slop undertaking funnel (230), and the master washes sewage and accepts water tank (34) Top is provided with main sewage of washing and accepts funnel (340);The water cover (50) is arranged on prewash slop undertaking funnel (230) and master washes dirt Water is accepted on funnel (340), and prewash slop diversion cavity (52) is accepted funnel (230) with prewash slop and connected, and master washes sewage water conservancy diversion Chamber (52) connects with main sewage undertaking funnel (340) of washing;The prewashing is sprayed head (22) and is located at prewash slop diversion cavity (52) in, the main washing and spraying syringe pipe (32) and hairbrush (33) are washed in sewage diversion cavity (52) positioned at main.
CN201510243823.1A 2015-05-13 2015-05-13 A kind of conduction band washing equipment of circular screen printer Active CN104816542B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510243823.1A CN104816542B (en) 2015-05-13 2015-05-13 A kind of conduction band washing equipment of circular screen printer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510243823.1A CN104816542B (en) 2015-05-13 2015-05-13 A kind of conduction band washing equipment of circular screen printer

Publications (2)

Publication Number Publication Date
CN104816542A CN104816542A (en) 2015-08-05
CN104816542B true CN104816542B (en) 2017-12-29

Family

ID=53727130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510243823.1A Active CN104816542B (en) 2015-05-13 2015-05-13 A kind of conduction band washing equipment of circular screen printer

Country Status (1)

Country Link
CN (1) CN104816542B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106945402A (en) * 2017-03-24 2017-07-14 苏州艾虎数码科技有限公司 A kind of digital decorating machine conduction band cleaning device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201275920Y (en) * 2008-08-25 2009-07-22 上海坚新机电设备有限公司 Water-saving conduction band water washing apparatus
CN103832069A (en) * 2012-11-20 2014-06-04 吴江市利群纺织有限公司 Guiding belt water washing device of circular screen printer
CN203974211U (en) * 2014-07-15 2014-12-03 陈崇元 Printing machine water tank auxiliary agent automatic adding device
CN204054939U (en) * 2014-07-23 2014-12-31 新昌越海印花机械有限公司 Guide belt of decorating machine cleaning device
CN204736559U (en) * 2015-05-13 2015-11-04 湖州博润实业有限公司 Circular screen printer's conduction band washing equipment

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0911447A (en) * 1995-06-28 1997-01-14 Mimatsu:Kk Cleaning equipment of screen plate or the like

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201275920Y (en) * 2008-08-25 2009-07-22 上海坚新机电设备有限公司 Water-saving conduction band water washing apparatus
CN103832069A (en) * 2012-11-20 2014-06-04 吴江市利群纺织有限公司 Guiding belt water washing device of circular screen printer
CN203974211U (en) * 2014-07-15 2014-12-03 陈崇元 Printing machine water tank auxiliary agent automatic adding device
CN204054939U (en) * 2014-07-23 2014-12-31 新昌越海印花机械有限公司 Guide belt of decorating machine cleaning device
CN204736559U (en) * 2015-05-13 2015-11-04 湖州博润实业有限公司 Circular screen printer's conduction band washing equipment

Also Published As

Publication number Publication date
CN104816542A (en) 2015-08-05

Similar Documents

Publication Publication Date Title
CN106894377A (en) A kind of recyclable road cleaning vehicle
CN204397578U (en) Steel wire oxide skin removal device
CN102490693A (en) Water-saving car washer
KR20100007340A (en) Dishwasher
CN108720783A (en) A kind of continuous filter unit for dish-washing machine
CN108580371B (en) Double-sided cleaning device for flat castings
CN104816542B (en) A kind of conduction band washing equipment of circular screen printer
CN204736559U (en) Circular screen printer's conduction band washing equipment
CN210673245U (en) Dish washer with residue filter equipment
KR20060095838A (en) Air break assembly of dish washing machine
CN208004404U (en) Radix Notoginseng cleaning machine cleans hair root reception device
CN204618140U (en) Dish cleaning device
CN207640350U (en) A kind of water tank cleaner
CN209568712U (en) A kind of construction site water-saving environment-friendly type footbath
CN215227293U (en) Clean cleaning machines people basic station
CN212394781U (en) Cavity glass belt cleaning device with sewage treatment function
JP2015012882A (en) Dishwasher
CN208466752U (en) A kind of cycling use of water high-pressure cleaning device
CN208513221U (en) A kind of ultrasonic cleaning apparatus filtration cycle mechanism
CN219581293U (en) Recoil type cleaning device and hair washing device
CN204995405U (en) Wash and float integrative drop and push away novel ultrasonic wave dish washer of oily formula
CN110834018A (en) Intelligent water heater with self-cleaning function
JP2009056425A (en) Cleaning device
CN204995404U (en) Small -size mini ultrasonic wave dish washer of side water sword floating oil formula
CN217661749U (en) Spraying device for vacuum filter

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Chen Yonglin

Inventor before: Xu Qiang

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20171110

Address after: 313000, room 3, 1506, Modern Plaza, Wuxing District, Zhejiang, Huzhou

Applicant after: HUZHOU YOUCHUANG TECHNOLOGY CO., LTD.

Address before: Wuxing District of Zhejiang city of Huzhou province in 313000 eight Zhen standard workshop four weft Road No. 888

Applicant before: Huzhou Bo Run Industrial Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181221

Address after: 224400 E4-2, E District, SME Park, Funing County Economic Development Zone, Yancheng City, Jiangsu Province

Patentee after: Jiangsu Kuntai Environmental Protection Technology Co., Ltd.

Address before: 313000 room 1506, 3 Hyundai Plaza, Wuxing District, Huzhou, Zhejiang.

Patentee before: HUZHOU YOUCHUANG TECHNOLOGY CO., LTD.

TR01 Transfer of patent right