A kind of conduction band washing equipment of circular screen printer
Technical field:
The present invention relates to circular screen printer technical field, the conduction band washing in particular to a kind of circular screen printer is set
It is standby.
Background technology:
The print guide belt of circular screen printer need to be drawn after a stamp is completed and suddenly be attached to the loose thread on conduction band surface, residual slurry
Deng dirt, patch stamp next time can be carried out.
Application No. CN 103832069A patent application discloses a kind of conductive band washing device of circular screen printer, bag
Include prewashing part and master washes part, the prewashing part is located at the top of pre- water tank, including two prewashing are sprayed head, one
Flat scraper and a sponge are cleaned block, the prewashing part is cleaned using the water in pre- water tank to conduction band;It is described
The main top washed part and be located at main water tank, including two main washing and spraying syringe pipes, a brush roll and the spaced T of twice
Type scraper, described two main washing and spraying syringe pipes are located at the front and rear sides of brush roll respectively, and the T-shaped scraper of twice is located at two
The rear side of main washing and spraying syringe pipe, the master are washed part and conduction band are cleaned using the water in main water tank.
The first purpose of foregoing invention application is by the design of the position and structure of main water tank and pre- water tank, to water
Resource is reused, saving water resource.
The content of the invention:
Technical problem solved by the invention:Although foregoing invention application by the position of main water tank and pre- water tank and
The design of structure, is reused to water resource, with saving water resource, still, is flowed into from main water tank in pre- water tank
Water in be mingled with some loose threads not soluble in water or other impurities unavoidably, in this way, using such a water to print guide belt carry out prewashing,
It is difficult to the cleaning effect for improving prewashing.
The present invention provides following technical scheme:
A kind of conduction band washing equipment of circular screen printer, including supply tank, prewashing device and main cleaning device;
The prewashing device includes pre- water tank, prewashing is sprayed head, prewash slop accepts water tank, the pre- washing and spraying
Syringe pipe draws the water in pre- water tank by water pipe and water pump and conduction band is rinsed, and prewash slop accepts water tank and is located at prewashing
It is sprayed the lower section of head;
The main cleaning device includes main water tank, main washing and spraying syringe pipe, main sewage of washing and accepts water tank, hairbrush;The confession
Water tank connects main water tank, and the water that the main washing and spraying syringe pipe is drawn by water pipe and water pump in main water tank is carried out to conduction band
Rinse, main sewage of washing accepts the lower section that water tank is located at main washing and spraying syringe pipe, and the master washes in sewage undertaking water tank and is provided with slagging-off
Grid basket, main sewage undertaking water tank of washing connect with pre- water tank;
Press the traffic direction of conduction band, the prewashing be sprayed head and main washing and spraying syringe pipe respectively positioned at hairbrush rear and
Front, the hairbrush are scrubbed to conduction band in rotary manner close to main washing and spraying syringe pipe, hairbrush.
By above-mentioned technical proposal, the prewashing in prewashing device is sprayed head and carries out prerinse to conduction band first;Afterwards, pass through
Conduction band after prerinse is run to main cleaning device, and hairbrush is brushed to conduction band surface in rotary manner under the driving of motor
Wash;Afterwards, main washing and spraying syringe pipe is rinsed to the conduction band scrubbed through hairbrush.Wherein, prewashing spray irrigation head enters to conduction band
The prewashed sewage of row falls into prewash slop and accepted in water tank, and accepting water tank by prewash slop discharges it this equipment;Master washes spray
Sewage after leaching syringe pipe is rinsed to conduction band falls into main sewage of washing and accepted in water tank, and slagging-off grid basket washes sewage to falling into master
The sewage accepted in water tank carries out filter residue, with except the debris in decontaminated water.Sewage after the grid basket filter residue that removes the gred flows into prewashing
In water tank, for the prerinse to conduction band.
Pass through above-mentioned technical proposal, the present invention are removed by the grid basket that removes the gred to the main sewage washed in sewage undertaking water tank
Prerinse is used it for after slag, in this way, the present invention improves the cleaning effect of prewashing on the premise of saving water resource.
As the present invention to a kind of main explanation washed sewage and accept water tank, the master, which washes sewage and accepts water tank and open up, to slag tap
Mouthful, slag notch is positioned at the lower section of slagging-off grid basket.Above-mentioned slag notch, which is used to discharging some, to be deposited on main sewage of washing and accepts water tank bottom
The tiny residue in portion.
As a modification of the present invention, conduction band washing equipment of the present invention also includes filtering foreign case, the debris
Rose Box with it is main wash sewage accept water tank and pre- water tank be set up in parallel and positioned at it is main wash sewage accept water tank and pre- water tank it
Between;Water inlet and delivery port are respectively equipped with the relative two side of the filtering foreign case, water inlet accepts water with main sewage of washing
Case connects, and delivery port connects with pre- water tank;The height of the delivery port is less than the height of water inlet, and filtering foreign case is provided with out
The madial wall at the mouth of a river is provided with the case of up/down perforation, and the delivery port is located in case.
By above-mentioned improvement, the sewage after the grid basket filter residue that removes the gred flows into filtering foreign case by water inlet, due to going out
The height at the mouth of a river is less than the height of water inlet, and the case for having up/down perforation is shrouded on delivery port, therefore, flows into filtering foreign case
Sewage in, the small debris of density ratio water floats on the surface under the stop of case, sewage through case lower openings flow into case
It is interior, then flow into pre- water tank through delivery port.To sum up, debris of the not soluble in water and density less than water can be trapped in by filtering foreign case
In filtering foreign case.If need to remove the debris being trapped in filtering foreign case, operating personnel can be from the top of filtering foreign case
Debris is drawn out.
Based on above-mentioned improvement, further improved as of the invention, the filtering foreign case, main sewage of washing accept water tank, pre-
Water tank is structure as a whole.
One kind of pre- water tank is illustrated as the present invention, is provided with suction pump in the pre- water tank, suction pump sets ball float
Switch, the delivery port of suction pump are accepted water tank with prewash slop by water pipe and connected;Liquid-level switch is provided with the pre- water tank,
Pre- water tank connects with supply tank, is provided with supply tank and extracts water in supply tank to the water pump in pre- water tank, the water pump with
Liquid-level switch connects, and when the water level in pre- water tank be less than liquid-level switch, water pump in supply tank acts, and supply tank is to prewashing
Cistern water supply.
By the above-mentioned explanation for pre- water tank, when the water in pre- water tank constantly accumulates, when the water surface reach a certain height,
Float switch drives suction pump to act, and the water in pre- water tank is drawn into prewash slop and accepted in water tank by suction pump, by prewashing
Sewage accepts water tank and water is exported into this equipment;When the water surface in pre- water tank is less than certain altitude, liquid-level switch drives water supply
Water pump action in case, from supply tank directly to prewashing cistern water supply.
As a modification of the present invention, conduction band washing equipment of the present invention also includes water cover, and the water cover includes master
Sewage diversion cavity and prewash slop diversion cavity are washed, the top that the prewash slop accepts water tank is provided with prewash slop undertaking funnel,
Funnel is accepted provided with main sewage of washing in the top that the master washes sewage undertaking water tank;The water cover is arranged on prewash slop and accepts funnel
Accepted with main sewage of washing on funnel, prewash slop diversion cavity is accepted funnel with prewash slop and connected, and master washes sewage diversion cavity and master
Wash sewage and accept funnel connection;The prewashing is sprayed head and is located in prewash slop diversion cavity, the main washing and spraying syringe pipe
Washed with hairbrush positioned at master in sewage diversion cavity.By above-mentioned improvement, prewash slop flows into prewash slop through prewash slop diversion cavity and held
Funnel is connect, then flows into prewash slop and accepts water tank;Main sewage of washing accepts funnel through the main main sewage of washing of sewage diversion cavity inflow of washing, then
Flow into main sewage of washing and accept water tank.
Brief description of the drawings:
The present invention is described further below in conjunction with the accompanying drawings:
Fig. 1 is a kind of general structure schematic diagram of the conduction band washing equipment of circular screen printer of the present invention;
Fig. 2 accepts water tank, the top view of pre- water tank for the filtering foreign case of integrative-structure, main sewage of washing in Fig. 1;
Fig. 3 is Fig. 2 left view;
Fig. 4 is the structural representation of Fig. 1 reclaimed water covers.
Embodiment:
Such as Fig. 1, a kind of conduction band washing equipment of circular screen printer, including it is supply tank 10, prewashing device and main cleaning device, miscellaneous
Thing Rose Box 40, water cover 50.
Such as Fig. 1, the prewashing device includes pre- water tank 21, prewashing is sprayed first 22, prewash slop and accepts water tank 23.
The prewashing is sprayed the water that head is drawn by water pipe and water pump in pre- water tank and conduction band A is rinsed.Prewash slop is held
Water receiving case is located at the lower section that prewashing is sprayed head.
In above-mentioned prewashing device, such as Fig. 1, the pre- water tank 21 is interior to be provided with suction pump 24, and suction pump sets float switch
240, the delivery port of suction pump is accepted water tank 23 with prewash slop by water pipe and connected;Opened in the pre- water tank provided with liquid level
Close, pre- water tank connects with supply tank 10, is provided with supply tank and extracts water in supply tank to the water pump in pre- water tank, the water
Pump is connected with liquid-level switch, when the water level in pre- water tank is less than liquid-level switch, the action of water pump in supply tank, supply tank to
Prewashing cistern water supply.
Such as Fig. 1, the main cleaning device, which includes main water tank 31, main washing and spraying syringe pipe 32, hairbrush 33, main sewage of washing, to be accepted
Water tank 34.The supply tank connects main water tank, and the main washing and spraying syringe pipe is drawn in main water tank by water pipe and water pump
Water conduction band is rinsed.With reference to Fig. 2, Fig. 3, main sewage of washing accepts the lower section that water tank is located at main washing and spraying syringe pipe, described
Main wash in sewage undertaking water tank is provided with slagging-off grid basket 342, and main sewage undertaking water tank of washing connects with pre- water tank.The master washes dirt
Water accepts water tank 34 and opens up slag notch 341, and slag notch is positioned at the lower section of slagging-off grid basket 342.
Such as Fig. 1, by conduction band A traffic direction, the prewashing is sprayed head and main washing and spraying syringe pipe is located at hair respectively
Brush rear and front, the hairbrush are scrubbed to conduction band in rotary manner close to main washing and spraying syringe pipe, hairbrush.
Such as Fig. 2, the filtering foreign case 40 washes that sewage accepts water tank 34 and pre- water tank 21 is set up in parallel and is located at main
Main sewage of washing is accepted between water tank and pre- water tank;The filtering foreign case 40, main sewage of washing accept water tank 34, pre- water tank 21
It is structure as a whole.With reference to Fig. 2, the filtering foreign case is respectively equipped with water inlet 41 and delivery port 42 on relative two side, enters
The mouth of a river connects with main sewage undertaking water tank of washing, and delivery port connects with pre- water tank;The height of the delivery port is less than water inlet
Highly, filtering foreign case is provided with case 43 of the madial wall provided with up/down perforation of delivery port, and the delivery port is located in case.
With reference to Fig. 1, Fig. 2, the water cover 50 includes master and washes sewage diversion cavity 51 and prewash slop diversion cavity 52, the prewashing
The top that sewage accepts water tank 23 is provided with prewash slop undertaking funnel 230, and the top that the master washes sewage undertaking water tank 34 is provided with
Main sewage of washing accepts funnel 340;The water cover is arranged on prewash slop undertaking funnel and main sewage of washing is accepted on funnel, and prewashing is dirty
Water diversion cavity is accepted funnel with prewash slop and connected, and main sewage diversion cavity of washing connects with main sewage undertaking funnel of washing;The prewashing
First 22 are sprayed in prewash slop diversion cavity, the main washing and spraying syringe pipe 32 and hairbrush 33 wash sewage water conservancy diversion positioned at master
Intracavitary.
In practical operation, the prewashing in prewashing device is sprayed first 22 and carries out prerinse, prewash slop to conduction band A first
Prewash slop, which is flowed into, through water cover 50 accepts water tank 23.Conduction band A after prerinse is run to main cleaning device, and hairbrush 33 is in motor
Driving under conduction band A surfaces are scrubbed in rotary manner;Afterwards, main washing and spraying syringe pipe 32 is to scrubbing through hairbrush 33
Conduction band A is rinsed, and main sewage of washing accepts water tank 34 through the main sewage of washing of the inflow of water cover 50.342 pairs of slagging-off grid basket falls into master and washed
The sewage that sewage is accepted in water tank 34 carries out filter residue, with except the debris in decontaminated water;Again density ratio is removed through filtering foreign case 40
The small debris of water.Afterwards, sewage is flowed into pre- water tank 21, for the prerinse to conduction band A.
Above content is only the better embodiment of the present invention, for one of ordinary skill in the art, according to the present invention
Thought, there will be changes, this specification content should not be construed as to this hair in specific embodiments and applications
Bright limitation.