CN104810834A - Voltage-sensitivity-based multi-section 500 kV grid reactive compensation switching strategy optimizing method - Google Patents

Voltage-sensitivity-based multi-section 500 kV grid reactive compensation switching strategy optimizing method Download PDF

Info

Publication number
CN104810834A
CN104810834A CN201510176608.4A CN201510176608A CN104810834A CN 104810834 A CN104810834 A CN 104810834A CN 201510176608 A CN201510176608 A CN 201510176608A CN 104810834 A CN104810834 A CN 104810834A
Authority
CN
China
Prior art keywords
voltage
switching
str
switching strategy
reactive power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510176608.4A
Other languages
Chinese (zh)
Other versions
CN104810834B (en
Inventor
张宁宇
周前
刘建坤
陈哲
臧林怡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510176608.4A priority Critical patent/CN104810834B/en
Publication of CN104810834A publication Critical patent/CN104810834A/en
Application granted granted Critical
Publication of CN104810834B publication Critical patent/CN104810834B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Control Of Electrical Variables (AREA)

Abstract

The invention discloses a voltage-sensitivity-based multi-section 500 kV grid reactive compensation switching strategy optimizing method. The voltage-sensitivity-based multi-section 500 kV grid reactive compensation switching strategy optimizing method comprises the following steps of inputting the grid structure data of a 500 kV grid and the configuration status of a reactive compensation device; based on a voltage sensitivity analysis method, analyzing transformer stations with the voltage over-limit problem under a multi-section situation, establishing a switching sequence list of the active compensation devices of the low-voltage sides of all the 500 kV transformer stations according to the sensitivity of every transformer station to voltage; according to the switching sequence list, switching practical grid reactive compensation devices until the busbar voltages of all the 500 kV transformer stations meet the requirements on the upper limit and the lower limit of operating voltage; obtaining an optimal switching strategy and switching records. According to the voltage-sensitivity-based multi-section 500 kV grid reactive compensation switching strategy optimizing method, the optimized switching strategy can ensure reasonable operation of 500 kV busbar voltage under the condition of continuous multiple sections, and meanwhile, reduce the number of times of switching of the reactive devices, so that the 500 kV transformer stations can meet the requirements on the upper limit and the lower limit of the busbar voltage.

Description

Based on multibreak 500kV electric network reactive compensation Switching Strategy optimization method of voltage sensibility
Technical field
The present invention relates to a kind of multibreak 500kV electric network reactive compensation Switching Strategy optimization method based on voltage sensibility, belong to electric network reactive-load voltage optimization technical field.
Background technology
The optimization switching of reactive compensator of electrical network is an important content in operation of power networks, based on existing reactive power compensator configuration and grid structure, in known optimization cycle each node load power of system prerequisite under, the best Switching Strategy of optimizing application technology determination Reactive Power Device, plays the effect reducing via net loss, elimination overload and improve voltage's distribiuting.
Study Reactive Power Device optimize switching problem time mainly contain towards time discontinuity surface static optimization and consider switching frequency restriction overall dynamic optimization two class methods.Static optimization is minimum for target with the system losses optimizing the moment, and considers various operation constraints.The variable of static optimization is only the input group number optimizing moment each Reactive Power Device, less being easy to of the scale of solution space obtains optimization solution at short notice, and both can carry out offline optimization according to the predicted load of following a day, the online load data of system also can be adopted to carry out real-time optimization.But the static optimization method of routine exists distinct issues: Optimized model is only minimum for target with the system losses in each moment, be difficult to consider switching frequency restriction, prioritization scheme does not often possess actual operability.Dynamic optimization, based on the load prediction data of following a day, was divided into some periods by one day, minimum for target with the network loss sum of whole day day part, and limited switching frequency as an important constraints.The control variables of dynamic optimization model comprises the input group number of each node Reactive Power Device of whole day day part, and the dimension of control variables sharply expands, and solution space scale and amount of calculation are all much bigger than static optimization, and its Optimization Solution is very difficult.
In 500kV electrical network actual motion, the switching of substation low-voltage side reactive power compensator is determined according to the change in voltage situation of single substation bus bar by monitor staff usually, there is the shortcomings such as switching frequency is many, voltage regulation result is poor, shortage global optimization.
Summary of the invention
For the deficiency that prior art exists, the object of the invention is to provide a kind of multibreak 500kV electric network reactive compensation Switching Strategy optimization method based on voltage sensibility, the switching sequence list that the present invention is based on voltage sensibility foundation is optimized switching to reactive power compensator, while when ensureing selected, in discontinuity surface, reactive power compensator adds up switching least number of times, and 500kV substation bus bar voltage meets bound requirement.
To achieve these goals, the present invention realizes by the following technical solutions:
Multibreak the 500kV electric network reactive compensation Switching Strategy optimization method based on voltage sensibility of the present invention, comprises following step:
(1) 500kV grid nodes, circuit, transformer, load data and reactive power compensator quantity and capacity is inputted, the node voltage of electrical network and the Switching Strategy of line power and reactive power compensator under the continuous operating time section quantity of input needs optimization, each section, Switching Strategy comprises optimum Switching Strategy, recently Switching Strategy and up-to-date Switching Strategy;
(2) based on voltage sensibility analytical method, the transformer station that there is voltage out-of-limit problem in multibreak situation is analyzed, the transformer station of voltage out-of-limit is there is under determining discontinuity surface of many times, calculate 500kV reactive compensator of electrical network to the voltage sensibility of voltage out-of-limit transformer station, set up the switching priority sequence table of all 500kV substation low-voltage side reactive power compensators according to sensitivity height;
(3) according to switching sequence list, switching is carried out to actual electric network reactive power compensator, until the busbar voltage of all 500kV transformer stations meets the requirement of working voltage bound;
(4) the optimum Switching Strategy of 500kV reactive compensator of electrical network in multibreak situation and switching record is finally obtained.
Step (2)-(4) specifically comprise following step:
To the continuous operating time section quantity optimized be needed to be set to T, optimum Switching Strategy be set to STR 0, recently Switching Strategy be set to STR 1sTR is set to up-to-date Switching Strategy 2, switching record is set to ACT, wherein: STR 0, STR 1and STR 2comprise the switching state of all 500kV Reactive Power Compensation Eqyuipment in Substations, described switching state comprises number of units and capacity; ACT records time of the reactive power compensator switching of each transformer station, number of units and capacity, and the state of the 500kV reactive power compensator under discontinuity surface time first is set to up-to-date Switching Strategy STR 2; t e=0 (t ediscontinuity surface when representing the 0th);
Step0: arrange t=1, discontinuity surface when representing first, by STR 2be updated to STR 0and STR 1, ACT empties;
Step1: by STR 2the operation of power networks data substituted under t section carry out Load flow calculation (computational methods are prior art, repeat no more) herein, and all 500kV transformer stations that there is the out-of-limit situation of busbar voltage are designated as S set TA o; As STA ofor sky, show to there is not out-of-limit situation, turn step2; If STA obe not empty, show to there is voltage out-of-limit situation, turn step3;
Step2:t=t+1, if t > is T, turns step7; Otherwise, turn step1;
Step3: calculate 500kV reactive compensator of electrical network to STA oin the voltage sensibility of all transformer stations, the preferential switching sequence list of reactive power compensator is set up according to voltage sensibility size, reactive power compensator is dropped into successively according to switching sequence list, and carry out Load flow calculation, until the 500kV substation bus bar voltage under t section meets bound requirement, and switching operation is updated to STR 2if, t e=t, turns step4;
Step4:t e=t e-1, as t e=0, turn step0; Otherwise, turn step5;
Step5: by STR 2substitute into t eoperation of power networks data under section carry out Load flow calculation, judge whether to there is the out-of-limit situation of 500kV transformer substation voltage, as existed, turn step6; If do not existed, turn step4;
Step6: compare STR 1and STR 2, by different Reactive Power Device switching state updating to ACT, turn step2;
Step7: export optimum Switching Strategy STR 0and ACT, terminate to calculate.
In described step (3), according to switching sequence list, switching is carried out to actual electric network reactive power compensator, and by electric power system specialty analysis software BPA, simulation analysis calculating is carried out to multiple electrical network profile data, whether checking there is the out-of-limit of 500kV substation bus bar voltage, meets service requirement.
While Switching Strategy after optimization of the present invention ensures that 500kV busbar voltage is rationally run in continuous multiple section situation, decrease the switching frequency of Reactive Power Device, 500kV substation bus bar voltage meets bound requirement, extend the useful life of reactive power compensator, play the effect reducing via net loss, elimination overload and improve voltage's distribiuting, improve economy and the stability of operation of power networks.
Accompanying drawing explanation
Fig. 1 is multibreak the 500kV electric network reactive compensation Switching Strategy optimization method workflow diagram based on voltage sensibility of the present invention.
Embodiment
The technological means realized for making the present invention, creation characteristic, reaching object and effect is easy to understand, below in conjunction with embodiment, setting forth the present invention further.
The present invention is a kind of multibreak 500kV electric network reactive compensation Switching Strategy optimization method based on voltage sensibility, it is the voltage out-of-limit problem that in employing voltage sensibility ANALYSIS OF CALCULATING multibreak situation, transformer station exists, thus decide its switching priority according to the height of each Reactive Power Compensation Eqyuipment in Substation to busbar voltage sensitivity, obtain the Switching Strategy after the optimization of 500kV electric network reactive compensation, the economical operation of decrease switching frequency, improve voltage regulation result, achieve global optimization and electrical network.Its concrete steps are as follows:
(1) 500kV Net Frame of Electric Network data and reactive power compensator configuring condition is determined, and continuous operating time section quantity, profile data and Switching Strategy to be optimized.
(2) adopt voltage sensibility analytic approach to analyze the transformer station that there is voltage out-of-limit problem in multibreak situation, set up the switching sequence list of the whole network reactive power compensator;
Computational methods detailed process based on voltage sensibility is as follows:
To the continuous operating time section quantity optimized be needed to be set to T, correlated variables comprises optimum Switching Strategy STR 0, nearest Switching Strategy STR 1with up-to-date Switching Strategy STR 2, switching operation ACT, wherein: STR 0, STR 1and STR 2comprise the switching state (number of units and capacity) of all 500kV Reactive Power Compensation Eqyuipment in Substations; ACT records time of the reactive power compensator switching of each transformer station, number of units and capacity.
Step0: discontinuity surface t=1 when remembering first, is updated to STR by the Switching Strategy of reactive power compensator under the t period 0, STR 1and STR 2, ACT=φ, t e=0;
Step1: by STR 2the operation of power networks data substituted under t section carry out Load flow calculation, and all 500kV transformer stations that there is the out-of-limit situation of busbar voltage are designated as S set TA o; As STA o=φ, turns step2; Otherwise, turn step3;
Step2:t=t+1, if t > is T, turns step7; Otherwise, turn step1;
Step3: calculate all reactive power compensators to STA oin the voltage sensibility of all transformer stations, according to STR 2sTA is formed with the capacity of Reactive Power Device omiddle transformer station Reactive Power Device switching priority sequence table, carries out the switching operation of Reactive Power Device, ensures to meet voltage bound requirement under t section, and Switching Strategy is updated to STR based on switching sequence list and voltage out-of-limit value 2if, t e=t turns step4;
Step4:t e=t e-1, as t e=0, turn step5; Otherwise, turn step6;
Step5:STR 0=STR 1=STR 2, turn step2:;
Step6: by STR 2substitute into t eunder section, operation of power networks data carry out Load flow calculation, as there is the 500kV transformer station of voltage out-of-limit, and contrast STR 2and STR 1the difference of middle Reactive Power Device switching state, and by the switching time t of relevant Reactive Power Device eaCT is added into, STR with switching capacity 1=STR 2, turn step2:;
Step7: export optimum Switching Strategy STR 0and ACT, terminate to calculate.
By above Algorithm Analysis, the Reactive Power Compensation Eqyuipment in Substation Switching Strategy that there is voltage out-of-limit problem obtains optimization, thus can set up the switching sequence list of all 500kV substation low-voltage side Reactive Power Devices according to the sensitivity height of each transformer station to voltage;
(3) table is selected the switching of Reactive Power Device and is ensured that whole 500kV substation bus bar voltage meets bound requirement in order;
(4) the optimum Switching Strategy of 500kV reactive compensator of electrical network and switching record is obtained; While Switching Strategy after optimization ensures that 500kV busbar voltage is rationally run in continuous multiple section situation, decrease the switching frequency of Reactive Power Device, extend the useful life of reactive power compensator, play the effect reducing via net loss, elimination overload and improve voltage's distribiuting, improve the economy of operation of power networks.
Consider the deficiency of existing Jiangsu Power Grid 500kV Reactive Power Compensation Eqyuipment in Substation Switching Strategy, above-mentioned optimization method is adopted to be optimized, compared with conventional Switching Strategy, while Switching Strategy after optimization ensures that 500kV busbar voltage is rationally run in continuous multiple section situation, reduce the equipment loss that cost of labor in operation of power networks and Reactive Power Device frequent switching cause, and economic benefit has long-lasting.
More than show and describe general principle of the present invention and principal character and advantage of the present invention.The technical staff of the industry should understand; the present invention is not restricted to the described embodiments; what describe in above-described embodiment and specification just illustrates principle of the present invention; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements all fall in the claimed scope of the invention.Application claims protection range is defined by appending claims and equivalent thereof.

Claims (3)

1., based on multibreak 500kV electric network reactive compensation Switching Strategy optimization method of voltage sensibility, it is characterized in that, comprise following step:
(1) 500kV grid nodes, circuit, transformer, load data and reactive power compensator quantity and capacity is inputted, the node voltage of electrical network and the Switching Strategy of line power and reactive power compensator under the continuous operating time section quantity of input needs optimization, each section, described Switching Strategy comprises optimum Switching Strategy, recently Switching Strategy and up-to-date Switching Strategy;
(2) based on voltage sensibility analytical method, the transformer station that there is voltage out-of-limit problem in multibreak situation is analyzed, the transformer station of voltage out-of-limit is there is under determining discontinuity surface of many times, calculate 500kV reactive compensator of electrical network to the voltage sensibility of voltage out-of-limit transformer station, set up the switching priority sequence table of all 500kV substation low-voltage side reactive power compensators according to sensitivity height;
(3) according to switching sequence list, switching is carried out to actual electric network reactive power compensator, until the busbar voltage of all 500kV transformer stations meets the requirement of working voltage bound;
(4) the optimum Switching Strategy of 500kV reactive compensator of electrical network in multibreak situation and switching record is finally obtained.
2. multibreak the 500kV electric network reactive compensation Switching Strategy optimization method based on voltage sensibility according to claim 1, it is characterized in that, step (2)-(4) specifically comprise following step:
To the continuous operating time section quantity optimized be needed to be set to T, optimum Switching Strategy be set to STR 0, recently Switching Strategy be set to STR 1sTR is set to up-to-date Switching Strategy 2, switching record is set to ACT, wherein: STR 0, STR 1and STR 2comprise the switching state of all 500kV Reactive Power Compensation Eqyuipment in Substations, described switching state comprises number of units and capacity; ACT records time of the reactive power compensator switching of each transformer station, number of units and capacity, and the state of the 500kV reactive power compensator under discontinuity surface time first is set to up-to-date Switching Strategy STR 2; t e=0;
Step0: arrange t=1, discontinuity surface when representing first, by STR 2be updated to STR 0and STR 1, ACT empties;
Step1: by STR 2the operation of power networks data substituted under t section carry out Load flow calculation, and all 500kV transformer stations that there is the out-of-limit situation of busbar voltage are designated as S set TA o; As STA ofor sky, show to there is not out-of-limit situation, turn step2; If STA obe not empty, show to there is voltage out-of-limit situation, turn step3;
Step2:t=t+1, if t > is T, turns step7; Otherwise, turn step1;
Step3: calculate 500kV reactive compensator of electrical network to STA oin the voltage sensibility of all transformer stations, the preferential switching sequence list of reactive power compensator is set up according to voltage sensibility size, reactive power compensator is dropped into successively according to switching sequence list, and carry out Load flow calculation, until the 500kV substation bus bar voltage under t section meets bound requirement, and switching operation is updated to STR 2if, t e=t, turns step4;
Step4:t e=t e-1, as t e=0, turn step0; Otherwise, turn step5;
Step5: by STR 2substitute into t eoperation of power networks data under section carry out Load flow calculation, judge whether to there is the out-of-limit situation of 500kV transformer substation voltage, as existed, turn step6; If do not existed, turn step4;
Step6: compare STR 1and STR 2, by different Reactive Power Device switching state updating to ACT, turn step2;
Step7: export optimum Switching Strategy STR 0and ACT, terminate to calculate.
3. multibreak the 500kV electric network reactive compensation Switching Strategy optimization method based on voltage sensibility according to claim 1, is characterized in that,
In described step (3), according to switching sequence list, switching is carried out to actual electric network reactive power compensator, and by electric power system specialty analysis software BPA, simulation analysis calculating is carried out to multiple electrical network profile data, whether checking there is the out-of-limit of 500kV substation bus bar voltage, meets service requirement.
CN201510176608.4A 2015-04-14 2015-04-14 Many section 500kV electric network reactive compensations switching strategy optimization methods based on voltage sensibility Active CN104810834B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510176608.4A CN104810834B (en) 2015-04-14 2015-04-14 Many section 500kV electric network reactive compensations switching strategy optimization methods based on voltage sensibility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510176608.4A CN104810834B (en) 2015-04-14 2015-04-14 Many section 500kV electric network reactive compensations switching strategy optimization methods based on voltage sensibility

Publications (2)

Publication Number Publication Date
CN104810834A true CN104810834A (en) 2015-07-29
CN104810834B CN104810834B (en) 2017-09-15

Family

ID=53695439

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510176608.4A Active CN104810834B (en) 2015-04-14 2015-04-14 Many section 500kV electric network reactive compensations switching strategy optimization methods based on voltage sensibility

Country Status (1)

Country Link
CN (1) CN104810834B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107023933A (en) * 2015-10-27 2017-08-08 阿自倍尔株式会社 Thermal source runs servicing unit and method
CN109713680A (en) * 2019-03-11 2019-05-03 云南电网有限责任公司电力科学研究院 Based on the area power grid voltage quickly regulating method for improving Sensitivity Method
CN110826228A (en) * 2019-11-07 2020-02-21 国网四川省电力公司电力科学研究院 Regional power grid operation quality limit evaluation method
CN115021278A (en) * 2022-07-07 2022-09-06 扬州浩辰电力设计有限公司 Switching strategy optimization method for multiple groups of switching reactive power compensation devices of 220kV transformer substation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63283431A (en) * 1987-05-15 1988-11-21 Fuji Electric Co Ltd Reactive power compensation system by stochastic optimal control
CN102545230A (en) * 2012-01-10 2012-07-04 四川省电力公司 Voltage out-of-limit adjusting method
CN103715700A (en) * 2013-12-19 2014-04-09 国家电网公司 Reactive power control system and control method applicable to wind farm grid-connection point voltage control
CN104092221A (en) * 2014-06-19 2014-10-08 航天科工深圳(集团)有限公司 Optimized and optimally-cutting reactive compensation method and reactive compensation device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63283431A (en) * 1987-05-15 1988-11-21 Fuji Electric Co Ltd Reactive power compensation system by stochastic optimal control
CN102545230A (en) * 2012-01-10 2012-07-04 四川省电力公司 Voltage out-of-limit adjusting method
CN103715700A (en) * 2013-12-19 2014-04-09 国家电网公司 Reactive power control system and control method applicable to wind farm grid-connection point voltage control
CN104092221A (en) * 2014-06-19 2014-10-08 航天科工深圳(集团)有限公司 Optimized and optimally-cutting reactive compensation method and reactive compensation device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107023933A (en) * 2015-10-27 2017-08-08 阿自倍尔株式会社 Thermal source runs servicing unit and method
CN107023933B (en) * 2015-10-27 2019-07-23 阿自倍尔株式会社 Heat source runs auxiliary device and method
CN109713680A (en) * 2019-03-11 2019-05-03 云南电网有限责任公司电力科学研究院 Based on the area power grid voltage quickly regulating method for improving Sensitivity Method
CN109713680B (en) * 2019-03-11 2022-05-20 云南电网有限责任公司电力科学研究院 Regional power grid voltage rapid adjustment method based on improved sensitivity method
CN110826228A (en) * 2019-11-07 2020-02-21 国网四川省电力公司电力科学研究院 Regional power grid operation quality limit evaluation method
CN115021278A (en) * 2022-07-07 2022-09-06 扬州浩辰电力设计有限公司 Switching strategy optimization method for multiple groups of switching reactive power compensation devices of 220kV transformer substation
CN115021278B (en) * 2022-07-07 2023-09-29 扬州浩辰电力设计有限公司 Switching strategy optimization method for multi-group switching reactive power compensation device of 220kV transformer substation

Also Published As

Publication number Publication date
CN104810834B (en) 2017-09-15

Similar Documents

Publication Publication Date Title
Lavorato et al. A constructive heuristic algorithm for distribution system planning
JP6244255B2 (en) Voltage stability monitoring apparatus and method
CN107038530A (en) A kind of power distribution network overall planning method and system
CN109980642A (en) A kind of digital intelligent distribution network planning auxiliary system
CN111680084A (en) Line loss calculation method based on multi-source data fusion
CN109447465B (en) Power distribution network planning scheme evaluation method based on collaborative optimization efficiency coefficient
CN104810834A (en) Voltage-sensitivity-based multi-section 500 kV grid reactive compensation switching strategy optimizing method
CN113239540B (en) Urban power distribution network line dynamic planning method and system
CN103326348B (en) A kind of system improving the analysis of area power grid power supply capacity and overall process on-line monitoring
CN103914741A (en) Line loss intelligent evaluation and assistant decision-making system for power distribution network
WO2015027484A1 (en) System, method and apparatuses for distribution network reconfiguration and a tangible computer readable medium
CN102157936A (en) Coordination control method
CN105141464A (en) Grid structure planning method for coordinated power transmission and distribution
CN113343426A (en) Urban distribution network line gauge method and system considering real demand guidance
CN105162110A (en) Configuration method for sectionalizing and interconnection switches of power distribution network
Bongers et al. Impact of curtailment of renewable energy sources on high voltage network expansion planning
CN111555293B (en) Reactive power equipment type selection system and method based on data model analysis
CN102801165A (en) Automatic voltage control method considering static security
CN105048473B (en) Transformer station's automatism voltage control mesolow reactive apparatus voltage sensibility statistical method
CN110414796B (en) AC/DC hybrid power distribution network frame planning method and device and storage medium
CN103762606B (en) Staged power distribution network low-voltage intelligent capacitor control method
Verma et al. Greenfield distribution network expansion strategy with hierarchical GA and MCDEA under uncertainty
CN113344364A (en) Power failure plan risk analysis method and device, electronic equipment and storage medium
CN107292759A (en) Distribution network planning based on power supply reliability calculates analysis system
CN104767281A (en) Method for simplifying topology of high-voltage distribution network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant