CN104809004B - Windows activates automatic test approach - Google Patents
Windows activates automatic test approach Download PDFInfo
- Publication number
- CN104809004B CN104809004B CN201410033934.5A CN201410033934A CN104809004B CN 104809004 B CN104809004 B CN 104809004B CN 201410033934 A CN201410033934 A CN 201410033934A CN 104809004 B CN104809004 B CN 104809004B
- Authority
- CN
- China
- Prior art keywords
- shelves
- log
- stages
- request
- windows8
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 28
- 238000013459 approach Methods 0.000 title claims abstract description 16
- 238000001994 activation Methods 0.000 claims abstract description 39
- 230000004913 activation Effects 0.000 claims abstract description 27
- 238000001514 detection method Methods 0.000 claims abstract description 5
- 238000000034 method Methods 0.000 claims description 12
- 230000007547 defect Effects 0.000 abstract description 3
- 238000004321 preservation Methods 0.000 abstract 1
- 238000005516 engineering process Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 108091006146 Channels Proteins 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010200 validation analysis Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Abstract
A kind of Windows activates automatic test approach, and it includes step:(1)Request marks shelves are generated after the request stage;(2)After Programmable detection to the request remembers shelves, the flash stages are automatic jumped to, delete the request marks shelves after the completion of the flash stages, and generate refreshing mark shelves;(3)After the Programmable detection to the refreshing marks shelves, the report stages are automatic jumped to, are deleted refreshing mark shelves after the completion of the report stages, and generate LOG shelves;(4)The content of the LOG shelves is judged by the program, if the LOG shelves are recorded as " 0 ", performs step(5)If the LOG shelves are recorded as " 1 ", step is performed(7);(5)It is successfully tested, Windows8 activation, then records result and upload onto the server;(6)Restarting operating systems, and the LOG shelves are uploaded into SFCS;(7)Test crash, the Windows8 un-activations, then record result and upload onto the server.Present invention, avoiding the preservation and tracking that the defects of manual operation, ensure that subsequent result.
Description
【Technical field】
The present invention relates to a kind of automatic test approach, and in particular to a kind of windows activates automatic test approach.
【Background technology】
Activation technique is always Windows important component, and Microsoft provides OA to manufacturer(OEM
Activation)Activation technique, using OA activation techniques, original equipment manufacturer can be specific by mainboard bulk activation
Windows system copies.Such as the respectively OA2.1 and OA2.0 activation technique that existing Window7/Vista is carried.
With the development of science and technology, OA technologies have been upgraded to OA3.0 by Window8, by adding the mechanism of online validation, use
To prevent situation of traditional information by simulating BIOS around activation, the activation process of the OA3.0 is:(1)Ask rank
Section:By OEM/ODM manufacturers(Can be that factory can also be company)Purchase DPK is proposed to Microsoft(Digital
Product Key)Demand, OEM/ODM manufacturers remove the DPK that takes by WEB or proprietary channel modes after paying a bill;(2)Flash ranks
Section:Sequence number of the factory end by the DPK taken using OA3.0tool generations DPK, and be inserted into the BIOS of board, while root
A hardware cryptographic Hash is generated by OA3.0 instruments again according to the configuration of board(hashcode), the sequence number and the cryptographic Hash
CBR can be generated(computer Build Report);(3)The report stages:The CBR is sent to Microsoft, by Microsoft according to
After the sequence number and cryptographic Hash received is judged and give OEM/ODM manufacturers feedback.At factory end, above-mentioned activation process it is each
Stage is individual operations, it is necessary to manually perform the activation in each stage, while individually judges test result by each stage,
Finally by manually according to the test result in each stage so as to judge whether the process of activation succeeds, but manual operation may
Cause the test leakage in some stage, and artificially check, be easily caused erroneous judgement, leak phenomena such as seeing, and the result after activation can not also preserve,
Subsequently it can not also follow the trail of.
In view of this, it is necessary to provide a kind of Windows activation automatic test approach in fact, to solve above-mentioned activation process
Each stage can not connect automatically redirects the problem of performing next stage, while solves manual operation and seen in each stage test leakage or leakage,
And result the problem of can not preserving and following the trail of of activation.
【The content of the invention】
It is therefore an object of the present invention to a kind of Windows activation automatic test approach is provided, to solve the above problems.
In order to achieve the above object, Windows activation automatic test approach provided by the invention, it is applied to Windows8
Activation technique in, the flow of the activation of the Windows8 includes three phases successively:Request stage, the flash stages and
In the report stages, it the described method comprises the following steps:
(1)Request marks shelves are generated after the request stage;
(2)After Programmable detection is to the request note shelves, the flash stages are automatic jumped to, in the flash stages
After the completion of by the request marks shelves delete, and generate refreshing mark shelves;
(3)After described program detects the refreshing mark shelves, the report stages are automatic jumped to, described
Mark shelves to delete described refresh after the completion of the report stages, and generate LOG shelves;
(4)The content of the LOG shelves is judged by described program, if the LOG shelves are recorded as " 0 ", performs step(5),
If the LOG shelves are recorded as " 1 ", step is performed(7);
(5)It is successfully tested, the Windows8 activation, then records result and upload onto the server;
(6)Restarting operating systems, and the LOG shelves are uploaded into SFCS(shop floor control
System, Workshop control system), so as to by being missed the stop automatically after SFCS processing;
(7)Test crash, the Windows8 un-activations, then record result and upload onto the server.
Preferably, the LOG shelves also record the information of the DPK sequence numbers generated after the flash stages, hardware Hash
The information and product SN of value(Serial Number, product serial number)Information.
Preferably, the request marks shelves are named with " reqflag.txt ".
Preferably, the mark shelves that refresh are named with " flashflag.txt ".
Compared to prior art, Windows activation automatic test approach of the present invention is realized in Windows8 activation processes
The automatic connection in each stage, overcomes the defects of each stage need to manually perform in activation process, avoids artificial individual operations production
The problem of raw test leakage and leakage is seen, and the present invention can also preserve the result whether Windows8 is activated, so as to ensure that production
The quality of product, follow-up tracking is ensure that by upload server and SFCS.
【Brief description of the drawings】
Fig. 1 is schematically shown as the flow chart of Windows activation automatic test approach of the present invention.
【Embodiment】
In order to achieve the above object, Fig. 1 being referred to illustrate, Windows provided by the invention activates automatic test approach, its
In activation technique applied to Windows8 OA3.0, the flow of the activation of the Windows8 includes three phases successively:Please
Stage, flash stages and report stages are asked, the described method comprises the following steps:
S101:Request marks shelves are generated after the request stage;
S102:After Programmable detection is to the request note shelves, the flash stages are automatic jumped to, in the flash ranks
The request marks shelves are deleted after the completion of section, and generate refreshing mark shelves;
S103:After described program detects the refreshing mark shelves, the report stages are automatic jumped to, described
Mark shelves to delete described refresh after the completion of the report stages, and generate LOG shelves;
S104:The content of the LOG shelves is judged by described program, if the LOG shelves are recorded as " 0 ", performs step
S105, if the LOG shelves are recorded as " 1 ", perform step S107;
S105:It is successfully tested, the Windows8 activation, then records result and upload onto the server;
S106:Restarting operating systems, and the LOG shelves are uploaded into SFCS(shop floor control
System, Workshop control system), so as to by being missed the stop automatically after SFCS processing;
S107:Test crash, the Windows8 un-activations, then record result and upload onto the server.
Wherein, the LOG shelves also record the information of the DPK sequence numbers generated after the flash stages, hardware cryptographic Hash
Information and product SN(Serial Number, product serial number)Information.
Wherein, the request marks shelves are named with " reqflag.txt ".
Wherein, the mark shelves that refresh are named with " flashflag.txt ".
When test, product SN information on traveler and the information of DPK item numbers are swept by barcode scanner by staff
Enter board, the request stage in activation process is now performed by program, in the present embodiment, in order to not waste each DPK,
Therefore after asking to DPK, before the flash stages, program can first judge board with the presence or absence of refreshing mark shelves, if in the presence of
The DPK asked can now be deleted, if being not present, the flash stages are performed according to the method for testing of the present invention successively
With the report stages.
Windows activation automatic test approach of the present invention realizes the automatic of each stage in Windows8 activation processes and connected
Connect, overcome the defects of each stage need to manually perform in activation process, avoid test leakage caused by artificial individual operations and leakage is seen
The problem of, and the present invention can also preserve the result whether Windows8 is activated, so as to ensure that the quality of product, by upper
Pass server and SFCS ensure that follow-up tracking.
Claims (4)
1. a kind of Windows activates automatic test approach, it is applied in Windows8 activation technique, the Windows8's
The flow of activation includes three phases successively:Request stage, flash stages and report stages, it is characterised in that methods described
Comprise the following steps:
(1) request marks shelves are generated after the request stage;
(2) after Programmable detection is to the request marks shelves, the flash stages are automatic jumped to, it is complete in the flash stages
The request marks shelves are deleted after, and generate refreshing mark shelves;
(3) after described program detects the refreshing mark shelves, the report stages are automatic jumped to, in the report
Mark shelves to delete described refresh after the completion of stage, and generate LOG shelves;
(4) content of the LOG shelves is judged by described program, if the LOG shelves are recorded as " 0 ", step (5) is performed, if institute
State LOG shelves and be recorded as " 1 ", then perform step (7);
(5) it is successfully tested, the Windows8 activation, then records result and upload onto the server;
(6) after the completion of step (5), restarting operating systems, and the LOG shelves are uploaded into Workshop control system, so as to
Missed the stop automatically after being handled by the Workshop control system;
(7) test crash, the Windows8 un-activations, then record result and upload onto the server.
2. Windows according to claim 1 activates automatic test approach, it is characterised in that the LOG shelves have also recorded
The information of the information of the DPK sequence numbers generated after the flash stages, the information of hardware cryptographic Hash and product SN.
3. Windows according to claim 1 activates automatic test approach, it is characterised in that the request marks shelves with
" reqflag.txt " is named.
4. Windows according to claim 1 activates automatic test approach, it is characterised in that it is described refresh mark shelves with
" flashflag.txt " is named.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410033934.5A CN104809004B (en) | 2014-01-24 | 2014-01-24 | Windows activates automatic test approach |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410033934.5A CN104809004B (en) | 2014-01-24 | 2014-01-24 | Windows activates automatic test approach |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104809004A CN104809004A (en) | 2015-07-29 |
CN104809004B true CN104809004B (en) | 2018-02-27 |
Family
ID=53693857
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410033934.5A Expired - Fee Related CN104809004B (en) | 2014-01-24 | 2014-01-24 | Windows activates automatic test approach |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104809004B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7702536B1 (en) * | 2002-12-04 | 2010-04-20 | Microsoft Corporation | Method, system, apparatus, and computer-readable medium for tracking referrals and product sell-through |
CN101895671A (en) * | 2010-07-21 | 2010-11-24 | 深圳创维数字技术股份有限公司 | Set top box Loader module updating method and set top box thereof |
CN102737200A (en) * | 2010-12-14 | 2012-10-17 | 微软公司 | Software activation using digital licenses |
CN103383647A (en) * | 2012-05-04 | 2013-11-06 | 鸿富锦精密工业(深圳)有限公司 | Computer hardware configuration information acquiring system and method |
CN103399815A (en) * | 2013-07-16 | 2013-11-20 | 广东欧珀移动通信有限公司 | Automated testing method and automated testing device |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8949813B2 (en) * | 2011-07-29 | 2015-02-03 | Dell Products Lp | Systems and methods for facilitating activation of operating systems |
-
2014
- 2014-01-24 CN CN201410033934.5A patent/CN104809004B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7702536B1 (en) * | 2002-12-04 | 2010-04-20 | Microsoft Corporation | Method, system, apparatus, and computer-readable medium for tracking referrals and product sell-through |
CN101895671A (en) * | 2010-07-21 | 2010-11-24 | 深圳创维数字技术股份有限公司 | Set top box Loader module updating method and set top box thereof |
CN102737200A (en) * | 2010-12-14 | 2012-10-17 | 微软公司 | Software activation using digital licenses |
CN103383647A (en) * | 2012-05-04 | 2013-11-06 | 鸿富锦精密工业(深圳)有限公司 | Computer hardware configuration information acquiring system and method |
CN103399815A (en) * | 2013-07-16 | 2013-11-20 | 广东欧珀移动通信有限公司 | Automated testing method and automated testing device |
Non-Patent Citations (1)
Title |
---|
Win8的OA3.0技术探秘;平淡;《电脑爱好者》;20121201;第30页 * |
Also Published As
Publication number | Publication date |
---|---|
CN104809004A (en) | 2015-07-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111399873B (en) | Model updating method and device | |
US9250257B2 (en) | Sample processing method, device and system for an assembly line workstation | |
CN102789405A (en) | Automated testing method and system for mainboard | |
CN104469409A (en) | Automatic testing method for smart television software differential upgrading | |
US20190087251A1 (en) | Runtime failure detection and correction | |
CN107357694A (en) | Error event reporting system and its method during startup self-detection | |
WO2020096665A3 (en) | Software application error detection | |
CN110941519B (en) | Chip testing method and device of network equipment | |
CN110716843B (en) | System fault analysis processing method and device, storage medium and electronic equipment | |
CN104809004B (en) | Windows activates automatic test approach | |
CN107515821B (en) | Control testing method and device | |
CN114328158A (en) | Abnormity monitoring method and device, electronic equipment and storage medium | |
CN114116353A (en) | Equipment testing method, device, equipment and storage medium | |
CN112882897A (en) | Abnormal scene processing method and device, electronic equipment and storage medium | |
CN104699556B (en) | The operating system CRC check method and system of computer | |
CN105278993A (en) | Linux system based drive module upgrading method and apparatus | |
CN103778060B (en) | Automatic software receiving and testing device and testing method thereof | |
CN116684382B (en) | Domain name detection and automation application domain name certificate method, system and storage medium | |
CN116449810B (en) | Fault detection method and device, electronic equipment and storage medium | |
CN104932907B (en) | Hard disk mirror-image is automatically loaded method | |
TW201926038A (en) | Server detection method and device thereof | |
CN110858171A (en) | System, method and device for application test, terminal equipment and medium | |
US20110246827A1 (en) | Testing Device and Testing Method | |
JP2012108773A (en) | Automatic software test device and automatic software test method | |
CN111258826B (en) | Method and device for testing command sequence of storage device and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180227 |
|
CF01 | Termination of patent right due to non-payment of annual fee |