CN104808549A - 带电网模型拼接功能的测控装置 - Google Patents

带电网模型拼接功能的测控装置 Download PDF

Info

Publication number
CN104808549A
CN104808549A CN201510155502.6A CN201510155502A CN104808549A CN 104808549 A CN104808549 A CN 104808549A CN 201510155502 A CN201510155502 A CN 201510155502A CN 104808549 A CN104808549 A CN 104808549A
Authority
CN
China
Prior art keywords
model
control device
interval
measure
splicing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510155502.6A
Other languages
English (en)
Other versions
CN104808549B (zh
Inventor
王顺江
南贵林
吴伽玲
高凯
刘金波
句荣滨
赵军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510155502.6A priority Critical patent/CN104808549B/zh
Publication of CN104808549A publication Critical patent/CN104808549A/zh
Application granted granted Critical
Publication of CN104808549B publication Critical patent/CN104808549B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers

Abstract

本发明公开了一种带电网模型拼接功能的测控装置,属于电力自动化技术领域。本发明主要包括三方面重要突破,分别是测控装置硬件结构的设计、测控装置电网模型的建立方式,电网模型存储和拼接机制。本发明实现了电力模型在测控装置中维护,在各应用端直接召唤拼接使用,大幅减少电网模型运维工作量。

Description

带电网模型拼接功能的测控装置
技术领域
本发明涉及电力自动化技术领域,具体涉及一种带电网模型拼接功能的测控装置。
背景技术
电网模型拼接技术已成为现阶段电网模型运维的热点,目前已实现国、网、省之间的拼接,而且仅仅限于主站系统与主站系统之间,从未涉及厂站内部或厂站与主站间的电网模型拼接,所以目前并未实现真正意义上的“源端维护,全局共享”。
要实现真正意义上的全网模型拼接,先决条件就是测控装置(即源端)具备电网模型拼接功能,保证所有电网模型维护工作都在测控装置上完成,全部应用端拼接使用。
目前,电力自动化研究并未涉及厂站端的模型拼接技术,更没有开展过测控装置带电网模型拼接功能的研究,本发明填补了这方面的空白。
发明内容
本发明的目的在于提供一种带电网模型拼接功能的测控装置,该测控装置能够实现“源端维护、全局共享”,大幅减少电网模型运维工作量。
本发明技术方案如下:
一种带电网模型拼接功能的测控装置,该装置是通过总线分别连接CPU、交流采样单元、遥信单元、直流采样单元、通讯接口单元、模型存储单元、键盘以及液晶显示屏形成;其中:所述模型存储单元用于间隔电网模型的存储。
所述测控装置的拼接功能实现按如下步骤完成:
(1)测控装置命名;
(2)四种模型的建立:
(2.1)两种方式绘制间隔拓扑模型
第一种方式是通过测控装置的菜单建立断路器、隔离开关、接地隔离开关、母线等电力一次设备模型及一次设备间的连接关系,直接生成;第二种方式是通过外接计算机,使用专用软件绘制生成。
(2.2)间隔遥信信息模型建立
首先将测控装置上能采集到的间隔遥信信息进行分别命名,然后将每个命名好的间隔遥信信息与测控装置实际间隔遥信信息采集点进行对应,生成间隔遥信信息模型。
(2.3)间隔遥测信息模型建立
首先将测控装置上能采集到的间隔遥测信息进行分别命名,然后将每个命名好的间隔遥测信息与测控装置实际间隔遥测信息采集点进行对应,生成间隔遥测信息模型。
(2.4)间隔遥控信息模型建立
首先将测控装置上能采集到的间隔遥控信息进行分别命名,然后将每个命名好的间隔遥控信息与测控装置实际间隔遥控信息控制点进行对应,生成间隔遥控信息模型。
(3)模型存储:
将所述模型存储单元划分成四个不同的存储区域A、B、C和D,A存储间隔拓扑模型,B存储间隔遥信信息模型,C存储间隔遥测信息模型,D存储间隔遥控信息模型。
(4)模型拼接:
测控装置依照接受到的拼接指令,进行部分模型拼接,或者进行全部模型拼接。
本发明的优点及有益效果如下:
1、本发明测控装置的硬件结构设计便于老设备的升级,只要增加模型存储单元,升级测控装置程序,就可以将一个普通的测控装置升级成带电网模型拼接功能的测控装置,有利于成本节约。
2、通过本发明真正意义上实现“源端维护、全局共享”,大幅减少电网模型运维工作量。
附图说明
图1为本发明带电网模型拼接功能测控装置的硬件结构设计。
图2为金南线间隔。
具体实施方式
以下结合附图详述本发明。
通过金南线间隔模型拼接详述本发明。举例间隔拓扑如附图2所示。
1、装置升级
将原金南线不带模型拼接功能的测控装置插入模型存储单元,再升级测控程序版本,使得金南线测控装置具备模型拼接功能。升级后的硬件结构如图1所示。
2、测控装置命名
对金南线带电网模型拼接功能的测控装置进行命名,名称主要包括三个部分,分别是测控间隔电压等级、测控间隔名称和测控装置名称,最后命名为“220kV.金南线.2263测控”。
3、间隔拓扑模型建立
不管是哪种方式,都需要先输入间隔拓扑中的一次设备,并进行命名,命名包括电压等级、间隔名称和设备名称三部分组成,例如“220kV.金南线.2263断路器”、“220kV.金南线.22631隔离刀闸”、“220kV.金南线.线路”。在测控装置和计算机专用软件中存储典型的拓扑结构,若非特殊拓扑,直接选择对应的典型拓扑结构,再将一次设备进行一一对应,生成本间隔拓扑;若为特殊拓扑,可在测控装置菜单中设置每个一次设备的连接设备,自动生成相应的拓扑,也可以通过计算机专用软件绘制,下装后直接生成。
4、间隔遥信信息模型建立
将测控装置上能采集到的遥信信息进行统一命名,命名包括电压等级、间隔名称、设备名称和信息名称四个部分,例如“220kV.金南线.2263断路器/控制回路断线”、“220kV.金南线.2263测控/装置异常”。将每个命名好的遥信信息与测控装置实际采集点进行对应,生成间隔遥信信息模型。
5、间隔遥测信息模型建立
将测控装置上能采集到的遥测信息进行统一命名,命名包括电压等级、间隔名称、设备名称和信息名称四个部分,例如“220kV.金南线.线路/有功”。将每个命名好的遥测信息与测控装置实际采集点进行对应,生成间隔遥测信息模型。
6、间隔遥控信息模型建立
将测控装置上能采集到的遥控信息进行统一命名,命名包括电压等级、间隔名称和设备名称三个部分,例如“220kV.金南线.2263断路器”。将每个命名好的遥控信息与测控装置实际控制点进行对应,生成间隔遥控信息模型。。
7、电网模型存贮及拼接机制
将建立的金南线四种不同电网模型,分别存储在A、B、C、D中,A存储间隔拓扑模型,B存储间隔遥信信息模型,C存储间隔遥测信息模型,D存储间隔遥控信息模型。
8、模型拼接
站内后台机通过拼接指令,可对金南线间隔电网模型进行部分模型拼接,或者进行全部模型拼接。

Claims (2)

1.一种带电网模型拼接功能的测控装置,其特征在于:该装置是通过总线分别连接CPU、交流采样单元、遥信单元、直流采样单元、通讯接口单元、模型存储单元、键盘以及液晶显示屏形成;其中:所述模型存储单元用于间隔电网模型的存储。
2.根据权利要求1所述的带电网模型拼接功能的测控装置,其特征在于:所述测控装置的拼接功能实现按如下步骤完成:
(1)测控装置命名;
(2)四种模型的建立:
(2.1)两种方式绘制间隔拓扑模型
第一种方式是通过测控装置的菜单建立断路器、隔离开关、接地隔离开关、母线等电力一次设备模型及一次设备间的连接关系,直接生成;第二种方式是通过外接计算机,使用专用软件绘制生成。
(2.2)间隔遥信信息模型建立
首先将测控装置上能采集到的间隔遥信信息进行分别命名,然后将每个命名好的间隔遥信信息与测控装置实际间隔遥信信息采集点进行对应,生成间隔遥信信息模型。
(2.3)间隔遥测信息模型建立
首先将测控装置上能采集到的间隔遥测信息进行分别命名,然后将每个命名好的间隔遥测信息与测控装置实际间隔遥测信息采集点进行对应,生成间隔遥测信息模型。
(2.4)间隔遥控信息模型建立
首先将测控装置上能采集到的间隔遥控信息进行分别命名,然后将每个命名好的间隔遥控信息与测控装置实际间隔遥控信息控制点进行对应,生成间隔遥控信息模型。
(3)模型存储:
将所述模型存储单元划分成四个不同的存储区域A、B、C和D,A存储间隔拓扑模型,B存储间隔遥信信息模型,C存储间隔遥测信息模型,D存储间隔遥控信息模型。
(4)模型拼接:
测控装置依照接受到的拼接指令,进行部分模型拼接,或者进行全部模型拼接。
CN201510155502.6A 2015-04-03 2015-04-03 带电网模型拼接功能的测控装置 Active CN104808549B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510155502.6A CN104808549B (zh) 2015-04-03 2015-04-03 带电网模型拼接功能的测控装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510155502.6A CN104808549B (zh) 2015-04-03 2015-04-03 带电网模型拼接功能的测控装置

Publications (2)

Publication Number Publication Date
CN104808549A true CN104808549A (zh) 2015-07-29
CN104808549B CN104808549B (zh) 2017-12-29

Family

ID=53693479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510155502.6A Active CN104808549B (zh) 2015-04-03 2015-04-03 带电网模型拼接功能的测控装置

Country Status (1)

Country Link
CN (1) CN104808549B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108022037A (zh) * 2017-11-06 2018-05-11 国家电网公司 一种交-直流混合系统操作票智能生成系统及实现方法
CN108899911A (zh) * 2018-08-16 2018-11-27 中国能源建设集团广东省电力设计研究院有限公司 直流变电系统

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010150048A1 (en) * 2009-06-26 2010-12-29 Abb Research Ltd A method for configuring an intelligent electronic device and a substation automation system
CN102324784A (zh) * 2011-06-09 2012-01-18 山东电力集团公司 一种基于统一编码的电网模型拼接方法
CN102521398A (zh) * 2011-12-23 2012-06-27 清华大学 变电站-调度中心两级分布式电网的建模方法
CN102664390A (zh) * 2012-05-22 2012-09-12 普尔盾电气(上海)有限公司 数字式通用保护测控装置
CN103150426A (zh) * 2013-02-09 2013-06-12 国家电网公司 面向调控一体仿真的电网一、二次设备统一建模方法
CN103532144A (zh) * 2013-10-30 2014-01-22 国网安徽省电力公司 用于继电保护多级整定计算的电网模型拼接方法及系统
CN104135069A (zh) * 2014-07-08 2014-11-05 广东电网公司电力科学研究院 智能变电站二次设备运行参数配置方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010150048A1 (en) * 2009-06-26 2010-12-29 Abb Research Ltd A method for configuring an intelligent electronic device and a substation automation system
CN102324784A (zh) * 2011-06-09 2012-01-18 山东电力集团公司 一种基于统一编码的电网模型拼接方法
CN102521398A (zh) * 2011-12-23 2012-06-27 清华大学 变电站-调度中心两级分布式电网的建模方法
CN102664390A (zh) * 2012-05-22 2012-09-12 普尔盾电气(上海)有限公司 数字式通用保护测控装置
CN103150426A (zh) * 2013-02-09 2013-06-12 国家电网公司 面向调控一体仿真的电网一、二次设备统一建模方法
CN103532144A (zh) * 2013-10-30 2014-01-22 国网安徽省电力公司 用于继电保护多级整定计算的电网模型拼接方法及系统
CN104135069A (zh) * 2014-07-08 2014-11-05 广东电网公司电力科学研究院 智能变电站二次设备运行参数配置方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108022037A (zh) * 2017-11-06 2018-05-11 国家电网公司 一种交-直流混合系统操作票智能生成系统及实现方法
CN108899911A (zh) * 2018-08-16 2018-11-27 中国能源建设集团广东省电力设计研究院有限公司 直流变电系统
CN108899911B (zh) * 2018-08-16 2021-04-06 中国能源建设集团广东省电力设计研究院有限公司 直流变电系统

Also Published As

Publication number Publication date
CN104808549B (zh) 2017-12-29

Similar Documents

Publication Publication Date Title
CN103427417B (zh) 基于多源信息融合的配电网故障处理方法
CN203311254U (zh) 舞台设备的综合控制系统
GB2518969A (en) Remote wireless communication control system for submerged arc furnace reactive compensation
CN103746451A (zh) 基于plc的一体化电源的监控系统及监控方法
CN104808549A (zh) 带电网模型拼接功能的测控装置
CN103683510A (zh) 具有选相控制和自录波功能的智能开关控制装置及方法
CN204287910U (zh) 用于光伏电站的智能监控装置
CN203813518U (zh) 一体化电源设备的监控系统的硬件平台
CN105024454A (zh) 变电站二次设备监控系统
CN110703679A (zh) 一种风力发电机组工业控制器
CN106933116B (zh) 具有matlb接口的微电网仿真调试方法
CN202033886U (zh) 数据采集传输仪
CN201897725U (zh) 一种能够实时进行通讯的双微机系统
CN202815949U (zh) 电缆信息掌上巡检器
CN204992532U (zh) 一种嵌入式微机弧光保护装置
CN203734380U (zh) 基于plc的一体化电源的监控系统
CN202978295U (zh) 水电与光伏发电共享型控制装置
CN203537066U (zh) 配网开闭所的信息采集器
CN201576963U (zh) 基于iec 61850的变电站智能数据装置
CN105021931A (zh) 智能电力能效监测装置
CN105047052B (zh) 一种直流储能监测调控教学平台
CN104112989A (zh) 一种新型智能精密云配电柜的设计方法
CN213521960U (zh) 水电站生态流量智能终端机
CN204538813U (zh) 一种用电信息管理系统
CN203840054U (zh) 面向对象的配电终端

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200407

Address after: 39-7 Siping Street, Heping District, 110006, Liaoning, Shenyang

Co-patentee after: STATE GRID CORPORATION OF CHINA

Patentee after: STATE GRID CORPORATION OF CHINA

Address before: 116001 A, block 181, Asia Fashion apartment, 809 democracy Road, Heping District, Liaoning, Shenyang

Patentee before: Wang Shunjiang

TR01 Transfer of patent right