CN104805738B - Ballasted railway ballast bed reinforcing device, system and method - Google Patents

Ballasted railway ballast bed reinforcing device, system and method Download PDF

Info

Publication number
CN104805738B
CN104805738B CN201510161094.5A CN201510161094A CN104805738B CN 104805738 B CN104805738 B CN 104805738B CN 201510161094 A CN201510161094 A CN 201510161094A CN 104805738 B CN104805738 B CN 104805738B
Authority
CN
China
Prior art keywords
side wall
fixing sleeve
elastic fixing
railway
stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510161094.5A
Other languages
Chinese (zh)
Other versions
CN104805738A (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510161094.5A priority Critical patent/CN104805738B/en
Publication of CN104805738A publication Critical patent/CN104805738A/en
Application granted granted Critical
Publication of CN104805738B publication Critical patent/CN104805738B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/001Track with ballast

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Railway Tracks (AREA)

Abstract

The invention provides a ballasted railway ballast bed reinforcing device, system and method and relates to the field of construction of railway infrastructures. A device with an elastic fixed sleeve comprises at least one elastic fixed sleeve which is formed by surrounding a columnar space by at least one elastic continuous side wall, and at least one locking system for controlling the shape of each side wall; the locking system is connected with at least two points on each side wall so that the side wall keeps a certain shape; each columnar space is internally filled with interior decoration materials; the interior decoration materials have the compressive strength higher than that of side wall materials. By the aid of the device with the elastic fixed sleeve, the good elasticity of a tire rubber layer and the vertical high compressive strength of crushed stone particle layers can be combined very well, and the device has excellent performances when being applied to the construction of the railway infrastructures.

Description

There are bracing means, the system and method for tiny fragments of stone, coal, etc. railway ballast
Technical field
The present invention relates to railway infrastructure construction field, more clearly, is related to build and be reinforced with tiny fragments of stone, coal, etc. railway ballast Devices, systems and methods.
Background technology
There is tiny fragments of stone, coal, etc. railroad track because construction investment is little, orbit adjusting and maintenance are convenient, by most of institutes of railroad in the world Using.
Ballast track is by rail, sleeper, road ballast bed, track switch, connecting piece composition.The general trapezoidal road ballast bed of section Uniform load suffered by sleeper is distributed to into road bed, and provides the elasticity and buffering of uniformity to slow down the impact of wheel track and shake It is dynamic.It helps fixed sleeper position, draining and by making adjustment sleeper position firm by ramming.
Rubble after being matched somebody with somebody using screening and level more than modern road ballast bed is piled up and is formed.In order to provide sleeper enough horizontal resistances Power, is specially provided with the railway roadbed flat-top shoulder block and inclined-plane side slope beyond length of sleeper.
The reciprocating of passing train load makes the shot railway ballast under sleeper, (a) moves to outside both sides even from side slope rolling Fall, cause non-response railway roadbed to sink;B () gradually wears out even broken generation fine particle, blocking water route pollution railway roadbed.Most Whole railway roadbed need by cleaning and again the extensive railway maintenance such as paving come restorability.
Railway circle is longer than the general rubble road ballast bed life-span in actively research and development always, higher other of elastic damping performance Ballast bed structure.David Bower are in U.S. Patent application US2013/0206853A1 (Railway stone ballast and Related system and methods) in propose to utilize Chemical Felter, such as epoxy resin is by ground waste and old wheel Tire fine powder is bonded on railway ballast particle, and the method for the railway ballast particle laying railway roadbed using these belt surface films.It is predictable It is, the Chemical Felter that the method is harmful to due to a large amount of use costs height of needs and to human and environment, it is difficult to push away in railway circle Extensively.
The content of the invention
In order to overcome the deficiencies in the prior art, the invention provides a kind of bracing means for having tiny fragments of stone, coal, etc. railway ballast, system and Method.
According to an aspect of the present invention, a kind of device with elastic fixing sleeve, i.e., for having a tiny fragments of stone, coal, etc. railway ballast plus be fixedly mounted with Put, it include by the continuous side wall of at least one elasticity surround at least one elastic fixing sleeve that a cylindrical space formed and At least one fastening system for controlling each side wall shape, the fastening system connects on each side wall at least 2 points protects side wall Definite shape is held, in each cylindrical space built with built-in material, the built-in material has the resistance to compression higher than spacer material Intensity.
Alternatively, it is monomer or multilayer board-like material to carry built-in material, and one is formed together with side wall than side wall sheet Body has the composite construction of more high compressive strength.
Preferably, the built-in material is built-in aggregate particle, and the built-in aggregate particle has higher than spacer material Compression strength.
Preferably, the fastening system includes that single group or multigroup side wall distance keep pad and strain component.
Preferably, the device with elastic fixing sleeve also includes the isolation of the single or multiple segmentations cylindrical space Wall, divider wall is fixed on elastic fixing sleeve by the locking device.
Preferably, the device with elastic fixing sleeve also includes one or more side wall reinforcing plates, and it passes through the lock Clamping system is fixed on side wall.
Preferably, the side wall carries multiple convex wings at top.
Preferably, multiple holes are carried on the side wall.
Preferably, the side wall reinforcing plate carries multiple convex wings at top.
Preferably, multiple holes are carried in the side wall reinforcing plate.
Preferably, the device with elastic fixing sleeve also includes collet with holes, and the collet with holes holds up and fills up elasticity The aggregate particle of fixed cover, so as to form the entirety that can be handled upside down.
Preferably, the side wall is made up of tire.
Preferably, the side wall distance keeps pad to be made up of tire.
Preferably, the divider wall is made up of tire.
Preferably, the side wall reinforcing plate is made up of tire.
Alternatively, at least 85% it is rubble of the granular size in the range of 15mm-70mm in the built-in aggregate particle.
Alternatively, carry in built-in aggregate particle most 15% be by made by tire section at 1 square millimeter -400 Strip fragment in the range of square millimeter.
According to a further aspect in the invention, device of the body with elastic fixing sleeve more than, many body band elastic fixing sleeves Device include multiple devices with elastic fixing sleeve, the device with elastic fixing sleeve includes by the company of at least one elasticity Continuous side wall surrounds a cylindrical space at least one elastic fixing sleeve for being formed and the fastening system for controlling each side wall shape, The fastening system connects on each side wall at least 2 points makes side wall keep definite shape, in each cylindrical space built with built-in Material, the built-in material has the compression strength higher than spacer material.
Preferably, the built-in material is built-in aggregate particle, and the built-in aggregate particle has higher than spacer material Compression strength.
According to other aspects of the invention, a kind of hardened system for having a tiny fragments of stone, coal, etc. railway ballast, it is above-mentioned with elastic fixing sleeve Device or above-mentioned device of many bodies with elastic fixing sleeve are disposed in railway roadbed shoulder block part or railway roadbed side slope part, itself and railway There is a movable aggregate particle layer between sleeper, so as to allow tamping operation to carry out in the periphery near sleeper.
Preferably, the device with elastic fixing sleeve is disposed in the position of the top near roadbed of elastic fixing sleeve Put.
According to other aspects of the invention, a kind of hardened system for having a tiny fragments of stone, coal, etc. railway ballast, above-mentioned many bodies band elastic fixing sleeves Device be disposed between railway roadbed mid portion and railway roadbed shoulder block part two parts, it has one between railroad sleeper Movable aggregate particle layer, so as to allow tamping operation to carry out in the periphery near sleeper.
Preferably, the thickness for carrying movable aggregate particle layer is defined as sleeper bottom surface to the distance on side wall top, its Between 20mm to 200mm.
Preferably, the side wall of the device with elastic fixing sleeve carries multiple convex wings at top, with many on its side wall Individual hole, convex wing is stretched in movable aggregate particle layer.
Alternatively, the movable aggregate particle layer includes taking from the fragment or particle of tire.
According to other aspects of the invention, a kind of method for supporting railroad track, including:The shop fixtures tiny fragments of stone, coal, etc. on ground;The bottom of at Tiny fragments of stone, coal, etc. upper berth covers the described device with elastic fixing sleeve of outer aggregate particle and arrangement or described many bodies with elastic fixing sleeve Device;Finally supplement the outer aggregate particle of more sets and form railway roadbed, railroad sleeper is supported by railway roadbed and the movement of sleeper is limited.
Alternatively, wherein the outer aggregate particle composition of the set is different from the built-in aggregate particle.
Description of the drawings
More intensions of the invention and principle can be understood by the help of appended diagram.Assembly of elements shown in figure differs Fixed proportional, it is intended to illustrate the principle of the present invention.
Fig. 1 illustrates a sandwich composite construction unit being made up of hard gravel particle and caoutchouc elasticity fixed cover, Monomer railway ballast brick.
Fig. 2 is the top view and front view of the monomer railway ballast brick according to specific embodiment of the present invention.
Fig. 3 is have ballast bed entirety with two strands of monomer railway ballast bricks being positioned in railway roadbed shoulder block of the invention Sectional view.
Fig. 4 is that the part with two strands of monomer railway ballast bricks being positioned in railway roadbed shoulder block of the invention has ballast bed Top view.
Fig. 5 is the partial enlarged drawing of the Fig. 3 according to the present invention.
Fig. 6 is many body railway ballast bricks being made up of multiple sandwich composite construction units according to specific embodiment of the present invention.
Fig. 7 is the top view and front view of many body railway ballast bricks according to the present invention.
Fig. 8 is putting for the ballast bed of having with many body railway ballast bricks being positioned under railroad sleeper of the invention configuration Big figure.
Fig. 9 is that the part with the brick of body railway ballast more than two strands being positioned under railroad sleeper of the invention has ballast bed Top view.
Figure 10 is the end cross-sectional view of the ballast bed of having with many body railway ballast bricks of the invention.
Figure 10 A illustrate another the alternative embodiment relative to Figure 10, wherein in railway ballast brick and against sleeper Pure rubble railway ballast in beneath ballast layer is replaced by the mixture of rubble railway ballast and strip rubber crumb.
Figure 11 illustrates the situation for installing railway ballast tamping operation after railway ballast brick.
Figure 12 is to make system firm by ramming according to the tiny fragments of stone, coal, etc. brick with mould and pressure head for consolidating railway ballast brick of the present invention.
Figure 13 illustrates the embodiment of another the alternative composite construction unit relative to Fig. 1, wherein hard broken Stone particle is replaced by hard platy structure.
Figure 14 illustrates another the alternative embodiment relative to Fig. 1, and wherein side wall top is without convex wing.
Specific embodiment
Further it is discussed in detail below with reference to the specific embodiment of Fig. 1-14 couple of present invention.
Fig. 1 is a specific example according to the present invention, can be seen from the sectional view of the monomer railway ballast brick 1, and it is wrapped Elastic fixing sleeve 1A that can be transformed by junk vehicle tire is included, one group of distance keeps pad 1B, take-up device 1C, side wall securing plate 1D, division board 1E, elastic webbing bottom hole support 1P and locking unit 1Q.
By shown in Fig. 1, Fig. 2, pad 1B and take-up device 1C, tire is kept to be become to force by circle by the distance for installing additional Elastic fixing sleeve 1A of nearly elongated rectangular shape.Side wall securing plate 1D helps elastic fixing sleeve 1A further to keep required form.Need Statement is that the present invention covers other other shapes of elastic fixing sleeves for keeping pad 1B and take-up device 1C to fix with distance Situation, be not limited solely to the structure provided in embodiment.
As shown in figure 1, elastic webbing bottom hole support 1P is placed in carried elastic fixing sleeve 1A.It can be by plate or netted with holes Material is formed and by carried take-up device 1C locking positionings.Thus, railway ballast 1J can in advance be inserted flexible fastening in factory in covering Set 1A, to form monomer railway ballast brick 1.It is to be understood that the present invention covers the scheme that other arrange elastic webbing bottom hole support, such as, Tire sidewall is punched and definite shape is cut into, and after long strip type elastic fixing sleeve is formed, by the sidewall cut out connection or It is glued into collet.
Monomer railway ballast brick 1 combines well the vertical high resistance to compression of the good elasticity of rubber for tire layer and gravel particle layer Intensity.
The built-in divider wall 1E of elastic fixing sleeve 1A keeps pad 1B and take-up device 1C to help position by distance, and it enters one Step reduces directly contact very stiff and demanding between built-in rubble and breakage.
The tire sidewall for forming elastic fixing sleeve 1A is cut into definite shape, forms several convex wings 1AF.Similar, it is convex Wing 1DF is equally arranged in side wall securing plate 1D, it is also possible to be arranged on divider wall 1E.
Fig. 3, Fig. 4 and Fig. 5 illustrate a specific embodiment of the monomer railway ballast brick 1 in road ballast bed.In this concrete reality In applying example, two strands of monomer railway ballast bricks 1 bury successively the shoulder block for being placed on ballast bed 3C according to length direction parallel to the mode of rail In 3O, and certain distance is kept with sleeper 3B.On vertical direction, the top of the close shoulder block 3O of convex wing 1AF of monomer railway ballast 1 band of brick Face.Their this set method can help to increase that the resistance of railway ballast particle transverse shifting, the shape of fixed road bed 3C, while Railway ballast tamping operation is allowed to carry out in sleeper surrounding normal.Because original scattered railway ballast particle is passed through flexible fastening by railway ballast brick Set connects into relatively solid and regular profile, and their embedment effectively strengthens the crucial portion of the railway roadbeds such as shoulder block and side slope Position, increased the lateral displacement resistance of track, reduce the maintenance load of railway roadbed.
It is to be understood that, the present invention covers the display case of any suitable monomer railway ballast brick, is not limited solely to above-mentioned Embodiment.
Preset hole 1G and 1H in elastic fixing sleeve 1A and side wall securing plate 1D respectively, help draining.
Above-mentioned elastic fixing sleeve 1A, distance holding pad 1B, side wall securing plate 1D, divider wall 1E can be by suitable material system Into, including but not limited to, natural or artificial rubber, the material on junked tire etc..Can see, the application of this patent need not Any working process with secondary environmental pollution or the notable consumption energy is carried out to junked tire.
Above-mentioned take-up device 1C and locking unit 1Q can be made up of any suitable material, as long as they can be provided enough Tensile strength, including but not limited to, natural or artificial rubber, spring steel band, nylon or macromolecular material bandage, waste and old wheel Material on tire etc..
It is to be understood that, the present invention is also covered by without elastic collet 1P, and it is solid that railway ballast 1J is loaded into elasticity at the scene of laying a railway track Surely cover 1A and form the situation of monomer railway ballast brick at the construction field (site).
Fig. 6 and Fig. 7 illustrate another kind of alternative embodiment of the present invention, i.e., a kind of many body railway ballast bricks 6.Except several Group with elastic fixing sleeve 1A shown in Fig. 1, distance keep pad 1B, divider wall 1E, the element as elastic webbing bottom hole support 1P with Outward, it is also included to adapt to the take-up device 6C of many bodies and adjusted design, side wall securing plate 6D, and locking unit 6Q, Yi Jitian Plus single or multiple lift termination reinforcing plate 6S and termination take-up device 6T.
Termination reinforcing plate 6S with convex wing 6SF contained by many body railway ballast bricks 6 is fixed on railway ballast brick by termination take-up device 6T On.Termination reinforcing plate 6S has the shape of similar holding elastic fixing sleeve with side wall reinforcing plate 6D, and then prevents railway ballast particle Free-moving effect.
Side wall securing plate 6D and termination reinforcing plate 6S can be made up of any suitable material, including but not limited to, natural Or artificial rubber, the material on junked tire etc..
Take-up device 6C and locking unit 6Q can be made up of any suitable material, as long as they can provide enough stretchings Intensity, including but not limited to, natural or artificial rubber, spring steel band, nylon or macromolecular material bandage, on junked tire Material etc..
As shown in fig. 6, the railway ballast 1J being mounted in elastic fixing sleeve can be rubble railway ballast and the junked tire for being cut into strip The mechanical impurity of piece 6W.Bar 6W can also be the bar newly composed by junked tire grain weight.The wheel of carried strip Its length of tire fragment and diameter of section ratio are more than 1.5.
Configuration and the method for the outer different railway ballasts of set, make some be difficult to the improvement mixing road applied originally in elastic fixing sleeve The tiny fragments of stone, coal, etc. is applied, such as the mechanical impurity with other compositions being easily blown to four winds, also than if desired for the high of recycling The high performance high-quality rubble railway ballast of cost or other railway ballasts with binding agent or protecting film.This method is applied at a high speed or heavily loaded The circuit high to railway ballast performance requirement such as railway, unifies that construction can be saved compared with heap spreads a kind of railway ballast and ties up with formula of being scattered originally Shield cost.
According to a further aspect in the invention, additionally provide a kind of general railway roadbed paving mode, i.e., after the bottom tiny fragments of stone, coal, etc. has spread, Before rail 3A and sleeper 3B layings, two station track tiny fragments of stone, coal, etc. band 8M will be overlay in location in sleeper end.
Fig. 8, Fig. 9 and Figure 10 illustrate many body railway ballast bricks 6 in this railway ballast that overlays with the one embodiment in 8M.Duo Ti roads Tiny fragments of stone, coal, etc. brick 6 lines up two strands in the way of length direction is perpendicular to track, and along rail 3A the lower section at sleeper 3B two ends, shape are continuously embedded in Cheng Suoti overlays skeleton of the railway ballast with 8M.That leaves certain thickness (20mm-200mm) between many body railway ballast bricks 6 and sleeper 3B can Dynamic railway ballast stratum granulosum 8H.Convex wing 1AF mentioned above and 6SF, stretch into movable ballast layer 8H of this layer, to railway ballast Particle free around Motion produces the restriction on different directions, improves the resistance of railway ballast transverse movement and the lateral displacement resistance of sleeper.It is same with this When, normal tamping operation can be carried out as usual.
It is to be understood that, the present invention covers and discontinuously railway ballast brick is put into into the method under every sleepers, and covers Other are in order to improve railway roadbed respectively to the railway ballast brick paving mode of stability.
Sleeper medium position is compared, sleeper two ends support near the position of rail with greater need for solid railway ballast.Railway ballast brick is joined It is not only firm but also have certain elastic recovery in sleeper end positions this needed for sleeper to be provided with the two station track tiny fragments of stone, coal, etc. bands built The support of ability.Their use contributes to improving the service life of railway roadbed and sleeper simultaneously.
Present invention encompasses using different from other roads in elastic railway ballast set 1A and on flowable ballast layer 8H position The method of the railway ballast at bed position.As shown in Figure 10 A, elastic railway ballast set 1A is interior and has loaded rubble road at movable ballast layer 8H position The mechanical impurity of the tiny fragments of stone, coal, etc. and the junked tire piece 6W for being cut into strip.
When railway roadbed becomes irregularity, it is necessary to which railway ballast is encased inside under sleeper makes sagging sleeper raise again.Generally this Completed by railway ballast tamping tool.
Figure 11 to show and make process firm by ramming using the railway roadbed after the present invention:Pick 11A and 11B are made for a pair firm by ramming in extrinsic power Drive lower vibration while inserting railway roadbed 3B simultaneously to clamp relatively simultaneously, force the particle in movable railway ballast stratum granulosum 8H, gram The resistance of convex wing 1AF is taken, sleeper 3B bottoms are clamp-oned.After pick 11A and 11B stopping applying external force is made firm by ramming, convex wing 1AF will be prevented The Particle free being squeezed into is slipped out.Convex wing 6SF positioned at many terminations of body railway ballast brick 6 plays similar work in track horizontal direction With.
As shown in Fig. 6 and Figure 12, pre-configured quantitative railway ballast 1J can in advance be filled out under the controllable environment of factory Enter in elastic fixing sleeve 1A, then prefabricated railway ballast brick 6 is put in mould 12Y, the vibration and die head by mould 12Y 12Z presses, and makes built-in railway ballast 1J reach suitable compacted density, and forces railway ballast brick profile to level off to inner chamber in mould 12Y Shape.
It is worthy of note that, present invention encompasses on big machineryization paving frame maintenance train, the outdoor " works of a flowing The above railway ballast brick manufacturing process is completed on factory ", and is supported in new causeway bed or railway roadbed by big machineryization paving frame maintenance train The method being automatically and accurately layered on railway ballast brick during shield in railway roadbed.
The railway ballast brick of prefabrication has controllable packing, and railway ballast brick is displayed on-site makes to a certain extent scene Construction quality and speed of application be all improved.
Figure 13 illustrates the specific embodiment of another alternative composite construction unit, the hard rubble in Fig. 1 Grain 1J is replaced by the platy structure 13E with high compressive strength.
Figure 14 illustrates the situation of the monomer railway ballast brick without convex wing.It is to be understood that, as shown in figure 14, the present invention Cover the application of the railway ballast brick without convex wing 1AF or without convex wing 6SF.
Require emphasis and be pointed out that application example mentioned above is only the concrete demonstration citing that the present invention covers content.Press The principle application mode that can have many multi-forms and the variation for allowing according to the present invention.
The application mode of these multi-forms and the variation for allowing are summarized by following patent states.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (16)

1. a kind of device with elastic fixing sleeve, it is characterised in that:It includes surrounding one by the continuous side wall of at least one elasticity At least one elastic fixing sleeve and at least one that individual cylindrical space is formed control the fastening system of each side wall shape, described Fastening system connects on each side wall at least 2 points makes side wall keep definite shape, in each cylindrical space built with built-in material Material, the built-in material has the compression strength higher than spacer material;The side wall carries multiple convex wings at top, on side wall With multiple holes.
2. the device with elastic fixing sleeve according to claim 1, it is characterised in that:The built-in material gathers materials for built-in Particle, the built-in aggregate particle has the compression strength higher than spacer material.
3. the device with elastic fixing sleeve according to one of claim 1-2, it is characterised in that:The fastening system includes Single group or multigroup side wall distance keep pad and strain component.
4. the device with elastic fixing sleeve according to claim 2, it is characterised in that:The device with elastic fixing sleeve Also include collet with holes, the collet with holes holds up the aggregate particle for filling up elastic fixing sleeve, so as to form can be handled upside down whole Body.
5. the device with elastic fixing sleeve according to one of claim 1-2, it is characterised in that:The band elastic fixing sleeve Device also include:One or more side wall reinforcing plates, it passes through the fastening system and is fixed on side wall, the side wall reinforcing plate Multiple convex wings are carried at top, multiple holes are carried in side wall reinforcing plate.
6. the device with elastic fixing sleeve according to claim 3, it is characterised in that:The side wall, side wall distance keep Pad is made up of tire.
7. the device with elastic fixing sleeve according to claim 2, it is characterised in that:Carry in built-in aggregate particle at most 15% is strip fragment of the section in the range of 1 square millimeter -400 square millimeters by made by tire.
8. a kind of hardened system for having a tiny fragments of stone, coal, etc. railway ballast, it is characterised in that:Band elasticity according to one of claim 1-2 is solid The device of fixed set is disposed in railway roadbed shoulder block part or railway roadbed side slope part, and it has one between railroad sleeper and movably gathers materials Granulosa, so as to allow tamping operation to carry out in the periphery near sleeper.
9. the hardened system for having a tiny fragments of stone, coal, etc. railway ballast according to claim 8, it is characterised in that:It is described with elastic fixing sleeve Device is arranged to, and the top with elastic fixing sleeve is near the position of roadbed.
10. a kind of hardened system for having a tiny fragments of stone, coal, etc. railway ballast, it is characterised in that:Band elasticity according to one of claim 1-2 The device of fixed cover is disposed between railway roadbed mid portion and railway roadbed shoulder block part two parts, and it is between railroad sleeper There is a movable aggregate particle layer, so as to allow tamping operation to carry out in the periphery near sleeper.
11. hardened systems for having a tiny fragments of stone, coal, etc. railway ballast according to claim 10, it is characterised in that:Carry movable aggregate particle The thickness of layer is defined as sleeper bottom surface to the distance on side wall top, and it is between 20mm to 200mm.
12. hardened systems for having a tiny fragments of stone, coal, etc. railway ballast according to claim 10, it is characterised in that:The band elastic fixing sleeve The side wall of device carry multiple convex wings at top, multiple holes are carried on its side wall, convex wing stretched in movable aggregate particle layer.
13. hardened systems for having a tiny fragments of stone, coal, etc. railway ballast according to one of claim 10-12, it is characterised in that:It is described movable Aggregate particle layer includes taking from the fragment or particle of tire.
A kind of 14. methods for supporting railroad track, including:The shop fixtures tiny fragments of stone, coal, etc. on ground;Outer aggregate particle and cloth are covered on bottom tiny fragments of stone, coal, etc. upper berth Put the device with elastic fixing sleeve according to claim 2;Finally supplement the outer aggregate particle of more sets and form railway roadbed, by Railway roadbed is supporting railroad sleeper and limit the movement of sleeper.
15. methods for supporting railroad track according to claim 14, wherein the outer aggregate particle composition of the set is different from The built-in aggregate particle.
A kind of 16. methods for supporting railroad track, including:The shop fixtures tiny fragments of stone, coal, etc. on ground;Outer aggregate particle and cloth are covered on bottom tiny fragments of stone, coal, etc. upper berth Put the device with elastic fixing sleeve according to claim 1;Finally supplement the outer aggregate particle of more sets and form railway roadbed, by Railway roadbed is supporting railroad sleeper and limit the movement of sleeper.
CN201510161094.5A 2015-04-07 2015-04-07 Ballasted railway ballast bed reinforcing device, system and method Expired - Fee Related CN104805738B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510161094.5A CN104805738B (en) 2015-04-07 2015-04-07 Ballasted railway ballast bed reinforcing device, system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510161094.5A CN104805738B (en) 2015-04-07 2015-04-07 Ballasted railway ballast bed reinforcing device, system and method

Publications (2)

Publication Number Publication Date
CN104805738A CN104805738A (en) 2015-07-29
CN104805738B true CN104805738B (en) 2017-04-19

Family

ID=53690909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510161094.5A Expired - Fee Related CN104805738B (en) 2015-04-07 2015-04-07 Ballasted railway ballast bed reinforcing device, system and method

Country Status (1)

Country Link
CN (1) CN104805738B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111523243B (en) * 2020-04-29 2023-08-25 中国国家铁路集团有限公司 Intelligent maintenance analysis system for ballast bed

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204780478U (en) * 2015-04-07 2015-11-18 张雄飞 Take elastic fixing sleeve's device and have hardened system of tiny fragments of stone, coal, etc. railway railway roadbed

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3716834A1 (en) * 1986-05-22 1987-11-26 Phoenix Ag Flexible web, consisting of cushion-like elements
DE9116628U1 (en) * 1991-07-09 1993-04-15 Clouth Gummiwerke AG, 5000 Köln Shock absorber element
GB0305071D0 (en) * 2003-03-06 2004-04-07 Hyperlast Ltd Railway track support structures
DE202011001771U1 (en) * 2011-01-20 2012-01-30 Naue Gmbh & Co. Kg Ballast mat
HU230288B1 (en) * 2012-09-21 2015-12-28 Zoltán Mészárics Railway track structure made of precast components and construction method of the same structure
CN203411863U (en) * 2013-07-24 2014-01-29 成都市新筑路桥机械股份有限公司 Embedded rail

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204780478U (en) * 2015-04-07 2015-11-18 张雄飞 Take elastic fixing sleeve's device and have hardened system of tiny fragments of stone, coal, etc. railway railway roadbed

Also Published As

Publication number Publication date
CN104805738A (en) 2015-07-29

Similar Documents

Publication Publication Date Title
CN207452594U (en) A kind of urban track traffic prestressing force slab track
CN109763397B (en) Asphalt pavement with embedded structure and construction method
CN107881858B (en) Railway foundation bed surface layer structure and laying method thereof
US8602318B2 (en) Method of covering a rail for a railway vehicle
CN106192646B (en) Vcehicular tunnel car-driving shock-absorbing denoising structure and its construction method
CN110904740B (en) Roadbed and method for controlling differential settlement of high-speed railway road and bridge transition section
KR100838227B1 (en) Structure of high-strength and rapidly-hardening prepacked concrete track for carrying out mechanization and working method thereof
CN207130543U (en) The embedded tracks structure of new precast track plate
CN108951306B (en) Ballast track bed and construction method thereof
CN204959479U (en) Embedded frame track board and track structure thereof
CN111945510A (en) Self-adaptive environment-friendly prevention and control construction method and device for bump at bridge head
CN109457564A (en) Anti-settling roadbed and its construction method
CN109811627B (en) Rapid forming highway construction method
CN104805738B (en) Ballasted railway ballast bed reinforcing device, system and method
CN105133439B (en) A kind of embedded ballastless track system for afforesting section
CN207176403U (en) Elastic shoe and resilient sleeper-bearing component and non-fragment orbit for non-fragment orbit
KR20150111547A (en) Wide sleeper for direct fastened track on asphalt roadbed, and constructing method for the same
CN109468893A (en) A kind of track structure laying method for having the tiny fragments of stone, coal, etc. and being combined without the tiny fragments of stone, coal, etc.
WO2013120059A1 (en) Railway stone ballast and related systems and methods
KR100709099B1 (en) Construction method of paving track for asphalt filling type and structure thereof
CN204780478U (en) Take elastic fixing sleeve's device and have hardened system of tiny fragments of stone, coal, etc. railway railway roadbed
DE4439816C2 (en) Process for the production of an elastically mountable track support plate
WO2013004242A1 (en) A substructure system of a railway track
KR100694490B1 (en) Doublerness composition layer footway blocks pentggram equipment of the concrete and rearrangement wastepaper
CN206127789U (en) Structure of making an uproar falls in highway tunnel driving damping

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170419

Termination date: 20190407

CF01 Termination of patent right due to non-payment of annual fee