CN104805470B - 一种500kA电解铝直流电流与交流功率对应关系的验证方法 - Google Patents

一种500kA电解铝直流电流与交流功率对应关系的验证方法 Download PDF

Info

Publication number
CN104805470B
CN104805470B CN201510212611.7A CN201510212611A CN104805470B CN 104805470 B CN104805470 B CN 104805470B CN 201510212611 A CN201510212611 A CN 201510212611A CN 104805470 B CN104805470 B CN 104805470B
Authority
CN
China
Prior art keywords
current
rectification
potline
power
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510212611.7A
Other languages
English (en)
Other versions
CN104805470A (zh
Inventor
刘陇平
赵中义
姚海
邢沛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiuquan Iron and Steel Group Co Ltd
Original Assignee
Jiuquan Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiuquan Iron and Steel Group Co Ltd filed Critical Jiuquan Iron and Steel Group Co Ltd
Priority to CN201510212611.7A priority Critical patent/CN104805470B/zh
Publication of CN104805470A publication Critical patent/CN104805470A/zh
Application granted granted Critical
Publication of CN104805470B publication Critical patent/CN104805470B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C25ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
    • C25CPROCESSES FOR THE ELECTROLYTIC PRODUCTION, RECOVERY OR REFINING OF METALS; APPARATUS THEREFOR
    • C25C3/00Electrolytic production, recovery or refining of metals by electrolysis of melts
    • C25C3/06Electrolytic production, recovery or refining of metals by electrolysis of melts of aluminium
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16ZINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
    • G16Z99/00Subject matter not provided for in other main groups of this subclass

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Rectifiers (AREA)

Abstract

一种500kA电解铝直流电流与交流功率对应关系的验证方法涉及直流电流与交流功率的变化关系参照系统建立技术领域,包括如下步骤:a把500kA电流均分。b出系列大闭环调节,转入机组小闭环调节。c调整整流变压器有载档位,晶闸管导通角。d确认机组电流处于均分状态,由整流上位机监控系统操作,将所有机组由分调切换至总调状态,同时确认总调均分整流机组给定为62.5 kA,确保切换过程中系列电流无扰动切换。e总调给定步长计算,将系列电流500 kA,按照基准值降3.5%的梯度,进行多次调解,每次调节后,用调解后的电流值除以8,重复上述操作。f将实测值带入I%=k*P%,算出k的数值。

Description

一种500kA电解铝直流电流与交流功率对应关系的验证方法
技术领域
本发明涉及直流电流与交流功率的变化关系参照系统建立技术领域,具体是一种500kA电解铝直流电流与交流功率对应关系的验证方法。
背景技术
目前国内电解铝500kA电解槽较为普遍,其电解槽生产为恒电流控制模式,电解铝计划降直流电流时无法预测出交流功率对应降多少,例如:现在需要电解铝计划将500kA降至400kA,对应降交流功率值无法精确计算,所以对电解铝交流功率调节只能进行估算,严重影响电力调度对负荷的定量控制,特别在直供电系统中对功率预算控制误差较大时,严重影响电网稳定。
发明内容
本发明的目的在于提供一种500kA电解铝直流电流与交流功率对应关系的验证方法,以解决现有技术无法预测出交流功率对应降低标准的问题。
为了解决上述技术问题,本发明提供了如下技术方案:一种500kA电解铝直流电流与交流功率对应关系的验证方法包括如下步骤。
a把500kA系列电流均分给8套整流机组,每套机组电流为62.5kA。
b通过整流上位机监控系统操作,退出系列大闭环调节,转入机组小闭环调节。
c调整整流变压器有载档位,晶闸管导通角,通过有载档位控制在100°~105°,使电解系列电流在稳态及效应暂态瞬间能够稳定在500kA。
d确认机组电流处于均分状态,由整流上位机监控系统操作,将所有机组由分调切换至总调状态,同时确认总调均分整流机组给定为62.5kA,确保切换过程中系列电流无扰动切换。
e总调给定步长计算,将系列电流500kA,按照基准值降3.5%的梯度,进行多次调解, 每次调节后,用调解后的电流值除以8,重复上述操作,不少于10次。
f将实测值带入I%=k*P%,算出k的数值。
步骤e中,下调幅度不大于基准值的40%。
本发明的有益效果在于:500kA电解铝直流电流与交流功率对应关系实测方法能有效解决通过调整直流电流控制交流功率。电力调度对交流功率调整量可以精确控制,避免了预算交流功率误差过大导致过于频繁调整。
附图说明
图1为本发明交流功率与系列电流对应关图。
具体实施方式
本发明500kA电解铝直流电流与交流功率控制对应关系实测方法是根据实际运行的数据进行实测。
测试地点:500kA电解整流所。
测试环境:500kA电解铝正常生产项目,其项目配套监控系统完善,对交流电流、交流电压、直流电流、直流电压、交流功率等数据采集精确,整流器电流调节功能正常,可以调节任意电流值,电解铝生产工艺允许。
测试条件:电解整流系列直流电流500kA;整流机组运行工况良好,运行参数稳定,电解生产无异常,具备应对电流变化条件;辅助设备工作正常,无影响机组运行的设备缺陷。
测试步骤。
a把500kA系列电流均分给8套整流机组,每套机组电流为62.5kA。
b通过整流上位机监控系统操作,退出系列大闭环调节,转入机组小闭环调节。
c调整整流变压器有载档位,晶闸管导通角,通过有载档位控制在100°~105°,使电解系列电流在稳态及效应暂态瞬间能够稳定在500kA。
d确认机组电流处于均分状态,由整流上位机监控系统操作,将所有机组由分调切换至 总调状态,同时确认总调均分整流机组给定为62.5kA,确保切换过程中系列电流无扰]动切换。
e总调给定步长计算,将系列电流500kA,按照基准值降3.5%的梯度,进行多次调解,每次调节后,用调解后的电流值除以8,重复上述操作,不少于10次。
f将实测值带入I%=k*P%,算出k的数值。
步骤e中,下调幅度不大于基准值的40%。
测试结果分析:见下列表。

Claims (1)

1.一种500kA电解铝直流电流与交流功率对应关系的验证方法,所述方法包括如下步骤,其特征在于:
a把500kA系列电流均分给8套整流机组,每套机组电流为62.5kA;
b通过整流上位机监控系统操作,退出系列大闭环调节,转入机组小闭环调节;
c调整整流变压器有载档位,晶闸管导通角,通过有载档位控制在100°~105°,使电解系列电流在稳态及效应暂态瞬间能够稳定在500kA;
d确认机组电流处于均分状态,由整流上位机监控系统操作,将所有机组由分调切换至总调状态,同时确认总调均分整流机组给定为62.5 kA,确保切换过程中系列电流无扰动切换;
e总调给定步长计算,将系列电流500 kA,按照基准值降3.5%的梯度,每次调节后,用调节后的电流值除以8,重复上述操作,不少于10次,下调幅度不大于基准值的40%;
f将实测值带入I%=k*P%,算出k的数值。
CN201510212611.7A 2015-04-29 2015-04-29 一种500kA电解铝直流电流与交流功率对应关系的验证方法 Active CN104805470B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510212611.7A CN104805470B (zh) 2015-04-29 2015-04-29 一种500kA电解铝直流电流与交流功率对应关系的验证方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510212611.7A CN104805470B (zh) 2015-04-29 2015-04-29 一种500kA电解铝直流电流与交流功率对应关系的验证方法

Publications (2)

Publication Number Publication Date
CN104805470A CN104805470A (zh) 2015-07-29
CN104805470B true CN104805470B (zh) 2017-05-31

Family

ID=53690650

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510212611.7A Active CN104805470B (zh) 2015-04-29 2015-04-29 一种500kA电解铝直流电流与交流功率对应关系的验证方法

Country Status (1)

Country Link
CN (1) CN104805470B (zh)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201126452Y (zh) * 2007-12-13 2008-10-01 云南省计量测试技术研究院 一种整流机组整流效率实时测量及显示装置
CN103606938A (zh) * 2013-11-26 2014-02-26 九江九整整流器有限公司 一种孤网运行下铝电解行业所用晶闸管整流装置控制系统
CN103603013A (zh) * 2013-12-02 2014-02-26 云南云铝泽鑫铝业有限公司 一种平稳可靠的铝电解行业整流所稳流系统

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2932033B1 (fr) * 2008-05-29 2012-12-28 Areva T & D Sa Circuit redresseur a forte puissance notamment pour electrolyse de l'aluminium

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201126452Y (zh) * 2007-12-13 2008-10-01 云南省计量测试技术研究院 一种整流机组整流效率实时测量及显示装置
CN103606938A (zh) * 2013-11-26 2014-02-26 九江九整整流器有限公司 一种孤网运行下铝电解行业所用晶闸管整流装置控制系统
CN103603013A (zh) * 2013-12-02 2014-02-26 云南云铝泽鑫铝业有限公司 一种平稳可靠的铝电解行业整流所稳流系统

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"铝电解整流效率的测试与探讨";张晋栋;《甘肃冶金》;20060331;第28卷(第1期);第62-63页 *

Also Published As

Publication number Publication date
CN104805470A (zh) 2015-07-29

Similar Documents

Publication Publication Date Title
Svensson et al. Practical implementation of delayed signal cancellation method for phase-sequence separation
US9785167B2 (en) Cascade adaptive regulator tap manager method and system
CN109409658A (zh) 一种配电网运行风险感知方法和装置
CN104805470B (zh) 一种500kA电解铝直流电流与交流功率对应关系的验证方法
CN104120456B (zh) 铝电解模糊控制方法
Seyedi et al. Coordinated control of distributed energy resources using features of voltage disturbances
Maslennikov et al. Implementation of ROSE for on-line voltage stability analysis at ISO New England
Ma et al. A new method for sensitive single-phase equipment testing to voltage sag
CN204333968U (zh) 一种孤网供电模式下的整流装置控制器
RU2269609C2 (ru) Способ и устройство для обнаружения анодных эффектов в электролизере для производства алюминия
Klaić et al. Probability density functions of voltage sags measured indices
US10175304B2 (en) Power-system short-circuit capacity monitoring method and system thereof
CN109457276A (zh) 一种电极短路检测方法及系统
CN104516389A (zh) 一种化成生产线vfe电压控制系统
CN104569664A (zh) 一种具有配电变压器能效在线监测分析装置的分析系统
CN105548940B (zh) 一种电压互感器的运行工况检验方法
Batseva et al. Technique for field data based identification of static polynomial load model
CN112952811A (zh) 一种电解铝可调节负荷潜力分析方法及系统
EP3580997B1 (en) Integrated flicker control for arc furnace
EP3417095A1 (en) Method for estimating dynamic state variables in an electrolytic cell suitable for the hall-héroult electrolysis process
Vlasov et al. Reducing the incidence of anode effects at the Krasnoyarsk aluminum plant
Agnihotri et al. Effect of metal pad instabilities on current efficiency in aluminium electrolysis
CN112583010B (zh) 一种晶闸管整流的电解类负荷等效参数确定方法及装置
Wang et al. Simulation method based on equivalent circuit to investigate the circuit characteristics in aluminum reduction cell
CN202840979U (zh) 一种带网络接口的程控可调直流稳压电源

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant