CN104792524B - Wide-distance superlong multi-guide rail structured tooling - Google Patents
Wide-distance superlong multi-guide rail structured tooling Download PDFInfo
- Publication number
- CN104792524B CN104792524B CN201510199329.XA CN201510199329A CN104792524B CN 104792524 B CN104792524 B CN 104792524B CN 201510199329 A CN201510199329 A CN 201510199329A CN 104792524 B CN104792524 B CN 104792524B
- Authority
- CN
- China
- Prior art keywords
- guide rail
- basic
- overlength
- slide block
- frock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A wide-distance superlong multi-guide rail structured tooling comprises two outer guide rails, a basic guide rail, an inner guide rail and a tooling, wherein the outer guide rails are mounted on a foundation platform in parallel, and the basic guide rail and the inner guide rail are arranged between the outer guide rails. The outer guide rails and the inner guide rail are fixedly mounted on the foundation platform by barrels and connecting bolts nested in the foundation platform. A slider matched with one end of the tooling is mounted on each guide rail, and two ends of the tooling are combined with the sliders of the adjacent guide rails in an adjustable-span connecting manner. Since the two ends of the tooling are combined with the sliders of the adjacent guide rails in an adjustable-span connecting manner, the tooling can mount two different spans of guide rails, and cost is saved. By means of the basic guide rail and the inner guide rail which are used as base for mounting the outer guide rails, the integral accuracy of the four guide rails can be well ensured due to high accuracy of the basic guide rail. In addition, the wide-distance superlong multi-guide rail structured tooling is simple and quick to mount.
Description
Technical field
The present invention relates to a kind of a plurality of overlength of width having in the plant equipment of width overlength closed slide that is applied to is led
Rail structure and frock, particularly relate to one kind be applied to large-scale(As Three Gorges)Ship lift drives the crucial driving section of elevating mechanism
Part(Gear, tooth bar)The width overlength closed slide installation method needed for combination property checking test platform and frock.
Background technology
Three-Gorges Ship-lift drives needed for the crucial drive disk assembly gear of elevating mechanism, the combination property checking test platform of tooth bar
Super-long guiding rail be always about ten meters, be made up of the splicing of many guide rails, wherein one length close to six meters, have four parallel super
Long guideway, span is about two meters, about 20 tons of every guide rail load-bearing, and in process of the test, mobile platform needs to move in circles on guide rail
Run, the linear precision of therefore every guide rail, the parallel accuracy between four guide rails, plane precision of guide rail upper surface etc. requires
All very high, its error can directly influence data acquisition results during test, and when precision is low, frictional force is correspondingly improved, fortune
Row resistance increases, and affects service life.The degreeof tortuosity of super-long guiding rail larger it is necessary to improve installation accuracy, error during installation
Less, the precision of linear motion and durability degree can be higher, thus being smoothed out of guarantee test.
Content of the invention
The purpose of the present invention is precisely in order to solving the above problems and providing a kind of machine being applicable to overlength closed slide
Width on tool equipment a plurality of super-long guiding rail structure and frock.
The purpose of the present invention is realized by following technical proposals:
The width a plurality of super-long guiding rail structure of the present invention and frock include being arranged on basic platform in the way of be arrangeding in parallel
On two follower rails, the basic rack being located between two follower rails, inboard track, and frock;Described two outer
Side rails and inboard track are fixedly mounted on basic platform by the swivel nut and connecting bolt being inlaid on basic platform respectively
On;Described basic rack includes swivel nut by being inlaid on basic platform and connecting bolt to install by way of longitudinally disposed
The overlength basic rack of plane on basic platform, is set in parallel in overlength basic rack side and by alignment pin, bolt peace
Be contained in the positioning datum plate of plane on basic platform, overlength basic rack opposite side, be vertically arranged with several and pass through
Bearing pin is arranged on the eccentric disc on basic platform, is provided with slide block, is used on overlength basic rack in the way of being slidably matched
Pretension slide block is simultaneously installed the mounting blocks of measuring instrument and is fixed on slide block;The relatively thin side of positioning datum plate is used for positioning overlength base
One side of quasi- guide rail, eccentric disc is used for positioning another side of overlength basic rack;Each guide rail be separately installed with
The slide block matching in described frock one end, the connected mode and adjacent two of scalable span is passed through at the two ends of described frock respectively
Slide block on root guide rail combines.
Heretofore described positioning datum plate is made up of the plank section that some front and back ends connect successively;Described overlength benchmark
Guide rail is made up of the guide rail section that some front and back ends connect successively;And the total length of described positioning datum plate leads more than overlength benchmark
The total length of rail, and arrange in the way of outside positioning datum plate two ends extend respectively to overlength basic rack two ends, described outer
Side rails, inboard track are equally all made up of the guide rail section that some front and back ends connect successively.
The concrete installation method of the present invention is as follows:
First basic rack is installed on basic platform, so that various precision is maintained in requirement, then remove mounting blocks,
Slide block is preserved for ensuing installation.Then inboard track is installed, every track loads two slide blocks, with tool part by four
Individual slide block couples together, and simultaneously by four slide block pretensions, promotes frock that slide block is moved on guide rail, first that inboard track is solid
Determine tools for bolts ' pretension, then according to the method tightened to two from centre, tighten bolt when measurement ensures precision, in the process
Slide block is required to move smooth, no unsmooth phenomenon, due to basic rack high precision, the therefore installation accuracy of inboard track also can compare
High.After inboard track is installed, benchmark that inboard track and basic rack are installed as follower rail, with slide block and frock by with
On method install two follower rails.Notice during installation mutually staggering in the guide rail section joint of four guide rails.Article two, guide rail
Span is relatively wide, close to two meters it is therefore necessary to ensure the rigidity of tool part, it is to avoid the deformation of tool part causes guide rail mounting precision
Decline, frock is using not only can guarantee that rigidity, weight but also lighter foundry goods.Whole installation process simple and fast, and can be well
Ensure the overall precision of a plurality of guide rail.
Beneficial effects of the present invention are as follows:
Beneficial effects of the present invention are as follows:
1st, structure is simple, easy to operate, and positioning precision is high, is that the accuracy of test data provides reliable guarantee.
2nd, do not destroy the surface of basic platform, do not increase the adnexaes such as firm banking, decrease cumulative error, save simultaneously
Cost.
3rd, guide rail is fixed on basic platform by swivel nut, improves condition of contact, improves the life-span and is easy to keep in repair.
4 further, since the two ends of described frock are respectively by connected mode and adjacent two guide rails of scalable span
On slide block combine, this also just solves the demand being suitable for installing two kinds of different span guide rails using a tool part
Problem, saves cost.
Brief description
Fig. 1 is the front view of width overlength closed slide structure of the present invention and frock(Inboard track installation diagram).
Fig. 2 is the side view of Fig. 1(Rotate Left).
Fig. 3 is follower rail installation diagram.
Fig. 4 is the side view of Fig. 3(Rotate Left).
Sequence number in Fig. 1~Fig. 4:1 follower rail, 1-1 follower rail, 2 basic racks, 3 frocks, 4 inboard track, 5
Basic platform, 6 swivel nuts, 7 slide blocks.
Fig. 5 is the front view of overlength basic rack high accuracy install detent mechanism of the present invention.
Fig. 6 is the top view of Fig. 5(Remove slide block 2-7, after mounting blocks 2-8, Rotate Right is placed).
Sequence number in Fig. 5~Fig. 6:5 basic platforms, 2-2 screw, 2-3 alignment pin, 2-4 positioning datum plate, 2-5 spiral shell
Bolt, 2-6 overlength basic rack, 2-7 slide block, 2-8 mounting blocks, 2-9 bolt, 2-10 bolt, 2-11 eccentric disc, 2-12
Alignment pin, 2-13 bearing pin, 2-14 swivel nut, 2-15 datum plate one, 2-16 datum plate two, 2-17 datum plate three, 2-18 base
Quasi- plate four, 2-19 guide rail one, 2-20 guide rail two, 2-21 guide rail three.
Specific embodiment
The present invention is with reference to embodiments(Accompanying drawing)It is described in further details:
As Figure 1-Figure 4, the width of the present invention a plurality of super-long guiding rail structure and frock are included in the way of be arrangeding in parallel
It is arranged on basic platform(5)On two follower rails(1、1-1), be located at two follower rails(1、1-1)Between benchmark lead
Rail(2), inboard track(4), and frock(3);Described two follower rails(1、1-1)And inboard track(4)Pass through embedding respectively
It is contained in basic platform(5)On swivel nut(6)And connecting bolt is fixedly mounted on basic platform(5)On;Described basic rack(2)
Including by being inlaid in basic platform(5)On swivel nut(2-14)And connecting bolt is arranged on basis in the way of longitudinally disposed
Platform(5)The overlength basic rack of upper plane(2-6), it is set in parallel in overlength basic rack(2-6)Alignment pin is simultaneously passed through in side
(2-3), bolt(2-2、2-5)It is arranged on basic platform(5)The positioning datum plate of upper plane(2-4), in overlength basic rack(2-
6)Opposite side, be vertically arranged with several pass through bearing pin(2-13)It is arranged on basic platform(5)On eccentric disc(2-11),
In overlength basic rack(2-6)On slide block is installed in the way of being slidably matched(2-7), for pretension slide block and install measuring instrument
The mounting blocks of device(2-8)It is fixed on slide block(2-7)On;Positioning datum plate(2-4)Relatively thin side is used for positioning overlength benchmark leads
Rail(2-6)A side, eccentric disc(2-11)For positioning overlength basic rack(2-6)Another side;In each guide rail
It is separately installed with and described frock(3)Two slide blocks matching in one end(7), described frock(3)Two ends respectively pass through adjustable
The section connected mode of span and two slide blocks on adjacent two guide rails(7)Combine(Due to the spacing between four guide rails not
Equal, two ends adopt the connected mode of scalable span and two slide blocks on adjacent two guide rails(7)The mode combining has
Effect solves the problems, such as to adapt to two kinds of different span guide rails using a frock simultaneously).
Heretofore described positioning datum plate(2-4)It is the datum plate one being connected successively by front and back end(2-15), datum plate
Two(2-16), datum plate three(2-17), datum plate four(2-18)Composition;Described overlength basic rack(2-6)Be by front and back end according to
The secondary guide rail one connecting(2-19), guide rail two(2-20), guide rail three(2-21)Composition;And described positioning datum plate(2-4)'s
Total length is more than beyond overlength basic rack(2-6)Total length, and with positioning datum plate(2-4)Two ends extend respectively to overlength
Basic rack(2-6)Mode outside two ends is arranged;Described follower rail(1,1-1), inboard track(4)It is all equally by some
The guide rail section composition that front and back end connects successively.
Described by bearing pin(2-13)It is arranged on basic platform(5)On eccentric disc(2-11)Logical after accurate adjustment position
Cross and be installed on eccentric disc(2-11)With basic platform(5)Between alignment pin(2-12)Positioned;Around eccentric disc(2-11)
To be uniformly that mode is machined with 8 alignment pin installing holes, the bore dia of 8 alignment pin installing holes is less than or equal to alignment pin in axle center
(2-12)The diameter of axle.(Referring to shown in Fig. 5,6).
The specific operation process of the present invention is as follows:
First basic platform before installation(5)On need scraping at guide rail is installed and to required precision, not only will ensure total length model
Error amount in enclosing, also needs to ensure the error amount in the range of every 2 meters, basic rack(2)In basic platform(5)On install, make
Various precision are maintained in requirement, then remove mounting blocks, retain slide block and are used for ensuing installation.Inboard track is then installed
(4), first swivel nut(6)In basic platform(5)On tighten, then will on every track load two slide blocks(7), use tool part
(3)By four slide blocks(7)Couple together, simultaneously by four slide block pretensions, promote frock(3)Slide block is moved on guide rail,
First by inboard track(4)Fixing bolt pretension, then according to the method tightened to two from centre, twists when measurement ensures precision
Tight bolt, requires slide block in the process(7)Movement is smooth, and no unsmooth phenomenon, due to basic rack(2)High precision, therefore interior
Guide rail(4)Installation accuracy also can be higher.Inboard track(4)After installation, by inboard track(4)And basic rack(2)As
Follower rail(1,1-1)The benchmark installed, uses slide block(7)And frock(3)By above method, two follower rails are installed(1).
Whole installation process is simple to operate, convenient and swift, and can ensure the overall precision of four guide rails well.
Claims (2)
1. a kind of a plurality of super-long guiding rail structure of width and frock, including being arranged on basic platform in the way of be arrangeding in parallel(5)On
Two follower rails(1、1-1), be located at two follower rails(1、1-1)Between basic rack(2), inboard track(4), with
And frock(3)It is characterised in that:Described two follower rails(1、1-1)And inboard track(4)Flat by being inlaid in basis respectively
Platform(5)On swivel nut(6)And connecting bolt is fixedly mounted on basic platform(5)On;Described basic rack(2)Including by embedding
It is contained in basic platform(5)On swivel nut(2-14)And connecting bolt is arranged on basic platform in the way of longitudinally disposed(5)On
The overlength basic rack of plane(2-6), it is set in parallel in overlength basic rack(2-6)Alignment pin is simultaneously passed through in side(2-3), bolt
(2-2、2-5)It is arranged on basic platform(5)The positioning datum plate of upper plane(2-4), in overlength basic rack(2-6)Another
Side, be vertically arranged with several pass through bearing pin(2-13)It is arranged on basic platform(5)On eccentric disc(2-11), in overlength base
Quasi- guide rail(2-6)On slide block is installed in the way of being slidably matched(2-7), for pretension slide block and install the installation of measuring instrument
Block(2-8)It is fixed on slide block(2-7)On;Positioning datum plate(2-4)Relatively thin side is used for positioning overlength basic rack(2-6)'s
One side, eccentric disc(2-11)For positioning overlength basic rack(2-6)Another side;It is separately installed with each guide rail
With described frock(3)The slide block matching in one end(7), described frock(3)Two ends respectively by the connection side of scalable span
Formula and the slide block on adjacent two guide rails(7)Combine.
2. a plurality of super-long guiding rail structure of width according to claim 1 and frock it is characterised in that:Described positioning datum plate
(2-4)It is made up of the plank section that some front and back ends connect successively;Described overlength basic rack(2-6)Be by some front and back ends according to
The secondary guide rail section composition connecting;And described positioning datum plate(2-4)Total length be more than overlength basic rack(2-6)Overall length
Degree, and with positioning datum plate(2-4)Two ends extend respectively to overlength basic rack(2-6)Mode outside two ends is arranged;Described
Follower rail (1,1-1), inboard track(4)All it is made up of the guide rail section that some front and back ends connect successively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510199329.XA CN104792524B (en) | 2015-04-24 | 2015-04-24 | Wide-distance superlong multi-guide rail structured tooling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510199329.XA CN104792524B (en) | 2015-04-24 | 2015-04-24 | Wide-distance superlong multi-guide rail structured tooling |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104792524A CN104792524A (en) | 2015-07-22 |
CN104792524B true CN104792524B (en) | 2017-02-15 |
Family
ID=53557514
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510199329.XA Active CN104792524B (en) | 2015-04-24 | 2015-04-24 | Wide-distance superlong multi-guide rail structured tooling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104792524B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1451593A (en) * | 2002-04-18 | 2003-10-29 | 株式会社英福姆 | Linear guide track retaining device |
CN102463462A (en) * | 2010-11-15 | 2012-05-23 | 深圳市大族激光科技股份有限公司 | Method for increasing mounting precision of linear guide rail |
CN102620934A (en) * | 2012-04-10 | 2012-08-01 | 南京理工大学 | Device and method for testing precision retention of precision rolling linear guide rail pair |
CN203765303U (en) * | 2014-01-08 | 2014-08-13 | 宁波奇力数控机床制造有限公司 | Dual-linear guide rail installing and fixing structure |
CN204262823U (en) * | 2014-11-25 | 2015-04-15 | 中国水利水电第七工程局有限公司 | Be applicable to the device of long guideway location processing guide rail end surface |
CN204535988U (en) * | 2015-04-24 | 2015-08-05 | 郑州机械研究所 | Width many super-long guiding rail structures and frock |
-
2015
- 2015-04-24 CN CN201510199329.XA patent/CN104792524B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1451593A (en) * | 2002-04-18 | 2003-10-29 | 株式会社英福姆 | Linear guide track retaining device |
CN102463462A (en) * | 2010-11-15 | 2012-05-23 | 深圳市大族激光科技股份有限公司 | Method for increasing mounting precision of linear guide rail |
CN102620934A (en) * | 2012-04-10 | 2012-08-01 | 南京理工大学 | Device and method for testing precision retention of precision rolling linear guide rail pair |
CN203765303U (en) * | 2014-01-08 | 2014-08-13 | 宁波奇力数控机床制造有限公司 | Dual-linear guide rail installing and fixing structure |
CN204262823U (en) * | 2014-11-25 | 2015-04-15 | 中国水利水电第七工程局有限公司 | Be applicable to the device of long guideway location processing guide rail end surface |
CN204535988U (en) * | 2015-04-24 | 2015-08-05 | 郑州机械研究所 | Width many super-long guiding rail structures and frock |
Non-Patent Citations (1)
Title |
---|
三峡升船机大模数齿条试验装置载荷施加与控制策略研究;李纪强等;《制造业自动化》;20141231;第36卷(第8期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN104792524A (en) | 2015-07-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103413489B (en) | Torque servo control loading load simulator | |
CN106092552B (en) | The longitudinal composite material plate spring performance testing device of automobile | |
CN203426056U (en) | Automatic detection equipment for wagon adapter | |
CN103759885B (en) | A kind of calibration test platform for force-measuring wheel set | |
CN206132031U (en) | Orthoscopic piston detecting system | |
CN102357842A (en) | Double compensation method and device for moving tilt of numerical control floor type boring-milling machine ram | |
CN105973550A (en) | Integrated measuring device and method for five kinds of static rigidity of linear guide pair | |
CN101793497B (en) | Method for measuring boring bar cantilever value by laser calibration apparatus | |
CN204535989U (en) | Overlength basic rack high precision installs detent mechanism | |
CN104792524B (en) | Wide-distance superlong multi-guide rail structured tooling | |
US9494400B1 (en) | Linear measuring system | |
CN106289771B (en) | A kind of measuring device of harmonic gear reducer engagement torsion stiffness | |
CN204535988U (en) | Width many super-long guiding rail structures and frock | |
CN102699760A (en) | Novel loading experiment device for numerical control turntable | |
CN202676449U (en) | Load controllable passive type servo-actuated force application linear guide rail pair test device | |
CN102865799B (en) | Train track plane parallelism measuring device | |
CN111272419A (en) | Flexible assembly platform for reliability test of coaxial speed reducer | |
CN208034496U (en) | High-strength bolt connects rubbing surface anti-slip coefficient test specimen clamp device | |
CN215178555U (en) | Comprehensive electric spindle reliability loading test device | |
CN104729384A (en) | Gearbox support leg detector | |
CN212886211U (en) | Square ram frame structure | |
CN114689234A (en) | Automatic static torque detection device and detection method | |
CN113237650A (en) | Comprehensive electric spindle reliability loading test device | |
CN111156941B (en) | Vehicle brake block surface full run-out detection device | |
CN104821111B (en) | Bench skill Practical training equipment and its operating method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: Fengyang high tech Industrial Development Zone, Henan province Zhengzhou city 450001 Street No. 10 Patentee after: Zhengzhou Machinery Research Institute Co., Ltd. Address before: Fengyang high tech Industrial Development Zone, Henan province Zhengzhou city 450001 Street No. 10 Patentee before: Zhengzhou Research Institute of Mechanical Engineering |