Prior art keywords
guide rail
basic
overlength
slide block
frock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510199329.XA
Other languages
Chinese (zh)
Other versions
CN104792524A (en
Inventor
张志宏
张和平
刘忠明
孟令先
李纪强
王征兵
颜世铛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Research Institute of Mechanical Engineering Co Ltd
Original Assignee
Zhengzhou Research Institute of Mechanical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Research Institute of Mechanical Engineering Co Ltd filed Critical Zhengzhou Research Institute of Mechanical Engineering Co Ltd
Priority to CN201510199329.XA priority Critical patent/CN104792524B/en
Publication of CN104792524A publication Critical patent/CN104792524A/en
Application granted granted Critical
Publication of CN104792524B publication Critical patent/CN104792524B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A wide-distance superlong multi-guide rail structured tooling comprises two outer guide rails, a basic guide rail, an inner guide rail and a tooling, wherein the outer guide rails are mounted on a foundation platform in parallel, and the basic guide rail and the inner guide rail are arranged between the outer guide rails. The outer guide rails and the inner guide rail are fixedly mounted on the foundation platform by barrels and connecting bolts nested in the foundation platform. A slider matched with one end of the tooling is mounted on each guide rail, and two ends of the tooling are combined with the sliders of the adjacent guide rails in an adjustable-span connecting manner. Since the two ends of the tooling are combined with the sliders of the adjacent guide rails in an adjustable-span connecting manner, the tooling can mount two different spans of guide rails, and cost is saved. By means of the basic guide rail and the inner guide rail which are used as base for mounting the outer guide rails, the integral accuracy of the four guide rails can be well ensured due to high accuracy of the basic guide rail. In addition, the wide-distance superlong multi-guide rail structured tooling is simple and quick to mount.

Description

Width a plurality of super-long guiding rail structure and frock
Technical field
The present invention relates to a kind of a plurality of overlength of width having in the plant equipment of width overlength closed slide that is applied to is led Rail structure and frock, particularly relate to one kind be applied to large-scale(As Three Gorges)Ship lift drives the crucial driving section of elevating mechanism Part(Gear, tooth bar)The width overlength closed slide installation method needed for combination property checking test platform and frock.
Background technology
Three-Gorges Ship-lift drives needed for the crucial drive disk assembly gear of elevating mechanism, the combination property checking test platform of tooth bar Super-long guiding rail be always about ten meters, be made up of the splicing of many guide rails, wherein one length close to six meters, have four parallel super Long guideway, span is about two meters, about 20 tons of every guide rail load-bearing, and in process of the test, mobile platform needs to move in circles on guide rail Run, the linear precision of therefore every guide rail, the parallel accuracy between four guide rails, plane precision of guide rail upper surface etc. requires All very high, its error can directly influence data acquisition results during test, and when precision is low, frictional force is correspondingly improved, fortune Row resistance increases, and affects service life.The degreeof tortuosity of super-long guiding rail larger it is necessary to improve installation accuracy, error during installation Less, the precision of linear motion and durability degree can be higher, thus being smoothed out of guarantee test.
Content of the invention
The purpose of the present invention is precisely in order to solving the above problems and providing a kind of machine being applicable to overlength closed slide Width on tool equipment a plurality of super-long guiding rail structure and frock.
The purpose of the present invention is realized by following technical proposals:
The width a plurality of super-long guiding rail structure of the present invention and frock include being arranged on basic platform in the way of be arrangeding in parallel On two follower rails, the basic rack being located between two follower rails, inboard track, and frock;Described two outer Side rails and inboard track are fixedly mounted on basic platform by the swivel nut and connecting bolt being inlaid on basic platform respectively On;Described basic rack includes swivel nut by being inlaid on basic platform and connecting bolt to install by way of longitudinally disposed The overlength basic rack of plane on basic platform, is set in parallel in overlength basic rack side and by alignment pin, bolt peace Be contained in the positioning datum plate of plane on basic platform, overlength basic rack opposite side, be vertically arranged with several and pass through Bearing pin is arranged on the eccentric disc on basic platform, is provided with slide block, is used on overlength basic rack in the way of being slidably matched Pretension slide block is simultaneously installed the mounting blocks of measuring instrument and is fixed on slide block;The relatively thin side of positioning datum plate is used for positioning overlength base One side of quasi- guide rail, eccentric disc is used for positioning another side of overlength basic rack;Each guide rail be separately installed with The slide block matching in described frock one end, the connected mode and adjacent two of scalable span is passed through at the two ends of described frock respectively Slide block on root guide rail combines.
Heretofore described positioning datum plate is made up of the plank section that some front and back ends connect successively;Described overlength benchmark Guide rail is made up of the guide rail section that some front and back ends connect successively;And the total length of described positioning datum plate leads more than overlength benchmark The total length of rail, and arrange in the way of outside positioning datum plate two ends extend respectively to overlength basic rack two ends, described outer Side rails, inboard track are equally all made up of the guide rail section that some front and back ends connect successively.
The concrete installation method of the present invention is as follows:
First basic rack is installed on basic platform, so that various precision is maintained in requirement, then remove mounting blocks, Slide block is preserved for ensuing installation.Then inboard track is installed, every track loads two slide blocks, with tool part by four Individual slide block couples together, and simultaneously by four slide block pretensions, promotes frock that slide block is moved on guide rail, first that inboard track is solid Determine tools for bolts ' pretension, then according to the method tightened to two from centre, tighten bolt when measurement ensures precision, in the process Slide block is required to move smooth, no unsmooth phenomenon, due to basic rack high precision, the therefore installation accuracy of inboard track also can compare High.After inboard track is installed, benchmark that inboard track and basic rack are installed as follower rail, with slide block and frock by with On method install two follower rails.Notice during installation mutually staggering in the guide rail section joint of four guide rails.Article two, guide rail Span is relatively wide, close to two meters it is therefore necessary to ensure the rigidity of tool part, it is to avoid the deformation of tool part causes guide rail mounting precision Decline, frock is using not only can guarantee that rigidity, weight but also lighter foundry goods.Whole installation process simple and fast, and can be well Ensure the overall precision of a plurality of guide rail.
Beneficial effects of the present invention are as follows:
Beneficial effects of the present invention are as follows:
1st, structure is simple, easy to operate, and positioning precision is high, is that the accuracy of test data provides reliable guarantee.
2nd, do not destroy the surface of basic platform, do not increase the adnexaes such as firm banking, decrease cumulative error, save simultaneously Cost.
3rd, guide rail is fixed on basic platform by swivel nut, improves condition of contact, improves the life-span and is easy to keep in repair.
4 further, since the two ends of described frock are respectively by connected mode and adjacent two guide rails of scalable span On slide block combine, this also just solves the demand being suitable for installing two kinds of different span guide rails using a tool part Problem, saves cost.
Brief description
Fig. 1 is the front view of width overlength closed slide structure of the present invention and frock(Inboard track installation diagram).
Fig. 2 is the side view of Fig. 1(Rotate Left).
Fig. 3 is follower rail installation diagram.
Fig. 4 is the side view of Fig. 3(Rotate Left).
Sequence number in Fig. 1~Fig. 4:1 follower rail, 1-1 follower rail, 2 basic racks, 3 frocks, 4 inboard track, 5 Basic platform, 6 swivel nuts, 7 slide blocks.
Fig. 5 is the front view of overlength basic rack high accuracy install detent mechanism of the present invention.
Fig. 6 is the top view of Fig. 5(Remove slide block 2-7, after mounting blocks 2-8, Rotate Right is placed).
Sequence number in Fig. 5~Fig. 6:5 basic platforms, 2-2 screw, 2-3 alignment pin, 2-4 positioning datum plate, 2-5 spiral shell Bolt, 2-6 overlength basic rack, 2-7 slide block, 2-8 mounting blocks, 2-9 bolt, 2-10 bolt, 2-11 eccentric disc, 2-12 Alignment pin, 2-13 bearing pin, 2-14 swivel nut, 2-15 datum plate one, 2-16 datum plate two, 2-17 datum plate three, 2-18 base Quasi- plate four, 2-19 guide rail one, 2-20 guide rail two, 2-21 guide rail three.
Specific embodiment
The present invention is with reference to embodiments(Accompanying drawing)It is described in further details:
As Figure 1-Figure 4, the width of the present invention a plurality of super-long guiding rail structure and frock are included in the way of be arrangeding in parallel It is arranged on basic platform(5)On two follower rails(1、1-1), be located at two follower rails(1、1-1)Between benchmark lead Rail(2), inboard track(4), and frock(3);Described two follower rails(1、1-1)And inboard track(4)Pass through embedding respectively It is contained in basic platform(5)On swivel nut(6)And connecting bolt is fixedly mounted on basic platform(5)On;Described basic rack(2) Including by being inlaid in basic platform(5)On swivel nut(2-14)And connecting bolt is arranged on basis in the way of longitudinally disposed Platform(5)The overlength basic rack of upper plane(2-6), it is set in parallel in overlength basic rack(2-6)Alignment pin is simultaneously passed through in side (2-3), bolt(2-2、2-5)It is arranged on basic platform(5)The positioning datum plate of upper plane(2-4), in overlength basic rack(2- 6)Opposite side, be vertically arranged with several pass through bearing pin(2-13)It is arranged on basic platform(5)On eccentric disc(2-11), In overlength basic rack(2-6)On slide block is installed in the way of being slidably matched(2-7), for pretension slide block and install measuring instrument The mounting blocks of device(2-8)It is fixed on slide block(2-7)On;Positioning datum plate(2-4)Relatively thin side is used for positioning overlength benchmark leads Rail(2-6)A side, eccentric disc(2-11)For positioning overlength basic rack(2-6)Another side;In each guide rail It is separately installed with and described frock(3)Two slide blocks matching in one end(7), described frock(3)Two ends respectively pass through adjustable The section connected mode of span and two slide blocks on adjacent two guide rails(7)Combine(Due to the spacing between four guide rails not Equal, two ends adopt the connected mode of scalable span and two slide blocks on adjacent two guide rails(7)The mode combining has Effect solves the problems, such as to adapt to two kinds of different span guide rails using a frock simultaneously).
Heretofore described positioning datum plate(2-4)It is the datum plate one being connected successively by front and back end(2-15), datum plate Two(2-16), datum plate three(2-17), datum plate four(2-18)Composition;Described overlength basic rack(2-6)Be by front and back end according to The secondary guide rail one connecting(2-19), guide rail two(2-20), guide rail three(2-21)Composition;And described positioning datum plate(2-4)'s Total length is more than beyond overlength basic rack(2-6)Total length, and with positioning datum plate(2-4)Two ends extend respectively to overlength Basic rack(2-6)Mode outside two ends is arranged;Described follower rail(1,1-1), inboard track(4)It is all equally by some The guide rail section composition that front and back end connects successively.
Described by bearing pin(2-13)It is arranged on basic platform(5)On eccentric disc(2-11)Logical after accurate adjustment position Cross and be installed on eccentric disc(2-11)With basic platform(5)Between alignment pin(2-12)Positioned;Around eccentric disc(2-11) To be uniformly that mode is machined with 8 alignment pin installing holes, the bore dia of 8 alignment pin installing holes is less than or equal to alignment pin in axle center (2-12)The diameter of axle.(Referring to shown in Fig. 5,6).
The specific operation process of the present invention is as follows:
First basic platform before installation(5)On need scraping at guide rail is installed and to required precision, not only will ensure total length model Error amount in enclosing, also needs to ensure the error amount in the range of every 2 meters, basic rack(2)In basic platform(5)On install, make Various precision are maintained in requirement, then remove mounting blocks, retain slide block and are used for ensuing installation.Inboard track is then installed (4), first swivel nut(6)In basic platform(5)On tighten, then will on every track load two slide blocks(7), use tool part (3)By four slide blocks(7)Couple together, simultaneously by four slide block pretensions, promote frock(3)Slide block is moved on guide rail, First by inboard track(4)Fixing bolt pretension, then according to the method tightened to two from centre, twists when measurement ensures precision Tight bolt, requires slide block in the process(7)Movement is smooth, and no unsmooth phenomenon, due to basic rack(2)High precision, therefore interior Guide rail(4)Installation accuracy also can be higher.Inboard track(4)After installation, by inboard track(4)And basic rack(2)As Follower rail(1,1-1)The benchmark installed, uses slide block(7)And frock(3)By above method, two follower rails are installed(1). Whole installation process is simple to operate, convenient and swift, and can ensure the overall precision of four guide rails well.

Claims (2)

1. a kind of a plurality of super-long guiding rail structure of width and frock, including being arranged on basic platform in the way of be arrangeding in parallel(5)On Two follower rails(1、1-1), be located at two follower rails(1、1-1)Between basic rack(2), inboard track(4), with And frock(3)It is characterised in that:Described two follower rails(1、1-1)And inboard track(4)Flat by being inlaid in basis respectively Platform(5)On swivel nut(6)And connecting bolt is fixedly mounted on basic platform(5)On;Described basic rack(2)Including by embedding It is contained in basic platform(5)On swivel nut(2-14)And connecting bolt is arranged on basic platform in the way of longitudinally disposed(5)On The overlength basic rack of plane(2-6), it is set in parallel in overlength basic rack(2-6)Alignment pin is simultaneously passed through in side(2-3), bolt (2-2、2-5)It is arranged on basic platform(5)The positioning datum plate of upper plane(2-4), in overlength basic rack(2-6)Another Side, be vertically arranged with several pass through bearing pin(2-13)It is arranged on basic platform(5)On eccentric disc(2-11), in overlength base Quasi- guide rail(2-6)On slide block is installed in the way of being slidably matched(2-7), for pretension slide block and install the installation of measuring instrument Block(2-8)It is fixed on slide block(2-7)On;Positioning datum plate(2-4)Relatively thin side is used for positioning overlength basic rack(2-6)'s One side, eccentric disc(2-11)For positioning overlength basic rack(2-6)Another side;It is separately installed with each guide rail With described frock(3)The slide block matching in one end(7), described frock(3)Two ends respectively by the connection side of scalable span Formula and the slide block on adjacent two guide rails(7)Combine.
2. a plurality of super-long guiding rail structure of width according to claim 1 and frock it is characterised in that:Described positioning datum plate (2-4)It is made up of the plank section that some front and back ends connect successively;Described overlength basic rack(2-6)Be by some front and back ends according to The secondary guide rail section composition connecting;And described positioning datum plate(2-4)Total length be more than overlength basic rack(2-6)Overall length Degree, and with positioning datum plate(2-4)Two ends extend respectively to overlength basic rack(2-6)Mode outside two ends is arranged;Described Follower rail (1,1-1), inboard track(4)All it is made up of the guide rail section that some front and back ends connect successively.
CN201510199329.XA 2015-04-24 2015-04-24 Wide-distance superlong multi-guide rail structured tooling Active CN104792524B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510199329.XA CN104792524B (en) 2015-04-24 2015-04-24 Wide-distance superlong multi-guide rail structured tooling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510199329.XA CN104792524B (en) 2015-04-24 2015-04-24 Wide-distance superlong multi-guide rail structured tooling

Publications (2)

Publication Number Publication Date
CN104792524A CN104792524A (en) 2015-07-22
CN104792524B true CN104792524B (en) 2017-02-15

Family

ID=53557514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510199329.XA Active CN104792524B (en) 2015-04-24 2015-04-24 Wide-distance superlong multi-guide rail structured tooling

Country Status (1)

Country Link
CN (1) CN104792524B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1451593A (en) * 2002-04-18 2003-10-29 株式会社英福姆 Linear guide track retaining device
CN102463462A (en) * 2010-11-15 2012-05-23 深圳市大族激光科技股份有限公司 Method for increasing mounting precision of linear guide rail
CN102620934A (en) * 2012-04-10 2012-08-01 南京理工大学 Device and method for testing precision retention of precision rolling linear guide rail pair
CN203765303U (en) * 2014-01-08 2014-08-13 宁波奇力数控机床制造有限公司 Dual-linear guide rail installing and fixing structure
CN204262823U (en) * 2014-11-25 2015-04-15 中国水利水电第七工程局有限公司 Be applicable to the device of long guideway location processing guide rail end surface
CN204535988U (en) * 2015-04-24 2015-08-05 郑州机械研究所 Width many super-long guiding rail structures and frock

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1451593A (en) * 2002-04-18 2003-10-29 株式会社英福姆 Linear guide track retaining device
CN102463462A (en) * 2010-11-15 2012-05-23 深圳市大族激光科技股份有限公司 Method for increasing mounting precision of linear guide rail
CN102620934A (en) * 2012-04-10 2012-08-01 南京理工大学 Device and method for testing precision retention of precision rolling linear guide rail pair
CN203765303U (en) * 2014-01-08 2014-08-13 宁波奇力数控机床制造有限公司 Dual-linear guide rail installing and fixing structure
CN204262823U (en) * 2014-11-25 2015-04-15 中国水利水电第七工程局有限公司 Be applicable to the device of long guideway location processing guide rail end surface
CN204535988U (en) * 2015-04-24 2015-08-05 郑州机械研究所 Width many super-long guiding rail structures and frock

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
三峡升船机大模数齿条试验装置载荷施加与控制策略研究;李纪强等;《制造业自动化》;20141231;第36卷(第8期);全文 *

Also Published As

Publication number Publication date
CN104792524A (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN103413489B (en) Torque servo control loading load simulator
CN106092552B (en) The longitudinal composite material plate spring performance testing device of automobile
CN203426056U (en) Automatic detection equipment for wagon adapter
CN103759885B (en) A kind of calibration test platform for force-measuring wheel set
CN206132031U (en) Orthoscopic piston detecting system
CN102357842A (en) Double compensation method and device for moving tilt of numerical control floor type boring-milling machine ram
CN105973550A (en) Integrated measuring device and method for five kinds of static rigidity of linear guide pair
CN101793497B (en) Method for measuring boring bar cantilever value by laser calibration apparatus
CN204535989U (en) Overlength basic rack high precision installs detent mechanism
CN104792524B (en) Wide-distance superlong multi-guide rail structured tooling
US9494400B1 (en) Linear measuring system
CN106289771B (en) A kind of measuring device of harmonic gear reducer engagement torsion stiffness
CN204535988U (en) Width many super-long guiding rail structures and frock
CN102699760A (en) Novel loading experiment device for numerical control turntable
CN202676449U (en) Load controllable passive type servo-actuated force application linear guide rail pair test device
CN102865799B (en) Train track plane parallelism measuring device
CN111272419A (en) Flexible assembly platform for reliability test of coaxial speed reducer
CN208034496U (en) High-strength bolt connects rubbing surface anti-slip coefficient test specimen clamp device
CN215178555U (en) Comprehensive electric spindle reliability loading test device
CN104729384A (en) Gearbox support leg detector
CN212886211U (en) Square ram frame structure
CN114689234A (en) Automatic static torque detection device and detection method
CN113237650A (en) Comprehensive electric spindle reliability loading test device
CN111156941B (en) Vehicle brake block surface full run-out detection device
CN104821111B (en) Bench skill Practical training equipment and its operating method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Fengyang high tech Industrial Development Zone, Henan province Zhengzhou city 450001 Street No. 10

Patentee after: Zhengzhou Machinery Research Institute Co., Ltd.

Address before: Fengyang high tech Industrial Development Zone, Henan province Zhengzhou city 450001 Street No. 10

Patentee before: Zhengzhou Research Institute of Mechanical Engineering