CN104790963A CN201510113581.4A CN201510113581A CN104790963A CN 104790963 A CN104790963 A CN 104790963A CN 201510113581 A CN201510113581 A CN 201510113581A CN 104790963 A CN104790963 A CN 104790963A
Authority
CN
China
Prior art keywords
boots
support boots
new
support
jurisdiction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510113581.4A
Other languages
Chinese (zh)
Other versions
CN104790963B (en
Inventor
叶蕾
庞培彦
袁文征
马哲
宁浩淞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Engineering Equipment Group Co Ltd CREG
Original Assignee
China Railway Engineering Equipment Group Co Ltd CREG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Engineering Equipment Group Co Ltd CREG filed Critical China Railway Engineering Equipment Group Co Ltd CREG
Priority to CN201510113581.4A priority Critical patent/CN104790963B/en
Publication of CN104790963A publication Critical patent/CN104790963A/en
Application granted granted Critical
Publication of CN104790963B publication Critical patent/CN104790963B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pistons, Piston Rings, And Cylinders (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The invention discloses a method for modifying a shield driving system adapting to 22.5-degree duct pieces to adapt to 36-degree duct pieces. An original oil cylinder arrangement of a propulsion oil cylinders adopting evenly distributed 32 oil cylinders and adapting to 22.5-degree duct pieces is divided into four quadrants according to two axes, first, second, third and fourth supporting shoes in the first quadrant of the propulsion oil cylinder are modified to form five sets of new supporting shoes, the modification of the symmetrical positions of the other three quadrants is the same with the first quadrant, and ten adjustment positions in the circumferential direction of 360 degrees are each provided with a set of oil cylinder corresponding to the occurrence position of a top sealing block of a 36-degree duct piece. The method solves the problem that a shield adapting to the 22.5-degree duct pieces can not adapt to the 36-degree duct pieces, the modification time is shortened, the waiting period when the shield equipment stops in the project continuing interval is shortened, and the equipment adaptability is enhanced.

Description

A kind of method adapting to 22.5 ° of section of jurisdiction shield propelling system transformations and extremely adapt to 36 ° of sections of jurisdiction
Technical field
The present invention relates to tunnel piercing technical field, specifically relate to a kind of method adapting to 22.5 ° of section of jurisdiction shield propelling system transformations and extremely adapt to 36 ° of sections of jurisdiction.
Background technology
During subway tunnel shield method is constructed at home at present, the preset section of jurisdiction longitudinal bolt calibration that the tunnel of same diameter adopts has two kinds of specifications, that wherein Guangzhou, Shenzhen, Xi'an, Nanchang, Chengdu city underground adopt is external diameter 6000mm, internal diameter 5400mm, longitudinal bolt calibration is the prefabricated pipe section of 36 °; That Beijing, Zhengzhou, Wuhan, Shenyang urban subway adopt is external diameter 6000mm, and internal diameter 5400mm, longitudinal bolt calibration is the prefabricated pipe section of 22.5 °.These two kinds of every closed-loops in section of jurisdiction form by 6 pieces of sections of jurisdiction, and in the order of 6 pieces of pipe sheet assembling Cheng Huan, the section of jurisdiction at two finally assembled end band oblique angles becomes the block that binds, and needs propelling cylinder symmetry to push guarantee pipe sheet assembling quality.But section of jurisdiction ring needs constantly to adjust relative to the attitude of Tunnel Design center line the circumferential position of block in the ring of section of jurisdiction that bind according to shield structure center line in assembled process, the adjustment of circumferential position must follow the integral multiple principle of longitudinal bolt calibration, ensure arranging in the shield structure tens of propelling cylinders manufactured, often adjustment bind any circumferential position of block time all have the oil cylinder correspondence block symmetry that binds to push.The section of jurisdiction of present 22.5 ° assembled, the propelling cylinder of design is arranged only can for 22.5 ° of calibration sections of jurisdiction, only can be applicable to the assembled of 22.5 ° of sections of jurisdiction, the assembled of 36 ° of sections of jurisdiction can not be used for, limit Suporting structure only to use at specific urban subway tunnel, mutually can not adjust use in all cities, cause the waste of social resources.CN201972712, application number 201020509595.0, name is called that being suitable for the shield driving oil cylinder installed two kinds of calibration sections of jurisdiction arranges, this utility model adopts 24 oil cylinders to arrange as the quantity of shield driving oil cylinder, only just can meet the assembled of 22.5 ° and 36 ° sections of jurisdiction when manufacturing and designing, and the shield propelling system transformation being applicable to 22.5 ° of sections of jurisdiction that can not be used for having manufactured is to adapting to 36 ° of sections of jurisdiction.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, provide a kind of and be applicable to 22.5 ° of section of jurisdiction shield propelling system transformations to the method adapting to 36 ° of sections of jurisdiction, solve the problem that the shield structure being applicable to 22.5 ° of sections of jurisdiction can not be applicable to 36 ° of pipe sheet assemblings.
In order to achieve the above object, technical scheme of the present invention is:
Arranged by the oil cylinder of the propelling cylinder of equally distributed for former employing 32 oil cylinders adaptation 22.5 ° of sections of jurisdiction and be divided into four quadrants by diaxon, comprise first quartile, the second quadrant, third quadrant, fourth quadrant, the transformation of first quartile comprises the following steps:
Step one: welding on the former No. 1 support boots of propelling cylinder is extended support boots, forms new No. 1 support boots, and install new No. 1 boots plate on new No. 1 support boots, enable propelling support boots and meet block 18 ° of positions assembled directly over departing from of binding;
Step 2: former No. 2, No. 3 of propelling cylinder support boots are divided into two, be respectively 2A and support boots and 2B support boots, 3A support boots and 3B support boots, 2B is supportted boots and 3A to support boots and be combined into new No. 3 support boots, and on new No. 3 support boots, new No. 3 boots plates are installed, enable propelling support boots and meet block 54 ° of positions assembled directly over departing from of binding, 2A is supportted boots and 3B to support boots and be modified as new No. 2 support boots and new No. 4 support boots respectively, and on new No. 2 support boots and new No. 4 support boots, new No. 2 boots plates and new No. 4 boots plates are installed respectively;
Step 3: former No. 4 support boots are not changed, become new No. 5 support boots, enable propelling support boots and meet block 90 ° of positions assembled directly over departing from of binding, the transformation of other three quadrant symmetrical positions is identical with first quartile, now, in circumference 360 ° 10 adjustment positions, all have a group oil cylinder to correspond to 36 ° of sections of jurisdiction to bind the position that block occurs.
Positive beneficial effect of the present invention:
1, solve the problem that the shield structure being applicable to 22.5 ° of sections of jurisdiction can not be applicable to 36 ° of pipe sheet assemblings, shorten the transformation time.
2, the cycle because of engineering continued access Suporting structure interval stopping wait being shortened.
3, the total quantity of domestic Suporting structure is reduced, cost-saving.
Accompanying drawing explanation
Fig. 1: the propulsion cylinder arrangement schematic diagram being applicable to 22.5 ° of sections of jurisdiction
Fig. 2: the propulsion cylinder arrangement schematic diagram being applicable to 36 ° of sections of jurisdiction after transformation
Bind the position view that block occurs for Fig. 3: 36 ° of sections of jurisdiction
Fig. 4: the cross-section structure of new No. 1 support boots
Fig. 5: the cross-section structure of new No. 2 support boots
Fig. 6: the cross-section structure of new No. 3 support boots
Fig. 7: the cross-section structure of new No. 4 support boots
The concrete meaning of number in the figure is: 1 is former No. 1 support boots, and 2 is former No. 2 support boots, and 3 is former No. 3 support boots, and 4 is former No. 4 support boots, 5 is new No. 1 support boots, and 6 is new No. 2 support boots, and 7 is new No. 3 support boots, 8 is new No. 4 support boots, and 9 is new No. 5 support boots, and 10 for extending support boots, 11 is new No. 1 boots plate, and 12 is 2A support boots, and 13 is new No. 2 boots plates, 14 is 2B support boots, and 15 is that 3A supports boots, and 16 is new No. 3 boots plates, 17 be 3B support boots, 18 be new No. 4 boots plates, 19 be 36 ° of sections of jurisdiction bind block appearance position.
Detailed description of the invention
Below in conjunction with Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, the present invention is further illustrated:
The invention provides the shield propelling system transformation of a kind of adaptation 22.5 ° of sections of jurisdiction to the method adapting to 36 ° of sections of jurisdiction, the oil cylinder of the propelling cylinder of equally distributed for former employing 32 oil cylinders adaptation 22.5 ° of sections of jurisdiction is arranged and is divided into four quadrants by diaxon, comprise first quartile, second quadrant, third quadrant, fourth quadrant, the transformation of first quartile comprises the following steps: on the former No. 1 support boots 1 of propelling cylinder, welding extends support boots 10, form new No. 1 support boots 5, new No. 1 boots plate 11 installed by new No. 1 support boots 5, enable propelling support boots and meet block 18 ° of positions assembled directly over departing from of binding.
Former No. 2 support No. 2,3, the boots support boots 3 of propelling cylinder are divided into two, be respectively 2A and support boots 12 and 2B support boots 14,3A support boots 15 and 3B support boots 17,2B is supportted boots 14 and 3A to support boots 15 and be combined into new No. 3 support boots 7, new No. 3 boots plates 16 installed by new No. 3 support boots 7, enable propelling support boots and meet block 54 ° of positions assembled directly over departing from of binding, 2A is supportted boots 12 and 3B to support boots 17 and be modified as new No. 2 support boots 6 and new No. 4 support boots 8 respectively, new No. 2 support boots 6 and new No. 4 support boots 8 install new No. 2 boots plates 13 and new No. 4 boots plates 18 respectively.
Former No. 4 support boots are not changed, become new No. 5 support boots 9, enable propelling support boots and meet block 90 ° of positions assembled directly over departing from of binding, the transformation of other three quadrant symmetrical positions is identical with first quartile, now, in circumference 360 ° 10 adjustment positions, all have a group oil cylinder to correspond to 36 ° of sections of jurisdiction to bind the position 19 that block occurs.
Finally should be noted that: above embodiment is only not intended to limit for illustration of technical scheme of the present invention, although with reference to preferred embodiment to invention has been detailed description, those of ordinary skill in the field are to be understood that: still can modify to the specific embodiment of the present invention or carry out equivalent replacement to portion of techniques feature; And not departing from the spirit of technical solution of the present invention, it all should be encompassed in the middle of the technical scheme scope of request of the present invention protection.

Claims (1)

1. one kind adapts to 22.5 ° of section of jurisdiction shield propelling system transformations to the method adapting to 36 ° of sections of jurisdiction, the oil cylinder of the propelling cylinder of equally distributed for former employing 32 oil cylinders adaptation 22.5 ° of sections of jurisdiction is arranged and is divided into four quadrants by diaxon, comprise first quartile, the second quadrant, third quadrant, fourth quadrant, it is characterized in that, the transformation of first quartile comprises the following steps:
Step one: welding on the former No. 1 support boots of propelling cylinder is extended support boots, forms new No. 1 support boots, and install new No. 1 boots plate on new No. 1 support boots, enable propelling support boots and meet block 18 ° of positions assembled directly over departing from of binding;
Step 2: former No. 2, No. 3 of propelling cylinder support boots are divided into two, be respectively 2A and support boots and 2B support boots, 3A support boots and 3B support boots, 2B is supportted boots and 3A to support boots and be combined into new No. 3 support boots, and on new No. 3 support boots, new No. 3 boots plates are installed, enable propelling support boots and meet block 54 ° of positions assembled directly over departing from of binding, 2A is supportted boots and 3B to support boots and be modified as new No. 2 support boots and new No. 4 support boots respectively, and on new No. 2 support boots and new No. 4 support boots, new No. 2 boots plates and new No. 4 boots plates are installed respectively;
Step 3: former No. 4 support boots are not changed, become new No. 5 support boots, enable propelling support boots and meet block 90 ° of positions assembled directly over departing from of binding, the transformation of other three quadrant symmetrical positions is identical with first quartile, now, in circumference 360 ° 10 adjustment positions, all have a group oil cylinder to correspond to 36 ° of sections of jurisdiction to bind the position that block occurs.
CN201510113581.4A 2015-03-16 2015-03-16 A kind of 22.5 ° of section of jurisdiction shield propelling systems of adaptation are transformed to 36 ° of methods of section of jurisdiction of adaptation Active CN104790963B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510113581.4A CN104790963B (en) 2015-03-16 2015-03-16 A kind of 22.5 ° of section of jurisdiction shield propelling systems of adaptation are transformed to 36 ° of methods of section of jurisdiction of adaptation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510113581.4A CN104790963B (en) 2015-03-16 2015-03-16 A kind of 22.5 ° of section of jurisdiction shield propelling systems of adaptation are transformed to 36 ° of methods of section of jurisdiction of adaptation

Publications (2)

Publication Number Publication Date
CN104790963A true CN104790963A (en) 2015-07-22
CN104790963B CN104790963B (en) 2017-06-16

Family

ID=53556098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510113581.4A Active CN104790963B (en) 2015-03-16 2015-03-16 A kind of 22.5 ° of section of jurisdiction shield propelling systems of adaptation are transformed to 36 ° of methods of section of jurisdiction of adaptation

Country Status (1)

Country Link
CN (1) CN104790963B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948837A (en) * 2017-05-26 2017-07-14 西南交通大学 A kind of shield tunnel liner ring for being adapted to quick subway line
CN113107503A (en) * 2021-04-27 2021-07-13 中铁工程装备集团有限公司 Shield machine simultaneously adapting to two segment assembling positions

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101649743A (en) * 2009-09-09 2010-02-17 清华大学 Adjustable propulsion mechanism for soil pressure balance type shield
CN101864965A (en) * 2010-05-17 2010-10-20 浙江大学 Pressure flow rate composite synchronization control energy-saving type shield propelling system
CN201972712U (en) * 2010-08-30 2011-09-14 中铁隧道装备制造有限公司 Shield propulsion oil cylinder arrangement mechanism suitable for installation of two kinds of indexing tunnel segments
CN202055835U (en) * 2011-05-13 2011-11-30 上海力行工程技术发展有限公司 Segment for connecting a shield machine and transition connection device of a joint for pipe jacking method
CN102322268A (en) * 2011-08-30 2012-01-18 中国铁建重工集团有限公司 Protecting device of shield machine thrust oil cylinder

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101649743A (en) * 2009-09-09 2010-02-17 清华大学 Adjustable propulsion mechanism for soil pressure balance type shield
CN101864965A (en) * 2010-05-17 2010-10-20 浙江大学 Pressure flow rate composite synchronization control energy-saving type shield propelling system
CN201972712U (en) * 2010-08-30 2011-09-14 中铁隧道装备制造有限公司 Shield propulsion oil cylinder arrangement mechanism suitable for installation of two kinds of indexing tunnel segments
CN202055835U (en) * 2011-05-13 2011-11-30 上海力行工程技术发展有限公司 Segment for connecting a shield machine and transition connection device of a joint for pipe jacking method
CN102322268A (en) * 2011-08-30 2012-01-18 中国铁建重工集团有限公司 Protecting device of shield machine thrust oil cylinder

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948837A (en) * 2017-05-26 2017-07-14 西南交通大学 A kind of shield tunnel liner ring for being adapted to quick subway line
CN113107503A (en) * 2021-04-27 2021-07-13 中铁工程装备集团有限公司 Shield machine simultaneously adapting to two segment assembling positions
CN113107503B (en) * 2021-04-27 2022-08-02 中铁工程装备集团有限公司 Shield machine simultaneously adapting to two segment assembling point positions

Also Published As

Publication number Publication date
CN104790963B (en) 2017-06-16

Similar Documents

Publication Publication Date Title
CN201972712U (en) Shield propulsion oil cylinder arrangement mechanism suitable for installation of two kinds of indexing tunnel segments
CN104235544A (en) Magnetic connecting elbow pipe
CN104790963A (en) Method for modifying shield driving system adapting to 22.5-degree duct pieces to adapt to 36-degree duct pieces
CN104832183A (en) Method for transforming shield tunneling system adapting to 36-degree pipe segments into shield tunneling system adapting to 22.5-degree pipe segments
CN202324785U (en) Double-cylinder chimney
CN202202247U (en) Concrete structure cooled by circulating water
CN203880273U (en) Split type flange
CN103184768A (en) Screw thread sleeve joint for detachable grid structure
CN206123542U (en) Erection equipment is connected to socket joint pipeline
CN204829019U (en) Novel flange joint structure
CN203401252U (en) Perpendicularity correction ruler for installation of flange and pipeline
CN202467224U (en) Crotch type steel component installing anchor ear
CN201954160U (en) Integrated pipe fitting
CN204459588U (en) The bindiny mechanism of transformer and Electrode in Gas Insulated System
CN103644233B (en) A kind of two circle wire rope damper manufacturing installation
CN202360056U (en) Left variable-diameter flashboard
CN202955411U (en) Novel blind plate
CN204435861U (en) For building the formwork structure of circular concrete column
CN204459570U (en) The Novel connecting mechanism of transformer and Electrode in Gas Insulated System
CN205835977U (en) Tetrafluoro hollow pipe flanging molding die
CN203821638U (en) Assembly type steel structure wallboard joint
CN202418648U (en) Valve clack chamfer shut-off valve
CN204239948U (en) Quick mounting dismounting double-ended pipe joint
CN202176839U (en) Connecting pipe of engine
CN202207853U (en) Forming protective device for pipeline welding

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Ye Lei

Inventor after: Di Xiaohong

Inventor after: Pang Peiyan

Inventor after: Yuan Wenzheng

Inventor after: Ma Zhe

Inventor after: Ning Haosong

Inventor before: Ye Lei

Inventor before: Pang Peiyan

Inventor before: Yuan Wenzheng

Inventor before: Ma Zhe

Inventor before: Ning Haosong

CB03 Change of inventor or designer information
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A Method of Adapting the Propulsion System of 22.5 deg Segment Shield to 36 deg Segment

Effective date of registration: 20221226

Granted publication date: 20170616

Pledgee: China Construction Bank Corporation Zhengzhou Railway Sub Branch

Pledgor: CHINA RAILWAY ENGINEERING EQUIPMENT GROUP Co.,Ltd.

Registration number: Y2022980029005

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20170616

Pledgee: China Construction Bank Corporation Zhengzhou Railway Sub Branch

Pledgor: CHINA RAILWAY ENGINEERING EQUIPMENT GROUP Co.,Ltd.

Registration number: Y2022980029005

PC01 Cancellation of the registration of the contract for pledge of patent right