CN104786369B - A kind of non-batch production sleeper prefabricated construction engineering method - Google Patents

A kind of non-batch production sleeper prefabricated construction engineering method Download PDF

Info

Publication number
CN104786369B
CN104786369B CN201510130083.0A CN201510130083A CN104786369B CN 104786369 B CN104786369 B CN 104786369B CN 201510130083 A CN201510130083 A CN 201510130083A CN 104786369 B CN104786369 B CN 104786369B
Authority
CN
China
Prior art keywords
sleeper
template
concrete
design
engineering method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510130083.0A
Other languages
Chinese (zh)
Other versions
CN104786369A (en
Inventor
李伟
严敏强
王福源
钱超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical No 4 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN201510130083.0A priority Critical patent/CN104786369B/en
Publication of CN104786369A publication Critical patent/CN104786369A/en
Application granted granted Critical
Publication of CN104786369B publication Critical patent/CN104786369B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/04Producing shaped prefabricated articles from the material by tamping or ramming
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/29Producing shaped prefabricated articles from the material by profiling or strickling the material in open moulds or on moulding surfaces

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The present invention relates to a kind of non-batch production sleeper prefabricated construction engineering method, comprise the following steps:(1) stencil design and processing;(2) template surface PROCESS FOR TREATMENT;(3) model sheetinstallat;(4) steel bar meter is installed;(5) concrete former material is detected;(6) mix Design;(7) casting concrete;(8) form removal is conserved.The engineering method forms complete set, scientific and reasonable sleeper template, clear-water concrete engineering construction process, effectively direct small-sized sleeper precast construction construction, solve the problems such as small members template is complicated, interior formwork is more, template turnover inconvenience, it is ensured that the prefabricated quality of sleeper, safety and duration.

Description

A kind of non-batch production sleeper prefabricated construction engineering method
Technical field
The present invention relates to technical field, more particularly to a kind of non-batch production sleeper prefabricated construction engineering method.
Background technology
Sleeper used by current China engineering is largely prefabrication, under the stacker-reclaimer track of Rizhao Iron Ore Terminal stockyard For prefabricated concrete sleeper, totally three thousand polylith, is limited by quantity and cost.Although in recent years, to gradually form batch production prefabricated for sleeper Production, for the larger engineering of demand be than better suited, but for smaller and higher to the appearance requirement engineering of project scale, It is also good selection to carry out at the scene prefabricated.During non-batch production is prefabricated, template and clear-water concrete should be paid attention to Design and construction.
The content of the invention
It is an object of the invention to provide in view of the shortcomings of the prior art it is a kind of ensure the prefabricated quality of sleeper, safety and Duration, effectively instruct the non-batch production sleeper prefabricated construction engineering method of small-sized sleeper precast construction construction.
To achieve these goals, the technical solution adopted in the present invention is as follows:A kind of non-batch production sleeper prefabricated construction Engineering method, comprises the following steps:
(1) stencil design and processing:From all-steel mold plate, design 33 sets of side forms of processing, 99 sets of bed dies;
(2) template surface PROCESS FOR TREATMENT:Releasing agent is coated in template surface, coating thickness is controlled in 0.05~0.2kg/ m2, time control 24h before formwork erection is smeared, smearing finishes and uses covered rearing with plastic film;
(3) model sheetinstallat:Template in manufacturing process, by sleeper lay above make end template, it is and pre- on bed die Pre-embedded bolt is stayed, construction is overturned, it is up big and down small;During formwork erection, carry out installing bed die first, place the steel processed Muscle cage, then installs surrounding template again;
(4) steel bar meter is installed:Sleeper reinforcing bar is at the scene after machine-shaping, and artificial lift is put into mould;
(5) concrete former material is detected:Alkali content≤0.6%, C3A content≤8% of cement;Coarse aggregate from intensity it is high, Continuous grading, same color, clay content<1.0%th, elongated particles<5% and without debris rubble;Fine aggregate selects fineness Modulus is 2.4~2.8, clay content<1.5% middle sand, solid colour and free from admixture;Admixture selects flyash, ground slag One kind in powder, natural zeolite powder;
(6) mix Design:Clear-water concrete mix-design is carried out with dense skeleton method of piling;
(7) casting concrete:Pouring work includes perfusion, consolidates and finishing process of wiping one's face, and concrete transportation is using small-sized Carriage, slump must be strict controlled between 60mm~90mm;
(8) form removal is conserved:Maintenance should cover the exposed face of whole concrete structure, should be first by concrete during watering maintenance The side and bottom surface of structure are sufficiently humidified so as to, and are then sprinkled water again by top surface.
Described flyash is from I grade of flyash.
The beneficial effects of the present invention are the engineering method forms complete set, scientific and reasonable sleeper template, clear water and mixed Solidifying soil engineering construction process, effectively directs small-sized sleeper precast construction construction, solves small members template complexity, concrete The problems such as blibbing is more, template turnover inconvenience, it is ensured that the prefabricated quality of sleeper, safety and duration.
Brief description of the drawings
Fig. 1 is the block diagram of non-batch production sleeper prefabricated construction engineering method.
Embodiment
Technical scheme is described further by specific embodiment below in conjunction with the accompanying drawings.
A kind of non-batch production sleeper prefabricated construction engineering method, comprises the following steps:
(1) stencil design and processing:From all-steel mold plate, design 33 sets of side forms of processing, 99 sets of bed dies;
(2) template surface PROCESS FOR TREATMENT:Releasing agent is coated in template surface, coating thickness is controlled in 0.05~0.2kg/ m2, time control 24h before formwork erection is smeared, smearing finishes and uses covered rearing with plastic film;
(3) model sheetinstallat:Template in manufacturing process, by sleeper lay above make end template, it is and pre- on bed die Pre-embedded bolt is stayed, construction is overturned, it is up big and down small;During formwork erection, carry out installing bed die first, place the steel processed Muscle cage, then installs surrounding template again;
(4) steel bar meter is installed:Sleeper reinforcing bar is at the scene after machine-shaping, and artificial lift is put into mould;
(5) concrete former material is detected:Alkali content≤0.6%, C3A content≤8% of cement;Coarse aggregate from intensity it is high, Continuous grading, same color, clay content<1.0%th, elongated particles<5% and without debris rubble;Fine aggregate selects fineness Modulus is 2.4~2.8, clay content<1.5% middle sand, solid colour and free from admixture;Admixture selects flyash, ground slag One kind in powder, natural zeolite powder;
(6) mix Design:Clear-water concrete mix-design is carried out with dense skeleton method of piling;
(7) casting concrete:Pouring work includes perfusion, consolidates and finishing process of wiping one's face, and concrete transportation is using small-sized Carriage, slump must be strict controlled between 60mm~90mm;
(8) form removal is conserved:Maintenance should cover the exposed face of whole concrete structure, should be first by concrete during watering maintenance The side and bottom surface of structure are sufficiently humidified so as to, and are then sprinkled water again by top surface.

Claims (2)

1. a kind of non-batch production sleeper prefabricated construction engineering method, it is characterised in that comprise the following steps:
(1) stencil design and processing:From all-steel mold plate, design 33 sets of side forms of processing, 99 sets of bed dies;
(2) template surface PROCESS FOR TREATMENT:Releasing agent is coated in template surface, coating thickness is controlled in 0.05~0.2kg/m2, smear Time control 24h before formwork erection, smearing finishes and uses covered rearing with plastic film;
(3) model sheetinstallat:Template in manufacturing process, by sleeper lay above make end template, and reserve on bed die pre- Bolt is buried, construction is overturned, it is up big and down small;During formwork erection, carry out installing bed die first, place the reinforcing bar processed Cage, then installs surrounding template again;
(4) steel bar meter is installed:Sleeper reinforcing bar is at the scene after machine-shaping, and artificial lift is put into mould;
(5) concrete former material is detected:Alkali content≤0.6%, C3A content≤8% of cement;Coarse aggregate is high, continuous from intensity Level is matched somebody with somebody, same color, clay content<1.0%th, elongated particles<5% and without debris rubble;Fine aggregate selects modulus of fineness For 2.4~2.8, clay content<1.5% middle sand, solid colour and free from admixture;Admixture selects flyash, ground slag powder, day One kind in right zeolite powder;
(6) mix Design:Clear-water concrete mix-design is carried out with dense skeleton method of piling;
(7) casting concrete:Pouring work includes perfusion, consolidates and finishing process of wiping one's face, and concrete transportation uses small four-wheel Car, slump must be strict controlled between 60mm~90mm;
(8) form removal is conserved:Maintenance should cover the exposed face of whole concrete structure, should be first by concrete structure during watering maintenance Side and bottom surface be sufficiently humidified so as to, then sprinkled water again by top surface.
2. non-batch production sleeper prefabricated construction engineering method according to claim 1, it is characterised in that described flyash is selected I grade of flyash.
CN201510130083.0A 2015-03-24 2015-03-24 A kind of non-batch production sleeper prefabricated construction engineering method Expired - Fee Related CN104786369B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510130083.0A CN104786369B (en) 2015-03-24 2015-03-24 A kind of non-batch production sleeper prefabricated construction engineering method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510130083.0A CN104786369B (en) 2015-03-24 2015-03-24 A kind of non-batch production sleeper prefabricated construction engineering method

Publications (2)

Publication Number Publication Date
CN104786369A CN104786369A (en) 2015-07-22
CN104786369B true CN104786369B (en) 2017-07-11

Family

ID=53551771

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510130083.0A Expired - Fee Related CN104786369B (en) 2015-03-24 2015-03-24 A kind of non-batch production sleeper prefabricated construction engineering method

Country Status (1)

Country Link
CN (1) CN104786369B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106003416A (en) * 2016-05-24 2016-10-12 中交航局第四工程有限公司 Construction technique of prefabricated runway panels of airfield runway
CN109732772A (en) * 2018-12-30 2019-05-10 中铁十四局集团有限公司 The method for prefabricating of section of jurisdiction and section of jurisdiction

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1363624A (en) * 2001-12-29 2002-08-14 中国科学院长春应用化学研究所 Process for preparing sleepers from powdered coal ash and waste plastics
CN1377849A (en) * 2002-05-27 2002-11-06 杨普安 Railway sleeper and its preparing method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1363624A (en) * 2001-12-29 2002-08-14 中国科学院长春应用化学研究所 Process for preparing sleepers from powdered coal ash and waste plastics
CN1377849A (en) * 2002-05-27 2002-11-06 杨普安 Railway sleeper and its preparing method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
高性能清水混凝土在桥梁工程中的应用;李静,安从志;《成都市"两快两射"快速路系统工程论文专辑》;20140530;第225-229页 *

Also Published As

Publication number Publication date
CN104786369A (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN105130368B (en) A kind of pervious surface material and preparation method thereof
CN105016642B (en) A kind of environmental protection and energy saving slag water-permeable brick and preparation method thereof
CN109824321B (en) Carbon dioxide curing prefabricated pervious concrete and preparation method thereof
CN106830987A (en) A kind of artificial culture stone with stone waste sludge as raw material and preparation method thereof
CN106904918A (en) Sculpture for city material and its method for making sculpture for city are made using construction waste
CN107759170A (en) A kind of prefabricated hollow stair of light ceramsite concrete and preparation method
CN107721303A (en) A kind of iron tailings is granulated water-permeable brick and preparation method thereof
CN104786369B (en) A kind of non-batch production sleeper prefabricated construction engineering method
CN104890123A (en) Automatic-feeding and uniform-discharging cement mixer with conveying belt
CN206737210U (en) A kind of non-dismantling formwork
CN109679660A (en) A kind of curing method of heavy-metal contaminated soil
CN102432234B (en) comprehensive treatment method for mud nonferrous metal oxidized ore dressing tailing water residue
CN104230256A (en) Self-compaction concrete and production technique of prefabricated municipal quadrate culvert component
CN109776044A (en) A kind of novel high-strength inorganic artificial hilllock stone and preparation method thereof
CN107986714A (en) A kind of sea work wave wall and its construction method
CN103896539B (en) Prefabricated sial base green cement concrete bidirectional hole hollow template and manufacture method thereof
CN106278065A (en) Imitative stone decoration element and production method thereof
CN109356185A (en) A kind of prefabricated pier foundation of regeneration monolith and its construction method
CN107620469A (en) A kind of clear water concrete casting method
CN107268755A (en) A kind of construction method of inlet for stom water
CN106801482A (en) A kind of current conversion station fire wall construction technology
CN103171021A (en) Method for enhancing concrete strength, improving volume stability and reducing cracking
CN103910534B (en) Energy-saving environment-friendly quick-dry aerated masonry-free wall material instantly prepared from gold ore tailings
CN109265035A (en) A kind of regeneration concrete material and the preparation method and application thereof
CN109437762A (en) High-titanium dry slag sand water-permeable brick and preparation method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Yan Minqiang

Inventor after: Wang Fuyuan

Inventor after: Li Wei

Inventor after: Qian Chao

Inventor before: Li Wei

Inventor before: Yan Minqiang

Inventor before: Wang Fuyuan

Inventor before: Qian Chao

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170711