CN104786369B - A kind of non-batch production sleeper prefabricated construction engineering method - Google Patents
A kind of non-batch production sleeper prefabricated construction engineering method Download PDFInfo
- Publication number
- CN104786369B CN104786369B CN201510130083.0A CN201510130083A CN104786369B CN 104786369 B CN104786369 B CN 104786369B CN 201510130083 A CN201510130083 A CN 201510130083A CN 104786369 B CN104786369 B CN 104786369B
- Authority
- CN
- China
- Prior art keywords
- sleeper
- template
- concrete
- design
- engineering method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B1/00—Producing shaped prefabricated articles from the material
- B28B1/04—Producing shaped prefabricated articles from the material by tamping or ramming
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B1/00—Producing shaped prefabricated articles from the material
- B28B1/29—Producing shaped prefabricated articles from the material by profiling or strickling the material in open moulds or on moulding surfaces
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
- Moulds, Cores, Or Mandrels (AREA)
Abstract
The present invention relates to a kind of non-batch production sleeper prefabricated construction engineering method, comprise the following steps:(1) stencil design and processing;(2) template surface PROCESS FOR TREATMENT;(3) model sheetinstallat;(4) steel bar meter is installed;(5) concrete former material is detected;(6) mix Design;(7) casting concrete;(8) form removal is conserved.The engineering method forms complete set, scientific and reasonable sleeper template, clear-water concrete engineering construction process, effectively direct small-sized sleeper precast construction construction, solve the problems such as small members template is complicated, interior formwork is more, template turnover inconvenience, it is ensured that the prefabricated quality of sleeper, safety and duration.
Description
Technical field
The present invention relates to technical field, more particularly to a kind of non-batch production sleeper prefabricated construction engineering method.
Background technology
Sleeper used by current China engineering is largely prefabrication, under the stacker-reclaimer track of Rizhao Iron Ore Terminal stockyard
For prefabricated concrete sleeper, totally three thousand polylith, is limited by quantity and cost.Although in recent years, to gradually form batch production prefabricated for sleeper
Production, for the larger engineering of demand be than better suited, but for smaller and higher to the appearance requirement engineering of project scale,
It is also good selection to carry out at the scene prefabricated.During non-batch production is prefabricated, template and clear-water concrete should be paid attention to
Design and construction.
The content of the invention
It is an object of the invention to provide in view of the shortcomings of the prior art it is a kind of ensure the prefabricated quality of sleeper, safety and
Duration, effectively instruct the non-batch production sleeper prefabricated construction engineering method of small-sized sleeper precast construction construction.
To achieve these goals, the technical solution adopted in the present invention is as follows:A kind of non-batch production sleeper prefabricated construction
Engineering method, comprises the following steps:
(1) stencil design and processing:From all-steel mold plate, design 33 sets of side forms of processing, 99 sets of bed dies;
(2) template surface PROCESS FOR TREATMENT:Releasing agent is coated in template surface, coating thickness is controlled in 0.05~0.2kg/
m2, time control 24h before formwork erection is smeared, smearing finishes and uses covered rearing with plastic film;
(3) model sheetinstallat:Template in manufacturing process, by sleeper lay above make end template, it is and pre- on bed die
Pre-embedded bolt is stayed, construction is overturned, it is up big and down small;During formwork erection, carry out installing bed die first, place the steel processed
Muscle cage, then installs surrounding template again;
(4) steel bar meter is installed:Sleeper reinforcing bar is at the scene after machine-shaping, and artificial lift is put into mould;
(5) concrete former material is detected:Alkali content≤0.6%, C3A content≤8% of cement;Coarse aggregate from intensity it is high,
Continuous grading, same color, clay content<1.0%th, elongated particles<5% and without debris rubble;Fine aggregate selects fineness
Modulus is 2.4~2.8, clay content<1.5% middle sand, solid colour and free from admixture;Admixture selects flyash, ground slag
One kind in powder, natural zeolite powder;
(6) mix Design:Clear-water concrete mix-design is carried out with dense skeleton method of piling;
(7) casting concrete:Pouring work includes perfusion, consolidates and finishing process of wiping one's face, and concrete transportation is using small-sized
Carriage, slump must be strict controlled between 60mm~90mm;
(8) form removal is conserved:Maintenance should cover the exposed face of whole concrete structure, should be first by concrete during watering maintenance
The side and bottom surface of structure are sufficiently humidified so as to, and are then sprinkled water again by top surface.
Described flyash is from I grade of flyash.
The beneficial effects of the present invention are the engineering method forms complete set, scientific and reasonable sleeper template, clear water and mixed
Solidifying soil engineering construction process, effectively directs small-sized sleeper precast construction construction, solves small members template complexity, concrete
The problems such as blibbing is more, template turnover inconvenience, it is ensured that the prefabricated quality of sleeper, safety and duration.
Brief description of the drawings
Fig. 1 is the block diagram of non-batch production sleeper prefabricated construction engineering method.
Embodiment
Technical scheme is described further by specific embodiment below in conjunction with the accompanying drawings.
A kind of non-batch production sleeper prefabricated construction engineering method, comprises the following steps:
(1) stencil design and processing:From all-steel mold plate, design 33 sets of side forms of processing, 99 sets of bed dies;
(2) template surface PROCESS FOR TREATMENT:Releasing agent is coated in template surface, coating thickness is controlled in 0.05~0.2kg/
m2, time control 24h before formwork erection is smeared, smearing finishes and uses covered rearing with plastic film;
(3) model sheetinstallat:Template in manufacturing process, by sleeper lay above make end template, it is and pre- on bed die
Pre-embedded bolt is stayed, construction is overturned, it is up big and down small;During formwork erection, carry out installing bed die first, place the steel processed
Muscle cage, then installs surrounding template again;
(4) steel bar meter is installed:Sleeper reinforcing bar is at the scene after machine-shaping, and artificial lift is put into mould;
(5) concrete former material is detected:Alkali content≤0.6%, C3A content≤8% of cement;Coarse aggregate from intensity it is high,
Continuous grading, same color, clay content<1.0%th, elongated particles<5% and without debris rubble;Fine aggregate selects fineness
Modulus is 2.4~2.8, clay content<1.5% middle sand, solid colour and free from admixture;Admixture selects flyash, ground slag
One kind in powder, natural zeolite powder;
(6) mix Design:Clear-water concrete mix-design is carried out with dense skeleton method of piling;
(7) casting concrete:Pouring work includes perfusion, consolidates and finishing process of wiping one's face, and concrete transportation is using small-sized
Carriage, slump must be strict controlled between 60mm~90mm;
(8) form removal is conserved:Maintenance should cover the exposed face of whole concrete structure, should be first by concrete during watering maintenance
The side and bottom surface of structure are sufficiently humidified so as to, and are then sprinkled water again by top surface.
Claims (2)
1. a kind of non-batch production sleeper prefabricated construction engineering method, it is characterised in that comprise the following steps:
(1) stencil design and processing:From all-steel mold plate, design 33 sets of side forms of processing, 99 sets of bed dies;
(2) template surface PROCESS FOR TREATMENT:Releasing agent is coated in template surface, coating thickness is controlled in 0.05~0.2kg/m2, smear
Time control 24h before formwork erection, smearing finishes and uses covered rearing with plastic film;
(3) model sheetinstallat:Template in manufacturing process, by sleeper lay above make end template, and reserve on bed die pre-
Bolt is buried, construction is overturned, it is up big and down small;During formwork erection, carry out installing bed die first, place the reinforcing bar processed
Cage, then installs surrounding template again;
(4) steel bar meter is installed:Sleeper reinforcing bar is at the scene after machine-shaping, and artificial lift is put into mould;
(5) concrete former material is detected:Alkali content≤0.6%, C3A content≤8% of cement;Coarse aggregate is high, continuous from intensity
Level is matched somebody with somebody, same color, clay content<1.0%th, elongated particles<5% and without debris rubble;Fine aggregate selects modulus of fineness
For 2.4~2.8, clay content<1.5% middle sand, solid colour and free from admixture;Admixture selects flyash, ground slag powder, day
One kind in right zeolite powder;
(6) mix Design:Clear-water concrete mix-design is carried out with dense skeleton method of piling;
(7) casting concrete:Pouring work includes perfusion, consolidates and finishing process of wiping one's face, and concrete transportation uses small four-wheel
Car, slump must be strict controlled between 60mm~90mm;
(8) form removal is conserved:Maintenance should cover the exposed face of whole concrete structure, should be first by concrete structure during watering maintenance
Side and bottom surface be sufficiently humidified so as to, then sprinkled water again by top surface.
2. non-batch production sleeper prefabricated construction engineering method according to claim 1, it is characterised in that described flyash is selected
I grade of flyash.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510130083.0A CN104786369B (en) | 2015-03-24 | 2015-03-24 | A kind of non-batch production sleeper prefabricated construction engineering method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510130083.0A CN104786369B (en) | 2015-03-24 | 2015-03-24 | A kind of non-batch production sleeper prefabricated construction engineering method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104786369A CN104786369A (en) | 2015-07-22 |
CN104786369B true CN104786369B (en) | 2017-07-11 |
Family
ID=53551771
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510130083.0A Expired - Fee Related CN104786369B (en) | 2015-03-24 | 2015-03-24 | A kind of non-batch production sleeper prefabricated construction engineering method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104786369B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106003416A (en) * | 2016-05-24 | 2016-10-12 | 中交航局第四工程有限公司 | Construction technique of prefabricated runway panels of airfield runway |
CN109732772A (en) * | 2018-12-30 | 2019-05-10 | 中铁十四局集团有限公司 | The method for prefabricating of section of jurisdiction and section of jurisdiction |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1363624A (en) * | 2001-12-29 | 2002-08-14 | 中国科学院长春应用化学研究所 | Process for preparing sleepers from powdered coal ash and waste plastics |
CN1377849A (en) * | 2002-05-27 | 2002-11-06 | 杨普安 | Railway sleeper and its preparing method |
-
2015
- 2015-03-24 CN CN201510130083.0A patent/CN104786369B/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1363624A (en) * | 2001-12-29 | 2002-08-14 | 中国科学院长春应用化学研究所 | Process for preparing sleepers from powdered coal ash and waste plastics |
CN1377849A (en) * | 2002-05-27 | 2002-11-06 | 杨普安 | Railway sleeper and its preparing method |
Non-Patent Citations (1)
Title |
---|
高性能清水混凝土在桥梁工程中的应用;李静,安从志;《成都市"两快两射"快速路系统工程论文专辑》;20140530;第225-229页 * |
Also Published As
Publication number | Publication date |
---|---|
CN104786369A (en) | 2015-07-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105130368B (en) | A kind of pervious surface material and preparation method thereof | |
CN105016642B (en) | A kind of environmental protection and energy saving slag water-permeable brick and preparation method thereof | |
CN109824321B (en) | Carbon dioxide curing prefabricated pervious concrete and preparation method thereof | |
CN106830987A (en) | A kind of artificial culture stone with stone waste sludge as raw material and preparation method thereof | |
CN106904918A (en) | Sculpture for city material and its method for making sculpture for city are made using construction waste | |
CN107759170A (en) | A kind of prefabricated hollow stair of light ceramsite concrete and preparation method | |
CN107721303A (en) | A kind of iron tailings is granulated water-permeable brick and preparation method thereof | |
CN104786369B (en) | A kind of non-batch production sleeper prefabricated construction engineering method | |
CN104890123A (en) | Automatic-feeding and uniform-discharging cement mixer with conveying belt | |
CN206737210U (en) | A kind of non-dismantling formwork | |
CN109679660A (en) | A kind of curing method of heavy-metal contaminated soil | |
CN102432234B (en) | comprehensive treatment method for mud nonferrous metal oxidized ore dressing tailing water residue | |
CN104230256A (en) | Self-compaction concrete and production technique of prefabricated municipal quadrate culvert component | |
CN109776044A (en) | A kind of novel high-strength inorganic artificial hilllock stone and preparation method thereof | |
CN107986714A (en) | A kind of sea work wave wall and its construction method | |
CN103896539B (en) | Prefabricated sial base green cement concrete bidirectional hole hollow template and manufacture method thereof | |
CN106278065A (en) | Imitative stone decoration element and production method thereof | |
CN109356185A (en) | A kind of prefabricated pier foundation of regeneration monolith and its construction method | |
CN107620469A (en) | A kind of clear water concrete casting method | |
CN107268755A (en) | A kind of construction method of inlet for stom water | |
CN106801482A (en) | A kind of current conversion station fire wall construction technology | |
CN103171021A (en) | Method for enhancing concrete strength, improving volume stability and reducing cracking | |
CN103910534B (en) | Energy-saving environment-friendly quick-dry aerated masonry-free wall material instantly prepared from gold ore tailings | |
CN109265035A (en) | A kind of regeneration concrete material and the preparation method and application thereof | |
CN109437762A (en) | High-titanium dry slag sand water-permeable brick and preparation method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Yan Minqiang Inventor after: Wang Fuyuan Inventor after: Li Wei Inventor after: Qian Chao Inventor before: Li Wei Inventor before: Yan Minqiang Inventor before: Wang Fuyuan Inventor before: Qian Chao |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170711 |