CN104785359B - A kind of mobile ore dressing plant - Google Patents

A kind of mobile ore dressing plant Download PDF

Info

Publication number
CN104785359B
CN104785359B CN201510162221.3A CN201510162221A CN104785359B CN 104785359 B CN104785359 B CN 104785359B CN 201510162221 A CN201510162221 A CN 201510162221A CN 104785359 B CN104785359 B CN 104785359B
Authority
CN
China
Prior art keywords
base
ore
machine
ball mill
belt conveyer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510162221.3A
Other languages
Chinese (zh)
Other versions
CN104785359A (en
Inventor
鲍秀萍
李顺
韩晓燕
陈松梅
郑健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Xinhai Mining Technology & Equipment Inc
Original Assignee
Shandong Xinhai Mining Technology & Equipment Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Xinhai Mining Technology & Equipment Inc filed Critical Shandong Xinhai Mining Technology & Equipment Inc
Priority to CN201510162221.3A priority Critical patent/CN104785359B/en
Publication of CN104785359A publication Critical patent/CN104785359A/en
Application granted granted Critical
Publication of CN104785359B publication Critical patent/CN104785359B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B03SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03BSEPARATING SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS
    • B03B7/00Combinations of wet processes or apparatus with other processes or apparatus, e.g. for dressing ores or garbage

Abstract

The present invention relates to a kind of mobile ore dressing plant, and level is removably attachable to together successively for first base, second base and the 3rd base, and first base, second base and the 3rd base are removable, and adjustable terrain clearance;Disintegrating machine, belt conveyer and ore storage bin are located at the upper surface of first base, the output end of the input connection disintegrating machine of belt conveyer, the open top of the output end connection ore storage bin of belt conveyer;Ball mill, jigging machine, spiral classifier, centrifugal ore separator, glue pump and shaking table are located at the upper surface of second base;Hair felt launder, water tank, electric-control system and generator are located at the upper surface of the 3rd base, and water tank is supplied water by the road by water pump, electric-control system via line control generator powered;Beneficial effect is a highly integrated, operating process is simplified, transport conveniently moving.

Description

A kind of mobile ore dressing plant
Technical field
The invention belongs to ore dressing plant structure-design technique field, specifically a kind of mobile ore dressing plant.
Background technology
In recent years, the regional mining development impetus such as Africa, Latin Africa, South Asia is swift and violent, and the investors aim at these areas Resources advantage, great amount of investment exploitation mineral products.But because these countries and regions fall behind relatively, infrastructure is not perfect enough, Mining activities, the exploitation of scale are hardly formed in a short time.Local existing technique of preparing and preparation equipment are general simpler and cruder Or technique is single, only for a workshop section in ore-dressing technique, be unable to reach valuable mineral in synthetical recovery ore will Ask.Preparation work (broken, ore grinding) generally requires artificial using the completion of most simple and crude equipment before choosing, and automaticity is low, worker Labor intensity is big;And local more decentralized management patterns in units of family or groupuscule, cause ore dressing plant stock dispersion;Simultaneously These regional infrastructure are horizontal generally relatively low, establish mammoth mill, no matter from factory's capital construction, equipment installation is selected, auxiliary is set Apply it is supporting etc., it is all very difficult, and cost is higher.
Therefore there is designer to devise moveable ore dressing plant, there is independent mobile system as mobile crushing station, though Right conveniently moving, but cost is very high, it is very high to the freight using scene by engineering.Mobile system translational speed typically compared with Slowly, and equipment is parked in use, mobile system deactivation, causes equipment to waste.
The content of the invention
The technical problems to be solved by the invention be to provide it is a kind of it is highly integrated, operating process is simplified, transport conveniently moving Mobile ore dressing plant, automaticity is high, and cost of transportation and labor strength are greatly reduced.
The technical scheme that the present invention solves above-mentioned technical problem is as follows:A kind of mobile ore dressing plant, including first base, second Base, the 3rd base, disintegrating machine, belt conveyer, ore storage bin, belt ore feeder, ball mill, jigging machine, spiral classifier, centrifugation Ore separators, glue pump, shaking table, hair felt launder, water tank, electric-control system and generator, the first base, second base and the 3rd bottom Level is removably attachable to together seat successively, and the first base, second base and the 3rd base are removable, and can adjust Terrain clearance;The disintegrating machine, belt conveyer and ore storage bin are located at the upper surface of the first base, the belt conveyer Input connects the output end of the disintegrating machine, and the output end of the belt conveyer connects the open top of the ore storage bin;Institute The upper surface that ball mill, jigging machine, spiral classifier, centrifugal ore separator, glue pump and shaking table are located at the second base is stated, it is described The feed end of belt ore feeder is located in the ore storage bin, and the discharge funnel of the belt ore feeder inserts the charging of the ball mill Mouthful, the discharging opening of the ball mill is located at the top of the jigging machine, and the concentrate outlet lower section of the jigging machine is provided with container, The mine tailing outlet of the jigging machine connects the charging aperture of the spiral classifier, and the sand return outlet of the spiral classifier is by slipping Groove connects the charging aperture of the ball mill, and the overflow pipe of the spiral classifier connects the glue pump by pipeline with baffle-box Charging aperture, the discharging opening of the glue pump connect the charging aperture of the centrifugal ore separator by pipeline, and the centrifugal ore separator goes out The material mouth connection shaking table gives ore deposit end;The hair felt launder, water tank, electric-control system and generator are located at the 3rd base Upper surface, the feed end of the hair felt launder connect the tailing outlet of the shaking table by pipeline, and the water tank is passed through by water pump Pipeline supplies water to the ball mill, jigging machine, spiral classifier, centrifugal ore separator, glue pump and hair felt launder, the electric-control system Via line controls the generator to the disintegrating machine, belt conveyer, belt ore feeder, ball mill, jigging machine, screw classifying Machine, centrifugal ore separator, glue pump and shaking table power supply.
The beneficial effects of the invention are as follows:It is each mill preparation equipment and power supply supply equipment be integrated in the first base, Highly integrated to grind preparation equipment into automation in second base and the 3rd base, operating process simplifies, high same of automaticity When reduce the labor intensity of worker;Using the detachable, removable of the first base, second base and the 3rd base and from The adjustable characteristic of ground level, the equipment being integrated on a base, second base and the 3rd base is uniformly loaded onto into container Transported with means of transports such as flat cars, means of transport can perform other transport tasks after removing stage makeup and costume, it is not necessary to stop in situ etc. Wait, travelling speed is fast while reducing cost of transportation.
Further, the first base, second base and the 3rd base are by support platform and positioned at the support platform The channel steel support seat composition of two bottom sides, the notch direction of the groove of the channel steel support seat is downward, in the channel steel support seat Groove in, close to the position at the channel steel support seat both ends be vertically arranged with the first adjusting screw rod and liftable universal Wheel, first adjusting screw rod and universal wheel can extend downwardly out the groove of the channel steel support seat, utilize the channel-section steel branch Support seat supports correspond to the equipment on base, and the lifting for adjusting first adjusting screw rod and the relatively described support platform of universal wheel is The loading-unloading vehicle of the present invention and the fine setting of produced on-site addressing can be completed, transports conveniently moving.
Further, the upper end of first adjusting screw rod passes through the support platform, and connects with the support platform screw thread Connect, the universal wheel is threadedly coupled by the second adjusting screw rod with the support platform, is set on second adjusting screw rod There is locking nut, be easy to the regulation of first adjusting screw rod and universal wheel and the support platform relative altitude, reliability height.
Further, the lower end of first adjusting screw rod is fixedly installed support block, the horizontal cross-section chi of the support block The very little horizontal cross section dimension more than first adjusting screw rod, improve the present invention first adjusting screw rod described in loading-unloading vehicle and support The reliability of its top device.
Further, the disintegrating machine is jaw crusher, it is ensured that the reliability of muck process of the present invention, and improve the present invention The efficiency of muck process.
Further, the belt conveyer is high angle belt conveyer transporter, lifts muck maintainability of the present invention.
Further, the spiral classifier is high weir spiral classifier, it is ensured that the reliability of the rough classification of the present invention.
Further, the pipeline of the water pump connects the ball mill, jigging machine, spiral classifier, centrifugal ore separator, glue pump One end with hair felt launder is quick coupling, and one end of the pipeline connection water pump of the water pump passes through multiple way union It is connected with the delivery port of the water pump, so as to the ball mill, jigging machine, spiral classifier, centrifugal ore separator, glue pump and felt Chute is quickly connected with the water pump, improves the pipeline disassembly efficiency of the present invention.
Further, disintegrating machine described in the connection of the electric-control system, belt conveyer, belt ore feeder, ball mill, Jigging machine, spiral classifier, centrifugal ore separator, glue pump, one end of shaking table and water pump are quick wire terminal, the electric-control system Connection described in one end of electric-control system be connected by assembly wire terminal with the electric-control system, so as to the disintegrating machine, Belt conveyer, belt ore feeder, ball mill, jigging machine, spiral classifier, centrifugal ore separator, glue pump and shaking table and the electricity Control system quickly connects, and improves the circuit disassembly efficiency of the present invention.
Further, the upper surface of the 3rd base is further fixedly arranged on storage tank close to the position of the electric-control system, It is easy to store maintenance tool and other items.
Brief description of the drawings
Fig. 1 is the overlooking the structure diagram of the present invention;
Fig. 2 is the partial structural diagram of first base of the present invention;
In accompanying drawing, the list of parts representated by each label is as follows:
1st, disintegrating machine, 2, belt conveyer, 3, first base, 4, ore storage bin, 5, chute, 6, spiral classifier, 7, jigging machine, 8th, glue pump, 9, second base, 10, storage tank, 11, electric-control system, 12, generator, the 13, the 3rd base, 14, water pump, 15, water Case, 16, hair felt launder, 17, shaking table, 18, centrifugal ore separator, 19, ball mill, 20, discharge funnel, 21, belt ore feeder, 22, First adjusting screw rod, 23, locking nut, 24, support platform, the 25, second adjusting screw rod, 26, channel steel support seat, 27, universal wheel, 28th, support block.
Embodiment
The principle and feature of the present invention are described below in conjunction with accompanying drawing, the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the present invention.
As shown in figure 1, a kind of mobile ore dressing plant, including first base 3, second base 9, the 3rd base 13, disintegrating machine 1, Belt conveyer 2, ore storage bin 4, belt ore feeder 21, ball mill 19, jigging machine 7, spiral classifier 6, centrifugal ore separator 18, glue pump 8th, shaking table 17, hair felt launder 16, water tank 15, electric-control system 11 and generator 12, first base 3, the base of second base 9 and the 3rd 13 successively level be removably attachable to together, first base 3, the base 13 of second base 9 and the 3rd are removable, and can adjust Terrain clearance;Disintegrating machine 1, belt conveyer 2 and ore storage bin 4 are located at the upper surface of first base 3, the input of belt conveyer 2 Connect the output end of disintegrating machine 1, the open top of the output end connection ore storage bin 4 of belt conveyer 2;Ball mill 19, jigging machine 7, Spiral classifier 6, centrifugal ore separator 18, glue pump 8 and shaking table 17 are located at the upper surface of second base 9, and belt ore feeder 21 enters Material end is located in ore storage bin 4, and the discharge funnel 20 of belt ore feeder 21 inserts the charging aperture of ball mill 19, the discharging opening of ball mill 19 Positioned at the top of jigging machine 7, the concentrate outlet lower section of jigging machine 7 is provided with container, the mine tailing outlet connection spiral point of jigging machine 7 The charging aperture of level machine 6, the sand return outlet of spiral classifier 6 connect the charging aperture of ball mill 19, spiral classifier 6 by chute 5 Overflow pipe the charging aperture of glue pump 8 is connected with baffle-box by pipeline, the discharging opening of glue pump 8 connects centrifugal ore separator by pipeline 18 charging aperture, the discharging opening connection shaking table 17 of centrifugal ore separator 18 give ore deposit end;Hair felt launder 16, water tank 15, electric-control system 11 and generator 12 be located at the upper surface of the 3rd base 13, the feed end of hair felt launder 16 passes through the tailing that pipeline connects shaking table 17 Outlet, water tank 15 is by water pump 14 by the road to ball mill 19, jigging machine 7, spiral classifier 6, centrifugal ore separator 18, glue pump 8 Supplied water with hair felt launder 16, the via line of electric-control system 11 controls generator 12 to disintegrating machine 1, belt conveyer 2, belt ore feeder 21st, ball mill 19, jigging machine 7, spiral classifier 6, centrifugal ore separator 18, glue pump 8, shaking table 17 and water pump 14 are powered.
In the present embodiment, as depicted in figs. 1 and 2, first base 3, the base 13 of second base 9 and the 3rd are by support platform 24 and the channel steel support seat 26 positioned at the two bottom sides of support platform 24 form, the notch direction of the groove of channel steel support seat 26 to Under, it is vertically arranged with the first adjusting screw rod in the groove of channel steel support seat 26, close to the position at the both ends of channel steel support seat 26 22 and liftable universal wheel 27, the first adjusting screw rod 22 and universal wheel 27 can extend downwardly out the recessed of channel steel support seat 26 Groove;The upper end of first adjusting screw rod 22 passes through support platform 24, and is threadedly coupled with support platform 24, and universal wheel 27 passes through second Adjusting screw rod 25 is threadedly coupled with support platform 24, and locking nut 23 is provided with the second adjusting screw rod 25;First regulation spiral shell The lower end of bar 22 is fixedly installed support block 28, and the horizontal cross section dimension of support block 28 is more than the level section of the first adjusting screw rod 22 Face size;Disintegrating machine 1 is jaw crusher;Belt conveyer 2 is high angle belt conveyer transporter;Spiral classifier 6 is high-weir type Spiral classifier.Pipeline connection ball mill 19, jigging machine 7, spiral classifier 6, centrifugal ore separator 18, the and of glue pump 8 of water pump 14 One end of hair felt launder 16 is quick coupling, and one end of the pipeline connection water pump 14 of water pump 14 passes through multiple way union and water The delivery port connection of pump 14;Connection disintegrating machine 1, belt conveyer 2, belt ore feeder 21, the ball mill of electric-control system 11 19th, one end of jigging machine 7, spiral classifier 6, centrifugal ore separator 18, glue pump 8, shaking table 17 and water pump 14 is quick wire terminal, One end of the connection electric-control system 11 of electric-control system 11 is connected by assembly wire terminal with electric-control system 11;3rd base 13 Upper surface be further fixedly arranged on storage tank 10 close to the position of electric-control system 11.
Operation principle:
Ore is broken into muck via jaw crusher, and muck transports into ore storage bin 4 via high angle belt conveyer transporter, enters Discharge funnel 20 of the muck through belt ore feeder 21 and belt ore feeder 21 in ore storage bin 4 equably feeds ball mill 19 and ground Ore deposit, discharging opening of the ore grinding discharge through ball mill 19 flow into jigging machine 7 and carry out roughing, concentrate outlet of the rougher concentration through jigging machine 7 Container is flowed into, and the rougher concentration in the container is transported to shaking table 17 and carries out selected by timing, obtains concentrate product;Jigging machine 7 is thick Mine tailing outlet of the mine tailing of choosing through jigging machine 7 flows into high weir spiral classifier and is classified, and high weir spiral classifier will jump The coarse fodder sand return eliminated in the mine tailing of the roughing of machine 7 regrinds composition closed circuit grinding through the return ball mill 19 of chute 5, and is produced in classification process Then the overflow pipe through high weir spiral classifier flows into glue pump 8 with baffle-box by the road for raw overflow, and then is delivered to by glue pump 8 Centrifugal ore separator 18 carries out roughing, and discharging opening of the concentrate through centrifugal ore separator 18 of the roughing of centrifugal ore separator 18 flows into shaking table 17 and entered Row is selected, obtains concentrate product;The mine tailing of centrifugal ore separator 19 and shaking table 17 flows into hair felt launder 16 and scanned by the road, sweeps Mine tailing is selected to be discharged for true tailings, scavenger concentrate transports high weir spiral classifier classification back.
The present embodiment container loading method:
The first step, take the connection between first base 3, the base 13 of second base 9 and the 3rd apart, at the same take apart each equipment it Between circuit and pipeline fast joint.
Second step, the first adjusting screw rod 22 is rotated first and is declined, makes channel steel support seat 26 liftoff, secondly the regulation of rotation second Screw rod 25 adjusts the height of universal wheel 27, the surface of universal wheel 27 is landed, screws locking nut 23, finally, the regulation of rotation first Screw rod 22 lifts.
3rd step, first base 3 is sling with lifting appliance, two universal wheels 27 enter packaging before first base 3 After case, allowing first base 3 to decline makes universal wheel 27 contact container bottom surface, Level Promoting first base 3, when first base 3 is moved After moving in place, untill the first adjusting screw rod 22 of rotation drops to the not load-bearing of universal wheel 27.
4th step, the base 13 of second base 9 and the 3rd is sequentially loaded into the method for the 3rd step.
The present embodiment container is unloaded method:
The first step, the first adjusting screw rod 22 of rotation lift, and make all load-bearing of universal wheel 27.
Second step, sling the 3rd base 13 with lifting appliance and gently remove, two universal wheels 27 move to chamber door when distal end The 3rd base 13 is put down when nearby, changes lifting position and the 3rd base 13 is moved into required putting position.
3rd step, second base 9 and first base 3 are removed successively by the first step and the method for second step, and it is moved to Required putting position.
4th step, if also needing transhipment to screw off the first adjusting screw rod 22 makes the not load-bearing of universal wheel 27, then use lifting appliance Sling displacement;If belonging to working site, the first adjusting screw rod 22 is rotated first and is declined, makes universal wheel 27 liftoff, secondly rotation the Two adjusting screw rods 25, which lift universal wheel 27, makes the lowest surfaces of universal wheel 27 be higher than the lower plane of channel steel support seat 26, finally rotates the One adjusting screw rod 22 lifts, and allows the lower plane of channel steel support seat 26 to land and levelling, connect the fastener between each base make it is whole The base in individual mobile ore dressing plant is integrally formed.The electrical equipment and pipe between the equipment on each base are finally connected by ore-dressing technique requirement Road snap joint, to meet the design requirement of complete set of equipments.
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent substitution and improvements made etc., it should be included in the scope of the protection.

Claims (10)

  1. A kind of 1. mobile ore dressing plant, it is characterised in that:Including first base (3), second base (9), the 3rd base (13), broken Machine (1), belt conveyer (2), ore storage bin (4), belt ore feeder (21), ball mill (19), jigging machine (7), spiral classifier (6), centrifugal ore separator (18), glue pump (8), shaking table (17), hair felt launder (16), water tank (15), electric-control system (11) and generating Machine (12), the first base (3), second base (9) and the 3rd base (13) are horizontal successively to be detachably connected, institute It is removable to state first base (3), second base (9) and the 3rd base (13), and adjustable terrain clearance;The disintegrating machine (1), belt conveyer (2) and ore storage bin (4) are located at the upper surface of the first base (3), the input of the belt conveyer (2) End connects the output end of the disintegrating machine (1), and the output end of the belt conveyer (2) connects to be opened at the top of the ore storage bin (4) Mouthful;The ball mill (19), jigging machine (7), spiral classifier (6), centrifugal ore separator (18), glue pump (8) and shaking table (17) position In the upper surface of the second base (9), the feed end of the belt ore feeder (21) is located in the ore storage bin (4), the skin Discharge funnel (20) with rock feeder (21) inserts the charging aperture of the ball mill (19), the discharging opening position of the ball mill (19) In the top of the jigging machine (7), the concentrate outlet lower section of the jigging machine (7) is provided with container, the tail of the jigging machine (7) Ore deposit outlet connects the charging aperture of the spiral classifier (6), and the sand return outlet of the spiral classifier (6) is connected by chute (5) The charging aperture of the ball mill (19) is connect, the overflow pipe of the spiral classifier (6) connects the glue with baffle-box by pipeline The charging aperture of pump (8), the discharging opening of the glue pump (8) connects the charging aperture of the centrifugal ore separator (18) by pipeline, described The discharging opening connection shaking table (17) of centrifugal ore separator (18) gives ore deposit end;It is the hair felt launder (16), water tank (15), automatically controlled System (11) and generator (12) are located at the upper surface of the 3rd base (13), and the feed end of the hair felt launder (16) passes through Pipeline connects the tailing outlet of the shaking table (17) and the centrifugal ore separator (18), and the water tank (15) is passed through by water pump (14) Pipeline is to the ball mill (19), jigging machine (7), spiral classifier (6), centrifugal ore separator (18), glue pump (8) and hair felt launder (16) supply water, electric-control system (11) via line controls the generator (12) to the disintegrating machine (1), belt conveyer (2), belt ore feeder (21), ball mill (19), jigging machine (7), spiral classifier (6), centrifugal ore separator (18), glue pump (8) Powered with shaking table (17).
  2. A kind of 2. mobile ore dressing plant according to claim 1, it is characterised in that:The first base (3), second base (9) and the 3rd base (13) is by support platform (24) and the channel steel support seat positioned at the support platform (24) two bottom sides (26) forming, the notch direction of the groove of the channel steel support seat (26) is downward, in the groove of the channel steel support seat (26), The first adjusting screw rod (22) and liftable universal wheel are vertically arranged with close to the position at channel steel support seat (26) both ends (27), first adjusting screw rod (22) and universal wheel (27) can extend downwardly out the groove of the channel steel support seat (26).
  3. A kind of 3. mobile ore dressing plant according to claim 2, it is characterised in that:The upper end of first adjusting screw rod (22) It is threadedly coupled through the support platform (24), and with the support platform (24), the universal wheel (27) passes through the second regulation Screw rod (25) is threadedly coupled with the support platform (24), and locking nut is provided with second adjusting screw rod (25) (23)。
  4. A kind of 4. mobile ore dressing plant according to Claims 2 or 3, it is characterised in that:First adjusting screw rod (22) Lower end is fixedly installed support block (28), and the horizontal cross section dimension of the support block (28) is more than first adjusting screw rod (22) Horizontal cross section dimension.
  5. A kind of 5. mobile ore dressing plant according to claim 1 or 2, it is characterised in that:The disintegrating machine (1) is jaw crushing Machine.
  6. A kind of 6. mobile ore dressing plant according to claim 1 or 2, it is characterised in that:The belt conveyer (2) is to incline greatly Angle belt conveyer.
  7. A kind of 7. mobile ore dressing plant according to claim 1 or 2, it is characterised in that:The spiral classifier (6) is high weir Formula spiral classifier.
  8. A kind of 8. mobile ore dressing plant according to claim 1 or 2, it is characterised in that:The pipeline connection of the water pump (14) The ball mill (19), jigging machine (7), spiral classifier (6), centrifugal ore separator (18), glue pump (8) and hair felt launder (16) One end is quick coupling, and one end of the pipeline connection water pump (14) of the water pump (14) passes through multiple way union and institute State the delivery port connection of water pump (14).
  9. A kind of 9. mobile ore dressing plant according to claim 1 or 2, it is characterised in that:The circuit of the electric-control system (11) Connect the disintegrating machine (1), belt conveyer (2), belt ore feeder (21), ball mill (19), jigging machine (7), screw classifying Machine (6), centrifugal ore separator (18), glue pump (8), one end of shaking table (17) and water pump (14) are quick wire terminal, described automatically controlled One end of electric-control system (11) described in the connection of system (11) is connected by assembly wire terminal with the electric-control system (11).
  10. A kind of 10. mobile ore dressing plant according to claim 1 or 2, it is characterised in that:The upper table of 3rd base (13) Face is further fixedly arranged on storage tank (10) close to the position of the electric-control system.
CN201510162221.3A 2015-04-07 2015-04-07 A kind of mobile ore dressing plant Active CN104785359B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510162221.3A CN104785359B (en) 2015-04-07 2015-04-07 A kind of mobile ore dressing plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510162221.3A CN104785359B (en) 2015-04-07 2015-04-07 A kind of mobile ore dressing plant

Publications (2)

Publication Number Publication Date
CN104785359A CN104785359A (en) 2015-07-22
CN104785359B true CN104785359B (en) 2017-12-05

Family

ID=53550813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510162221.3A Active CN104785359B (en) 2015-04-07 2015-04-07 A kind of mobile ore dressing plant

Country Status (1)

Country Link
CN (1) CN104785359B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105944818B (en) * 2016-07-04 2019-03-15 郭大军 The dual-purpose movement of rail is broken to select platform
CN108636595B (en) * 2018-07-17 2023-08-01 曲靖开发区聚思科技有限公司 Movable combined coal preparation plant

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2661312Y (en) * 2003-05-15 2004-12-08 谭正才 Flow type multifunctional mil running device
US20140262968A1 (en) * 2013-03-15 2014-09-18 Fritz Enterprises, Inc. System and method for recovery of valuable constituents from steel-making slag fines
CN204564315U (en) * 2015-04-07 2015-08-19 烟台鑫海矿山机械有限公司 A kind of mobile ore dressing plant

Also Published As

Publication number Publication date
CN104785359A (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN103041920B (en) A kind of beneficiation method being suitable for chromium depleted zone and ore-sorting system
CN109351447B (en) Lean magnetite's ore dressing production system
CN110479467A (en) A kind of high pressure roller mill dry screening wet type pre-selecting technique of chromium depleted zone stone
CN104826727B (en) Coal Multistage ore-grinding floatation process and system in a kind of particulate
CN107199178A (en) A kind of magnetic hard rock finely removes iron separation system
CN106216082A (en) Low-grade Anshan type iron mine composite ore ore-dressing technique
WO2019006889A1 (en) Double-region flotation method for copper-cobalt sulfide ore in industrial production
Jankovic Developments in iron ore comminution and classification technologies
CN204564315U (en) A kind of mobile ore dressing plant
CN103100475A (en) High-efficiency concentrate ore pulp processing device suitable for long-distance pipeline transportation
CN104785359B (en) A kind of mobile ore dressing plant
US7431830B2 (en) Compact slurry preparation system for oil sand
CN110479468A (en) A kind of pre-selection technique of chromium depleted zone stone
CN107661814B (en) Screening-magnetic separation-ore grinding-magnetic separation flow equipment arrangement system
CN205868519U (en) Broken system is concentrated in ore dressing
CN101161349B (en) Ore-sorting system and technique for iron ore powder
CN101161351B (en) Ore-sorting system and technique of ferro-sulphur ore powder
CA2480122C (en) Compact slurry preparation system for oil sand
AU2021267559B2 (en) Mine site comminution arrangement and methodology
CN112844816B (en) Gravity dressing regrinding process and equipment for treating Nelson products
CN106191458A (en) A kind of process reclaiming coarse gold in grinding circuit in advance
CN210080112U (en) Phosphorite look selects system
CN108190400A (en) Ball milling workshop AGV trolleies automation charging discharging production line
CN203764371U (en) Crushing and transport system for deep mined ore
US2784841A (en) Hydraulic classification of solids

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Xinhai high tech Industrial Area in Fushan District in Shandong province Yantai city 265500 Street No. 188

Applicant after: SHANDONG XINHAI MINING TECHNOLOGY & EQUIPMENT INC.

Address before: Xinhai high tech Industrial Area in Fushan District in Shandong province Yantai city 264006 Street No. 188

Applicant before: Yantai Xinhai Mining Machinery Co., Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A mobile concentrator

Effective date of registration: 20220527

Granted publication date: 20171205

Pledgee: China Postal Savings Bank Corporation Yantai Fushan District sub branch