CN104779612B - The micro-grid system control method that many PCC point based on PCS energy storage device controls - Google Patents

The micro-grid system control method that many PCC point based on PCS energy storage device controls Download PDF

Info

Publication number
CN104779612B
CN104779612B CN201510144173.5A CN201510144173A CN104779612B CN 104779612 B CN104779612 B CN 104779612B CN 201510144173 A CN201510144173 A CN 201510144173A CN 104779612 B CN104779612 B CN 104779612B
Authority
CN
China
Prior art keywords
energy storage
switching point
pcc
storage device
micro
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510144173.5A
Other languages
Chinese (zh)
Other versions
CN104779612A (en
Inventor
陈海波
陈常曦
张宇
曹智慧
方陈
赵晓丹
刘舒
陈世锋
柳劲松
吕海超
时珊珊
赵玲
雷珽
胡丽明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
East China Power Test and Research Institute Co Ltd
Xuji Power Co Ltd
Original Assignee
State Grid Shanghai Electric Power Co Ltd
East China Power Test and Research Institute Co Ltd
Xuji Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Co Ltd, East China Power Test and Research Institute Co Ltd, Xuji Power Co Ltd filed Critical State Grid Shanghai Electric Power Co Ltd
Priority to CN201510144173.5A priority Critical patent/CN104779612B/en
Publication of CN104779612A publication Critical patent/CN104779612A/en
Application granted granted Critical
Publication of CN104779612B publication Critical patent/CN104779612B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention relates to the micro-grid system control method that a kind of many PCC point based on PCS energy storage device controls, this control method setting the first PCC switching point and the 2nd PCC switching point at micro-grid system with bulk power system junction point, 3rd PCC switching point is arranged on the inside common bus of micro-grid system, by the control realization micro-grid system control to each PCC switching point, it is connected with multiple pc S energy storage device, this control method specifically includes on described internal common bus:A) electrical breakdown rate-determining steps;B) power system restoration power supply control step.Compared with prior art, the present invention setting the first PCC switching point and the 2nd PCC switching point at micro-grid system with bulk power system junction point, 3rd PCC switching point is arranged on the inside common bus of micro-grid system, control by 3 PCC switching points, realize the control strategy to PCS energy storage device for the micro-grid system, have the advantages that control is flexible.

Description

The micro-grid system control method that many PCC point based on PCS energy storage device controls
Technical field
The present invention relates to electric and electronic technical field, especially relate to a kind of point of many PCC based on PCS energy storage device and control Micro-grid system control method.
Background technology
At present, in large-scale micro-grid system (as island microgrid system etc.) application, the volume of separate unit PCS energy storage device Constant volume cannot meet so huge generating and electricity system, for ensureing the stability that large-scale micro-grid system runs, fills PCS (the Power Convert System) coordinative role to generating end and load end for the energy storage device is waved in distribution, typically using many Platform PCS energy storage device cooperation, to make up the problem that rated capacity cannot meet.
It is soft that Chinese patent application CN 104218612A discloses a kind of micro-capacitance sensor based on overall-in-one control schema at points of common connection Property grid-connected control method, configuration energy-storage system and SSTS at PCC, can be adopted with power distribution network points of common connection place using micro-capacitance sensor The complete micro-capacitance sensor collecting and power distribution network information about power, coordinate the energy storage of this place configuration, temporarily drop generation in distribution network voltage When, send idle to power distribution network, consumes unnecessary idle during voltage swell, alleviates Voltage Instability degree;Cooperation solid converting switch, Improve micro-capacitance sensor off-network switch speed and precision.But being gradually increased with power system capacity, single PCC point (Point of Common Coupling, points of common connection) control the mode that whole system is connected with electrical network too single, cause internal system Control strategy cannot flexibly realize P/Q (being incorporated into the power networks), V/F (islet operation) to multiple pc S energy storage device and control mould The use of formula.
So needing to design a kind of micro-capacitance sensor network architecture of the multiple PCC points based on PCS energy storage device, to meet great Rong The flexible use of amount micro-grid system control strategy.
Content of the invention
The purpose of the present invention is exactly to overcome the defect of above-mentioned prior art presence to provide a kind of control flexibly and easily The micro-grid system control method that controls of many PCC point based on PCS energy storage device.
The purpose of the present invention can be achieved through the following technical solutions:
The micro-grid system control method that a kind of many PCC point based on PCS energy storage device controls, this control method is in micro- electricity At net system and bulk power system junction point, a PCC switching point and the 2nd PCC switching point are set, in the inside of micro-grid system 3rd PCC switching point is arranged on common bus, by the control realization micro-grid system control to each PCC switching point, described interior Multiple pc S energy storage device is connected with portion's common bus, this control method specifically includes:
A) electrical breakdown rate-determining steps;
B) power system restoration power supply control step.
Described electrical breakdown rate-determining steps are specially:
A01) detect whether that presence plan isolated island instructs, if so, then enter plan isolated island control strategy, execution step A02), if it is not, then entering unplanned isolated island control strategy;
A02) judge whether the 3rd PCC switching point closes, if so, then execution step a03), if it is not, then micro-grid system divides Other two micro-capacitance sensor subsystems, execution step a06);
A03) judge whether PCS energy storage device is in unit V/F pattern, if so, then execution step a04), if it is not, then holding Row step a05);
A04) one PCS energy storage device of labelling enters V/F pattern, disconnects the 2nd PCC switching point and PCC switch successively Point, sends to the PCS energy storage device of labelling and turns V/F instruction;
A05) disconnect the 2nd PCC switching point and a PCC switching point successively, send to all PCS energy storage devices simultaneously and turn V/F instructs;
A06) judge whether PCS energy storage device is in unit V/F pattern, if so, then execution step a07), if it is not, then holding Row step a08);
A07) a PCS energy storage device of two micro-capacitance sensor subsystems of labelling enters V/F pattern respectively, simultaneously switches off first PCC switching point and the 2nd PCC switching point, send to the PCS energy storage device of two station symbol notes and turn V/F instruction;
A08) simultaneously switch off a PCC switching point and the 2nd PCC switching point, turn V/F to the transmission of all PCS energy storage devices and refer to Order.
In described unplanned isolated island control strategy, the 2nd PCC switching point and a PCC switching point are and simultaneously switch off.
Described power system restoration power supply control step is specially:
B01) judge whether the 3rd PCC switching point closes, if so, then execution step b02), if it is not, then micro-grid system divides Other two micro-capacitance sensor subsystems, execution step b06);
B02) judge whether PCS energy storage device is in unit V/F pattern, if so, then to the PCS being in unit V/F pattern Energy storage device carries out same period regulation, execution step b03), if it is not, then same period regulation is carried out to all PCS energy storage devices, execute step Rapid b03);
B03) judge whether a PCC switching point grid side is all consistent with the voltage magnitude of microgrid side, phase angle, if so, then Stop same period regulation, execution step b05), if it is not, then execution step b04);
B04) judge whether regulating time is more than given threshold, if so, then the same period is adjusted unsuccessfully, if it is not, then readjusting, Return to step b03);
B05) close a PCC switching point, and send, to PCS energy storage device, the instruction turning P/Q pattern, judge all PCS Whether energy storage device normally runs, and if so, then closes a PCC switching point, if it is not, then return to step b05);
B06) judge whether PCS energy storage device is in unit V/F pattern, if so, then respectively to two micro-capacitance sensor subsystems In be in the PCS energy storage device of unit V/F pattern and carry out same period regulation, execution step b07), if it is not, then to all PCS energy storage Device carries out same period regulation, execution step b07);
B07) judge whether a PCC switching point grid side is all consistent with the voltage magnitude of two microgrid sides, phase angle respectively, If so, same period regulation, execution step b09 are then stopped), if it is not, then execution step b08);
B08) judge whether regulating time is more than given threshold, if so, then the same period is adjusted unsuccessfully, if it is not, then readjusting, Return to step b07);
B09) it is closed at a PCC switching point and the 2nd PCC switching point, and turn P/Q pattern to the transmission of PCS energy storage device Instruction, judge whether all PCS energy storage devices normally run, if so, then close the 3rd PCC switching point, if it is not, then return step Rapid b09).
Described PCS energy storage device is carried out the same period adjust be specially:
To the PCS energy storage device being in V/F pattern send the voltage magnitude of a PCC switching point grid side, frequency and Same period regulating command.
Described PCS energy storage device is provided with least 4.
Compared with prior art, the present invention is directed to many PCC point design present in micro-grid system, proposes one kind and is directed to PCS energy storage device the new type of control method of off-network switching, have advantages below:
(1) present invention arranges a PCC switching point at micro-grid system with bulk power system junction point and the 2nd PCC opens Guan Dian, arranges the 3rd PCC switching point on the inside common bus of micro-grid system, by the control of 3 PCC switching points, real The existing control strategy to PCS energy storage device for the micro-grid system, controls flexible;
(2) present invention can conveniently realize electrical breakdown control and power system restoration power supply control.
Brief description
Fig. 1 is the network architecture schematic diagram of micro-grid system in the present invention;
Fig. 2 is the schematic flow sheet of electrical breakdown rate-determining steps in the present invention;
Fig. 3 is the schematic flow sheet of power system restoration power supply control step in the present invention.
Specific embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention Premised on implemented, give detailed embodiment and specific operating process, but protection scope of the present invention be not limited to Following embodiments.
The present embodiment provides the micro-grid system control method that a kind of many PCC point based on PCS energy storage device controls, and such as schemes Shown in 1, this control method setting the first PCC switching point 1 (PCC1) and the at micro-grid system and bulk power system junction point Two PCC switching points 2 (PCC2), arrange the 3rd PCC switching point 3 (PCC3) on the inside common bus of micro-grid system, pass through The control realization micro-grid system of each PCC switching point is controlled.PCS energy storage device can be arranged as required to multiple stage, the present embodiment In, internal common bus is connected with 4 PCS energy storage devices 4.
The control method of the present embodiment specifically includes:
A) electrical breakdown rate-determining steps;
B) power system restoration power supply control step.
When system is normally run, 3 PCC switching points are in closure state, as shown in Fig. 2 electrical breakdown rate-determining steps tool Body is:
A01) detect whether that presence plan isolated island instructs, if so, then enter plan isolated island control strategy, execution step A02), if it is not, then entering unplanned isolated island control strategy;
A02) judge whether the 3rd PCC switching point closes, if so, then micro-grid system is a big microgrid, execution step A03), if it is not, then micro-grid system respectively two micro-capacitance sensor subsystems, now in detection PCS energy storage device list V/F or many V/F Simultaneously need to giving respectively to instruct, to ensure the continued power of 2 sub- micro-grid systems, execution step to 2 micro-capacitance sensor subsystems a06);
A03) judge whether PCS energy storage device is in unit V/F pattern, if so, then execution step a04), if it is not, then holding Row step a05);
A04) one PCS energy storage device of labelling enters V/F pattern, disconnects the 2nd PCC switching point and PCC switch successively Point, sends to the PCS energy storage device of labelling and turns V/F instruction;
A05) disconnect the 2nd PCC switching point and a PCC switching point successively, send to all PCS energy storage devices simultaneously and turn V/F instructs;
A06) judge whether PCS energy storage device is in unit V/F pattern, if so, then execution step a07), if it is not, then holding Row step a08);
A07) a PCS energy storage device of two micro-capacitance sensor subsystems of labelling enters V/F pattern respectively, simultaneously switches off first PCC switching point and the 2nd PCC switching point, send to the PCS energy storage device of two station symbol notes and turn V/F instruction;
A08) simultaneously switch off a PCC switching point and the 2nd PCC switching point, turn V/F to the transmission of all PCS energy storage devices and refer to Order.
Unplanned isolated island control strategy is with the difference of plan isolated island, a PCC switching point, the 2nd PCC switching point Disjunction mode is different, plans isolated island the PCC switching point and the 2nd PCC switching point when the 3rd PCC switching point closes, for ensureing PCS energy storage device V/F patten transformation is stable, need to have successively, can not disjunction simultaneously, and unplanned isolated island then can disjunction first simultaneously PCC switching point and the 2nd PCC switching point.
During micro-grid system isolated power grid, if now power system restoration is powered, issue simultaneous interconnecting instruction.As shown in figure 3, Power system restoration power supply control step is specially:
B01) judge whether the 3rd PCC switching point closes, if so, then execution step b02), if it is not, then micro-grid system divides Other two micro-capacitance sensor subsystems, need to carry out corresponding command operating, execution step b06 to two micro-capacitance sensor subsystems respectively);
B02) judge whether PCS energy storage device is in unit V/F pattern, if so, then to the PCS being in unit V/F pattern Energy storage device carries out same period regulation, execution step b03), if it is not, then same period regulation is carried out to all PCS energy storage devices, execute step Rapid b03);
PCS energy storage device is carried out with same period regulation be specially:
To the PCS energy storage device being in V/F pattern send the voltage magnitude of a PCC switching point grid side, frequency and Same period regulating command.
B03) judge whether a PCC switching point grid side is all consistent with the voltage magnitude of microgrid side, phase angle, if so, then Stop same period regulation, execution step b05), if it is not, then execution step b04);
B04) judge whether regulating time is more than given threshold, if so, then the same period is adjusted unsuccessfully, if it is not, then readjusting, Return to step b03);
B05) close a PCC switching point, and send, to PCS energy storage device, the instruction turning P/Q pattern, judge all PCS Whether energy storage device normally runs, and if so, then closes a PCC switching point, completes simultaneous interconnecting, if it is not, then return to step b05);
B06) judge whether PCS energy storage device is in unit V/F pattern, if so, then respectively to two micro-capacitance sensor subsystems In be in the PCS energy storage device of unit V/F pattern and carry out same period regulation, execution step b07), if it is not, then to all PCS energy storage Device carries out same period regulation, execution step b07);
B07) judge whether a PCC switching point grid side is all consistent with the voltage magnitude of two microgrid sides, phase angle respectively, If so, same period regulation, execution step b09 are then stopped), if it is not, then execution step b08);
B08) judge whether regulating time is more than given threshold, if so, then the same period is adjusted unsuccessfully, if it is not, then readjusting, Return to step b07);
B09) it is closed at a PCC switching point and the 2nd PCC switching point, and turn P/Q pattern to the transmission of PCS energy storage device Instruction, judge whether all PCS energy storage devices normally run, if so, then close the 3rd PCC switching point, complete simultaneous interconnecting, If it is not, then return to step b09).

Claims (5)

1. a kind of many PCC point based on PCS energy storage device controls micro-grid system control method is it is characterised in that this control Method setting the first PCC switching point and the 2nd PCC switching point at micro-grid system with bulk power system junction point, in micro-capacitance sensor On the inside common bus of system, the 3rd PCC switching point is set, by the control realization micro-grid system control to each PCC switching point System, described internal common bus is connected with multiple pc S energy storage device, this control method specifically includes:
A) electrical breakdown rate-determining steps;
B) power system restoration power supply control step;
Described electrical breakdown rate-determining steps are specially:
A01) detect whether that presence plan isolated island instructs, if so, then enter plan isolated island control strategy, execution step a02), if No, then enter unplanned isolated island control strategy;
A02) judge whether the 3rd PCC switching point closes, if so, then execution step a03), if it is not, then micro-grid system is divided into two Individual micro-capacitance sensor subsystem, execution step a06);
A03) judge whether PCS energy storage device is in unit V/F pattern, if so, then execution step a04), if it is not, then executing step Rapid a05);
A04) one PCS energy storage device of labelling enters V/F pattern, disconnects the 2nd PCC switching point and a PCC switching point successively, Send to the PCS energy storage device of labelling and turn V/F instruction;
A05) disconnect the 2nd PCC switching point and a PCC switching point successively, turn V/F to all PCS energy storage devices transmissions simultaneously and refer to Order;
A06) judge whether PCS energy storage device is in unit V/F pattern, if so, then execution step a07), if it is not, then executing step Rapid a08);
A07) a PCS energy storage device of two micro-capacitance sensor subsystems of labelling enters V/F pattern respectively, simultaneously switches off a PCC Switching point and the 2nd PCC switching point, send to the PCS energy storage device of two station symbol notes and turn V/F instruction;
A08) simultaneously switch off a PCC switching point and the 2nd PCC switching point, send to all PCS energy storage devices and turn V/F instruction.
2. the micro-grid system control method that the many PCC point based on PCS energy storage device according to claim 1 controls, its It is characterised by, in described unplanned isolated island control strategy, the 2nd PCC switching point and a PCC switching point are and simultaneously switch off.
3. the micro-grid system control method that the many PCC point based on PCS energy storage device according to claim 1 controls, its It is characterised by, described power system restoration power supply control step is specially:
B01) judge whether the 3rd PCC switching point closes, if so, then execution step b02), if it is not, then micro-grid system is divided into two Individual micro-capacitance sensor subsystem, execution step b06);
B02) judge whether PCS energy storage device is in unit V/F pattern, if so, then to the PCS energy storage being in unit V/F pattern Device carries out same period regulation, execution step b03), if it is not, then same period regulation, execution step are carried out to all PCS energy storage devices b03);
B03) judge that whether a PCC switching point grid side is all consistent with the voltage magnitude of microgrid side, phase angle, if so, then stops The same period is adjusted, execution step b05), if it is not, then execution step b04);
B04) judging whether regulating time is more than given threshold, if so, then the same period is adjusted unsuccessfully, if it is not, then readjusting, returning Step b03);
B05) close a PCC switching point, and send, to PCS energy storage device, the instruction turning P/Q pattern, judge all PCS energy storage Whether device normally runs, and if so, then closes a PCC switching point, if it is not, then return to step b05);
B06) judge whether PCS energy storage device is in unit V/F pattern, if so, then locate in two micro-capacitance sensor subsystems respectively PCS energy storage device in unit V/F pattern carries out same period regulation, execution step b07), if it is not, then to all PCS energy storage devices Carry out same period regulation, execution step b07);
B07) judge whether a PCC switching point grid side is all consistent with the voltage magnitude of two microgrid sides, phase angle respectively, if It is then to stop same period regulation, execution step b09), if it is not, then execution step b08);
B08) judging whether regulating time is more than given threshold, if so, then the same period is adjusted unsuccessfully, if it is not, then readjusting, returning Step b07);
B09) it is closed at a PCC switching point and the 2nd PCC switching point, and send the finger turning P/Q pattern to PCS energy storage device Order, judges whether all PCS energy storage devices normally run, and if so, then closes the 3rd PCC switching point, if it is not, then return to step b09).
4. the micro-grid system control method that the many PCC point based on PCS energy storage device according to claim 1 controls, its Be characterised by, described PCS energy storage device is carried out the same period adjust be specially:
Send voltage magnitude, frequency and the same period of a PCC switching point grid side to the PCS energy storage device being in V/F pattern Regulating command.
5. the micro-grid system controlling party being controlled according to the arbitrary described many PCC point based on PCS energy storage device of claim 1-4 Method is it is characterised in that described PCS energy storage device is provided with least 4.
CN201510144173.5A 2015-03-30 2015-03-30 The micro-grid system control method that many PCC point based on PCS energy storage device controls Active CN104779612B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510144173.5A CN104779612B (en) 2015-03-30 2015-03-30 The micro-grid system control method that many PCC point based on PCS energy storage device controls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510144173.5A CN104779612B (en) 2015-03-30 2015-03-30 The micro-grid system control method that many PCC point based on PCS energy storage device controls

Publications (2)

Publication Number Publication Date
CN104779612A CN104779612A (en) 2015-07-15
CN104779612B true CN104779612B (en) 2017-03-08

Family

ID=53620921

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510144173.5A Active CN104779612B (en) 2015-03-30 2015-03-30 The micro-grid system control method that many PCC point based on PCS energy storage device controls

Country Status (1)

Country Link
CN (1) CN104779612B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106410841B (en) * 2016-09-26 2019-06-21 日立楼宇技术(广州)有限公司 The flexible combination method and device of rectification side current transformer
CN109066785B (en) * 2018-08-23 2022-06-07 上海电气分布式能源科技有限公司 Micro-grid real-time control method and micro-grid

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103490409B (en) * 2013-08-20 2015-09-30 国家电网公司 A kind of microgrid operational mode method for handover control
CN103560535B (en) * 2013-11-20 2015-04-22 北京四方继保自动化股份有限公司 Micro-grid operation mode seamless switching method based on energy storage current transformer
CN103647274B (en) * 2013-11-26 2016-01-20 中国西电电气股份有限公司 A kind of for can the energy control method of grid-connected and micro-grid system from network operation
CN203690940U (en) * 2013-11-28 2014-07-02 国家电网公司 Nested-type microgrid system
CN104242340B (en) * 2014-09-10 2016-07-27 南京磐能电力科技股份有限公司 The unplanned grid-connected stable control method turned when islet operation pattern switches of micro-capacitance sensor
CN104393610B (en) * 2014-10-10 2018-01-09 许继电气股份有限公司 A kind of pcs system and device

Also Published As

Publication number Publication date
CN104779612A (en) 2015-07-15

Similar Documents

Publication Publication Date Title
CN103560535B (en) Micro-grid operation mode seamless switching method based on energy storage current transformer
CN102983593B (en) Seamless handover control method for microgrid based on intelligent switch
CN104682431B (en) Self-starting method and self-starting system of energy storage converter
CN103560538B (en) Micro-capacitance sensor protection and the switching integrated control method of Based PC C place's energy storage
CN104184151B (en) A kind of dynamic electric voltage recovery device realizing the different operational mode of microgrid and take over seamlessly
WO2015081897A1 (en) Device and method for testing steady-state operation of mmc flexible direct current sub-module
CN104362665B (en) Microgrid on-grid to off-grid switching control system and control method thereof
CN105515209A (en) Microgrid hybrid energy storage system and control method thereof
CN104281977A (en) Hybrid microgrid application platform and control method theref
CN103296696B (en) Inverter and control method thereof
CN104578187A (en) Multi-end flexible direct current power transmission system level coordination control device
CN102520276B (en) Integrated testing circuit for modular multi-level converter valve and control method of integrated testing circuit
CN106877311A (en) A kind of direct current photovoltaic generating system
CN103441532B (en) Synchronization method for parallel-connection operation control of multiple energy storing devices of microgrid
CN109768571B (en) Grid-connected micro-grid control system and method
CN105262131A (en) Black-start system and black-start method applicable to light storage micro grid
CN104065104A (en) Micro grid rapid grid connection method based on three-phase independent regulation
CN103904778A (en) Self-adaptive control method for microgrid
CN103872775A (en) Intelligent micro-grid monitoring system and monitoring method
CN104779612B (en) The micro-grid system control method that many PCC point based on PCS energy storage device controls
CN203312829U (en) Inverter capable of smoothly switching between grid-off mode and grid-connected mode
CN105245002A (en) Seamless switching control system of micro-grid
CN104319815A (en) Grid connection/disconnection seamless switching method for micro-grid converter
CN107069777A (en) The apparatus and method for preventing inrush current based on micro-capacitance sensor islet operation
CN204858718U (en) Hierarchical supply control device of microgrid load

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant