CN104765933B - The implementation method that a kind of power distribution station wiring diagram is intelligently layered - Google Patents

The implementation method that a kind of power distribution station wiring diagram is intelligently layered Download PDF

Info

Publication number
CN104765933B
CN104765933B CN201510199764.2A CN201510199764A CN104765933B CN 104765933 B CN104765933 B CN 104765933B CN 201510199764 A CN201510199764 A CN 201510199764A CN 104765933 B CN104765933 B CN 104765933B
Authority
CN
China
Prior art keywords
node
power distribution
distribution station
wiring diagram
layered
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510199764.2A
Other languages
Chinese (zh)
Other versions
CN104765933A (en
Inventor
李运硕
盛万兴
王金丽
张健
缪庆庆
王熠
薛天龙
李强
马法伟
商峰
王秀丽
刁琳琳
梁英
段祥骏
冯德志
方恒福
王逢浩
孔平
刘宗杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Shandong Electric Power Co Ltd
Jining Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Shandong Electric Power Co Ltd
Jining Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI, State Grid Shandong Electric Power Co Ltd, Jining Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510199764.2A priority Critical patent/CN104765933B/en
Publication of CN104765933A publication Critical patent/CN104765933A/en
Application granted granted Critical
Publication of CN104765933B publication Critical patent/CN104765933B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses the implementation method that a kind of power distribution station wiring diagram is intelligently layered, comprise the following steps:Graphic element and actual track setting element are divided into infrastructure elements, element, connection element and other elements are relied on, and it is corresponding with facility information according to element;In the wiring diagram of power distribution station, using distribution transformer as first node, customer charge is end-node, sets up catenation sequence, with outlet connected mode, sets up disaggregated model, builds topological relation;With reference to topological structure, virtualization process is carried out to node, node combing is carried out;Set up the topological structure in current network framework and node to realize the extraction of element in aspect tree construction, combine, virtualize, subregion topological structure is set up in intelligence layering.The present invention can separated time road inside fast selecting power supply area power distribution station, reduce the selection of first and last node in production process, carry out the operation of the practical businesses such as load prediction, evaluation of power supply capability, base support is provided for analysis power distribution station construction.

Description

The implementation method that a kind of power distribution station wiring diagram is intelligently layered
Technical field
The present invention relates to the implementation method that a kind of power distribution station wiring diagram is intelligently layered.
Background technology
It is the operation that single aspect realizes power distribution station wiring diagram mostly in power distribution station software systems are drawn at present, carries out When power distribution station planning, segmentation load prediction etc. need to calculate part circuit, existing graphic operation technology is in operation Come with some shortcomings, such as the selection in region, division operation of first and last node etc. all causes inefficiency, calculates inaccurate The problems such as.
The content of the invention
The present invention is in order to solve the above problems, it is proposed that a kind of implementation method of the intelligent layering of power distribution station wiring diagram, should Method diagnoses formula loop method using section, realizes that what is be intelligently layered in the wiring diagram of power distribution station shows, by between layers Association, realize the adjustment of layer position and the combination of line topological, and region-type, section layer and the segmentation definition between system logic, Element intelligently layering is realized by practical operation demand so that layer thickness division is more accurate, operates more succinct.
To achieve these goals, the present invention is adopted the following technical scheme that:
The implementation method that a kind of power distribution station wiring diagram is intelligently layered, comprises the following steps:
(1) graphic element and actual track setting element are divided into infrastructure elements, rely on element, connection element and other yuan Element, and it is corresponding with facility information according to element;
(2) in the wiring diagram of power distribution station, using distribution transformer as first node, customer charge is end-node, sets up connection Sequence, with outlet connected mode, sets up disaggregated model, builds topological relation;
(3) topological structure is combined, virtualization process is carried out to node, node combing is carried out;
(4) set up the topological structure in current network framework and node realize the extraction of element in aspect tree construction, combine, Virtualization, intelligence layering, sets up subregion topological structure.
In the step (1), infrastructure elements include customer charge, and relying on element includes distribution transformer, connection element bag Circuit is included, other elements include pressure regulator.
In the step (2), specific method is:In the wiring diagram of power distribution station, using distribution transformer as first node, user Load is end-node, sets up catenation sequence, by bus outlet method, sets up disaggregated model, and setting is unidirectional to quote, whole model In by handling node parameter mathematicization, be built into mathematical modeling, mould processing carried out to pass rule formula, in building topology relation The heart.
In the step (2), the method for setting up disaggregated model is by determining that bus transmission line circuit number determines pattern number, such as Three loop outlets, that is, advise 3 sets of loop models.
In the step (2), setting is unidirectional to be cited as building topological relation from distribution transforming outgoing line side and current loop.
In the step (3), specific method is:When choosing subregion on figure, first identification region pattern is negative for part During lotus pattern, by the partial virtual of selection into a node, this dummy node (being appreciated that this node is load group) and upper one is formed Node is connected, and is formed node and is echoed, forms the virtual topological structure of change electric network composition, is formd new virtual topology and is closed System.
In the step (4), intelligence layering refers to the topological relation for being built into selection region, forms one virtually independently Layer, including intelligent layered security engine ILS (Intelligent Layered Security) and intelligence layering search tree HIC (Hierarchical Intelligent Cuttings), by intelligent layered security engine ILS based on power distribution station circuit A middle virtual reality safety return circuit, the i.e. selection area of being formed voluntarily selects to rely on the necessary bar of element realization structure safety return circuit Part;Intelligence layering search tree HIC mainly sets up the topological structure in current network framework and realizes member in aspect tree construction with node Extraction, combination, the virtualization of element.
Beneficial effects of the present invention are:
(1) can separated time road inside fast selecting power supply area power distribution station, reduce the choosing of first and last node in production process Select, carry out the operation of the practical businesses such as load prediction, evaluation of power supply capability, base support is provided for analysis power distribution station construction.
Brief description of the drawings
Fig. 1 is the flow chart of the present invention;
Fig. 2 is the intelligence layering search tree HIC structural representations of the present invention.
Embodiment:
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
The implementation method that a kind of power distribution station wiring diagram is intelligently layered, process schematic is as shown in Figure 1.
The present invention is divided into element classification, topology addressing, node combing, intelligence 4 steps of layering according to data application.
1. element classification
Graphic element and actual track setting element are divided into infrastructure elements (such as:Customer charge), rely on element (such as:Match somebody with somebody Piezoelectric transformer), connection element (such as:Circuit) and other elements are (such as:Pressure regulator etc.) 4 dvielements, and believed according to element and equipment Breath correspondence.
2. topology addressing
In the wiring diagram of power distribution station, using distribution transformer as first node, customer charge is end-node, sets up connection sequence Row, with outlet connected mode, set up disaggregated model, quote power flow algorithm, carry out stage topology verification, line number is entered to each node Huas mould processing, builds topological relation center.
3. node is combed
With reference to topological structure, virtualization process is carried out to node, setting triggering information sets up node and quotes service and adjust Mode is taken, virtual topology relation is built.
It is main when selected part regional choice is realized in practical operation, directly acquisition to should child node information, for Child node sets up dummy node, during by being selected in subregion, and dummy node is echoed with first node, forms new topology knot Structure, builds new virtual topology relation.
4. intelligence layering
Intelligence layering is primarily referred to as the topological relation for being built into selection region, forms a quasi-independent layer of void, mainly It is divided into intelligent layered security engine ILS (Intelligent Layered Security) and intelligence layering search tree HIC (Hierarchical Intelligent Cuttings), by intelligent layered security engine ILS based on power distribution station circuit A middle virtual reality safety return circuit, the i.e. selection area of being formed voluntarily selects to rely on the necessary bar of element realization structure safety return circuit Part;Intelligence layering search tree HIC mainly sets up the topological structure in current network framework and realizes member in aspect tree construction with node The extraction of element, combination, a process of virtualization, such as build the tree knot of single-side triangle form by origin of distribution transformer Structure, builds the virtual Rotating fields by origin of same distribution transformer, structural representation is as shown in Figure 2 in selection region.From And intelligence layering is realized, set up subregion topological structure.
Although above-mentioned the embodiment of the present invention is described with reference to accompanying drawing, not to present invention protection model The limitation enclosed, one of ordinary skill in the art should be understood that on the basis of technical scheme those skilled in the art are not Need to pay various modifications or deform still within protection scope of the present invention that creative work can make.

Claims (6)

1. the implementation method that a kind of power distribution station wiring diagram is intelligently layered, it is characterized in that:Comprise the following steps:
(1) graphic element and actual track setting element are divided into infrastructure elements, rely on element, connection element and other elements, And it is corresponding with facility information according to element;
(2) in the wiring diagram of power distribution station, using distribution transformer as first node, customer charge is end-node, sets up catenation sequence, With outlet connected mode, disaggregated model is set up, topological relation is built;
(3) topological structure is combined, virtualization process is carried out to node, node combing is carried out;
(4) topological structure in current network framework is set up to realize the extraction of element in aspect tree construction with node, combine, virtually Change, subregion topological structure is set up in intelligence layering;
In the step (4), intelligence layering refers to the topological relation for being built into selection region, forms a void quasi-independent Layer, including intelligent layered security engine ILS and intelligence layering search tree HIC, by intelligent layered security engine ILS based on A virtual reality safety return circuit, i.e. selection area are formed in the circuit of radio area voluntarily selects dependence element to realize that building safety returns Road necessary condition;The topological structure that intelligence layering search tree HIC is mainly set up in current network framework realizes aspect tree with node Extraction, combination, the virtualization of element in structure.
2. the implementation method that a kind of power distribution station wiring diagram as claimed in claim 1 is intelligently layered, it is characterized in that:The step (1) in, infrastructure elements include customer charge, and relying on element includes distribution transformer, and connection element includes circuit, other elements bag Include pressure regulator.
3. the implementation method that a kind of power distribution station wiring diagram as claimed in claim 1 is intelligently layered, it is characterized in that:The step (2) in, specific method is:In the wiring diagram of power distribution station, using distribution transformer as first node, customer charge is end-node, is built Vertical catenation sequence, by bus outlet method, sets up disaggregated model, setting is unidirectional to quote, by joining to node in whole model Number mathematicization processing, is built into mathematical modeling, mould processing, building topology relationship-centric is carried out with recursion.
4. the implementation method that a kind of power distribution station wiring diagram as claimed in claim 3 is intelligently layered, it is characterized in that:The step (2) in, the method for setting up disaggregated model is by determining that bus transmission line circuit number determines pattern number.
5. the implementation method that a kind of power distribution station wiring diagram as claimed in claim 3 is intelligently layered, it is characterized in that:The step (2) in, setting is unidirectional to be cited as building topological relation from distribution transforming outgoing line side and current loop.
6. the implementation method that a kind of power distribution station wiring diagram as claimed in claim 1 is intelligently layered, it is characterized in that:The step (3) in, specific method is:When choosing subregion on figure, when first identification region pattern is sub-load pattern, by selection Partial virtual forms this dummy node and is connected with a upper node into a node, forms node and echoes, forms change electric network composition Virtual topological structure, form new virtual topology relation.
CN201510199764.2A 2015-04-23 2015-04-23 The implementation method that a kind of power distribution station wiring diagram is intelligently layered Active CN104765933B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510199764.2A CN104765933B (en) 2015-04-23 2015-04-23 The implementation method that a kind of power distribution station wiring diagram is intelligently layered

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510199764.2A CN104765933B (en) 2015-04-23 2015-04-23 The implementation method that a kind of power distribution station wiring diagram is intelligently layered

Publications (2)

Publication Number Publication Date
CN104765933A CN104765933A (en) 2015-07-08
CN104765933B true CN104765933B (en) 2017-09-05

Family

ID=53647758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510199764.2A Active CN104765933B (en) 2015-04-23 2015-04-23 The implementation method that a kind of power distribution station wiring diagram is intelligently layered

Country Status (1)

Country Link
CN (1) CN104765933B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108229087A (en) * 2017-09-30 2018-06-29 国网上海市电力公司 A kind of destructed method of low-voltage platform area typical scene
CN109344476B (en) * 2018-09-20 2023-05-26 山东鲁能软件技术有限公司 CIM model-based power distribution network single line diagram line branch structure generation method and device
CN112465349A (en) * 2020-11-26 2021-03-09 国网天津市电力公司营销服务中心 Marketing line loss calculation and evaluation system based on one district and one index
CN116167891B (en) * 2022-12-06 2024-04-16 北京市腾河电子技术有限公司 Method, system, equipment and medium for deriving area topology based on line impedance

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6606731B1 (en) * 1999-08-05 2003-08-12 The Boeing Company Intelligent wiring diagram system
CN101951027A (en) * 2010-09-01 2011-01-19 中国电力科学研究院 Uniform data acquisition and monitoring system of low-medium voltage power distribution network
CN103219710A (en) * 2013-03-26 2013-07-24 国家电网公司 Assessment method for 35/0.4kV rection station area protection equipment selection
CN203466629U (en) * 2013-09-24 2014-03-05 许继集团有限公司 City power distribution area autonomous control optimized power supply system and monitoring system thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6606731B1 (en) * 1999-08-05 2003-08-12 The Boeing Company Intelligent wiring diagram system
CN101951027A (en) * 2010-09-01 2011-01-19 中国电力科学研究院 Uniform data acquisition and monitoring system of low-medium voltage power distribution network
CN103219710A (en) * 2013-03-26 2013-07-24 国家电网公司 Assessment method for 35/0.4kV rection station area protection equipment selection
CN203466629U (en) * 2013-09-24 2014-03-05 许继集团有限公司 City power distribution area autonomous control optimized power supply system and monitoring system thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王金丽 等.配电网电能质量智能监控与治理仿真.《电网技术》.2014,第38卷(第02期),第516-519页. *

Also Published As

Publication number Publication date
CN104765933A (en) 2015-07-08

Similar Documents

Publication Publication Date Title
CN112467722B (en) Active power distribution network source-network-load-storage coordination planning method considering electric vehicle charging station
CN104765933B (en) The implementation method that a kind of power distribution station wiring diagram is intelligently layered
CN107545085B (en) Automatic generation method for process level network connection diagram of intelligent substation
CN109742779B (en) Distributed energy storage scheduling method and device
CN108458716A (en) A kind of electric vehicle charging air navigation aid based on the prediction of charging pile dynamic occupancy
CN103218753B (en) A kind of modeling method of extra-high voltage grid information model and information interacting method
CN108736465A (en) A kind of future-state electric network model construction method and device
CN103729801A (en) Method for power distribution network state estimation on basis of SG-CIM model
CN106099907B (en) The online emergent control decision-making technique of meter and transient state and static security scleronomic constraint
CN108182323A (en) A kind of intelligent operation management method for low-voltage network
CN109878369A (en) A kind of electric car charge and discharge Optimization Scheduling based on fuzzy Spot Price
CN106875086A (en) A kind of electric network data modeling method and its system based on graphical interactive operation
CN113222241B (en) Taxi quick-charging station planning method considering charging service guide and customer requirements
CN110912137A (en) Flexible power distribution network operation domain model construction method considering alternating current power flow
CN106208099A (en) A kind of Method for Reactive Power Optimization in Power based on bi-level programming and application thereof
CN110428080A (en) A kind of worksheet processing method and apparatus of the real-time trip order based on idle stroke vehicle
CN102970163A (en) Method and system for upgrading nodes in power communication backbone network
CN109861281A (en) One provenance net lotus stores up integrated coordination optimizing method and device, system
CN108092267A (en) A kind of power distribution network access planning system and method based on intelligent body
CN104036074B (en) Low voltage discrimination method for distribution substation regions
CN114117705A (en) Power distribution information physical system optimization method and system, storage medium and computing equipment
CN110414796A (en) AC/DC hybrid power distribution network frame planning method and device and storage medium
CN106452837B (en) A kind of intelligent substation switch Dynamic Configuration
CN116758740B (en) Intelligent traffic efficient simulation method based on digital twin and information tree
CN102638103B (en) Switching operation on-line early warning analysis method suitable for distributed molding system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant