CN104765910A - Multiple-loop branch line selection, ranking interaction, scene modeling system and method - Google Patents

Multiple-loop branch line selection, ranking interaction, scene modeling system and method Download PDF

Info

Publication number
CN104765910A
CN104765910A CN201510124891.6A CN201510124891A CN104765910A CN 104765910 A CN104765910 A CN 104765910A CN 201510124891 A CN201510124891 A CN 201510124891A CN 104765910 A CN104765910 A CN 104765910A
Authority
CN
China
Prior art keywords
loop
ranking
segmentation
branch
path
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510124891.6A
Other languages
Chinese (zh)
Other versions
CN104765910B (en
Inventor
张瑞永
王作民
贾振宏
陶青松
赵新宇
彭伟
奚海波
崔君瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Original Assignee
China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Jiangsu Power Design Institute Co Ltd filed Critical China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Priority to CN201510124891.6A priority Critical patent/CN104765910B/en
Publication of CN104765910A publication Critical patent/CN104765910A/en
Application granted granted Critical
Publication of CN104765910B publication Critical patent/CN104765910B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a multiple-loop branch line selection, ranking interaction, scene modeling system and method. The multiple-loop branch line selection, ranking interaction, scene modeling system and method comprises the steps of sequentially determining net rack logical relation of a power transmission system through a multiple-loop branch line selection module and generating a loop flat cross section index, cutting a segmented path cross section diagram and re-writing the segmented path cross section diagram into a segmented flat cross section database, enabling an in-line tower positioning module to utilize the loop flat cross section index and reuse the segmented flat cross section database to perform loop path rod tower ranking, enabling a three-dimensional scene modeling module to utilize a line-hanging template to automatically arrange a best ground wire hanging mode and perform three-dimensional scene modeling of the power transmission system. The multiple-loop branch line selection, ranking interaction, scene modeling system and method can achieve whole-process processing including single-loop and double-loop transformation, line connection and disconnection, selection of mixed-compression line branches and other complicated circuit types, ranking interaction and scene modeling and meets the design demand of a complicated power transmission net frame project, accordingly the integrity and practicability of a three-dimensional collaborative design system of the power transmission net frame project are improved, front-back consistency of a design result is kept, information sharing degree is high, and working efficacy is remarkably improved.

Description

A kind of route selection, ranking of Duo Hui branch are mutual, scene modeling system and method
Technical field
The present invention relates to and a kind ofly can realize based on GIS and CAD that the route selection of Duo Hui branch, ranking are mutual, scene modeling system and method, belong to power transmission engineering design field.
Background technology
Along with the development of computer technology and the intensification of power transmission engineering integrated software exploitation, the design means of power transmission engineering changes three-dimensional collaborative minute design into by tradition gradually, drastically increases efficiency and the quality of power transmission engineering design.
But the three-dimensional collaborative design of power transmission engineering is compared other field and is started late, and current integrated software only can process route selection, the shaft tower ranking of point-to-point simple path reluctantly; Therefore also well cannot process the common and circuit types of complexity of process single double back conversion, line disconnection, mixed pressure lines branch etc., be difficult to the power transmission engineering design requirement meeting routine.
Specifically there is some deficiency following in existing power transmission engineering design system:
1, wire selection system only support point to a path route selection for some one direction trend, express with the segmented paths set without logic, correctly cannot describe the rack relation of power transmission electric network system.
2, on the basis of the segmented paths set without logic, can only to each segmented paths isolated carry out ranking, not only cut off the comformity relation of control voltage, front and back overlap joint tower, and repeatedly can only judge, revise by the pattern of manpower in ranking process, operation process is original and easily make mistakes, and work efficiency has to be hoisted.
3, because segmented paths and ranking shaft tower lack relevance, can only by manually carrying out the extension string hanging wire of the filtration of redundancy shaft tower, overlap joint and mixed pressure many times shaft towers during three-dimensional scenic modeling, this generic operation all too relies on the pattern of manpower, directly cause working strength large, the work efficiency of directly impact design and correctness.
Therefore, need that exploitation is a kind of can carry out to existing many times branched lines that route selection, ranking are mutual, the system and method for scene modeling, to solve the problem badly.
Summary of the invention
Fundamental purpose of the present invention is, overcome deficiency of the prior art, a kind of route selection of Duo Hui branch is provided, ranking is mutual, scene modeling system and method, can realize converting single double back, line disconnection, the route selection of the complicated circuit typess such as mixed pressure lines branch, ranking is mutual, the whole process processing process of scene modeling, complicated transmission of electricity rack engineering design demand can be met, thus improve integrated level and the practicality of the three-dimensional collaborative design system of power transmission engineering, keep self-consistentency, reliable, efficiently, information sharing degree is high, applied widely, work efficiency significantly improves.
In order to achieve the above object, the technical solution adopted in the present invention is:
A kind of route selection, ranking of Duo Hui branch are mutual, scene modeling system, comprise the Duo Hui branch route selection module, the row's tower locating module and three-dimensional scenic MBM that connect successively, described row's tower locating module and three-dimensional scenic MBM all with segmentation flat profile data storehouse carry out data sharing.
Wherein, described Duo Hui branch route selection module is used for carrying out combination of paths segmentation, generation pass fragment, according to the order of sequence path segments and corner pile are named after choosing main chain path and each side chain main chain, determine the rack logical relation of transmission system by choosing the loop path group, the defined loop attribute that are made up of path segments and generate the flat section index in loop, and cutting segmented paths sectional drawing re-write the flat profile data storehouse of segmentation.
Meanwhile, described row's tower locating module, for reconstructing loop path plane cross section, carries out the shaft tower ranking of loop path, and sets up lead wire and earth wire database in circuit pole tower annex and shelves.
And described three-dimensional scenic MBM is for extracting the flat section of segmentation and segmentation shaft tower Ranking Information, and in reconstruct corridor range, the model of house, bridge, trees and transmission facility, carries out the three-dimensional scenic modeling of transmission system.
The present invention also provides that a kind of route selection of Duo Hui branch, ranking are mutual, scene modeling method, comprises the following steps:
Step S01, data encasement;
Carry out the warehouse-in of geo-spatial data, altitude figures, electrical network topic space data, carry out shaft tower, the three-dimensional modeling of insulator chain and the type selection of engineering;
Step S02, combination of paths segmentation, generation pass fragment;
Move towards drafting line route according to the actual track of transmission system Duo Hui branch, the connection according to line route, branch's corner pile carries out combination of paths segmentation, and generating with branch's corner pile connection is the path segments of node; Described transmission system Duo Hui branch comprises the conversion of single double back, line disconnection and mixed pressure lines branch;
Step S03, definition main chain path, each branch road main chain;
On the path segments basis of each segmentation, according to corner pile quantity be higher limit, the principle that do not circulate of closed path defines main chain path, each branch road main chain successively;
Step S04, the name of path segments and corner pile;
According to the order of main chain path, each branch road main chain, the path segments of each segmentation and corner pile are named;
Step S05, generates loop path group navigation scheme;
By defining the terminal of each time line route, the connection according to branch's corner pile generates the several loop path group navigation scheme be made up of path segments;
Step S06, chooses loop path group;
By selecting loop path group navigation scheme, optimize loop path group;
Step S07, determines transmission system rack logical relation, generates flat profile data storehouse, loop, cutting segmented paths sectional drawing, re-writes the flat profile data storehouse of segmentation;
On the basis of the loop path group chosen in step S06, carry out loop attribute definition, described loop attribute comprises electric pressure, alternating current-direct current type and feeder number; Again according to the rack logical relation of path segments in loop path group, carry out the association of branch's corner pile, and generate the flat section index in loop; Simultaneously go out segmented paths sectional drawing for all path segments after step S04 name, ground elevation cutting, re-write the flat profile data storehouse of segmentation;
Step S08, reconstruct loop path plane cross section;
According to the flat section index in loop, and utilize segmentation flat profile data storehouse virtual reconstruction loop path plane cross section;
Step S09, whether ranking judges;
Judge whether there is the flat section of the segmentation having completed shaft tower ranking in the section combination of loop path plane cross section, entering next step after then calling the segmentation flat section shaft tower database of ranking as existed, if do not existed, directly entering next step;
Step S10, sets up lead wire and earth wire database in circuit pole tower annex and shelves;
By utilizing loop path plane cross section to carry out shaft tower ranking, set up lead wire and earth wire database in circuit pole tower annex and shelves, and ranking results is write segmentation flat section shaft tower database corresponding to the flat section of each segmentation; Described shaft tower ranking can adopt two kinds of working methods, is respectively manual row's tower and Automatic Optimal ranking;
Step S11, arranges out several lead wire and earth wire hanging wire mode;
By carrying out hanging wire template definition on three-dimensional shaft tower, described hanging wire template comprises lead wire and earth wire electric pressure, alternating current-direct current type, phase sequence installation site and loop hanging wire grouping template; Utilize lead wire and earth wire database in flat profile data storehouse, loop, segmentation flat profile data storehouse, segmentation flat section shaft tower database, circuit pole tower annex and shelves, according to loop trend, avoid that lead wire and earth wire is intersected, the principle auto arrangement of multiloop negative phase sequence goes out several lead wire and earth wire hanging wire mode;
Step S12, batch is optimized, change lead wire and earth wire hanging wire mode;
Optimize loop, phase sequence hanging wire mode, require to carry out batch optimization, change lead wire and earth wire hanging wire mode according to transformer station interval, loop transposition, wire commutation and special overlap joint, upgrade lead wire and earth wire database in circuit pole tower annex and shelves according to lead wire and earth wire hanging wire mode simultaneously;
Step S13, completes three-dimensional scenic modeling.
Compared with prior art, the beneficial effect that the present invention has is:
1, the route selection of Duo Hui branch provided by the invention, ranking are mutual, scene modeling system and method, common and the circuit types of complexity can carry out that route selection, ranking are mutual, the whole process monoblock type processing process of scene modeling to single double back conversion, line disconnection, mixed pressure lines branch etc., complicated transmission of electricity rack engineering design demand can be met, thus improve integrated level and the practicality of the three-dimensional collaborative design system of power transmission engineering.
2, the present invention overcome current wire selection system only support point-to-point simply move towards route selection, cannot accurate description complexity transmission of electricity rack defect, propose automatically to name based on the corner pile in main chain path, rationally determining transmission system rack logical relation by choosing loop path group, the obstacle that route selection function extends can be avoided.
3, this invention removes the isolated ranking of segmented paths in legacy system, control voltage and the conforming problem of front and back overlap joint tower cannot be realized, utilize lead wire and earth wire database in the flat profile data storehouse of the segmentation of each loop path, circuit pole tower annex and shelves, the flat profile data storehouse of concurrent multiplexing segmentation, the each loop path plane cross section of virtual reconstruction, make that the flat section of segmentation is correct, rational joint, realize the tower of shared flat section, exhale height completely the same, thus industry working strength in reducing, increase work efficiency.
4, the present invention is by extracting the flat section of segmentation and segmentation shaft tower Ranking Information, and by definition three-dimensional shaft tower loop hanging wire grouping template, fast automaticly can realize the three-dimensional modeling of house in corridor range, bridge, trees and transmission facility etc., reduce the workload of three dimensional field field modeling, promote work efficiency further.
Foregoing is only the general introduction of technical solution of the present invention, and in order to clearer understanding technological means of the present invention, below in conjunction with accompanying drawing, the invention will be further described.
Accompanying drawing explanation
Fig. 1 is that the route selection of Duo Hui branch of the present invention, ranking are mutual, the schematic flow sheet of scene modeling method;
Fig. 2 is the schematic diagram that definition main chain path of the present invention, path segments and corner pile are named;
Fig. 3 is each loop path plane cross section of virtual reconstruction of the present invention;
Fig. 4 is three-dimensional shaft tower loop of the present invention hanging wire grouping template schematic diagram.
Embodiment
Below in conjunction with Figure of description, the present invention is further illustrated.
Route selection, the ranking of a kind of Duo Hui branch are as shown in Figure 1 mutual, scene modeling system, comprise the Duo Hui branch route selection module 1, row's tower locating module 2 and the three-dimensional scenic MBM 3 that connect successively, described row's tower locating module 2 and three-dimensional scenic MBM 3 all with segmentation flat profile data storehouse carry out data sharing.
Wherein, described Duo Hui branch route selection module 1 is for carrying out combination of paths segmentation, generation pass fragment, according to the order of sequence path segments and corner pile are named after choosing main chain path and each side chain main chain, determine the rack logical relation of transmission system by choosing the loop path group, the defined loop attribute that are made up of path segments and generate the flat section index in loop, and cutting segmented paths sectional drawing re-write the flat profile data storehouse of segmentation.
Meanwhile, described row's tower locating module 2, for reconstructing loop path plane cross section, carries out the shaft tower ranking of loop path, and sets up lead wire and earth wire database in circuit pole tower annex and shelves.
And described three-dimensional scenic MBM 3 is for extracting the flat section of segmentation and segmentation shaft tower Ranking Information, and in reconstruct corridor range, the model of house, bridge, trees and transmission facility, carries out the three-dimensional scenic modeling of transmission system.
Route selection, the ranking of a kind of Duo Hui branch are as shown in Figure 1 mutual, scene modeling method, comprise the following steps:
Step S01, data encasement; Carry out the warehouse-in of geo-spatial data, altitude figures, electrical network topic space data, carry out shaft tower, the three-dimensional modeling of insulator chain and the type selection of engineering.
Step S02, combination of paths segmentation, generation pass fragment;
Step S021, moves towards to draw line route according to the actual track of transmission system Duo Hui branch; Described transmission system Duo Hui branch comprises the conversion of single double back, line disconnection and mixed pressure lines branch;
Step S022, the connection according to line route, branch's corner pile carries out combination of paths segmentation, generates that to connect with branch corner pile be the path segments of node.
Step S03, definition main chain path, each branch road main chain; On the path segments basis of each segmentation, according to corner pile quantity be higher limit, the principle that do not circulate of closed path defines main chain path, each branch road main chain successively.
Step S04, the name of path segments and corner pile; According to the order of main chain path, each branch road main chain, the path segments of each segmentation and corner pile are named.
Step S05, generates loop path group navigation scheme;
Step S051, by defining the terminal of each time line route; Step S052, the connection according to branch's corner pile generates the several loop path group navigation scheme be made up of path segments.
Step S06, chooses loop path group;
Step S061, selects loop path group navigation scheme; Step S062, optimizes loop path group.
Step S07, determines transmission system rack logical relation, generates loop flat section index, cutting segmented paths sectional drawing, re-writes the flat profile data storehouse of segmentation;
Step S071, on the basis of the loop path group chosen in step S06, carry out loop attribute definition, described loop attribute comprises electric pressure, alternating current-direct current type and feeder number;
Step S072, according to the rack logical relation of path segments in loop path group, carries out the association of branch's corner pile, and generates the flat section index in loop;
Step S073, goes out segmented paths sectional drawing for all path segments after step S04 name, ground elevation cutting, re-writes the flat profile data storehouse of segmentation.
Step S08, reconstruct loop path plane cross section; According to the flat section index in loop, and utilize segmentation flat profile data storehouse virtual reconstruction loop path plane cross section.
Step S09, whether ranking judges;
Step S091, judging whether there is the flat section of the segmentation having completed shaft tower ranking in the section combination of loop path plane cross section, if do not existed, directly entering step S102;
Step S092, enters step 102 after then calling the segmentation flat section shaft tower database of ranking as existed.
Step S10, sets up lead wire and earth wire database in circuit pole tower annex and shelves;
Step S101, utilizes loop path plane cross section to carry out shaft tower ranking, and described shaft tower ranking can adopt two kinds of working methods, is respectively manual row's tower and Automatic Optimal ranking;
Step S102, sets up lead wire and earth wire database in circuit pole tower annex and shelves, and ranking results is write segmentation flat section shaft tower database corresponding to the flat section of each segmentation.
Step S11, arranges out several lead wire and earth wire hanging wire mode;
Step S111, three-dimensional shaft tower carries out hanging wire template definition, and described hanging wire template comprises lead wire and earth wire electric pressure, alternating current-direct current type, phase sequence installation site and loop hanging wire grouping template;
Step S112, utilize lead wire and earth wire database in flat profile data storehouse, loop, segmentation flat profile data storehouse, segmentation flat section shaft tower database, circuit pole tower annex and shelves, according to loop trend, avoid that lead wire and earth wire is intersected, the principle auto arrangement of multiloop negative phase sequence goes out several lead wire and earth wire hanging wire mode.
Step S12, batch is optimized, change lead wire and earth wire hanging wire mode;
Step S121, optimizes loop, phase sequence hanging wire mode;
Step S122, requires to carry out batch optimization, change lead wire and earth wire hanging wire mode according to transformer station interval, loop transposition, wire commutation and special overlap joint, upgrades lead wire and earth wire database in circuit pole tower annex and shelves simultaneously according to lead wire and earth wire hanging wire mode.
Step S13, completes three-dimensional scenic modeling.
In the present invention as shown in Figure 2, main chain path, each branch road main chain, segmented paths fragment and corner pile name, explain various name title below.
Branch node: by 3 and with the interconnective corner pile of upper pathway.
Path segments: the strain section set of contiguous branch node composition.
Main chain path: the path that the path segments of corner pile at most (namely quantity is higher limit) is combined into, not circulating in path, differs to be decided to be actual loop path and to move towards.
Branch's branch road main chain: in the basic top set in main chain path, branch's branch road that the path segments that corner pile is maximum is combined into, not circulating in path, differs and be decided to be actual loop path trend.
Segmented paths fragment naming method: along main chain path, branch's branch road sequentially encodes to path segments, generally represents with " fragment "+arabic numeral.
Main chain path corner pile naming method: sequentially encode to corner pile along main chain path, generally represents with " J "+arabic numeral.
Branch's branch road corner pile naming method: the branch node on primary link footpath increases progressively numbering, suffix increases branch road code (degradation), wherein the define method of branch road code is along main chain path sequential search, first branch's branch road suffix found increases alphabetical A code, second, third, the 4th be respectively B, C, D, the like, when same branch branch road connects the duplexure of different stage, get high one-level branch road code.
As shown in Fig. 2 (a), two ends are that single loop, the middle transmission line of electricity main chain path by the erection of common-tower double-return road, each branch road main chain, segmented paths fragment and corner pile name are as follows:
Main chain path: J1, J2, J3, J4, J5
The first order branch branch road main chain A:J3, J4A
The first order branch branch road main chain B:J4, J5B
Segmented paths fragment: fragment 1 (J1, J2, J3), fragment 2 (J3, J4), fragment 3 (J4, J5), fragment 4 (J4A, J3), fragment 5 (J4, J5B)
Loop path prescription case: loop one (J1, J2, J3, J4, J5B), loop two (J4A, J3, J4, J5); Or loop (one) (J1, J2, J3, J4, J5), loop (two) (J4A, J3, J4, J5B).
As shown in Fig. 2 (b), two ends are common-tower double-return road, the transmission line of electricity main chain path that centre is set up by single loop, each branch road main chain, segmented paths fragment and corner pile name as follows:
Main chain path: J1, J2, J3, J4, J5, J6, J7
The first order branch branch road main chain A:J2, J3A, J4A, J6
Segmented paths fragment: fragment 1 (J1, J2), fragment 2 (J2, J3, J4, J5, J6), fragment 3 (J6, J7), fragment 4 (J2, J3A, J4A, J6)
Loop path prescription case: loop one (J1, J2, J3, J4, J5, J6, J7), loop two (J1, J2, J3A, J4A, J6, J7).
As shown in Fig. 2 (c), one end is common-tower double-return road, the transmission line of electricity main chain path that the other end sets up by two single loops, each branch road main chain, segmented paths fragment and corner pile name as follows:
Main chain path: J1, J2, J3, J4
The first order branch branch road main chain A:J2, J3A
Segmented paths fragment: fragment 1 (J1, J2), fragment 2 (J2, J3, J4), fragment 3 (J2, J3A)
Loop path prescription case: loop one (J1, J2, J3, J4), loop two (J1, J2, J3A), loop three (J3A, J2, J3, J4); Or loop (one) (J1, J2, J3, J4), loop (two) (J3A, J2, J3, J4).
The transmission line of electricity main chain path of the complexity as shown in Fig. 2 (d), each branch road main chain, segmented paths fragment and corner pile name are as follows:
Main chain path: J1, J2, J3, J4, J5, J6, J7, J8
The first order branch branch road main chain A:J12A, J11A, J10A, J9A, J8A, J7
The second level branch branch road main chain AA:J11AA, J10AA, J9AA, J8A
The second level branch branch road main chain AB:J11AB, J10AB, J9A
Depend on the third level branch branch road main chain ABA:J11ABA, J10AB of second level branch branch road main chain AB
Segmented paths fragment: fragment 1 (J1, J2, J3, J4, J5, J6, J7), fragment 2 (J7, J8), fragment 3 (J7, J8A), fragment 4 (J8A, J9A), fragment 5 (J9A, J10A, J11A, J12A), fragment 6 (J8A, J9AA, J10AA, J11AA), fragment 7 (J9A, J10AB), fragment 8 (J10AB, J11AB), fragment 9 (J10AB, J11ABA).
More complicated transmission line of electricity main chain path as shown in Fig. 2 (e), each branch road main chain, segmented paths fragment and corner pile name are as follows:
Main chain path: J1, J2, J3, J4, J5, J6, J7, J8
The first order branch branch road main chain A:J2, J3A, J4A, J5A, J6A, J7A
The first order branch branch road main chain B:J3, J4B, J6A
Depend on the third level branch branch road main chain AA:J4A, J5AA, J6AA of second level branch branch road main chain A
Segmented paths fragment: fragment 1 (J1, J2), fragment 2 (J2, J3), fragment 3 (J3, J4, J5, J6, J7, J8), fragment 4 (J2, J3A, J4A), fragment 5 (J4A, J5A, J6A), fragment 6 (J6A, J7A), fragment 7 (J3, J4B, J6A), fragment 8 (J4A, J5AA, J6AA).
Two ends as shown in Fig. 2 (a) He Fig. 3 are single loop, the middle loop path prescription case capable of being combined by the transmission line of electricity of common-tower double-return road erection: loop one (J1, J2, J3, J4, J5B), loop two (J4A, J3, J4, J5); Or loop (one) (J1, J2, J3, J4, J5), loop (two) (J4A, J3, J4, J5B).
Wherein loop one is made up of fragment 1 (J1, J2, J3), fragment 2 (J3, J4), fragment 5 (J4, J5B), and loop two is made up of fragment 4 (J4A, J3), fragment 2 (J3, J4), fragment 3 (J4, J5); Or loop (one) is made up of fragment 1 (J1, J2, J3), fragment 2 (J3, J4), fragment 3 (J4, J5), loop (two) are made up of fragment 4 (J4A, J3), fragment 2 (J3, J4), fragment 5 (J4, J5B).
As shown in Fig. 3 (a), the row's tower locating module 2 shared with segmentation flat profile data storehouse is by lead wire and earth wire database in the flat section index in loop one, loop two, circuit pole tower annex and shelves, share flat section and the tower document data bank of fragment 2, form the plane cross section in loop one (fragment 1, fragment 2, fragment 5), loop two (fragment 4, fragment 2, fragment 3) respectively, carry out the shaft tower ranking operation in loop one, loop two towards same data source, ensure that the section of fragment 2 and the uniqueness of ranking scheme.
As shown in Fig. 3 (b), the row's tower locating module 2 shared with the flat profile data storehouse of segmentation also can pass through loop (), the flat section index in loop (two), lead wire and earth wire database in circuit pole tower annex and shelves, share flat section and the tower document data bank of fragment 2, form loop (one) (fragment 1 respectively, fragment 2, fragment 3), loop (two) (fragment 4, fragment 2, fragment 5) plane cross section, loop (one) is carried out towards same data source, the shaft tower ranking operation in loop (two), ensure that the section of fragment 2 and the uniqueness of ranking scheme.
As shown in Figure 4, the definition of loop hanging wire grouping template is carried out for three ground wires, four loop alternating-current direct transmission towers.
As shown in Fig. 4 (a), complete by method from top to bottom, from left to right allly to lead, the definition of ground wire hanging point; According to the design service condition of four loop alternating-current direct transmission towers, to leading, ground wire hanging point carries out grouping and can be formed:
Grouping one as shown in Fig. 4 (b), loop 1 (hanging point 1), loop 2 (hanging point 2), loop 3 (hanging point 3), loop 4 (hanging point 4, hanging point 8, hanging point 12), loop 5 (hanging point 5, hanging point 9, hanging point 13), loop 6 (hanging point 6, hanging point 10, hanging point 14), loop 7 (hanging point 7, hanging point 11, hanging point 15);
Grouping two as shown in Fig. 4 (c), loop 1 (hanging point 1), loop 2 (hanging point 2), loop 3 (hanging point 3), loop 4 (hanging point 4, hanging point 5, hanging point 9), loop 5 (hanging point 6, hanging point 7, hanging point 10), loop 6 (hanging point 8, hanging point 12, hanging point 13), loop 7 (hanging point 11, hanging point 14, hanging point 15);
Grouping three as shown in Fig. 4 (d), loop 1 (hanging point 1), loop 2 (hanging point 2), loop 3 (hanging point 3), loop 4 (hanging point 4, hanging point 5, hanging point 8), loop 5 (hanging point 6, hanging point 7, hanging point 11), loop 6 (hanging point 9, hanging point 12, hanging point 13), loop 7 (hanging point 10, hanging point 14, hanging point 15).
The three-dimensional scenic MBM 3 shared with segmentation flat profile data storehouse can utilize above-mentioned three kinds of templates of dividing into groups, for every base shaft tower, according to loop trend, avoid that lead wire and earth wire is intersected, the principle of multiloop negative phase sequence auto arrangement can go out multiple lead wire and earth wire hanging wire mode, select preferably after loop, phase sequence hanging wire mode user, require the optimization of batch according to transformer station interval, loop transposition, wire commutation and special overlap joint, change lead wire and earth wire hanging wire mode, automatically can realize the three-dimensional scenic modeling of transmission system.
Innovative point of the present invention is, by Duo Hui branch route selection module, the setting of row's tower locating module and three-dimensional scenic MBM, realize the route selection of complicated circuit types, ranking is mutual, the whole process monoblock type processing process of scene modeling, not only overcome many defects of existing system, such as wire selection system is only supported point-to-pointly simply to move towards route selection, cannot accurate description complexity transmission of electricity rack, the isolated ranking of segmented paths, control voltage and front and back overlap joint tower consistance cannot be realized, and automaticity is not high, rely on manual operation, working strength is high, the aspects such as efficiency is low, and by the name of choosing main chain path implement corner pile, associative combination by the flexible realizing route fragment of defined loop group of paths, can accurate description feeder number, electric pressure, each loop cabling rack logical relation, carry out the shaft tower ranking operation of each loop path simultaneously towards same data source, the uniqueness of Duo Hui branch section and ranking scheme can be ensured, and modeling is efficient, information is comprehensive, therefore, complicated transmission of electricity rack engineering design demand can be met, thus improve integrated level and the practicality of the three-dimensional collaborative design system of power transmission engineering.
More than show and describe ultimate principle of the present invention, principal character and advantage.The technician of the industry should understand; the present invention is not restricted to the described embodiments; what describe in above-described embodiment and instructions just illustrates principle of the present invention; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements all fall in the claimed scope of the invention.Application claims protection domain is defined by appending claims and equivalent thereof.

Claims (6)

1. the route selection of a Zhong Duohui branch, ranking are mutual, scene modeling system, it is characterized in that: comprise the Duo Hui branch route selection module, the row's tower locating module and three-dimensional scenic MBM that connect successively, described row's tower locating module and three-dimensional scenic MBM all with segmentation flat profile data storehouse carry out data sharing;
Described Duo Hui branch route selection module is used for carrying out combination of paths segmentation, generation pass fragment, according to the order of sequence path segments and corner pile are named after choosing main chain path and each side chain main chain, determine the rack logical relation of transmission system by choosing the loop path group, the defined loop attribute that are made up of path segments and generate the flat section index in loop, and cutting segmented paths sectional drawing re-write the flat profile data storehouse of segmentation;
Described row's tower locating module, for reconstructing loop path plane cross section, carries out the shaft tower ranking of loop path, and sets up lead wire and earth wire database in circuit pole tower annex and shelves;
Described three-dimensional scenic MBM is for extracting the flat section of segmentation and segmentation shaft tower Ranking Information, and in reconstruct corridor range, the model of house, bridge, trees and transmission facility, carries out the three-dimensional scenic modeling of transmission system.
2. the route selection of a Zhong Duohui branch, ranking are mutual, scene modeling method, it is characterized in that, comprise the following steps:
Step S01, data encasement;
Carry out the warehouse-in of geo-spatial data, altitude figures, electrical network topic space data, carry out shaft tower, the three-dimensional modeling of insulator chain and the type selection of engineering;
Step S02, combination of paths segmentation, generation pass fragment;
Move towards drafting line route according to the actual track of transmission system Duo Hui branch, the connection according to line route, branch's corner pile carries out combination of paths segmentation, and generating with branch's corner pile connection is the path segments of node;
Step S03, definition main chain path, each branch road main chain;
On the path segments basis of each segmentation, according to corner pile quantity be higher limit, the principle that do not circulate of closed path defines main chain path, each branch road main chain successively;
Step S04, the name of path segments and corner pile;
According to the order of main chain path, each branch road main chain, the path segments of each segmentation and corner pile are named;
Step S05, generates loop path group navigation scheme;
By defining the terminal of each time line route, the connection according to branch's corner pile generates the several loop path group navigation scheme be made up of path segments;
Step S06, chooses loop path group;
By selecting loop path group navigation scheme, optimize loop path group;
Step S07, determines transmission system rack logical relation, generates loop flat section index, cutting segmented paths sectional drawing, re-writes the flat profile data storehouse of segmentation;
On the basis of the loop path group chosen in step S06, carry out loop attribute definition; Again according to the rack logical relation of path segments in loop path group, carry out the association of branch's corner pile, and generate flat profile data storehouse, loop; Simultaneously go out segmented paths sectional drawing for all path segments after step S04 name, ground elevation cutting, re-write the flat profile data storehouse of segmentation;
Step S08, reconstruct loop path plane cross section;
According to the flat section index in loop, and utilize segmentation flat profile data storehouse virtual reconstruction loop path plane cross section;
Step S09, whether ranking judges;
Judge whether there is the flat section of the segmentation having completed shaft tower ranking in the section combination of loop path plane cross section, entering next step after then calling the segmentation flat section shaft tower database of ranking as existed, if do not existed, directly entering next step;
Step S10, sets up lead wire and earth wire database in circuit pole tower annex and shelves;
By utilizing loop path plane cross section to carry out shaft tower ranking, set up lead wire and earth wire database in circuit pole tower annex and shelves, and ranking results is write segmentation flat section shaft tower database corresponding to the flat section of each segmentation;
Step S11, arranges out several lead wire and earth wire hanging wire mode;
By carrying out hanging wire template definition on three-dimensional shaft tower, utilize lead wire and earth wire database in loop flat section index, segmentation flat profile data storehouse, segmentation flat section shaft tower database, circuit pole tower annex and shelves, according to loop trend, avoid that lead wire and earth wire is intersected, the principle auto arrangement of multiloop negative phase sequence goes out several lead wire and earth wire hanging wire mode;
Step S12, batch is optimized, change lead wire and earth wire hanging wire mode;
Optimize loop, phase sequence hanging wire mode, require to carry out batch optimization, change lead wire and earth wire hanging wire mode according to transformer station interval, loop transposition, wire commutation and special overlap joint, upgrade lead wire and earth wire database in circuit pole tower annex and shelves according to lead wire and earth wire hanging wire mode simultaneously;
Step S13, completes three-dimensional scenic modeling.
3. the route selection of a kind of Duo Hui branch according to claim 2, ranking are mutual, scene modeling method, it is characterized in that: described transmission system Duo Hui branch comprises the conversion of single double back, line disconnection and mixed pressure lines branch.
4. the route selection of a kind of Duo Hui branch according to claim 2, ranking are mutual, scene modeling method, it is characterized in that: described loop attribute comprises electric pressure, alternating current-direct current type and feeder number.
5. the route selection of a kind of Duo Hui branch according to claim 2, ranking are mutual, scene modeling method, it is characterized in that: described shaft tower ranking can adopt two kinds of working methods, are respectively manual row's tower and Automatic Optimal ranking.
6. the route selection of a kind of Duo Hui branch according to claim 2, ranking are mutual, scene modeling method, it is characterized in that: described hanging wire template comprises lead wire and earth wire electric pressure, alternating current-direct current type, phase sequence installation site and loop hanging wire grouping template.
CN201510124891.6A 2015-03-20 2015-03-20 A kind of route selection of Duo Hui branches, ranking interaction, scene modeling system and method Active CN104765910B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510124891.6A CN104765910B (en) 2015-03-20 2015-03-20 A kind of route selection of Duo Hui branches, ranking interaction, scene modeling system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510124891.6A CN104765910B (en) 2015-03-20 2015-03-20 A kind of route selection of Duo Hui branches, ranking interaction, scene modeling system and method

Publications (2)

Publication Number Publication Date
CN104765910A true CN104765910A (en) 2015-07-08
CN104765910B CN104765910B (en) 2017-10-31

Family

ID=53647735

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510124891.6A Active CN104765910B (en) 2015-03-20 2015-03-20 A kind of route selection of Duo Hui branches, ranking interaction, scene modeling system and method

Country Status (1)

Country Link
CN (1) CN104765910B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105071955A (en) * 2015-07-20 2015-11-18 常州大学 Algorithm for avoiding routing loop for RPL (IPv6Routing Protocol for Low-Power and Lossy Networks) protocol
CN106557601A (en) * 2015-09-30 2017-04-05 中国电力科学研究院 A kind of transmission line of electricity emulation mode
CN108646135A (en) * 2018-04-08 2018-10-12 中国电建集团河北省电力勘测设计研究院有限公司 A kind of digitlization selection method of UHV transmission line
CN109165398A (en) * 2018-07-02 2019-01-08 武汉珞珈德毅科技股份有限公司 A kind of route modeling tool
CN109583108A (en) * 2018-12-06 2019-04-05 中国电力工程顾问集团西南电力设计院有限公司 A kind of UHV transmission line scenario building method based on GIS
CN112749460A (en) * 2019-10-31 2021-05-04 北京博超时代软件有限公司 Power transmission branch line design method, device, equipment and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2874879Y (en) * 2005-12-31 2007-02-28 江苏省电力设计院 Lattice branch tower for multiple loop transmission line
CN101621186A (en) * 2008-07-03 2010-01-06 张兵 Power supply and distribution method for low-voltage system
US20120142537A1 (en) * 2010-12-02 2012-06-07 Lighthouse Energy Solutions LLC Superconducting direct current transmission system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2874879Y (en) * 2005-12-31 2007-02-28 江苏省电力设计院 Lattice branch tower for multiple loop transmission line
CN101621186A (en) * 2008-07-03 2010-01-06 张兵 Power supply and distribution method for low-voltage system
US20120142537A1 (en) * 2010-12-02 2012-06-07 Lighthouse Energy Solutions LLC Superconducting direct current transmission system

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
史方舟: "三维GIS输电线路管理系统的研究与应用", 《中国优秀硕士学位论文全文数据库 基础科学辑》 *
张瑞永等: "输电线路三维可视化辅助设计系统的研究", 《电力勘测设计》 *
潘广亮: "架空输电线路同塔多回架设的设计初探", 《中国新技术新产品》 *
熊晓光: "输电线路三维数字化设计平台建设与应用研究", 《电力勘测设计》 *
陆小艺: "输电线路选线三维GIS技术及工程应用", 《广西电力》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105071955A (en) * 2015-07-20 2015-11-18 常州大学 Algorithm for avoiding routing loop for RPL (IPv6Routing Protocol for Low-Power and Lossy Networks) protocol
CN105071955B (en) * 2015-07-20 2018-06-29 常州大学 A kind of method for evading route loop to RPL agreements
CN106557601A (en) * 2015-09-30 2017-04-05 中国电力科学研究院 A kind of transmission line of electricity emulation mode
CN106557601B (en) * 2015-09-30 2019-10-15 中国电力科学研究院 A kind of transmission line of electricity emulation mode
CN108646135A (en) * 2018-04-08 2018-10-12 中国电建集团河北省电力勘测设计研究院有限公司 A kind of digitlization selection method of UHV transmission line
CN109165398A (en) * 2018-07-02 2019-01-08 武汉珞珈德毅科技股份有限公司 A kind of route modeling tool
CN109583108A (en) * 2018-12-06 2019-04-05 中国电力工程顾问集团西南电力设计院有限公司 A kind of UHV transmission line scenario building method based on GIS
CN109583108B (en) * 2018-12-06 2023-04-28 中国电力工程顾问集团西南电力设计院有限公司 Extra-high voltage transmission line scene construction method based on GIS
CN112749460A (en) * 2019-10-31 2021-05-04 北京博超时代软件有限公司 Power transmission branch line design method, device, equipment and storage medium

Also Published As

Publication number Publication date
CN104765910B (en) 2017-10-31

Similar Documents

Publication Publication Date Title
CN104765910A (en) Multiple-loop branch line selection, ranking interaction, scene modeling system and method
CN110619454B (en) Power distribution network planning method based on improved genetic algorithm and PRIM algorithm
CN101661527B (en) Automatic switching system from geographical wiring diagram of distribution network to single line diagram
CN105117518A (en) Automatic drawing method and system for power distribution feeder single-line diagram of radiation connection mode
CN104143127B (en) CIM-based three-diagram linkage processing method for distribution network
US9053275B2 (en) Techniques for facilitating electrical design of an energy generation system
CN103336873B (en) The coding method of a kind of transformer station three-dimensional design KKS intelligent batch
CN112035589B (en) Intelligent verification method for single line diagram update of distribution network automation master station
CN104218673A (en) Automatic intelligent power grid partitioning method
CN110046391B (en) Automatic transformer substation primary wiring diagram generation method based on monitoring information table
Moreira et al. Large-scale network layout optimization for radial distribution networks by parallel computing
CN113343426B (en) Urban power distribution network line planning method and system considering real demand guidance
CN103426126A (en) Generation method for segmental contact topological relationship of feeder line group of regional power grid
CN107609694B (en) Structure optimization method for offshore wind power cluster power transmission system and storage medium
CN112464545B (en) Layout method, system, equipment and medium for cables and transformer substation of offshore wind farm
CN102592005A (en) Method and device for generating single line drawing
CN113696935A (en) Signal equipment primitive data model establishing method and system
CN103441988A (en) Data migration method crossing GIS platforms
CN104750468A (en) Server side topological data conversion method and device
CN106645868A (en) Short-circuit current scanning method and device
CN109193948A (en) A kind of intelligent substation void circuit automatic connecting method
CN115688341A (en) Distribution network thematic map layout method based on multi-branch tree collision detection and storage medium
CN108805336A (en) It is a kind of to choose the method and device for sharing shaft tower based on power grid GIS
CN106557601B (en) A kind of transmission line of electricity emulation mode
CN108170871B (en) Element browsing method and graphic layout method for electromagnetic transient topology data

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant