CN104764321A - Tunnel kiln used for producing fireproof materials - Google Patents

Tunnel kiln used for producing fireproof materials Download PDF

Info

Publication number
CN104764321A
CN104764321A CN201510217599.9A CN201510217599A CN104764321A CN 104764321 A CN104764321 A CN 104764321A CN 201510217599 A CN201510217599 A CN 201510217599A CN 104764321 A CN104764321 A CN 104764321A
Authority
CN
China
Prior art keywords
kiln
tube connector
throwing
service aisle
communicated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510217599.9A
Other languages
Chinese (zh)
Other versions
CN104764321B (en
Inventor
吴建昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changxing Zhen Ming Refractory Co Ltd
Original Assignee
Changxing Zhen Ming Refractory Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changxing Zhen Ming Refractory Co Ltd filed Critical Changxing Zhen Ming Refractory Co Ltd
Priority to CN201510217599.9A priority Critical patent/CN104764321B/en
Publication of CN104764321A publication Critical patent/CN104764321A/en
Application granted granted Critical
Publication of CN104764321B publication Critical patent/CN104764321B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a tunnel kiln used for producing fireproof materials. The tunnel kiln is characterized by comprising a kiln body and a kiln car, wherein the kiln body extends in the transverse direction, and the kiln car is driven inside the kiln body. The kiln body comprises a kiln top, a kiln wall and a working channel, the working channel sequentially comprises an inlet section, a preheating section, a roasting section, a thermal insulation section and a cooling section in the extending direction, and sand seal groove structures are formed in the sides, close to the working channel, of built-up layers of the inlet section, the preheating section, the roasting section, the thermal insulation section and the cooling section and used for sealing the bottom space of the kiln car. The sand seal groove structures are reasonable in arrangement and high in strength, the effect of isolation between steel apron boards on the two sides of the kiln car and the sand seal grooves in the side walls is good, and the overall sealing effect is improved. A thermal insulation structure on the kiln top is arranged reasonably, and in this way, a thermal insulation layer on the kiln top can be supported powerfully and can be arranged to be a thick thermal insulation layer on the kiln top. A sand throwing tube is arranged for throwing sand, sandy soil inside the sand seal grooves can be supplemented at any time in the production process and can be driven forwards by a sand seal cutter, a worker does not need to enter the kiln to add the sand, in this way, labor investment is omitted, the structure is simple, and construction is convenient.

Description

A kind of tunnel cave for the production of refractory material
Technical field
The present invention relates to a kind of tunnel cave for the production of refractory material.
Background technology
Tunnel cave is generally a long linear tunnel, and fixing wall and vault are arranged at its both sides and top, and the track that bottom is laid runs kiln car.Combustion apparatus is located at the both sides, middle part of tunnel cave, constitute fixing high temperate zone--clinkering zone, the high-temperature flue gas that burning produces is under the effect of tunnel cave front end chimney or air-introduced machine, flow along tunnel to kiln hood direction, preheating enters the goods in kiln step by step simultaneously, and this section constitutes the preheating zone of tunnel cave.Blast cold wind at the kiln tail of tunnel cave, the goods of latter a section in cooling tunnel kiln, the cold wind blasted flows through goods and after being heated, then extracts out and send into the thermal source of drier as dried, and this section just constitutes the salband of tunnel cave.In existing refractory material production process, consider cost factor, mostly adopt gangue as combustion material, gangue is the solid waste discharged in coal mining process and coal washing process, is a kind of black gray expandable rock lower, harder than coal with a kind of phosphorus content of coal seam association in coalification course.Comprise choose from the spoil of extraction top board, base plate and interlayer and coal washing process in the digging gangue in tunnelling process, mining process wash spoil.In the process firing refractory material, there is following problem in existing gangue tunnel cave:
1) sand sealing groove vibrational power flow is unreasonable, sand sealing groove cannot arrange very high height because intensity limits, cause the partition weak effect between the steel skirtboard of kiln car both sides and the sand sealing groove of side wall, cold air is made easily to leak in people's kiln, hot gas also easily spills outside kiln, affects production cost and product quality;
2) kiln top heat insulation structural arranges unreasonable, causes kiln top insulating to obtain powerful support, limits the thickness of kiln top insulating, have impact on heat insulation effect;
3) sand in sand sealing groove is constantly loss in process of production, manually enters in kiln and adds sand inconvenience, add sand efficiency low;
4) inducer is for unsaturated vapor, causes realizing good cross-ventilation effect in tunnel cave, affects the pre-heat effect of preheating section
5) the smoke discharging structure design of existing tunnel kiln is unreasonable, causes realizing comparatively reasonably temperature adjustment, voltage regulation result, affects quality of finished in kiln.
Summary of the invention
The object of the invention is to overcome above shortcomings in prior art, and a kind of reasonable in design is provided, sand sealing groove intensity is good, kiln top heat insulation structural structural strength is high, conveniently add sand, can provide air inlet to inducer and have the tunnel cave for the production of refractory material of smoke discharging structure rational in infrastructure.
The present invention's adopted technical scheme that solves the problem is:
A kind of tunnel cave for the production of refractory material, it is characterized in that: comprise the kiln body extended transversely and the kiln car travelled in described kiln body, kiln body comprises Yao Ding, kiln wall and service aisle, service aisle comprises inducer, preheating section, furnace zone, soaking zone and cooling section in the direction of extension successively, kiln wall comprises the body of wall plateau for being fixed on ground, body of wall plateau adopts rubble brick body to be built into, and described body of wall plateau is provided with the padded layer adopting concreting, inducer, preheating section, furnace zone, the padded layer of soaking zone and cooling section is provided with the sand sealing groove structure for sealing kiln car bottom space by service aisle side, described sand sealing groove comprises the angle steel be embedded in padded layer, angle steel is 20 °-70 ° and is obliquely installed, angle steel is welded with dowel by service aisle side, the top of dowel is fixed with sand sealing groove angle steel, the cross section of described sand sealing groove angle steel is L-shaped, the side of described dowel is welded with reinforcement steel plate, described sand sealing groove angle steel is fitted in be strengthened steel plate and is bolted sand sealing groove angle steel and strengthens steel plate, the appearance sand launder for holding sealing sand is formed between sand sealing groove angle steel and padded layer, kiln top comprises kiln lamina tecti, and the two ends of kiln lamina tecti are supported on the top of the 3rd body of wall layer, the below of the kiln lamina tecti of preheating section, furnace zone, soaking zone and cooling section is fixed with elevator, the lower end of elevator connects kiln top insulating, the two ends up and down of elevator are provided with inserting groove, preheating section, furnace zone, soaking zone are provided with kiln top insulating, the below of kiln top insulating is provided with the support boatswain chair for kiln top insulating, and described boatswain chair is connected on elevator by steel wire rope, preheating section is provided with throws sandpipe, air intake structure, the padded layer of inducer is provided with adopt light fire brick be built into the 4th before body of wall layer, body of wall layer before described throwing sandpipe oblique cutting enters the 4th, the inside and outside two ends of throwing sandpipe pass from both sides inside and outside body of wall layer before the 4th respectively, throwing sandpipe is 20 °-70 ° and is obliquely installed, and the outer end of throwing sandpipe is provided with the throwing sandpipe cover plate being hinged on and throwing on sandpipe, described air intake structure comprises the air inlet duct outside the kiln wall being arranged on inducer, described air inlet duct adopts light fire brick to be built into, described inducer is provided with the air inlet pipe penetrating body of wall plateau from air inlet duct, the inner of described air inlet pipe is arranged on the medium position of service aisle, be provided with the first track cover plate in the service aisle of inducer, the two ends of the first track cover plate are fixed on adjacent two track installation layers, preheating section is provided with fume extractor, fume extractor comprises multiple first tube connectors be arranged on above kiln lamina tecti, the two ends of described first tube connector are communicated with the second tube connector respectively, two the second tube connectors penetrate kiln wall from the both sides of preheating section respectively and are communicated in service aisle, the below of described first tube connector is communicated with multiple the 3rd tube connector that is set in distance, described 3rd tube connector is in vertically arranging and penetrate kiln top to be communicated in service aisle, realize being communicated with by the 4th tube connector between first tube connector, the 4th tube connector access smoking blower fan, be provided with every hollow plate between adjacent orbit mounting layer in the service aisle of preheating section, describedly adopt pea gravel concreten to be built into every empty version, be arranged on above the space between adjacent orbit mounting layer every empty version.
As preferably, furnace zone is provided with the throwing texture of coal for throwing in gangue, throw texture of coal to comprise and penetrate kiln top from the top on kiln top and the throwing coal pipe being communicated to service aisle, described throwing coal pipe comprises throwing on coal manages under pipe and throwing coal, described throwing coal is managed and is connected by flange arrangement between pipe under throwing coal, on described throwing coal, the top of pipe realizes sealing by throwing coal pipe lid, and described throwing coal pipe covers and is provided with for mentioning the handle throwing coal pipe lid, throws on coal and pipe is welded with the retainer ring being against kiln top.
As preferably, furnace zone is provided with and first send hot air apparatus for what control temperature in service aisle, first send hot air apparatus to comprise is arranged on the 5th tube connector on kiln top, the below of described first tube connector is communicated with multiple the 6th tube connector that is set in distance, 6th tube connector is in vertically arranging and penetrate kiln top to be communicated in service aisle, and the 5th tube connector is connected to and send air-heater, soaking zone is provided with and second send hot air apparatus for what control temperature in service aisle, second send hot air apparatus to comprise is arranged on multiple 7th tube connectors above kiln lamina tecti, the two ends of described 6th tube connector are communicated with the 8th tube connector respectively, two the 8th tube connectors penetrate kiln wall from the both sides of soaking zone respectively and are communicated in service aisle, the below of described 7th tube connector is communicated with multiple the 9th tube connector that is set in distance, described 9th tube connector is in vertically arranging and penetrate kiln top to be communicated in service aisle, realize being communicated with and being connected to sending air-heater by the tenth tube connector between 7th tube connector, air-heater is sent to be connected in the service aisle of preheating section.Preheating section and furnace zone are provided with the baroceptor for sensing service aisle internal gas pressure and the temperature sensor for sensing the temperature in service aisle, temperature sensor and baroceptor connection control system, and control system connects air-heater.
The present invention compared with prior art, has the following advantages and effect:
1) sand sealing groove vibrational power flow is reasonable, the intensity of sand sealing groove is higher, partition between the steel skirtboard of kiln car both sides and the sand sealing groove of side wall is effective, improve integral sealing effect, cold air is made not allow in leakiness people kiln, hot gas is not easy to spill outside kiln, ensure that production cost and product quality, simple and reliable for structure, cost is low, long service life;
2) kiln top heat insulation structural arranges rationally, and kiln top insulating can powerful support, can arrange thicker kiln top insulating, ensure that heat insulation effect, and structure is simple, the easy construction of kiln top, and construction cost is low;
3) throw sand by throwing sandpipe, the sand in sand sealing groove can supplement in process of production at any time, and sand can be driven forward by sand sealing knife, does not need manually to enter in kiln to add sand, and eliminate hand labor and drop into, structure is simple, easy construction;
4) inducer can realize air inlet by air inlet duct and air inlet pipe, improves in tunnel cave and outside air convection effect, improves the pre-heat effect of preheating section;
5) by arranging multiple discharge duct, carrying out central exhaust, making the negative pressure of kiln hood be unlikely to too large, solve existing structure Problems existing, and have adjusted the temperature curve in kiln, ensure that quality of finished in kiln, and arrange every hollow plate, and reduce the flow effect in kiln;
6) described throwing coal managed and connected by flange arrangement between pipe under throwing coal, making it possible to set gradually throw on coal and manage under pipe and throwing coal, make successively according to corresponding component, efficiency of construction to be improve in the process of construction in layer;
7) by temperature sensor and baroceptor connection control system, and send hot air apparatus and second to send hot air apparatus to first, automatically can realize temperature, Stress control in kiln, save labour turnover, improve scientific management degree.
Accompanying drawing explanation
Fig. 1 is the structural representation of the embodiment of the present invention for the production of the tunnel cave of refractory material.
Fig. 2 is the cross section structure schematic diagram at A-A place in Fig. 1 in the embodiment of the present invention.
Fig. 3 is the cross section structure schematic diagram at B-B place in Fig. 1 in the embodiment of the present invention.
Fig. 4 is the cross section structure schematic diagram at C-C place in Fig. 1 in the embodiment of the present invention.
Fig. 5 is the cross section structure schematic diagram at D-D place in Fig. 1 in the embodiment of the present invention.
Fig. 6 is the cross section structure schematic diagram at E-E place in Fig. 1 in the embodiment of the present invention.
Fig. 7 is the cross section structure schematic diagram at F-F place in Fig. 1 in the embodiment of the present invention.
Fig. 8 is the cross section structure schematic diagram at G-G place in Fig. 1 in the embodiment of the present invention.
Fig. 9 is the cross section structure schematic diagram at H-H place in Fig. 1 in the embodiment of the present invention.
Figure 10 is embodiment of the present invention middle orbit mounting structure schematic diagram.
Figure 11 is the structural representation of sand sealing groove structure in the embodiment of the present invention.
Figure 12 is the Elevator structure schematic diagram in the embodiment of the present invention.
Figure 13 is the mounting structure schematic diagram of suspended block and axle brick in the embodiment of the present invention.
Figure 14 is the structural representation throwing sandpipe in the embodiment of the present invention.
Figure 15 is the mounting structure schematic diagram of air blast in the embodiment of the present invention.
Figure 16 is the mounting structure schematic diagram of another angle air blast in the embodiment of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, also by embodiment, the present invention is described in further detail, and following examples are explanation of the invention and the present invention is not limited to following examples.
See Fig. 1-Figure 16, the present embodiment is for the production of the tunnel cave of refractory material, comprise the kiln body extended transversely and the kiln car travelled in described kiln body, kiln body comprises Yao Ding, kiln wall and service aisle 1, service aisle 1 comprises inducer L1, preheating section L2, furnace zone L3, soaking zone L4 and cooling section L5 in the direction of extension successively, kiln wall comprises the body of wall plateau 21 for being fixed on ground, body of wall plateau 21 adopts rubble brick body to be built into, and described body of wall plateau 21 is provided with the padded layer 22 adopting concreting.
Preheating section L2, furnace zone L3, the padded layer 22 of soaking zone L4 and cooling section L5 is provided with the first body of wall layer 23 set gradually from the inside to the outside, second cavity layer 24, cavity insulating 25 and the 3rd body of wall layer 26, described first body of wall layer 23 adopts concreting to form, second cavity layer 24 adopts light fire brick to be built into, 3rd body of wall layer 26 adopts brick body to be built into, supporting layer 27 is provided with between described second cavity layer 24 and padded layer 22, described supporting layer 27 adopts brick body to be built into, the separation layer 28 adopting refractory brick to form is provided with between supporting layer 27 and the 3rd body of wall layer 26, the articulamentum 29 adopting concreting is provided with between first body of wall layer 23 and supporting layer 27, the medial surface 30mm-60mm of the medial surface distance first body of wall layer 23 of articulamentum 29, the medial surface 80mm-120mm of the medial surface distance supporting layer 27 of articulamentum.
Track 34 structure travelled for kiln car is provided with in the service aisle 1 of inducer L1, preheating section L2, furnace zone L3, soaking zone L4 and cooling section L5, described track 34 structure comprises track plateau 31 and track installation layer 32, described track plateau 31 adopts rubble brick body to be built into, the width of track plateau 31 is 500mm-900mm, track installation layer 32 adopts concreting to form, U bolt 33 is embedded with in track installation layer 32, be provided with track 34 between the two ends of U bolt 33, described track 34 is fixed on U bolt 33 by pressure strip 35.
Inducer L1, preheating section L2, furnace zone L3, the padded layer 22 of soaking zone L4 and cooling section L5 is provided with the sand sealing groove structure 41 for sealing kiln car bottom space by service aisle 1 side, described sand sealing groove comprises the angle steel 42 be embedded in padded layer 22, angle steel 42 is obliquely installed in 20 °-70 °, angle steel 42 is welded with dowel 43 by service aisle 1 side, the top of dowel 43 is fixed with sand sealing groove angle steel 44, the cross section of described sand sealing groove angle steel 44 is L-shaped, the side of described dowel 43 is welded with strengthens steel plate 45, described sand sealing groove angle steel 44 is fitted in be strengthened steel plate 45 and is bolted sand sealing groove angle steel 44 and strengthens steel plate 45, the appearance sand launder 46 for holding sealing sand is formed between sand sealing groove angle steel 44 and padded layer 22.
Kiln top comprises kiln lamina tecti, and the two ends of kiln lamina tecti are supported on the top of the 3rd body of wall layer 26.
The below of the kiln lamina tecti of preheating section L2, furnace zone L3, soaking zone L4 and cooling section L5 is fixed with elevator 51, the lower end of elevator 51 connects kiln top insulating 52, the two ends up and down of elevator 51 are provided with inserting groove 511, preheating section L2, furnace zone L3, soaking zone L4 are provided with kiln top insulating 52, the below of kiln top insulating 52 is provided with the support boatswain chair 53 for kiln top insulating 52, and described boatswain chair is connected on elevator 51 by steel wire rope.
Preheating section L2 is provided with and throws sandpipe 61, air intake structure, the padded layer 22 of inducer L1 is provided with adopt light fire brick be built into the 4th before body of wall layer 62, body of wall layer 62 before described throwing sandpipe 61 oblique cutting enters the 4th, the inside and outside two ends of throwing sandpipe 61 pass from both sides inside and outside body of wall layer 62 before the 4th respectively, throw sandpipe 61 to be obliquely installed in 20 °-70 °, the outer end of throwing sandpipe 61 is provided with the throwing sandpipe cover plate 63 being hinged on and throwing on sandpipe 61.
Described air intake structure comprises the air inlet duct 71 outside the kiln wall being arranged on inducer L1, described air inlet duct 71 adopts light fire brick to be built into, described inducer L1 is provided with the air inlet pipe 72 penetrating body of wall plateau 21 from air inlet duct 71, the inner of described air inlet pipe 72 is arranged on the medium position of service aisle 1, the two ends being provided with the first track cover plate 73, first track cover plate 73 in the service aisle 1 of inducer L1 are fixed on adjacent two track installation layers 32.
Preheating section L2 is provided with fume extractor, fume extractor comprises multiple first tube connectors 81 be arranged on above kiln lamina tecti, the two ends of described first tube connector 81 are communicated with the second tube connector 82 respectively, two the second tube connectors 82 penetrate kiln wall from the both sides of preheating section L2 respectively and are communicated in service aisle 1, the below of described first tube connector 81 is communicated with multiple the 3rd tube connector 83 that is set in distance, described 3rd tube connector 83 is in vertically arranging and penetrate kiln top to be communicated in service aisle 1, realize being communicated with by the 4th tube connector 84 between first tube connector 81, 4th tube connector 84 accesses smoking blower fan.
Be provided with between adjacent orbit mounting layer 32 in the service aisle 1 of preheating section L2 every hollow plate 102, describedly adopt pea gravel concreten to be built into every empty version, be arranged on above the space between adjacent orbit mounting layer 32 every empty version.
Furnace zone L3 is provided with the throwing texture of coal for throwing in gangue, throw texture of coal to comprise and penetrate kiln top from the top on kiln top and the throwing coal pipe 11 being communicated to service aisle 1, described throwing coal pipe 11 comprises throws pipe 111 and pipe 112 under throwing coal on coal, on described throwing coal, pipe 111 and throwing under coal is connected by flange arrangement 113 between pipe 112, on described throwing coal, the top of pipe 111 realizes sealing by throwing coal pipe lid 114, described throwing coal pipe lid 114 being provided with for mentioning the handle 115 throwing coal pipe lid 114, throwing on coal and pipe 111 is welded with the retainer ring 116 being against kiln top.
Furnace zone L3 is provided with and first send hot air apparatus for what control temperature in service aisle 1, first send hot air apparatus to comprise is arranged on the 5th tube connector 85 on kiln top, the below of described first tube connector 81 is communicated with multiple the 6th tube connector 86 that is set in distance, 6th tube connector 86 is in vertically arranging and penetrate kiln top to be communicated in service aisle 1, and the 5th tube connector 85 is connected to and send air-heater 101.
Soaking zone L4 is provided with and second send hot air apparatus for what control temperature in service aisle 1, second send hot air apparatus to comprise is arranged on multiple 7th tube connectors 87 above kiln lamina tecti, the two ends of described 6th tube connector 87 are communicated with the 8th tube connector 88 respectively, two the 8th tube connectors 88 penetrate kiln wall from the both sides of soaking zone L4 respectively and are communicated in service aisle 1, the below of described 7th tube connector 87 is communicated with multiple the 9th tube connector 89 that is set in distance, described 9th tube connector 89 is in vertically arranging and penetrate kiln top to be communicated in service aisle 1, realize being communicated with and being connected to sending air-heater 101 by the tenth tube connector 810 between 7th tube connector 87, in the service aisle 1 sending air-heater 101 to be connected to preheating section L2.
Preheating section L2 and furnace zone L3 is provided with for sensing the baroceptor of service aisle 1 internal gas pressure and the temperature sensor for sensing the temperature in service aisle 1, temperature sensor and baroceptor connection control system, control system connects air-heater, cooling section L5 is provided with for air-blast device pressure balanced in service aisle 1, described air-blast device comprises air blast 121, the air blast erecting bed 122 adopting refractory brick to be built into is provided with between adjacent two track plateau 31 in service aisle 1, air blast erecting bed 122 is provided with air blast 121 installing hole for installing air blast 121, service aisle 1 bottom surface residing for described air blast erecting bed 122 is 15 °-35 ° and is obliquely installed, air-blast device connection control system.
Soaking zone L4 is provided with suspended block 131 structure, described suspended block 131 structure comprises successively near multiple suspended blocks 131 of arrangement, described suspended block 131 is in inverted T-shape, the upper end of described suspended block 131 is provided with the inserted terminal 1311 for snapping in elevator 51 lower end inserting groove 511, the both sides, lower end of described suspended block 131 are provided with semicircular axle brick 132 installing hole, axle brick 132 installing hole of adjacent two suspended blocks 131 is spliced into axle brick 132 hole of inserting for axle brick 132, is filled with insulation material between adjacent two suspended blocks 131.
Above content described in this description is only made for the present invention illustrating.Those skilled in the art can make various amendment or supplement or adopt similar mode to substitute to described specific embodiment; only otherwise depart from the content of description of the present invention or surmount this scope as defined in the claims, protection scope of the present invention all should be belonged to.

Claims (3)

1. the tunnel cave for the production of refractory material, it is characterized in that: comprise the kiln body extended transversely and the kiln car travelled in described kiln body, kiln body comprises Yao Ding, kiln wall and service aisle, service aisle comprises inducer, preheating section, furnace zone, soaking zone and cooling section in the direction of extension successively, kiln wall comprises the body of wall plateau for being fixed on ground, body of wall plateau adopts rubble brick body to be built into, and described body of wall plateau is provided with the padded layer adopting concreting, inducer, preheating section, furnace zone, the padded layer of soaking zone and cooling section is provided with the sand sealing groove structure for sealing kiln car bottom space by service aisle side, described sand sealing groove comprises the angle steel be embedded in padded layer, angle steel is 20 °-70 ° and is obliquely installed, angle steel is welded with dowel by service aisle side, the top of dowel is fixed with sand sealing groove angle steel, the cross section of described sand sealing groove angle steel is L-shaped, the side of described dowel is welded with reinforcement steel plate, described sand sealing groove angle steel is fitted in be strengthened steel plate and is bolted sand sealing groove angle steel and strengthens steel plate, the appearance sand launder for holding sealing sand is formed between sand sealing groove angle steel and padded layer, kiln top comprises kiln lamina tecti, and the two ends of kiln lamina tecti are supported on the top of the 3rd body of wall layer, the below of the kiln lamina tecti of preheating section, furnace zone, soaking zone and cooling section is fixed with elevator, the lower end of elevator connects kiln top insulating, the two ends up and down of elevator are provided with inserting groove, preheating section, furnace zone, soaking zone are provided with kiln top insulating, the below of kiln top insulating is provided with the support boatswain chair for kiln top insulating, and described boatswain chair is connected on elevator by steel wire rope, preheating section is provided with throws sandpipe, air intake structure, the padded layer of inducer is provided with adopt light fire brick be built into the 4th before body of wall layer, body of wall layer before described throwing sandpipe oblique cutting enters the 4th, the inside and outside two ends of throwing sandpipe pass from both sides inside and outside body of wall layer before the 4th respectively, throwing sandpipe is 20 °-70 ° and is obliquely installed, and the outer end of throwing sandpipe is provided with the throwing sandpipe cover plate being hinged on and throwing on sandpipe, described air intake structure comprises the air inlet duct outside the kiln wall being arranged on inducer, described air inlet duct adopts light fire brick to be built into, described inducer is provided with the air inlet pipe penetrating body of wall plateau from air inlet duct, the inner of described air inlet pipe is arranged on the medium position of service aisle, be provided with the first track cover plate in the service aisle of inducer, the two ends of the first track cover plate are fixed on adjacent two track installation layers, preheating section is provided with fume extractor, fume extractor comprises multiple first tube connectors be arranged on above kiln lamina tecti, the two ends of described first tube connector are communicated with the second tube connector respectively, two the second tube connectors penetrate kiln wall from the both sides of preheating section respectively and are communicated in service aisle, the below of described first tube connector is communicated with multiple the 3rd tube connector that is set in distance, described 3rd tube connector is in vertically arranging and penetrate kiln top to be communicated in service aisle, realize being communicated with by the 4th tube connector between first tube connector, the 4th tube connector access smoking blower fan, be provided with every hollow plate between adjacent orbit mounting layer in the service aisle of preheating section, describedly adopt pea gravel concreten to be built into every empty version, be arranged on above the space between adjacent orbit mounting layer every empty version.
2. the tunnel cave for the production of refractory material according to claim 1, it is characterized in that: furnace zone is provided with the throwing texture of coal for throwing in gangue, throw texture of coal to comprise and penetrate kiln top from the top on kiln top and the throwing coal pipe being communicated to service aisle, described throwing coal pipe comprises throwing on coal manages under pipe and throwing coal, described throwing coal is managed and is connected by flange arrangement between pipe under throwing coal, on described throwing coal, the top of pipe realizes sealing by throwing coal pipe lid, described throwing coal pipe covers and is provided with for mentioning the handle throwing coal pipe lid, throw on coal and pipe is welded with the retainer ring being against kiln top.
3. the tunnel cave for the production of refractory material according to claim 1, it is characterized in that: furnace zone is provided with and first send hot air apparatus for what control temperature in service aisle, first send hot air apparatus to comprise is arranged on the 5th tube connector on kiln top, the below of described first tube connector is communicated with multiple the 6th tube connector that is set in distance, 6th tube connector is in vertically arranging and penetrate kiln top to be communicated in service aisle, and the 5th tube connector is connected to and send air-heater, soaking zone is provided with and second send hot air apparatus for what control temperature in service aisle, second send hot air apparatus to comprise is arranged on multiple 7th tube connectors above kiln lamina tecti, the two ends of described 6th tube connector are communicated with the 8th tube connector respectively, two the 8th tube connectors penetrate kiln wall from the both sides of soaking zone respectively and are communicated in service aisle, the below of described 7th tube connector is communicated with multiple the 9th tube connector that is set in distance, described 9th tube connector is in vertically arranging and penetrate kiln top to be communicated in service aisle, realize being communicated with and being connected to sending air-heater by the tenth tube connector between 7th tube connector, air-heater is sent to be connected in the service aisle of preheating section.Preheating section and furnace zone are provided with the baroceptor for sensing service aisle internal gas pressure and the temperature sensor for sensing the temperature in service aisle, temperature sensor and baroceptor connection control system, and control system connects air-heater.
CN201510217599.9A 2015-04-29 2015-04-29 A kind of tunnel cave for producing refractory material Expired - Fee Related CN104764321B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510217599.9A CN104764321B (en) 2015-04-29 2015-04-29 A kind of tunnel cave for producing refractory material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510217599.9A CN104764321B (en) 2015-04-29 2015-04-29 A kind of tunnel cave for producing refractory material

Publications (2)

Publication Number Publication Date
CN104764321A true CN104764321A (en) 2015-07-08
CN104764321B CN104764321B (en) 2017-03-29

Family

ID=53646303

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510217599.9A Expired - Fee Related CN104764321B (en) 2015-04-29 2015-04-29 A kind of tunnel cave for producing refractory material

Country Status (1)

Country Link
CN (1) CN104764321B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108826968A (en) * 2018-07-05 2018-11-16 力华智能设备科技(东莞)有限公司 A kind of induction heating continuous tunnel furnace
CN110340115A (en) * 2019-07-25 2019-10-18 江苏大地益源环境修复有限公司 Glow reaction unit

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53104610A (en) * 1977-02-08 1978-09-12 Shinagawa Refractories Co Tunnel kilns for reheating carbonaceous material impregnated with tar and pitch
US4940408A (en) * 1988-05-30 1990-07-10 Ngk Insulators, Ltd. Tunnel kiln
CN1928478A (en) * 2006-09-21 2007-03-14 魏胜英 Mobile tunnel furnace
CN202420154U (en) * 2011-12-26 2012-09-05 王玉福 Energy-saving tunnel kiln
CN103307876A (en) * 2013-06-04 2013-09-18 湖南省科辉墙材有限公司 Automatic sand feeding device for tunnel kiln
CN204730639U (en) * 2015-04-29 2015-10-28 长兴震铭耐火材料有限公司 For the production of the tunnel cave of refractory material

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53104610A (en) * 1977-02-08 1978-09-12 Shinagawa Refractories Co Tunnel kilns for reheating carbonaceous material impregnated with tar and pitch
US4940408A (en) * 1988-05-30 1990-07-10 Ngk Insulators, Ltd. Tunnel kiln
CN1928478A (en) * 2006-09-21 2007-03-14 魏胜英 Mobile tunnel furnace
CN202420154U (en) * 2011-12-26 2012-09-05 王玉福 Energy-saving tunnel kiln
CN103307876A (en) * 2013-06-04 2013-09-18 湖南省科辉墙材有限公司 Automatic sand feeding device for tunnel kiln
CN204730639U (en) * 2015-04-29 2015-10-28 长兴震铭耐火材料有限公司 For the production of the tunnel cave of refractory material

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108826968A (en) * 2018-07-05 2018-11-16 力华智能设备科技(东莞)有限公司 A kind of induction heating continuous tunnel furnace
CN110340115A (en) * 2019-07-25 2019-10-18 江苏大地益源环境修复有限公司 Glow reaction unit

Also Published As

Publication number Publication date
CN104764321B (en) 2017-03-29

Similar Documents

Publication Publication Date Title
CN204730639U (en) For the production of the tunnel cave of refractory material
CN104792158A (en) Tunnel kiln with automatic temperature control system
CN203869493U (en) Tunnel kiln
CN104764321A (en) Tunnel kiln used for producing fireproof materials
CN205002590U (en) Tunnel cave with automatic temperature control system
CN102266114B (en) Airflow descending dense curing barn having brick-concrete structure
CN205002594U (en) Tunnel cave with sand seal structure
CN204730631U (en) For the production of the gangue tunnel cave of refractory material
CN204757658U (en) Gangue tunnel cave preheating section structure
CN204757657U (en) Gangue tunnel cave calcination stage structure
CN204987850U (en) A temperature control system for tunnel cave
CN204730637U (en) Energy-saving tunnel cave
CN204739895U (en) Gangue tunnel cave
CN204730632U (en) Gangue tunnel cave cooling section structure
CN104819642B (en) A kind of gangue tunnel cave
CN204730635U (en) Gangue tunnel cave soaking zone structure
CN104792160B (en) A kind of gangue tunnel cave is calcined segment structure
CN104792167B (en) Energy-saving type tunnel kiln
CN104792159B (en) Coal gangue tunnel kiln for producing refractory materials
CN204730640U (en) Tunnel cave insulation construction
CN103485800B (en) Down-hole tunnel cooling system
CN104792166B (en) A kind of tunnel cave with sand seal structure
CN204739897U (en) A throw coal structure for tunnel cave
CN204151368U (en) The natural air cooled device of iron alloy electric furnace furnace bottom
CN104792162A (en) Coal gangue tunnel kiln preheating section structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170329

Termination date: 20180429