CN104763165A CN201510192139.5A CN201510192139A CN104763165A CN 104763165 A CN104763165 A CN 104763165A CN 201510192139 A CN201510192139 A CN 201510192139A CN 104763165 A CN104763165 A CN 104763165A
Authority
CN
China
Prior art keywords
shaped steel
ring beam
ball
wall
setting bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510192139.5A
Other languages
Chinese (zh)
Other versions
CN104763165B (en
Inventor
陈刚
程涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Second Construction Engineering Co Ltd
Original Assignee
ANHUI CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical ANHUI CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN201510192139.5A priority Critical patent/CN104763165B/en
Priority to CN201610784036.2A priority patent/CN106382039B/en
Publication of CN104763165A publication Critical patent/CN104763165A/en
Application granted granted Critical
Publication of CN104763165B publication Critical patent/CN104763165B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/22Containers for fluent solids, e.g. silos, bunkers; Supports therefor
    • E04H7/24Constructions, with or without perforated walls, depending on the use of specified materials
    • E04H7/30Constructions, with or without perforated walls, depending on the use of specified materials mainly of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Abstract

The invention discloses a cement silo top steel net frame supporting structure and a construction method thereof. The cement silo top steel net frame supporting structure is characterized in that a net frame reference circle is fixedly arranged on a circular top ring beam on the silo wall of a cement silo through a supporting frame; the supporting frame is formed in the mode that section steel supporting legs are symmetrically arranged on the circular top ring beam on the silo wall of the cement silo and located on the inner sidewall and the outer sidewall of the silo wall of the cement silo, and section steel suspension beams are fixedly arranged on the circular top ring beam through the section steel supporting legs in a cantilever form; support bolted balls are fixedly arranged on the circular top ring beam, upright stand columns are fixedly arranged on the support bolted balls, and the top ends of the stand columns are fixedly provided with a first layer of upper chord spiral balls; length-adjustable pull rods are connected between the first layer of upper chord spiral balls and the far ends of the section steel suspension beams, and bottom supporting units which are evenly distributed on the circular top ring beam of the wall of a clinker silo are connected in a complete circle through rod pieces to form the net frame reference circle. The cement silo top steel net frame supporting structure is used for achieving quick construction of a cement silo steel roof truss.

Description

A kind of cement bunker top Elements of Space Grid Truss braced structures and construction method thereof
Technical field
The present invention relates to constructional materials production process equipment technical field, relate in particular to a kind of cement bunker top steel grid structure for the production of cement storage and construction method thereof.
Background technology
Cement is as the indispensable constructional materials of one, and demand is large, needs corresponding outfit for storing the storehouse of cement.Traditional cement bunker is the roof system adopting concrete center pillar, and this roof system exists shortcomings: one is that the cement bunker machine for zipper platform of production line is usually higher apart from ground, and cement is very large to the impact force of concrete center pillar.According to statistics, when using 2 years to 4 years, namely concrete center pillar can be subject to major injury; Two is cement bunkers is closed cylindrical shells, and only have very little access, heavy mechanical equipment cannot pass in and out.Once concrete center pillar sustains damage, needing stops production completely repairs, and reparation difficulty is large, cost is high; Three be concrete center pillar be subject to badly damaged after, larger potential safety hazard can be produced, time serious, there will be the disastrous effect that roof system decays.Cement bunker environment is severe simultaneously, monitoring damage difficulty.The large-span steel rack that adopts replaces tradition to have post roof system for the construction of cement bunker more in recent years, and construction method is different.Comprising without the firm Roof Truss Construction method of concrete support center pillar in prior art: one, integral hoisting rack method, elder generation is assembled in place to complete, lifted by loop wheel machine again and put in place, can settle at one go, but require high to hoisting and hanging construction operation, and there is steel roof truss and concrete silo can not the phenomenon of effective seamless link, cause the later stage that rectification work difficulty is installed larger; Two, subitem hoisting grid method, that rack reference circle is divided into some sections, select each segmentation of several crane substep lifting reference circle, and substantially put in place with crane, then interim lifting is stable, until rack reference circle hands over circle, in installation process, each segmentation rack is at overhead connection, technical requirements is high, and danger is larger; Three, scaffold support method, the method on the wall inwall of storehouse, sets up the above scaffold of three rows to wall top, storehouse, lay job platform at an upper portion thereof, to complete the installation of rack, the method takies that the construction plant time is long, long in time limit, demand pipe amount is large, construction costs is high.
Summary of the invention
The present invention is the deficiency for avoiding existing for above-mentioned prior art, provides a kind of cement bunker top Elements of Space Grid Truss braced structures and construction method thereof, to reaching quick, the construction of convenient, safe cement bunker steel roof truss.
The present invention is that technical solution problem adopts following technical scheme:
The feature of cement bunker top of the present invention Elements of Space Grid Truss braced structures is: on the round apical ring beam of wall of cement bunker, be fixedly installed rack reference circle by bracing frame, the form of structure of support frame as described above is: on the round apical ring beam of described wall of cement bunker, point to be on the inside wall of wall of cement bunker and lateral wall and to be symmetrical arranged shaped steel supporting leg, on described round apical ring beam, utilize described shaped steel supporting leg to be fixedly installed shaped steel overarm in cantilevered fashion, described shaped steel overarm overhangs towards the outside of clinker warehouse wall in level; Described round apical ring beam is fixedly installed each carrier setting bolt ball, is fixedly mounted on described carrier setting bolt ball in upright column, on the top of described column, fixed installation first floor winds up spiral ball; Wherein, carrier setting bolt ball corresponds to shaped steel supporting leg position and is in the center of round apical ring beam, and wind up spiral ball and described carrier setting bolt ball of described column and first floor is being on same vertical position; The adjustable pull bar of connecting length between string spiral ball and the shaped steel far-end of hanging oneself from a beam on the first layer; Wind up spiral ball as bottom supporting unit using pull bar, carrier setting bolt ball, column and first floor, utilize rod member and by carrier setting bolt ball and the first floor spiral ball that winds up, each bottom supporting unit be evenly distributed on the round apical ring beam of clinker warehouse wall carried out complete cycle connection, forming rack reference circle.
The feature of cement bunker top of the present invention Elements of Space Grid Truss braced structures is also: the far-end of hanging oneself from a beam at described shaped steel arranges hanging ring screw, and described pull bar is connected with hanging ring screw by turnbuckle.
The feature of the construction method of cement bunker top of the present invention Elements of Space Grid Truss braced structures is carried out as follows:
Step 1: on the round apical ring beam of described clinker warehouse wall, point to be on the inside wall of clinker warehouse wall and lateral wall and to be symmetrical arranged shaped steel supporting leg; On described round apical ring beam, utilize and described shaped steel supporting leg is fixedly installed in cantilevered fashion shaped steel overarm, described shaped steel overarm overhangs towards the outside of clinker warehouse wall in level;
Step 2: be fixedly installed each carrier setting bolt ball on described round apical ring beam, is fixedly mounted on described carrier setting bolt ball in upright column, on the top of described column, fixed installation first floor winds up spiral ball; Wherein, carrier setting bolt ball corresponds to shaped steel supporting leg position and is in the center of round apical ring beam, and wind up spiral ball and described carrier setting bolt ball of described column and first floor is being on same vertical position;
Step 3: the adjustable pull bar of connecting length between string spiral ball and the shaped steel far-end of hanging oneself from a beam on the first layer; Wind up spiral ball as bottom supporting unit using pull bar, carrier setting bolt ball, column and first floor, utilize rod member and by carrier setting bolt ball and the first floor spiral ball that winds up, each bottom supporting unit be evenly distributed on the round apical ring beam of clinker warehouse wall carried out complete cycle connection, forming rack reference circle;
Step 4: the holding state keeping each bottom supporting unit, rack reference circle successively upwards completes clinker warehouse Elements of Space Grid Truss shaping across construction.
Compared with the prior art, beneficial effect of the present invention is embodied in:
1, the present invention is based on the round apical ring beam of wall of cement bunker, and the assembly working environment of its rack reference circle is greatly improved, and construction quality and workman's personal safety are protected.
2, in the present invention, Tiebar structure is light, detachable, and it is easy to assembly, technique is simple, easy to operate, and only need a crane to complete construction, the adjustable of pull bar length effectively can guarantee construction precision.
3, the deadweight active balance gravity of bracing frame of pull bar and shaped steel overarm in the present invention, the center of gravity of the structural system at more than clinker warehouse wall top is overlapped with clinker warehouse top center substantially, greatly reduce eccentric moment, on shaped steel supporting leg, upper group power of expansion bolt is relatively little, be conducive to the stable of whole system, thus guarantee construction safety.
4, the present invention adopts pull bar can realize the stable of bracing frame, and auxiliary construction material is only 1/4th of high-altitude stent support formula construction method material therefor, and mounting cost be only its 1/5th, therefore its economic benefit is clearly.
5, in the present invention, pull bar is reusable, can save temporary lining Master Cost further, and the construction period is relatively short simultaneously, and the total investment of engineering of cement bunker significantly reduces.
Accompanying drawing explanation
Fig. 1 is cement bunker top Elements of Space Grid Truss braced structures vertical section schematic diagram in the present invention;
Fig. 2 is Elements of Space Grid Truss plan structure schematic diagram in cement bunker top in the present invention;
Number in the figure: 1 clinker warehouse wall, 2 shaped steel supporting legs, 3 shaped steel overarms, 4 carrier setting bolt balls, 5 hanging ring screws, 6 turnbuckles, 7 pull bars, 8 first floors wind up spiral ball, 9 columns, 10 rack reference circles, 11 bolt sphere bearings, 12 round apical ring beams, 13 Elements of Space Grid Truss.
Detailed description of the invention
See Fig. 1, in the present embodiment, cement bunker top Elements of Space Grid Truss braced structures is: on the round apical ring beam 12 of wall of cement bunker 1, be fixedly installed rack reference circle 10 by bracing frame, the form of structure of support frame as described above is: on the round apical ring beam 12 of described wall of cement bunker 1, point to be on the inside wall of wall of cement bunker 1 and lateral wall and to be symmetrical arranged shaped steel supporting leg 2, on described round apical ring beam, utilize and described shaped steel supporting leg 2 is fixedly installed in cantilevered fashion shaped steel overarm 3, described shaped steel overarm 3 overhangs towards the outside of clinker warehouse wall 1 in level; Described round apical ring beam is fixedly installed each carrier setting bolt ball 4 by each bolt sphere bearing 11, is fixedly mounted on described carrier setting bolt ball 4 in upright column 9, on the top of described column 9, fixed installation first floor winds up spiral ball 8; Wherein, carrier setting bolt ball 4 corresponds to shaped steel supporting leg 2 position and is in the center of round apical ring beam, and described column 9 and the first floor spiral ball 8 that winds up is being on same vertical position with described carrier setting bolt ball 4; On the first layer string spiral ball 8 and shaped steel hang oneself from a beam 3 far-end between the adjustable pull bar 7 of connecting length; Wind up spiral ball 8 as bottom supporting unit using pull bar 7, carrier setting bolt ball 4, column 9 and first floor, utilize rod member and by carrier setting bolt ball 4 and the first floor spiral ball 8 that winds up, each bottom supporting unit be evenly distributed on the round apical ring beam of clinker warehouse wall 1 carried out complete cycle connection, and connect each interior string ball by rod member, form rack reference circle.
In concrete enforcement, arrange hanging ring screw 5 at the far-end of described shaped steel overarm 3, described pull bar 7 is connected with hanging ring screw 5 by turnbuckle 6.
In the present embodiment, the construction method of top, clinker Kuku Elements of Space Grid Truss is carried out as follows:
Step 1: as shown in Figure 1, on the round apical ring beam of described clinker warehouse wall 1, point to be on the inside wall of clinker warehouse wall 1 and lateral wall and to be symmetrical arranged shaped steel supporting leg 2; On described round apical ring beam, utilize and described shaped steel supporting leg 2 is fixedly installed in cantilevered fashion shaped steel overarm 3, described shaped steel overarm 3 overhangs towards the outside of clinker warehouse wall 1 in level;
Step 2: be fixedly installed each carrier setting bolt ball 4 by each bolt sphere bearing 12 on described round apical ring beam, is fixedly mounted in upright column 9 on described carrier setting bolt ball 4, and on the top of described column 9, fixed installation first floor winds up spiral ball 8; Wherein, carrier setting bolt ball 4 corresponds to shaped steel supporting leg 2 position and is in the center of round apical ring beam, and described column 9 and the first floor spiral ball 8 that winds up is being on same vertical position with described carrier setting bolt ball 4;
Step 3: on the first layer string spiral ball 8 and shaped steel hang oneself from a beam 3 far-end between the adjustable pull bar 7 of connecting length; Wind up spiral ball 8 as bottom supporting unit using pull bar 6, carrier setting bolt ball 4, column 9 and first floor, utilize rod member and by carrier setting bolt ball 4 and the first floor spiral ball 8 that winds up, each bottom supporting unit be evenly distributed on the round apical ring beam of wall of cement bunker 1 carried out complete cycle connection, and connect each interior string ball by rod member, form rack reference circle;
Step 4: the holding state keeping each bottom supporting unit, rack reference circle successively upwards completes the construction of cement bunker Elements of Space Grid Truss 13 as shown in Figure 2.
Cement bunker Elements of Space Grid Truss 13 in the present embodiment comprises: the connection first floor triangular unit of spiral ball 8 inwall side of winding up at carrier setting bolt ball 4 and first floor, second layer triangular unit is connected subsequently on first floor triangular unit, and successively complete installation in this way, subsequently, all carrier setting bolt balls 4 are fixedly welded with the bolt sphere bearing 11 on correspondence position, namely complete cement bunker Elements of Space Grid Truss shaping across installation, the pull bar 7 of dismounting is reusable.

Claims (3)

1. a cement bunker top Elements of Space Grid Truss braced structures, it is characterized in that: on the round apical ring beam (12) of wall of cement bunker (1), be fixedly installed rack reference circle (10) by bracing frame, the form of structure of support frame as described above is: on the round apical ring beam of described wall of cement bunker (1), point to be on the inside wall of wall of cement bunker (1) and lateral wall and to be symmetrical arranged shaped steel supporting leg (2), on described round apical ring beam, described shaped steel supporting leg (2) is utilized to be fixedly installed shaped steel overarm (3) in cantilevered fashion, described shaped steel overarm (3) overhangs towards the outside of clinker warehouse wall (1) in level, described round apical ring beam is fixedly installed each carrier setting bolt ball (4), be fixedly mounted in upright column (9) on described carrier setting bolt ball (4), on the top of described column (9), fixed installation first floor winds up spiral ball (8), wherein, carrier setting bolt ball (4) is corresponding to shaped steel supporting leg (2) position and be in the center of round apical ring beam, and described column (9) and the first floor spiral ball (8) that winds up is being on same vertical position with described carrier setting bolt ball (4), on the first layer string spiral ball (8) and shaped steel hang oneself from a beam (3) far-end between the adjustable pull bar of connecting length (7), wind up spiral ball (8) as bottom supporting unit using pull bar (6), carrier setting bolt ball (4), column (9) and first floor, utilize rod member and by carrier setting bolt ball (4) and the first floor spiral ball (8) that winds up, each bottom supporting unit be evenly distributed on the round apical ring beam of clinker warehouse wall (1) carried out complete cycle connection, forming rack reference circle.
2. cement bunker top according to claim 1 Elements of Space Grid Truss braced structures, it is characterized in that: arrange hanging ring screw (5) at the far-end of described shaped steel overarm (3), described pull bar (7) is connected with hanging ring screw (5) by turnbuckle (6).
3. a construction method for cement bunker top Elements of Space Grid Truss braced structures, is characterized in that carrying out as follows:
Step 1: upper the round apical ring beam (12) of described clinker warehouse wall (1), point to be in clinker warehouse wall (1) inside wall and lateral wall are symmetrical arranged shaped steel supporting leg (2); On described round apical ring beam, utilize and described shaped steel supporting leg (2) is fixedly installed in cantilevered fashion shaped steel overarm (3), described shaped steel overarm (3) overhangs towards the outside of clinker warehouse wall (1) in level;
Step 2: be fixedly installed each carrier setting bolt ball (4) on described round apical ring beam, be fixedly mounted in upright column (9) on described carrier setting bolt ball (4), on the top of described column (9), fixed installation first floor winds up spiral ball (8); Wherein, carrier setting bolt ball (4) is corresponding to shaped steel supporting leg (2) position and be in the center of round apical ring beam, and described column (9) and the first floor spiral ball (8) that winds up is being on same vertical position with described carrier setting bolt ball (4);
Step 3: on the first layer string spiral ball (8) and shaped steel hang oneself from a beam (3) far-end between the adjustable pull bar of connecting length (7); Wind up spiral ball (8) as bottom supporting unit using pull bar (6), carrier setting bolt ball (4), column (9) and first floor, utilize rod member and by carrier setting bolt ball (4) and the first floor spiral ball (8) that winds up, each bottom supporting unit be evenly distributed on the round apical ring beam of clinker warehouse wall (1) carried out complete cycle connection, forming rack reference circle;
Step 4: the holding state keeping each bottom supporting unit, rack reference circle successively upwards completes clinker warehouse Elements of Space Grid Truss shaping across construction.
CN201510192139.5A 2015-04-21 2015-04-21 A kind of cement bunker top Elements of Space Grid Truss supporting construction Active CN104763165B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201510192139.5A CN104763165B (en) 2015-04-21 2015-04-21 A kind of cement bunker top Elements of Space Grid Truss supporting construction
CN201610784036.2A CN106382039B (en) 2015-04-21 2015-04-21 A kind of construction method of cement bunker top steel mesh frame support structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510192139.5A CN104763165B (en) 2015-04-21 2015-04-21 A kind of cement bunker top Elements of Space Grid Truss supporting construction

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201610784036.2A Division CN106382039B (en) 2015-04-21 2015-04-21 A kind of construction method of cement bunker top steel mesh frame support structure

Publications (2)

Publication Number Publication Date
CN104763165A true CN104763165A (en) 2015-07-08
CN104763165B CN104763165B (en) 2016-11-16

Family

ID=53645228

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201610784036.2A Active CN106382039B (en) 2015-04-21 2015-04-21 A kind of construction method of cement bunker top steel mesh frame support structure
CN201510192139.5A Active CN104763165B (en) 2015-04-21 2015-04-21 A kind of cement bunker top Elements of Space Grid Truss supporting construction

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201610784036.2A Active CN106382039B (en) 2015-04-21 2015-04-21 A kind of construction method of cement bunker top steel mesh frame support structure

Country Status (1)

Country Link
CN (2) CN106382039B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107299765A (en) * 2017-06-12 2017-10-27 芜湖天航科技(集团)股份有限公司 Method of starting for truncated cone-shaped rack

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2360105A (en) * 1942-05-29 1944-10-10 Buckles William Scaffold
CN201165752Y (en) * 2008-03-03 2008-12-17 广州市建筑集团有限公司 Moveable building construction platform
CN101974977A (en) * 2010-10-29 2011-02-16 中建二局第三建筑工程有限公司 Pulley bracket platform with large-column-grid and large-area grid structure and construction method thereof by utilizing pulley bracket method
CN203113826U (en) * 2013-03-22 2013-08-07 山西一建集团有限公司 Double-machine hoisting steel truss temporary supporting device
CN203129625U (en) * 2013-02-05 2013-08-14 中国建筑第八工程局有限公司 Central circular ring supporting frame in steel grid structure construction
CN104060851A (en) * 2014-06-09 2014-09-24 武汉武船重型装备工程有限责任公司 Supporting structure and construction method for arch-rib roof truss sliding construction
CN204531472U (en) * 2015-04-21 2015-08-05 安徽建工集团有限公司 A kind of cement bunker top Elements of Space Grid Truss braced structures

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06345225A (en) * 1993-06-11 1994-12-20 Satake Eng Co Ltd Cereals storage tank
JP3236881B2 (en) * 1994-10-31 2001-12-10 日鐵建材工業株式会社 Steel silo leg structure
CN101691823A (en) * 2009-08-27 2010-04-07 安徽海螺建材设计研究院 Cement clinker library

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2360105A (en) * 1942-05-29 1944-10-10 Buckles William Scaffold
CN201165752Y (en) * 2008-03-03 2008-12-17 广州市建筑集团有限公司 Moveable building construction platform
CN101974977A (en) * 2010-10-29 2011-02-16 中建二局第三建筑工程有限公司 Pulley bracket platform with large-column-grid and large-area grid structure and construction method thereof by utilizing pulley bracket method
CN203129625U (en) * 2013-02-05 2013-08-14 中国建筑第八工程局有限公司 Central circular ring supporting frame in steel grid structure construction
CN203113826U (en) * 2013-03-22 2013-08-07 山西一建集团有限公司 Double-machine hoisting steel truss temporary supporting device
CN104060851A (en) * 2014-06-09 2014-09-24 武汉武船重型装备工程有限责任公司 Supporting structure and construction method for arch-rib roof truss sliding construction
CN204531472U (en) * 2015-04-21 2015-08-05 安徽建工集团有限公司 A kind of cement bunker top Elements of Space Grid Truss braced structures

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107299765A (en) * 2017-06-12 2017-10-27 芜湖天航科技(集团)股份有限公司 Method of starting for truncated cone-shaped rack

Also Published As

Publication number Publication date
CN106382039B (en) 2018-07-27
CN106382039A (en) 2017-02-08
CN104763165B (en) 2016-11-16

Similar Documents

Publication Publication Date Title
CN100545367C (en) The net-shell net-rack overhanging high altitude bulk construction method of bolted spherical node
CN102505846B (en) Steel pipe column bearing table girder connection construction method
CN110206155B (en) Bottom-added hydraulic jacking system and construction method
CN104831939A (en) Bolt ball welding ball mixed node large span cantilever grid structure construction method
CN110616885A (en) Movable overhanging working frame
CN103043543B (en) Device for reinforcing tower crane in coastal zone
CN103266778A (en) Detachable triangular scaffold and steel truss assembly construction method
CN102797643A (en) Wind power generation tower device
CN204531472U (en) A kind of cement bunker top Elements of Space Grid Truss braced structures
CN110656723B (en) Rail support for sliding construction of cylindrical arch shell roof
CN104763165A (en) Cement silo top steel net frame supporting structure and construction method thereof
CN107237515B (en) Support device of circular steel truss structure and use method thereof
CN205400216U (en) Steel construction silo flip -chip construction auxiliary device
CN112502475B (en) Supporting bearing capacity conversion device and using method thereof
CN204185777U (en) A kind of cantilevered auxiliary landing leg structure of bridge erecting machine
CN205444935U (en) Special -shaped steel space frame construction and installation structure of complicated large -span department
CN202745351U (en) Bailey truss supporting structure
CN207277893U (en) A kind of section steel platform formwork erecting structure for high-altitude overhanging
CN203961318U (en) A kind of underground nuclear power station reactor cavern containment dome installation structure
CN201367335Y (en) Hydraulic lifting device used for hoisting water tank of water tower
CN111622485A (en) Chimney lining masonry construction operation platform and construction method thereof
CN101709344B (en) Method for hoisting terrace for furnace top raw gas pipeline
CN103485564B (en) A kind of clinker warehouse top base ring support frame structure and construction method thereof
CN105804401B (en) A kind of construction steel moulding bed and the method using its lighting roof steel construction of constructing
CN220247541U (en) Suspension type supporting system for silo construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170424

Address after: 233000 Anhui City, East China Sea Road, Cheung Shan Road South

Patentee after: Anhui Water Resources Development Co., Ltd.

Address before: Wuhu road in Baohe District of Hefei city of Anhui Province, No. 325 230001

Patentee before: Anhui Construction Engineering Group Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190409

Address after: 230011 No. 1060 Yuxi Road, Yaohai District, Hefei City, Anhui Province

Patentee after: Anhui Second Construction Engineering Co., Ltd.

Address before: 233000 South Side of Zhanggongshan Road, Donghai Avenue, Bengbu City, Anhui Province

Patentee before: Anhui Water Resources Development Co., Ltd.