CN104759442B - A kind of rubbish Large Copacity heap buried method - Google Patents

A kind of rubbish Large Copacity heap buried method Download PDF

Info

Publication number
CN104759442B
CN104759442B CN201510124065.1A CN201510124065A CN104759442B CN 104759442 B CN104759442 B CN 104759442B CN 201510124065 A CN201510124065 A CN 201510124065A CN 104759442 B CN104759442 B CN 104759442B
Authority
CN
China
Prior art keywords
rubbish
storage lattice
heap
garbage
lattice
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510124065.1A
Other languages
Chinese (zh)
Other versions
CN104759442A (en
Inventor
陆红胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Jinxu Hengtai environmental protection Co., Ltd.
Original Assignee
Guizhou Shengpinrui Environmental Protection And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Shengpinrui Environmental Protection And Technology Co Ltd filed Critical Guizhou Shengpinrui Environmental Protection And Technology Co Ltd
Priority to CN201510124065.1A priority Critical patent/CN104759442B/en
Publication of CN104759442A publication Critical patent/CN104759442A/en
Application granted granted Critical
Publication of CN104759442B publication Critical patent/CN104759442B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The present invention discloses a kind of rubbish Large Copacity heap buried method, comprises the steps: 1, lays at the bottom of one layer of proof liner in bottom, rubbish heap buried hole; 2, level, vertical water permeating pipeline are set; 3 laying one layer of high-strength corrosion-resisting silk screen; 4, construct by steel plate level on high-strength corrosion-resisting silk screen and about pick and place storage lattice; 5, to storing up heap garbage in lattice and use compactor, from storage lattice top, rubbish is carried out compacting; 6, in storage lattice, solidifying agent powder body or solidifying agent liquid is sprayed; 7, on lower floor's storage lattice, level constructs the storage lattice of identical size, equal amts again; The storage lattice taking-up that 8, each fill solidification rubbish transports garbage burning factory burning disposal to; 9, when Leachate site liquid level exceedes the 3/4 of storage tank height, automatically open bleed valve and enter in sewage farm and process. In present method unit surface, garbage treatment quantity improves 10-50 doubly; Landfill stacking realizes modularization, facilitates follow-up incineration disposal, and processing efficiency significantly promotes, and reduces cost.

Description

A kind of rubbish Large Copacity heap buried method
Technical field
The present invention relates to a kind of rubbish Large Copacity heap buried method, belong to field of environment protection.
Background technology
Along with the continuous growth of population and the quick propelling of urbanization, China's urban population is increased sharply fast. Consequent problem also displays gradually, and refuse treatment problem is exactly one of wherein the most outstanding problem. China's urban population density is big, and refuse production is huge, and urban land resource is rare simultaneously, and the surrounding area in nearly all city is all surrounded by garbage mountain.
The treatment process of current rubbish is primarily of landfill method, burning method, biological degradation method etc. Wherein biological degradation method treatment cycle is very long, and also has a large amount of nondegradable rubbish, therefore cannot meet a large amount of cities come and process. Landfill method, burning method are still the treatment of urban garbage methods generally adopted at present, but there is following problem:
1, landfill takies a large amount of soil;
2, the garbage leachate polluted underground water produced and soil is filled;
3, the garbage loading embeading amount of unit surface is limited, and processing power is not enough.
These problems seriously restrict into the extensive process of municipal wastes above, urgently to be resolved hurrily.
Summary of the invention
For above-mentioned prior art Problems existing, the present invention provides a kind of rubbish Large Copacity heap buried method, and the method comprises the steps:
(1), lay at the bottom of one layer of proof liner in bottom, rubbish heap buried hole;
(2) surrounding, cheated in rubbish heap buried arranges some vertical water permeating pipelines, and at the bottom of proof liner on be close to the horizontal water permeating pipeline grid of laying at the bottom of proof liner, if horizontal water permeating pipeline upper tube wall evenly has water seepage hole, described vertical water permeating pipeline is connected with horizontal water permeating pipeline, finally pools together and connects garbage percolation liquid storage tank entrance;
(3), on horizontal water permeating pipeline grid, one layer of high-strength corrosion-resisting silk screen is laid;
(4), constructing about 4-36 by steel plate level can pick and place storage lattice on high-strength corrosion-resisting silk screen, the volume of described storage lattice can store 1~5 day rubbish stacked;
(5), to heap garbage in storage lattice, rubbish is after Chu Gezhong deposits 1~5 day, the Leachate site produced is flowed in garbage percolation liquid storage tank by horizontal and vertical water permeating pipeline, and now the volume of rubbish and water ratio all decrease, it may also be useful to rubbish is carried out compacting from storage lattice top by compactor;
(6) heap garbage in storage lattice, is then continued, and the operation of repeating step (5) is until this layer of all storage lattice heap piles rubbish, then sprays solidifying agent powder body or solidifying agent liquid in storage lattice;
(7), on lower floor's storage lattice, level constructs the storage lattice of identical size, equal amts again;
(8), repeating step (5)-(7);
(9), when rubbish heap buried height exceedes ground, the surrounding along rubbish heap buried hole builds sealing baffle, and it is identical that sealing baffle height stores up lattice height with individual layer;
(10), continue to repeat (7)-(8), until ground has been constructed 2-4 layer storage lattice;
(11), utilize forklift and crane that each fills the storage lattice taking-up of solidification rubbish, directly transport garbage burning factory burning disposal to, transport back after storage lattice are empty clearly and be reinstalled in rubbish heap buried hole or in sealing baffle;
(12), garbage percolation liquid storage tank liquid level controller is set, when Leachate site liquid level exceedes the 3/4 of storage tank height, automatically open bleed valve and enter in sewage farm and process.
Step (4) constructs 8-12 by steel plate level on high-strength corrosion-resisting silk screen and can pick and place storage lattice.
In step (10), ground is constructed 3 layers of storage lattice.
It is an advantage of the current invention that:
(1) namely present method is suitable for and is applicable to big area landfill region, is more suitable for small area landfill region, and in unit surface, garbage treatment quantity improves 10-50 doubly, significantly improves the refuse treatment ability of unit surface;
(2) filling stacking and realize modularization, facilitate follow-up incineration disposal, processing efficiency significantly promotes, and module can be reused, and reduces cost;
(3) owing to being provided with at the bottom of proof liner, level, vertical water permeating pipeline, avoid garbage leachate to the pollution of soil and groundwater.
Embodiment
Below in conjunction with embodiment, the invention will be further described.
Embodiment 1
(1) bottom, rubbish heap buried hole being, 500 square meters at area is laid at the bottom of one layer of proof liner;
(2) surrounding, cheated in rubbish heap buried arranges some vertical water permeating pipelines, and at the bottom of proof liner on be close to the horizontal water permeating pipeline grid of laying at the bottom of proof liner, if horizontal water permeating pipeline upper tube wall evenly has water seepage hole, described vertical water permeating pipeline is connected with horizontal water permeating pipeline, finally pools together and connects garbage percolation liquid storage tank entrance;
(3), on horizontal water permeating pipeline grid, one layer of high-strength corrosion-resisting silk screen is laid;
(4), constructing about 4 by steel plate level can pick and place storage lattice on high-strength corrosion-resisting silk screen, the volume of described storage lattice can store 1~5 day rubbish stacked;
(5), to heap garbage in storage lattice, rubbish is after Chu Gezhong deposits 1 day, the Leachate site produced is flowed in garbage percolation liquid storage tank by horizontal and vertical water permeating pipeline, and now the volume of rubbish and water ratio all decrease, it may also be useful to rubbish is carried out compacting from storage lattice top by compactor;
(6) heap garbage in storage lattice, is then continued, and the operation of repeating step (5) is until this layer of all storage lattice heap piles rubbish, then sprays solidifying agent powder body or solidifying agent liquid in storage lattice;
(7), on lower floor's storage lattice, level constructs the storage lattice of identical size, equal amts again;
(8), repeating step (5)-(7);
(9), when rubbish heap buried height exceedes ground, the surrounding along rubbish heap buried hole builds sealing baffle, and it is identical that sealing baffle height stores up lattice height with individual layer;
(10), continue to repeat (7)-(8), until ground has been constructed 4 layers of storage lattice;
(11), utilize forklift and crane that each fills the storage lattice taking-up of solidification rubbish, directly transport garbage burning factory burning disposal to, transport back after storage lattice are empty clearly and be reinstalled in rubbish heap buried hole or in sealing baffle;
(12), garbage percolation liquid storage tank liquid level controller is set, when Leachate site liquid level exceedes the 3/4 of storage tank height, automatically open bleed valve and enter in sewage farm and process.
By above-mentioned steps, the refuse treatment ability of unit surface improves 50 times, and processing cost reduces 92%.
Embodiment 2
(1), lay at the bottom of one layer of proof liner in the bottom, rubbish heap buried hole of 2400 square meters;
(2) surrounding, cheated in rubbish heap buried arranges some vertical water permeating pipelines, and at the bottom of proof liner on be close to the horizontal water permeating pipeline grid of laying at the bottom of proof liner, if horizontal water permeating pipeline upper tube wall evenly has water seepage hole, described vertical water permeating pipeline is connected with horizontal water permeating pipeline, finally pools together and connects garbage percolation liquid storage tank entrance;
(3), on horizontal water permeating pipeline grid, one layer of high-strength corrosion-resisting silk screen is laid;
(4), constructing about 20 by steel plate level can pick and place storage lattice on high-strength corrosion-resisting silk screen, the volume of described storage lattice can store 1~5 day rubbish stacked;
(5), to heap garbage in storage lattice, rubbish is after Chu Gezhong deposits 3 days, the Leachate site produced is flowed in garbage percolation liquid storage tank by horizontal and vertical water permeating pipeline, and now the volume of rubbish and water ratio all decrease, it may also be useful to rubbish is carried out compacting from storage lattice top by compactor;
(6) heap garbage in storage lattice, is then continued, and the operation of repeating step (5) is until this layer of all storage lattice heap piles rubbish, then sprays solidifying agent powder body or solidifying agent liquid in storage lattice;
(7), on lower floor's storage lattice, level constructs the storage lattice of identical size, equal amts again;
(8), repeating step (5)-(7);
(9), when rubbish heap buried height exceedes ground, the surrounding along rubbish heap buried hole builds sealing baffle, and it is identical that sealing baffle height stores up lattice height with individual layer;
(10), continue to repeat (7)-(8), until ground has been constructed 3 layers of storage lattice;
(11), utilize forklift and crane that each fills the storage lattice taking-up of solidification rubbish, directly transport garbage burning factory burning disposal to, transport back after storage lattice are empty clearly and be reinstalled in rubbish heap buried hole or in sealing baffle;
(12), garbage percolation liquid storage tank liquid level controller is set, when Leachate site liquid level exceedes the 3/4 of storage tank height, automatically open bleed valve and enter in sewage farm and process.
By above-mentioned steps, the refuse treatment ability of unit surface improves 30 times, and processing cost reduces 85%.
Embodiment 3
(1), lay at the bottom of one layer of proof liner in the bottom, rubbish heap buried hole of 4200 square meters;
(2) surrounding, cheated in rubbish heap buried arranges some vertical water permeating pipelines, and at the bottom of proof liner on be close to the horizontal water permeating pipeline grid of laying at the bottom of proof liner, if horizontal water permeating pipeline upper tube wall evenly has water seepage hole, described vertical water permeating pipeline is connected with horizontal water permeating pipeline, finally pools together and connects garbage percolation liquid storage tank entrance;
(3), on horizontal water permeating pipeline grid, one layer of high-strength corrosion-resisting silk screen is laid;
(4), constructing about 36 by steel plate level can pick and place storage lattice on high-strength corrosion-resisting silk screen, the volume of described storage lattice can store 1~5 day rubbish stacked;
(5), to heap garbage in storage lattice, rubbish is after Chu Gezhong deposits 5 days, the Leachate site produced is flowed in garbage percolation liquid storage tank by horizontal and vertical water permeating pipeline, and now the volume of rubbish and water ratio all decrease, it may also be useful to rubbish is carried out compacting from storage lattice top by compactor;
(6) heap garbage in storage lattice, is then continued, and the operation of repeating step (5) is until this layer of all storage lattice heap piles rubbish, then sprays solidifying agent powder body or solidifying agent liquid in storage lattice;
(7), on lower floor's storage lattice, level constructs the storage lattice of identical size, equal amts again;
(8), repeating step (5)-(7);
(9), when rubbish heap buried height exceedes ground, the surrounding along rubbish heap buried hole builds sealing baffle, and it is identical that sealing baffle height stores up lattice height with individual layer;
(10), continue to repeat (7)-(8), until ground has been constructed 2 layers of storage lattice;
(11), utilize forklift and crane that each fills the storage lattice taking-up of solidification rubbish, directly transport garbage burning factory burning disposal to, transport back after storage lattice are empty clearly and be reinstalled in rubbish heap buried hole or in sealing baffle;
(12), garbage percolation liquid storage tank liquid level controller is set, when Leachate site liquid level exceedes the 3/4 of storage tank height, automatically open bleed valve and enter in sewage farm and process.
By above-mentioned steps, the refuse treatment ability of unit surface improves 20 times, and processing cost reduces 74%.

Claims (3)

1. a rubbish Large Copacity heap buried method, it is characterised in that the method comprises the steps:
(1), lay at the bottom of one layer of proof liner in bottom, rubbish heap buried hole;
(2) surrounding, cheated in rubbish heap buried arranges some vertical water permeating pipelines, and at the bottom of proof liner on be close to the horizontal water permeating pipeline grid of laying at the bottom of proof liner, the tube wall of horizontal water permeating pipeline evenly has some water seepage holes, described vertical water permeating pipeline is connected with horizontal water permeating pipeline, finally pools together and connects garbage percolation liquid storage tank entrance;
(3), on horizontal water permeating pipeline grid, one layer of high-strength corrosion-resisting silk screen is laid;
(4), constructing 4-36 by steel plate level can pick and place and to reuse storage lattice on high-strength corrosion-resisting silk screen, the volume of described storage lattice can store 1~5 day rubbish stacked;
(5), to heap garbage in storage lattice, rubbish is after Chu Gezhong deposits 1~5 day, the Leachate site produced is flowed in garbage percolation liquid storage tank by horizontal and vertical water permeating pipeline, and now the volume of rubbish and water ratio all decrease, it may also be useful to rubbish is carried out compacting from storage lattice top by compactor;
(6) heap garbage in storage lattice, is then continued, and the operation of repeating step (5) is until this layer of all storage lattice heap piles rubbish, then sprays solidifying agent powder body or solidifying agent liquid in storage lattice;
(7), on lower floor's storage lattice, level constructs the storage lattice of identical size, equal amts again;
(8), repeating step (5)-(7);
(9), when rubbish heap buried height exceedes ground, the surrounding along rubbish heap buried hole builds sealing baffle, and it is identical that sealing baffle height stores up lattice height with individual layer;
(10), continue to repeat (7)-(8), until ground has been constructed 2-4 layer storage lattice;
(11), utilize forklift and crane that each fills the storage lattice taking-up of solidification rubbish, directly transport garbage burning factory burning disposal to, transport back after storage lattice are empty clearly and be reinstalled in rubbish heap buried hole or in sealing baffle;
(12), garbage percolation liquid storage tank liquid level controller is set, when Leachate site liquid level exceedes the 3/4 of storage tank height, automatically open bleed valve and enter in sewage farm and process.
2. rubbish Large Copacity heap buried method as claimed in claim 1, it is characterised in that, step (4) constructs 8-12 by steel plate level on high-strength corrosion-resisting silk screen and can pick and place storage lattice.
3. rubbish Large Copacity heap buried method as claimed in claim 1, it is characterised in that, in step (10), ground is constructed 3 layers of storage lattice.
CN201510124065.1A 2015-03-22 2015-03-22 A kind of rubbish Large Copacity heap buried method Expired - Fee Related CN104759442B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510124065.1A CN104759442B (en) 2015-03-22 2015-03-22 A kind of rubbish Large Copacity heap buried method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510124065.1A CN104759442B (en) 2015-03-22 2015-03-22 A kind of rubbish Large Copacity heap buried method

Publications (2)

Publication Number Publication Date
CN104759442A CN104759442A (en) 2015-07-08
CN104759442B true CN104759442B (en) 2016-06-15

Family

ID=53641721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510124065.1A Expired - Fee Related CN104759442B (en) 2015-03-22 2015-03-22 A kind of rubbish Large Copacity heap buried method

Country Status (1)

Country Link
CN (1) CN104759442B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105523678A (en) * 2016-02-03 2016-04-27 深圳市地质局 Closed-cycle brine spraying system and method for garbage disposal
CN109396156B (en) * 2018-09-21 2021-06-04 广州市通用新产品开发有限公司 Harmless reduction treatment method for hazardous waste
CN111687176B (en) * 2020-06-15 2021-08-24 内蒙古今日环保工程有限公司 Environment-friendly solidifying treatment method and device for industrial solid waste

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1849184A (en) * 2003-08-13 2006-10-18 克里斯托弗·穆特 Disposal area for storing substances composite substances or mixtures thereof, method for treating the same, and corresponding device
CN101439344A (en) * 2008-12-25 2009-05-27 同济大学 Filling method for reducing discharge of methane using wind force intensified ventilation
CN101879516A (en) * 2009-05-06 2010-11-10 中国环境科学研究院 Improved urban domestic garbage landfilling structure and landfilling treatment method
CN102441551A (en) * 2011-09-13 2012-05-09 北京高能时代环境技术股份有限公司 Garbage dumping method based on bioreactor principle
CN202390860U (en) * 2011-11-25 2012-08-22 华侨大学 Anti-leakage system capable of guiding and discharging seepage of garbage sanitary landfill

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1849184A (en) * 2003-08-13 2006-10-18 克里斯托弗·穆特 Disposal area for storing substances composite substances or mixtures thereof, method for treating the same, and corresponding device
CN101439344A (en) * 2008-12-25 2009-05-27 同济大学 Filling method for reducing discharge of methane using wind force intensified ventilation
CN101879516A (en) * 2009-05-06 2010-11-10 中国环境科学研究院 Improved urban domestic garbage landfilling structure and landfilling treatment method
CN102441551A (en) * 2011-09-13 2012-05-09 北京高能时代环境技术股份有限公司 Garbage dumping method based on bioreactor principle
CN202390860U (en) * 2011-11-25 2012-08-22 华侨大学 Anti-leakage system capable of guiding and discharging seepage of garbage sanitary landfill

Also Published As

Publication number Publication date
CN104759442A (en) 2015-07-08

Similar Documents

Publication Publication Date Title
CN104358267B (en) Vacuum tube well precipitation and disposal method for rapidly restoring in-situ water and soil in polluted place
CN109944610B (en) Method for rebuilding refuse landfill by using abandoned coal mine roadway
CN102493397A (en) In-situ landfill and island creation method for recycling polluted bed-mud dehydrated by geotextile tubes
CN104759442B (en) A kind of rubbish Large Copacity heap buried method
CN102367193A (en) Method for landfilling and processing municipal sludge by using geotechnical filter bag
CN103971778A (en) Disposal unit and method for nuclear power plant radioactive wet solid waste packaging container
CN111515214A (en) Step type hazardous waste rigid landfill system based on valley terrain and operation method
CN105344702B (en) A kind of residue circulates landfill yard
CN104475419A (en) Garbage landfill site multi-layer leachate recirculation pipe network and gas-liquid drainage exchange system
CN1187136C (en) Method of refill spent mining field using city solid garbage
CN201817805U (en) Closure structure of sludge house
CN219503430U (en) Vertical partition structure of household garbage landfill
CN102605760A (en) Method and device of vacuum in-situ consolidation of large-area urban domestic sludge
CN207592408U (en) A kind of pollution separation layer on Mini nutritionalassessment junk-heap body
CN111501727A (en) Device for vacuum preloading treatment of waste slurry of drainage plate and construction process thereof
CN111005435A (en) Rigid landfill
CN110400649A (en) A kind of method and structure of low middle level radioactive waste grotto disposition
CN114457855B (en) Sinking type horizontal seepage-proofing and vertical seepage-proofing combined structure
CN202989939U (en) Vertical drainage well of ash storage yard
CN202202339U (en) Geogrid reinforced soil retaining wall of concrete module
CN108580503B (en) Large garbage pile slope shaping construction method
CN111335362B (en) Structural arrangement mode of common industrial solid waste storage place
CN114293596A (en) Vertical seepage-proofing process for large garbage mountain
CN212610197U (en) Vacuum type waste slurry treatment device
CN111335363B (en) New method for storing and disposing general industrial solid waste

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 550000, No. 1, unit 11, building 148, Yunshan international, No. 20-5 North Road, Yunyan District, Guizhou, Guiyang

Applicant after: Guizhou Shengpinrui Environmental Protection and Technology Co., Ltd

Address before: Dayuan town of Fuyang city new village in Hangzhou city of Zhejiang province in 311414.

Applicant before: FUYANG HONGXIANG TECHNOLOGY SERVICES CO., LTD.

CB03 Change of inventor or designer information

Inventor after: Lu Hongsheng

Inventor before: Li Chengwei

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180810

Address after: 550008 Auxiliary Room B306 of Standard Factory Building of Jinyang Science and Technology Industrial Park, Guiyang National High-tech Industrial Development Zone, Guizhou Province

Patentee after: Guizhou Jinxu Hengtai environmental protection Co., Ltd.

Address before: 550000 No. 1, unit 11, poly Yunshan international 11, 148 North Road, Yunyan District, Guiyang, Guizhou.

Patentee before: Guizhou Shengpinrui Environmental Protection and Technology Co., Ltd

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160615

Termination date: 20200322

CF01 Termination of patent right due to non-payment of annual fee