CN104757752B CN201510187666.7A CN201510187666A CN104757752B CN 104757752 B CN104757752 B CN 104757752B CN 201510187666 A CN201510187666 A CN 201510187666A CN 104757752 B CN104757752 B CN 104757752B
Authority
CN
China
Prior art keywords
cam
plastic material
rocking arm
jumper bar
process equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510187666.7A
Other languages
Chinese (zh)
Other versions
CN104757752A (en
Inventor
何志琳
江海强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI LANSE ELECTROMECHANICAL SCIENCE AND TECHNOLOGY Co Ltd
Original Assignee
SHANGHAI LANSE ELECTROMECHANICAL SCIENCE AND TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI LANSE ELECTROMECHANICAL SCIENCE AND TECHNOLOGY Co Ltd filed Critical SHANGHAI LANSE ELECTROMECHANICAL SCIENCE AND TECHNOLOGY Co Ltd
Priority to CN201510187666.7A priority Critical patent/CN104757752B/en
Publication of CN104757752A publication Critical patent/CN104757752A/en
Application granted granted Critical
Publication of CN104757752B publication Critical patent/CN104757752B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of plastic cement sprocket process equipment.Above-mentioned plastic cement sprocket process equipment includes motor, first assembly, the second component and the 3rd component, and first assembly includes the first cam, the first rocking arm, pressing plate and cutting knife;Second component includes the second cam, the second rocking arm, linkage board, fagging, roller and jumper bar;3rd component includes the 3rd cam, the 3rd rocking arm and pressure pin.Can realize first pressing the course of work cut depart from again afterwards, pressing plate compresses the both sides of zipper strip, positions zipper strip, cutting knife cuts away part plastic material afterwards, pressure pin and jumper bar clamp plastic material, make remaining plastic material depart from zipper strip.Pressure pin and jumper bar are engaged, and enable the complete disengaging from zipper strip of plastic material, disposably thoroughly carry out to the plastic material of tooth position will be gone to remove, and improve processing efficiency.Meanwhile, the connection of the first cam, the second cam and the 3rd cam coaxial can be driven by same motor, save space, reduces cost.

Description

Plastic cement sprocket process equipment
Technical field
The present invention relates to the technical field of slide fastener processing, more particularly to a kind of plastic cement sprocket process equipment.
Background technology
Traditional plastic zipper process technology uses eccentric wheel, with the haul distance mating mold undershoot of eccentric wheel, will go Tooth position is directly smashed.Due to the composition characteristics of plastic cement sprocket, sprocket has certain fragility, and mould undershoot directly smashes tooth position Sprocket raw material, it is impossible to make that broken tooth is complete to be departed from from cloth band, the broken tooth in part needs manually to depart from.Simultaneously as passing Method of the system technology using sprocket is directly smashed, causes the broken tooth being crashed to pieces to be scattered on the periphery and ground of equipment, it is not easy to Collect, it is difficult to secondary to use.
The content of the invention
Based on this, it is necessary to during processing sprocket, the problem that broken tooth completely can not depart from from cloth band is carried For a kind of plastic cement sprocket process equipment.
A kind of plastic cement sprocket process equipment, the plastic material gone in tooth position for cutting zipper strip, to form sprocket, institute Stating plastic cement sprocket process equipment includes:
Motor;
First assembly, including the first cam, the first rocking arm, pressing plate and cutting knife;The motor drive described first is convex Wheel is rotated, the first rocking arm lengthwise movement described in first cam driven, and it is described that first rocking arm drives the pressing plate to compress The both sides of zipper strip, first rocking arm drives the cutting knife lengthwise movement, the cutting knife is cut the plastic material;
Second component, including the second cam, the second rocking arm, linkage board, fagging, roller and jumper bar;Second cam with First cam coaxial connection, the motor drives second cam rotation, the described in second cam driven Two rocking arm lengthwise movements, second rocking arm drives the linkage board lengthwise movement;After the linkage board moves to the fagging, The linkage board drives the fagging lengthwise movement, and the fagging drives the roller transverse movement;The roller drives described Cutting knife transverse movement, makes the cutting knife cut away the part plastic material;It is described after the linkage board moves to the jumper bar Dynamic strip moves the jumper bar lengthwise movement, the jumper bar is depressed into the surface of the plastic material;And
3rd component, including the 3rd cam, the 3rd rocking arm and pressure pin;3rd cam connects with first cam coaxial Connect, the motor drives the 3rd cam rotation, the 3rd rocking arm lengthwise movement described in the 3rd cam driven is described 3rd rocking arm drives the pressure pin lengthwise movement, the pressure pin and the jumper bar is clamped the plastic material and is transported to the pressure pin It is dynamic, the plastic material is departed from the zipper strip.
Wherein in one embodiment, also including broken tooth collecting box, the plastic cement thing of the zipper strip is departed to collect Material, the broken tooth collecting box is located at the lower section of the pressure pin.
Wherein in one embodiment, when the jumper bar is depressed into the surface of the plastic material, the linkage board with it is described Pressing plate elastic connection.
Wherein in one embodiment, the blind hole towards the linkage board is offered on the pressing plate, set in the blind hole It is equipped with stage clip;
When the jumper bar is depressed into the surface of the plastic material, the linkage board is abutted with the stage clip.
Wherein in one embodiment, the width of the end face contacted with the plastic material of the jumper bar is less than the modeling The width of glue material;Width of the width of the end face contacted with the plastic material of the pressure pin more than the plastic material.
Wherein in one embodiment, first rocking arm is located at the top of first cam, the second rocking arm position In the top of second cam, the 3rd rocking arm is located at the lower section of the 3rd cam;The longitudinal direction is vertical direction, institute State laterally as horizontal direction.
Wherein in one embodiment, second component also includes upper mould, the pressing plate and the cutting knife with it is described Upper mould connection, first rocking arm is moved by driving the upper mould, so as to drive the pressing plate and the cutting knife to move.
Wherein in one embodiment, the 3rd component also includes lower mould, and the lower mould offers groove, the pressure pin Including bar body and blocking part, the blocking part is located at the both sides of the bar body, the bar body by the lower mould lower section Penetrate the groove, the blocking part and the lower mould clamping.
Wherein in one embodiment, the fagging has inclined-plane, and the inclined-plane is rolled with the roller and is connected.
Wherein in one embodiment, first rocking arm drives multigroup pressing plate and the cutting knife to move respectively, often The pressing plate of group and the quantity of the cutting knife are two;
The linkage board drives multigroup fagging, the roller and the jumper bar, every group of the fagging and institute respectively The quantity for stating roller is two, and the quantity of every group of the jumper bar is one;
The symmetrical both sides for being arranged on the jumper bar of every group of two pressing plates, and every group of two pressing plates difference Compress the both sides of the zipper strip;The symmetrical both sides for being arranged on the jumper bar of every group of two cutting knifes;
The symmetrical both sides for being arranged on the jumper bar of every group of two faggings, and the pressing plate be located at the jumper bar and Between the fagging;The symmetrical both sides for being arranged on the jumper bar of every group of two rollers;
Every group of the fagging is connected correspondingly with the roller, and every group of two rollers drive every group respectively Two cutting knifes move in the opposite direction.
Above-mentioned plastic cement sprocket process equipment, it is possible to achieve first press the course of work cut depart from again afterwards, pressing plate compresses zipper strip Both sides, position zipper strip, cutting knife cuts away part plastic material afterwards, and pressure pin and jumper bar clamp plastic material, make remaining Plastic material departs from zipper strip.Pressure pin and jumper bar are engaged, and enable the complete disengaging from zipper strip of plastic material, disposably Thoroughly carry out to the plastic material of tooth position will be gone to remove, eliminate secondary operation, improve processing efficiency.Meanwhile, first is convex The connection of wheel, the second cam and the 3rd cam coaxial, can be driven by same motor, save space, reduces cost.
Brief description of the drawings
Fig. 1 is the schematic diagram of an embodiment plastic cement sprocket process equipment;
Fig. 2 is the front view of plastic cement sprocket process equipment shown in Fig. 1;
Fig. 3 is partial enlarged drawing at the A of plastic cement sprocket process equipment shown in Fig. 2;
Fig. 4 is the top view of plastic cement sprocket process equipment shown in Fig. 2;
Fig. 5 is the left view of plastic cement sprocket process equipment shown in Fig. 2;
Fig. 6 is the right view of plastic cement sprocket process equipment shown in Fig. 2;
Fig. 7 is partial enlarged drawing at the B of plastic cement sprocket process equipment shown in Fig. 6.
Specific embodiment
For the ease of understanding the present invention, plastic cement sprocket process equipment is more fully retouched below with reference to relevant drawings State.The first-selected embodiment of plastic cement sprocket process equipment is given in accompanying drawing.But, plastic cement sprocket process equipment can be with many not With form realize, however it is not limited to embodiment described herein.On the contrary, the purpose for providing these embodiments is made to modeling The disclosure of glue sprocket process equipment is more thorough comprehensive.
Unless otherwise defined, all of technologies and scientific terms used here by the article with belong to technical field of the invention The implication that technical staff is generally understood that is identical.The term used in the description in plastic cement sprocket process equipment is herein In order to describe the purpose of specific embodiment, it is not intended that in the limitation present invention.
As shown in Figure 1 and Figure 2, the plastic cement sprocket process equipment 10 of an implementation method includes first assembly, the second component, the Three components and motor 100.Referring also to Fig. 3, the plastic cement sprocket process equipment 10 of the present embodiment is used to cut zipper strip 20 The plastic material 30 gone in tooth position, to form sprocket.
Referring also to Fig. 4, Fig. 5, specifically, first assembly includes the first cam 110, the first rocking arm 120, the and of pressing plate 130 Cutting knife 140.Motor 100 drives the first cam 110 to rotate, and the first cam 110 drives the lengthwise movement of the first rocking arm 120, the One rocking arm 120 compresses the both sides of zipper strip 20 with dynamic pressure plate 130, and the first rocking arm 120 drives the lengthwise movement of cutting knife 140, makes cutting knife 140 incision plastic materials 30.
Second component includes the second cam 210, the second rocking arm 220, linkage board 230, fagging 240, roller 250 and jumper bar 260.Second cam 210 is coaxially connected with the first cam 110, and motor 100 drives the second cam 210 to rotate, second in Fig. 1 Cam 210 overlaps with the first cam 110.Second cam 210 drives the lengthwise movement of the second rocking arm 220, and the second rocking arm 220 drives connection The dynamic lengthwise movement of plate 230, the second rocking arm 220 overlaps with the first rocking arm 120 in Fig. 1.After linkage board 230 moves to fagging 240, connection Dynamic plate 230 drives the lengthwise movement of fagging 240, and fagging 240 drives the transverse movement of roller 250.In one embodiment, fagging 240 has There is inclined-plane, inclined-plane is rolled with roller 250 and is connected.Roller 250 drives the transverse movement of cutting knife 140, cutting knife 140 is cut away part plastic cement Material 30.After linkage board 230 moves to jumper bar 260, linkage board 230 drives the lengthwise movement of jumper bar 260, jumper bar 260 is depressed into modeling The surface of glue material 30.
3rd component includes the 3rd cam 310, the 3rd rocking arm 320 and pressure pin 330.3rd cam 310 and the first cam 110 Coaxially connected, motor 100 drives the 3rd cam 310 to rotate, and the 3rd cam 310 overlaps with the first cam 110 in Fig. 1.The Three cam 310 drives the lengthwise movement of the 3rd rocking arm 320, and the 3rd rocking arm 320 drives the lengthwise movement of pressure pin 330, makes pressure pin 330 and punching Bar 260 clamps plastic material 30 and is moved to pressure pin 330, plastic material 30 is departed from zipper strip 20.
The plastic cement sprocket process equipment 10 of the present embodiment, it is possible to achieve first press the course of work cut depart from again afterwards, pressing plate 130 The both sides of zipper strip 20 are compressed, zipper strip 20 is positioned, cutting knife 140 cuts away part plastic material 30, pressure pin 330 and jumper bar afterwards 260 clamp plastic material 30, remaining plastic material 30 is departed from zipper strip 20.Pressure pin 330 and jumper bar 260 are engaged, and make modeling Glue material 30 completely can depart from from zipper strip 20, disposably thoroughly carry out to the plastic material 30 of tooth position will be gone to go Remove, eliminate secondary operation, improve processing efficiency.Meanwhile, the first cam 110, the second cam 210 and the 3rd cam 310 are same Axle is connected, and can be driven by same motor 100, saves space, reduces cost.
In the present embodiment, the first rocking arm 120 is located at the top of the first cam 110, and the second rocking arm 220 is located at the second cam 210 top, the 3rd rocking arm 320 is located at the lower section of the 3rd cam 310.Above-mentioned longitudinal direction is vertical direction, and above-mentioned transverse direction is level Direction.Now, the operation of equipment is not easy to be caused a deviation because of the effect of weight.Certainly, in other embodiments, it would however also be possible to employ Other coordinate systems, such as longitudinal direction are horizontal direction, are laterally vertical direction.
Wherein in one embodiment, the second component can also include upper mould 270, pressing plate 130 and cutting knife 140 with upper mould 270 connections, the first rocking arm 120 is moved by driving upper mould 270, so that band dynamic pressure plate 130 and cutting knife 140 are moved so that pressing plate 130 and synchronism is more preferable during 140 lengthwise movement of cutting knife.Further, the 3rd component can also include lower mould 340, and lower mould 340 is opened Groove is provided with, pressure pin 330 includes bar body 332 and blocking part 334, and blocking part 334 is located at the both sides of bar body 332, bar body 332 penetrate groove, blocking part 334 and the clamping of lower mould 340 by the lower section of lower mould 340.Motion of the lower mould 340 to pressure pin 330 is played The effect for being oriented to and positioning.
Motor 100 can be servomotor, and motor 100 drives the first cam 110, the second cam 210 and the Three cams 310 circle, and can complete three below action:
Action one, drive the first rocking arm 120 upper mould 270 is down moved by the first cam 110, move to pressing plate 130 and press The both sides of chain belt 20 are strained at, cutting knife 140 cuts off the part above plastic material 30 of zipper strip 20.
Action two, the second rocking arm 220 is driven linkage board 230 is pressed onto fagging 240 by the second cam 210, roller 250 makes to cut Knife 140 or so is strutted, and then linkage board 230 is pressed onto jumper bar 260, jumper bar 260 is pressed onto the surface of plastic material 30.
Action three, to drive the 3rd rocking arm 320 pressure pin 330 and jumper bar 260 is clamped plastic material 30 by the 3rd cam 310 same Step is down moved, and plastic material 30 is departed from zipper strip 20 and is covered journey row, and each moving component returns to shuttling movement in situ.
Above three action is synchronous to be carried out, by the sequencing of cam locus control action.Due to the first cam 110th, the second cam 210 and the 3rd cam 310 are coaxially connected, and synchronism is high, it is to avoid because different driving equipment above three is dynamic Make caused to coordinate not smooth.
The quantity of the first cam 110, the second cam 210 and the 3rd cam 310 may each be one or more, similarly, the The quantity of one rocking arm 120, the second rocking arm 220 and the 3rd rocking arm 320 can also be one or more.In the present embodiment, first The quantity of the cam 310 of cam 110 and the 3rd is two, and the quantity of the second cam 210 is one, and the second cam 210 is located at two Between 3rd cam 310, two the 3rd cams 310 and second cam 210 are located between two the first cams 110.Accordingly , the quantity of the first rocking arm 120 and the 3rd rocking arm 320 is two, and the quantity of the second rocking arm 220 is one, the second 220, rocking arm Between two the 3rd rocking arms 320, two the 3rd rocking arms 320 and second rocking arm 220 be located at two the first rocking arms 120 it Between.
Referring also to Fig. 6, Fig. 7, in one embodiment, plastic cement sprocket process equipment 10 can simultaneously process multiple sprockets. First rocking arm 120 can respectively drive multigroup pressing plate 130 and cutting knife 140 to move, every group of pressing plate 130 and the quantity of cutting knife 140 It is two.Linkage board 230 drives multigroup fagging 240, roller 250 and jumper bar 260, every group of fagging 240 and roller 250 respectively Quantity be two, the quantity of every group of jumper bar 260 is one.Every group of two pressing plates 130 it is symmetrical be arranged on jumper bar 260 Both sides, and every group of two pressing plates 130 compress the both sides of zipper strip 20 respectively.The symmetrical setting of every group of two cutting knifes 140 In the both sides of jumper bar 260.The symmetrical both sides for being arranged on jumper bar 260 of every group of two faggings 240, and pressing plate 130 is located at jumper bar Between 260 and fagging 240.The symmetrical both sides for being arranged on jumper bar 260 of every group of two rollers 250.Every group of fagging 240 and rolling The one-to-one connection of wheel 250, every group of two rollers 250 drive every group of two cutting knifes 140 to transport in the opposite direction respectively It is dynamic.
Wherein in one embodiment, plastic cement sprocket process equipment 10 (can also not show including broken tooth collecting box in figure Go out), the plastic material 30 of zipper strip 20 is departed to collect.So as to conveniently be carried out to the plastic material 30 for departing from zipper strip 20 secondary Use.Broken tooth collecting box is located at the lower section of pressure pin 330, and plastic material 30 is fallen into broken tooth collecting box.In one embodiment, broken tooth Collecting box may be mounted on the 3rd component, another part that the part plastic material 30 and jumper bar 260 that cutting knife 140 cuts sweep away Plastic material 30 each fall within broken tooth collecting box.
Zipper strip 20 is generally strap, in order to ensure that it is tight enough that pressing plate 130 is pressed zipper strip 20, and avoids pressing plate simultaneously The tensions of the 130 pairs of zipper strips 20 pressure and damage zipper strip 20 by pressure, in one embodiment, jumper bar 260 is depressed into the surface of plastic material 30 When, linkage board 230 and the elastic connection of pressing plate 130.When jumper bar 260 is depressed into the surface of plastic material 30, will coordinate with pressure pin 330 makes Plastic material 30 departs from zipper strip 20, and now need that pressing plate 130 press zipper strip 20 is tight enough, linkage board 230 and pressing plate 130 Elastic connection, enhances thrust of the pressing plate 130 to zipper strip 20, while the effect of elasticity can avoid pressing plate 130 to slide fastener Zipper strip 20 is damaged by pressure with 20 tensions pressed.Further, in a specific embodiment, offered on pressing plate 130 towards connection The blind hole of dynamic plate 230, is provided with stage clip 132 in blind hole.When jumper bar 260 is depressed into the surface of plastic material 30, linkage board 230 with pressure Spring 132 is abutted.
Wherein in one embodiment, the width of the end face contacted with plastic material 30 of jumper bar 260 is less than plastic material 30 width, the impulse force of jumper bar 260 is more concentrated.The width of the end face contacted with plastic material 30 of pressure pin 330 is more than plastic cement The width of material 30, can be with relatively reliable support plastic material 30.The jumper bar 260 of the present embodiment is engaged with pressure pin 330, can To improve the reliability and stability that plastic material 30 departs from the motion of zipper strip 20.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope of this specification record is all considered to be.
Embodiment described above only expresses several embodiments of the invention, and its description is more specific and detailed, but simultaneously Can not therefore be construed as limiting the scope of the patent.It should be pointed out that coming for one of ordinary skill in the art Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (8)

1. a kind of plastic cement sprocket process equipment, the plastic material gone in tooth position for cutting zipper strip, to form sprocket, it is special Levy and be, the plastic cement sprocket process equipment includes:
Motor;
First assembly, including the first cam, the first rocking arm, pressing plate and cutting knife;The motor drives first cam to turn Dynamic, the first rocking arm lengthwise movement described in first cam driven, first rocking arm drives the pressing plate to compress the slide fastener The both sides of band, first rocking arm drives the cutting knife lengthwise movement, the cutting knife is cut the plastic material;
Second component, including the second cam, the second rocking arm, linkage board, fagging, roller and jumper bar;Second cam with it is described First cam coaxial is connected, the motor drive second cam rotation, and second shakes described in second cam driven Arm lengthwise movement, second rocking arm drives the linkage board lengthwise movement;It is described after the linkage board moves to the fagging Linkage board drives the fagging lengthwise movement, and the fagging drives the roller transverse movement;The roller drives the cutting knife Transverse movement, makes the cutting knife cut away the part plastic material;After the linkage board moves to the jumper bar, the linkage board The jumper bar lengthwise movement is driven, the jumper bar is depressed into the surface of the plastic material;And
3rd component, including the 3rd cam, the 3rd rocking arm and pressure pin;3rd cam is connected with first cam coaxial, The motor drives the 3rd cam rotation, the 3rd rocking arm lengthwise movement described in the 3rd cam driven, and described the Three rocking arms drive the pressure pin lengthwise movement, the pressure pin and the jumper bar is clamped the plastic material and are transported to the pressure pin It is dynamic, the plastic material is departed from the zipper strip;
Also include broken tooth collecting box, the plastic material of the zipper strip is departed to collect, the broken tooth collecting box is located at institute State the lower section of pressure pin;
When the jumper bar is depressed into the surface of the plastic material, the linkage board and the pressing plate elastic connection.
2. plastic cement sprocket process equipment according to claim 1, it is characterised in that offered on the pressing plate towards described The blind hole of linkage board, stage clip is provided with the blind hole;
When the jumper bar is depressed into the surface of the plastic material, the linkage board is abutted with the stage clip.
3. plastic cement sprocket process equipment according to claim 1, it is characterised in that the jumper bar with the plastic material Width of the width of the end face of contact less than the plastic material;The width of the end face contacted with the plastic material of the pressure pin Width of the degree more than the plastic material.
4. plastic cement sprocket process equipment according to claim 1, it is characterised in that first rocking arm is located at described first The top of cam, second rocking arm is located at the top of second cam, and the 3rd rocking arm is located at the 3rd cam Lower section;The longitudinal direction is vertical direction, and the transverse direction is horizontal direction.
5. plastic cement sprocket process equipment according to claim 4, it is characterised in that second component also includes upper mould, The pressing plate and the cutting knife are connected with the upper mould, and first rocking arm is moved by driving the upper mould, so as to drive The pressing plate and the cutting knife are moved.
6. plastic cement sprocket process equipment according to claim 4, it is characterised in that the 3rd component also includes lower mould, The lower mould offers groove, and the pressure pin includes bar body and blocking part, and the blocking part is located at the both sides of the bar body, The bar body is by penetrating the groove, the blocking part and the lower mould clamping below the lower mould.
7. plastic cement sprocket process equipment according to claim 1, it is characterised in that the fagging has an inclined-plane, it is described tiltedly Face rolls with the roller and is connected.
8. plastic cement sprocket process equipment according to claim 1, it is characterised in that first rocking arm drives multigroup respectively The pressing plate and the cutting knife are moved, and every group of the pressing plate and the quantity of the cutting knife are two;
The linkage board drives multigroup fagging, the roller and the jumper bar, every group of the fagging and the rolling respectively The quantity of wheel is two, and the quantity of every group of the jumper bar is one;
The symmetrical both sides for being arranged on the jumper bar of every group of two pressing plates, and every group of two pressing plates compress respectively The both sides of the zipper strip;The symmetrical both sides for being arranged on the jumper bar of every group of two cutting knifes;
The symmetrical both sides for being arranged on the jumper bar of every group of two faggings, and the pressing plate is located at the jumper bar and described Between fagging;The symmetrical both sides for being arranged on the jumper bar of every group of two rollers;
Every group of the fagging is connected correspondingly with the roller, and every group of two rollers drive the two of every group respectively The individual cutting knife is moved in the opposite direction.
CN201510187666.7A 2015-04-20 2015-04-20 Plastic cement sprocket process equipment Expired - Fee Related CN104757752B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510187666.7A CN104757752B (en) 2015-04-20 2015-04-20 Plastic cement sprocket process equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510187666.7A CN104757752B (en) 2015-04-20 2015-04-20 Plastic cement sprocket process equipment

Publications (2)

Publication Number Publication Date
CN104757752A CN104757752A (en) 2015-07-08
CN104757752B true CN104757752B (en) 2017-07-04

Family

ID=53640120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510187666.7A Expired - Fee Related CN104757752B (en) 2015-04-20 2015-04-20 Plastic cement sprocket process equipment

Country Status (1)

Country Link
CN (1) CN104757752B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3958319A (en) * 1974-01-31 1976-05-25 Yoshida Kogyo Kabushiki Kaisha Apparatus for producing element-free gaps in a continuous fastener chain
US4325173A (en) * 1978-11-16 1982-04-20 Yoshida Kogyo K.K. Method and apparatus for finishing a pair of elongate slide fastener stringers
US5177855A (en) * 1990-11-29 1993-01-12 Yoshida Kogyo K. K. Method and apparatus for forming element-free spaces in slide fastener chain
CN1140573A (en) * 1995-05-31 1997-01-22 Ykk株式会社 Method and apparatus for forming element-free space portion in slide fastener chain
CN1245667A (en) * 1998-08-25 2000-03-01 Ykk株式会社 Finishing equipment for zipper chain
CN101524206A (en) * 2008-03-07 2009-09-09 福建浔兴拉链科技股份有限公司 Zipper tooth collector and zipper sizing tooth remover using same
CN204599600U (en) * 2015-04-20 2015-09-02 深圳市蓝瑟机电科技有限公司 Plastic cement sprocket process equipment

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3958319A (en) * 1974-01-31 1976-05-25 Yoshida Kogyo Kabushiki Kaisha Apparatus for producing element-free gaps in a continuous fastener chain
US4325173A (en) * 1978-11-16 1982-04-20 Yoshida Kogyo K.K. Method and apparatus for finishing a pair of elongate slide fastener stringers
US5177855A (en) * 1990-11-29 1993-01-12 Yoshida Kogyo K. K. Method and apparatus for forming element-free spaces in slide fastener chain
CN1140573A (en) * 1995-05-31 1997-01-22 Ykk株式会社 Method and apparatus for forming element-free space portion in slide fastener chain
CN1245667A (en) * 1998-08-25 2000-03-01 Ykk株式会社 Finishing equipment for zipper chain
CN101524206A (en) * 2008-03-07 2009-09-09 福建浔兴拉链科技股份有限公司 Zipper tooth collector and zipper sizing tooth remover using same
CN204599600U (en) * 2015-04-20 2015-09-02 深圳市蓝瑟机电科技有限公司 Plastic cement sprocket process equipment

Also Published As

Publication number Publication date
CN104757752A (en) 2015-07-08

Similar Documents

Publication Publication Date Title
CN105922522A (en) Water gap separation device and water gap separation method thereof
CN105538410B (en) Align punch system
CN107116832A (en) Card press machine
KR20150006338A (en) Processing apparatus of bodnded substrate
CN104843444A (en) Multi-part conveyor
CN104757752B (en) Plastic cement sprocket process equipment
CN204599600U (en) Plastic cement sprocket process equipment
CN209498800U (en) Zipper tape flushing device
CN207014478U (en) Punching formation equipment
EP2633988B1 (en) Method for trimming a tire part from an elastomer with a material thickness that is thin at the sides and comes to a sharp point
CN206925230U (en) A kind of sheet material crimping unit
CN102774126A (en) Four-border synchronous automatic stretching mechanism for SMT (surface mount technology) stencils
CN204713935U (en) A kind of multi-part conveyer
JP6410157B2 (en) Bonded substrate processing equipment
CN105024255A (en) RF terminal assembly device
CN203528030U (en) Attaching device for foamed material
CN209077071U (en) A kind of glass front and back sides UV glue spreader
CN211445782U (en) Cow hide processing tightening device
CN208100652U (en) A kind of full-automatic foot pier molding machine
CN209812624U (en) Automatic feeding mechanism of woodworking edge bonding machine
DE102011086983B4 (en) Device for stacking veneer sheets
CN207723849U (en) A kind of proportioning valve assembling test machine
CN209273998U (en) A kind of tread plate welding processing structure on pallet
CN109941738A (en) A kind of device and method that tobacco pile is thin layer
CN206611706U (en) Glass panel inserts PIN devices

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170704