CN104754893B - The protective housing and installation method of equipment are gathered and sent for steel construction Monitoring Data - Google Patents

The protective housing and installation method of equipment are gathered and sent for steel construction Monitoring Data Download PDF

Info

Publication number
CN104754893B
CN104754893B CN201510150551.0A CN201510150551A CN104754893B CN 104754893 B CN104754893 B CN 104754893B CN 201510150551 A CN201510150551 A CN 201510150551A CN 104754893 B CN104754893 B CN 104754893B
Authority
CN
China
Prior art keywords
steel
screw thread
external screw
casing
demarcation strip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510150551.0A
Other languages
Chinese (zh)
Other versions
CN104754893A (en
Inventor
周俊龙
余流
邵辉
郭颖
高璞
石丰祥
李飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201510150551.0A priority Critical patent/CN104754893B/en
Publication of CN104754893A publication Critical patent/CN104754893A/en
Application granted granted Critical
Publication of CN104754893B publication Critical patent/CN104754893B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses the protective housing and installation method that equipment is gathered and sent for steel construction Monitoring Data, it includes:Casing is sling to installation site and is welded on steel structure surface, plastic bushing is screwed on the external screw thread screwed pipe of steel box bottom, power line is introduced into steel box house from the plastic bushing, select the external screw thread screwed pipe inlet wire on steel box side, the external screw thread screwed pipe of cabling is screwed on into steel sleeve, signal wire is introduced inside steel plate box through steel sleeve;Steel plate box inner bin demarcation strip is installed, power line is placed in lower floor's demarcation strip, static monitoring techniques equipment and wireless transmission device split middle level demarcation strip and upper strata demarcation strip, and space of the signal wire in steel plate box between casing demarcation strip and steel plate box rear wall is connected in static monitoring techniques equipment;The antenna of wireless transmission device is passed via the idle external screw thread screwed pipe at side plate, and a plastic bushing is screwed on the external screw thread screwed pipe.Using this method field monitoring equipment can be made to have perfect shelter.

Description

The protective housing and installation method of equipment are gathered and sent for steel construction Monitoring Data
Technical field
The present invention relates to steel construction to monitor field, relates in particular to a kind of steel construction Monitoring Data collection, sends equipment Protect box structure and its installation method.
Background technology
Steel construction monitoring makes it for monitoring instrument in monitoring process because it has the characteristics that the time is long, required precision is high Protection have very high requirement.It is small that protective housing for the collection of steel construction Monitoring Data and transmission equipment must be placed at interference Shelter, do not contacted with ground so that in order to avoid making moist, generally use backboard welding method is welded on rod structure, in order to avoid construction is dry Disturb, it is desirable to fixation.Reduce the opening of casing as far as possible, casing top cabling is avoided, to improve the waterproof and dustproof of structure Effect;Monitoring signals line and power line must separate cabling, place respectively, and casing can not shield the wireless communication of monitoring device Number.It is currently known in steel construction monitoring field, for steel construction Monitoring Data gather and send equipment protection box structure Ununified standard, therefore the manufacture and installation of casing are all very random.Often in order to pursue the effect of waterproof and dustproof and Using the strong casing of closure, monitoring device wireless signal can be caused to be shielded, the signal of signal wire also can be by power supply magnetic The interference of field;And although open preferably casing can guarantee that the transmission of wireless signal, but do not possess the property of waterproof and dustproof Can, make precision equipment well damage.
Chinese patent CN200910262541.0 discloses " electrical device accommodating casing ", has installation electrical equipment Backboard and the front frame being assembled on backboard, front frame are formed by top plate, bottom plate, left side plate and are integrated, the preceding surface of front frame with The back side is provided with opening portion, is provided with door body freely in the opening and closing of preceding surface hole portion, is set at the junction surface of backboard and front frame There is the line access unit for inserting the electric wire for being routed to electrical equipment.The structure of the patent disclosure is electric suitable for commodiously band Equipment is installed, and the open structure of its front and rear enabling used, and its body structure backboard top sets cable hole, using top Casing top cabling mode so that body structure does not simply fail to fix, and is unfavorable for the waterproof and dustproof of precision monitor equipment.Letter Number line and equipment junction are vulnerable to the interference of interference source away from extraneous nearer.
Chinese patent CN98228621.X is disclosed " a kind of Novel box ", including by top cover, empty stomach side frame plate and is provided with Wire inlet/outlet hole special-shaped bottom plate composition housing, with before housing and/or rear side which fits circular arc bended plate type door, be arranged on housing Interior component installing component, the cross section of empty stomach side frame plate is spill, and circular arc bended plate type door is fixed on by hinge assemblies On empty stomach side frame plate medial surface, built-in hinge is formed, its opening of empty stomach side frame plate has coordinates and be fixed on empty stomach side frame with it Side cover on plate.The structure of the patent disclosure is applied to the big equipment protection for having totally-enclosed requirement in operating space, the structure Circular arc bended plate type door and particular/special requirement for understructure are not content with the stenosis peace of steel construction monitoring device protection cabinet Dress and rod structure such as are welded and fixed at the custom requirements;The structure is set using totally enclosed type, and monitoring device wireless signal is sent and made Into extreme influence.
Chinese patent CN200520018009.1 discloses " a kind of cabinet for communication equipment and supporting subrack ", and rack includes Upper and lower rectangle peripheral frame and left and right side wall and bent angle installed part, left and right side wall are made up of madial wall and lateral wall, madial wall and Wiring cavity is provided between lateral wall;The multiple captive nuts arranged in length and breadth are provided with left and right madial wall;Opened on madial wall Provided with cloth line three-way hole;Upper rectangle peripheral frame offers cloth line three-way hole close to two side position;Subrack has left and right side panel, left and right Side panel leading edge sets assembling to pick up the ears, and sets the multiple screws arranged in length and breadth on left and right side panel, the spacing in length and breadth of screw with The spacing in length and breadth of rack captive nut is identical.The patent is applied to indoor communication equipment installation, be subrack structure, its installation according to The existing vertical cabinet structures of Lai Yu, it is impossible to adapt to the welding operation of job site;And structure is carried out by inner side cloth line three-way hole Lead, cabling disperse, and item concentrates the characteristics of connecting for monitoring device, forms unnecessary wire network structure, easily causes and lead Line loss is bad;The structure is open before belonging to, it is impossible to realizes the demand of monitoring device water proof and dust proof.
The content of the invention
It is an object of the invention to overcome the shortcomings of prior art, there is provided a kind of versatile, to structure influence is small, energy Enough steel constructions that is used for for carrying out disposition to monitoring device in the case where not influenceing signal transmission and wire traction monitor Data acquisition and the protective housing and installation method for sending equipment.
To reach above-mentioned purpose, the present invention uses following technical proposals:
The protective housing of equipment is gathered and sent for steel construction Monitoring Data, it includes the steel casing that cross section is rectangle, Steel cabinet front plate is connected by folding with steel casing left plate is used as casing unlatching door, bottom plate, left side in described steel casing Multiple holes are had on plate and right plate, an external screw thread spiral shell for protruding from the setting of steel casing is installed on each hole Pipe, described external screw thread screwed pipe is arranged at the side of deviation steel after panel box, when connecting signal wire, in left and right side plate Steel sleeve is threaded with external screw thread screwed pipe, plastic bushing is threaded with the external screw thread screwed pipe on described bottom plate, Interval is welded with compound steel bar on the inwall of the left side plate of steel casing, and gluing is supported by the left and right steel bar that same layer is set Plate is as demarcation strip, and width of the described demarcation strip along casing depth direction is the 2/3~3/4 of case bottom width, static monitoring techniques Equipment and wireless transmission device are split on middle level demarcation strip and upper strata demarcation strip, and signal wire is worn according to the line position of walking of monitoring point Cross the space that the steel sleeve being correspondingly arranged is introduced between demarcation strip and steel after panel box to be connected in static monitoring techniques equipment, power line Box house is introduced from plastic bushing to be placed on lower floor's demarcation strip, the antenna of wireless transmission device is via corresponding with upper strata demarcation strip Left plate or right plate on idle external screw thread screwed pipe pass the setting of steel casing, and screw in one on the idle external screw thread screwed pipe Plastic bushing, the otic placode of lifting is installed on described steel roof box.
Steel construction Monitoring Data gathers and sent the installation method of equipment, and it comprises the following steps:
(1) casing is sling to installation site and steel after panel box is welded on beam using the otic placode of jack drawing steel casing Or on the steel structure surface of rod structure, steel casing installation site be on beam or rod structure with monitoring device position corresponding position;
(2) an optional external screw thread screwed pipe in multiple external screw thread screwed pipes of steel box bottom, screws on plastic bushing, by electricity Source line introduces steel box house from the plastic bushing;
(3) needs are connected up according to actual monitoring, selects the external screw thread screwed pipe inlet wire on steel casing left plate or right plate, will The external screw thread screwed pipe of cabling screws on steel sleeve, and signal wire is introduced into steel box house through steel sleeve;
(4) steel box house casing demarcation strip is installed, power line is placed in lower floor's demarcation strip, static monitoring techniques equipment and wireless Send equipment and split middle level demarcation strip and upper strata demarcation strip, signal wire is in steel casing via casing demarcation strip and steel casing rear wall Between space be connected in static monitoring techniques equipment;
(5) antenna of wireless transmission device is passed via the idle external screw thread screwed pipe at the equipment placed layer side plate, and A plastic bushing is screwed on the idle external screw thread screwed pipe, to protect antenna.
The beneficial effects of the invention are as follows:
(1) by the design of steel construction Monitoring Data vasculum, field monitoring equipment can be made to have perfect shelter, entered And reduce live precision instrument spoilage;
(2) some temporary data acquisition case upper end inlet wires used at present can be reduced using the method for lateral openings inlet wire Caused incoming line enters phenomena such as dust, infiltration, can prevent monitoring instrument from being damaged greatly because of water inlet and dust;
(3) power line and signal wire separation can be realized by the way of power line is entered in casing bottom, reduces current field Interference to data;
(4) it can keep wire straight within the specific limits using steel sleeve cabling, reduce wire and bent at screw socket, can Reduce wire breakage rate, and signal wire and equipment junction can be increased the distance between to casing outward opening, be advantageous to reduce ash Influence of the dirt to signal wire junction;
(5) power line is connected using plastic bushing, protective action can be played to power line, and power line can be avoided to cover The mouth of pipe leaks electricity after being ruptured caused by abrasion;
(6) signal can be avoided by metallic shield by connecting wireless transmission device antenna using plastic bushing;
(7) casing demarcation strip can mitigate box weight using glued board, save steel, and can reduce casing to inside The shielding action of the wireless transmission device of placement;
(8) width of the casing demarcation strip along casing depth direction should be the 2/3~3/4 of case bottom width, can conveniently set The cabling of stand-by power source line and signal wire;
(9) it is provided with using jack drawing otic placode lifting method and is positioned beneficial to casing.
Brief description of the drawings
Fig. 1 is that the present invention is used for the structural representation that steel construction Monitoring Data gathered and sent the protective housing of equipment;
Fig. 2 is the schematic diagram of the steel sleeve in the protective housing shown in Fig. 1 of the present invention;
Fig. 3 is the plastic bushing schematic diagram in the protective housing shown in Fig. 1 of the present invention.
Embodiment
It is described further below in conjunction with the accompanying drawings with use of the specific embodiment to the present invention.
The protective housing for being used for steel construction Monitoring Data and gathering and sending equipment of the present invention as shown in drawings, it includes horizontal stroke The steel casing 1 of rectangular cross-section, the foreboard of steel casing 1 is connected by folding 6 with the left plate of steel casing 1 is used as casing unlatching door 5. Multiple holes are had on the bottom plate of described steel casing 1, left plate and right plate, a protrusion is installed on each hole In the external screw thread screwed pipe 2 that steel casing 1 is set, described external screw thread screwed pipe 2 is arranged at the side of the back plate of deviation steel casing 1, outside The quantity and spacing of screw thread screwed pipe 2 can according to use it needs to be determined that, generally can uniformly arrange, the external screw thread screwed pipe 2 A diameter of 8-10cm is advisable.When connecting signal wire, steel sleeve 3 is threaded with the external screw thread screwed pipe of left and right side plate, Plastic bushing 4 is threaded with external screw thread screwed pipe on described bottom plate.The quantity and screw-in of steel sleeve 3 or plastic bushing 4 Position is defined by the needs for walking line position and wireless equipment antenna placement location of monitoring point.In the left side plate of steel casing 1 Interval is welded with compound steel bar 7 on inwall, and glued board is supported by as demarcation strip 8 on the left and right steel bar 7 that same layer is set, described Width of the demarcation strip along casing depth direction be the 2/3~3/4 of case bottom width, static monitoring techniques equipment and wireless transmission device Split on middle level demarcation strip and upper strata demarcation strip, signal wire walks line position through the steel sleeve being correspondingly arranged according to monitoring point Space between 3 introducing demarcation strips 8 and the back plate of steel casing 1 is connected in static monitoring techniques equipment, and power line introduces from plastic bushing Box house is placed on lower floor's demarcation strip 8.The antenna of wireless transmission device is via left plate corresponding with upper strata demarcation strip or the right side Idle external screw thread screwed pipe on side plate passes the setting of steel casing, and screws in a plastic bushing on the idle external screw thread screwed pipe, with Antenna is protected.The otic placode 9 of lifting is installed on the described top plate of steel casing 1, is easy to lifting construction.
Steel construction Monitoring Data gathers and sent the installation method of equipment, and it comprises the following steps:
(1) casing is sling using the otic placode 9 of jack drawing steel casing 1 to installation site and by plate weld after steel casing 1 On the steel structure surface of beam or rod structure, the installation site of steel casing 1 be on beam or rod structure with monitoring device position pair It should locate;
(2) an optional external screw thread screwed pipe 2 in multiple external screw thread screwed pipes 2 of the bottom plate of steel casing 1, screws on plastic bushing 4, Power line is introduced inside steel casing 1 from the plastic bushing 4;
(3) needs are connected up according to actual monitoring, select the inlet wire of external screw thread screwed pipe 2 on the left plate of steel casing 1 or right plate, The external screw thread screwed pipe 2 of cabling is screwed on into steel sleeve 3, signal wire is introduced inside steel casing 1 through steel sleeve 3;
(4) the inner bin demarcation strip 8 of steel casing 1 is installed, power line is placed in lower floor's demarcation strip, static monitoring techniques equipment and nothing Line sends equipment and splits middle level demarcation strip and upper strata demarcation strip, and signal wire is in steel casing 1 via casing demarcation strip 8 and steel casing Space between 1 rear wall is connected in static monitoring techniques equipment;
(5) antenna of wireless transmission device is passed via the idle external screw thread screwed pipe 2 at the equipment placed layer side plate, and A plastic bushing 4 is screwed on the external screw thread screwed pipe 2, to protect antenna.
Embodiment 1
Steel construction Monitoring Data gathers and sent the installation method of equipment, and it comprises the following steps:
(1) at the steel construction monitoring device position of setting, not influence structure subsequent installation as principle, in beam or The installation site of steel casing 1 is determined on rod structure;
(2) in the set installed position of steel casing 1, steel casing 1 is hung casing by the way of jack pulls otic placode 9 Rise, after positioning, the back plate of steel casing 1 is welded on the steel structure surface specified along steel plate edge full weld;
(3) in the optional external screw thread screwed pipe 2 of bottom half, plastic bushing 4 is screwed in, by power line from the plastic bushing 4 Introduce inside steel casing 1;
(4) in the inlet wire of external screw thread screwed pipe 2 of steel casing side, the external screw thread screwed pipe 2 of cabling is revolved with steel sleeve 3, will be believed Number line is introduced inside steel casing 1 through steel sleeve 3;
(5) the inner bin demarcation strip 8 of steel casing 1 is installed, power line is placed in lower floor, during static monitoring techniques equipment is placed on Layer, wireless transmission device are placed into upper strata, and signal wire is in steel casing 1 between casing demarcation strip 8 and the rear wall of steel casing 1 Space, it is connected in monitoring device;
(6) plastic bushing 4 is screwed on the upside external screw thread screwed pipe 2 of steel casing 1, the antenna of wireless transmission device is penetrated into modeling Expect in sleeve pipe 4, and complete the wire connection of each equipment.
Through examining structure and installation method using the present invention:It is capable of the scene existence energy of significant increase construction monitoring equipment Power, and the interference in data acquisition can be reduced, effectively improve the accuracy of Monitoring Data.

Claims (3)

1. the protective housing of equipment is gathered and sent for steel construction Monitoring Data, it is characterised in that:It is rectangle including cross section Steel casing, steel cabinet front plate be connected by folding with steel casing left plate is used as casing open door, in described steel casing Multiple holes are had on bottom plate, left plate and right plate, one is provided with each hole and protrudes from the setting of steel casing External screw thread screwed pipe, described external screw thread screwed pipe is arranged at the side of deviation steel after panel box, when connecting signal wire, it is left, Steel sleeve is threaded with the external screw thread screwed pipe of right plate, modeling is threaded with the external screw thread screwed pipe on described bottom plate Expect sleeve pipe, interval is welded with compound steel bar on the inwall of the left side plate of steel casing, is propped up on the left and right steel bar that same layer is set Support has glued board as demarcation strip, and width of the described demarcation strip along casing depth direction is the 2/3~3/4 of case bottom width, Static monitoring techniques equipment and wireless transmission device are split on middle level demarcation strip and upper strata demarcation strip, and signal wire is walked according to monitoring point Line position is connected to static monitoring techniques equipment through the space that the steel sleeve being correspondingly arranged is introduced demarcation strip and steel after panel box On, power line introduces box house from plastic bushing and is placed on lower floor's demarcation strip, the antenna of wireless transmission device via with upper strata Idle external screw thread screwed pipe on left plate corresponding to demarcation strip or right plate passes the setting of steel casing, and in the idle external screw thread spiral shell A plastic bushing is screwed on pipe, the otic placode of lifting is installed on described steel roof box.
2. the protective housing according to claim 1 for gathering and sending equipment for steel construction Monitoring Data, it is characterised in that: The a diameter of 8-10cm of external screw thread screwed pipe.
3. a kind of steel construction Monitoring Data collection of claim 1 and the installation method for sending equipment, it is characterised in that it includes Following steps:
(1) casing is sling to installation site and steel after panel box is welded on beam or post using the otic placode of jack drawing steel casing On the steel structure surface of structure, steel casing installation site be on beam or rod structure with monitoring device position corresponding position;
(2) an optional external screw thread screwed pipe in multiple external screw thread screwed pipes of steel box bottom, screws on plastic bushing, by power line Steel box house is introduced from the plastic bushing;
(3) needs are connected up according to actual monitoring, the external screw thread screwed pipe inlet wire on steel casing left plate or right plate is selected, by cabling External screw thread screwed pipe screw on steel sleeve, by signal wire through steel sleeve introduce steel box house;
(4) steel box house casing demarcation strip is installed, power line is placed in lower floor's demarcation strip, static monitoring techniques equipment and wireless transmission Equipment splits middle level demarcation strip and upper strata demarcation strip, and signal wire is in steel casing between casing demarcation strip and steel casing rear wall Space be connected in static monitoring techniques equipment;
(5) antenna of wireless transmission device is passed via the idle external screw thread screwed pipe at the equipment placed layer side plate, and at this A plastic bushing is screwed on external screw thread screwed pipe, to protect antenna.
CN201510150551.0A 2015-03-31 2015-03-31 The protective housing and installation method of equipment are gathered and sent for steel construction Monitoring Data Active CN104754893B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510150551.0A CN104754893B (en) 2015-03-31 2015-03-31 The protective housing and installation method of equipment are gathered and sent for steel construction Monitoring Data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510150551.0A CN104754893B (en) 2015-03-31 2015-03-31 The protective housing and installation method of equipment are gathered and sent for steel construction Monitoring Data

Publications (2)

Publication Number Publication Date
CN104754893A CN104754893A (en) 2015-07-01
CN104754893B true CN104754893B (en) 2017-11-28

Family

ID=53593803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510150551.0A Active CN104754893B (en) 2015-03-31 2015-03-31 The protective housing and installation method of equipment are gathered and sent for steel construction Monitoring Data

Country Status (1)

Country Link
CN (1) CN104754893B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201119173Y (en) * 2007-10-08 2008-09-17 颜玲明 Waterproof device for circuit board
CN201134783Y (en) * 2007-12-15 2008-10-15 甘肃容和矿用设备有限公司 Mining flame-proof type intermediate voltage frequency-changing speed-regulating apparatus
CN202476006U (en) * 2011-11-11 2012-10-03 无锡爱玛车业有限公司 Electric vehicle three-gear shunting controller structure
CN202721927U (en) * 2012-07-18 2013-02-06 康舒科技股份有限公司 A wire rod waterproof structure of the housing of a power supply unit
CN204119679U (en) * 2014-10-14 2015-01-21 江苏源之岭智能科技有限公司 Security device assembling case
CN204217261U (en) * 2014-11-26 2015-03-18 王春 The access case of monitoring, communication network access terminal equipment
CN204498499U (en) * 2015-03-31 2015-07-22 中国建筑第六工程局有限公司 Gather and the protective housing of transmitting apparatus for steel construction Monitoring Data

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201466596U (en) * 2009-07-30 2010-05-12 卢毅峰 Integrated distribution box
CN202269122U (en) * 2011-10-28 2012-06-06 天水七四九电子有限公司 Anti-interference double-cavity parallel soldering and sealing metal shell mixed assembly structure
CN203587644U (en) * 2013-11-13 2014-05-07 钟勇 Novel metal meter box

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201119173Y (en) * 2007-10-08 2008-09-17 颜玲明 Waterproof device for circuit board
CN201134783Y (en) * 2007-12-15 2008-10-15 甘肃容和矿用设备有限公司 Mining flame-proof type intermediate voltage frequency-changing speed-regulating apparatus
CN202476006U (en) * 2011-11-11 2012-10-03 无锡爱玛车业有限公司 Electric vehicle three-gear shunting controller structure
CN202721927U (en) * 2012-07-18 2013-02-06 康舒科技股份有限公司 A wire rod waterproof structure of the housing of a power supply unit
CN204119679U (en) * 2014-10-14 2015-01-21 江苏源之岭智能科技有限公司 Security device assembling case
CN204217261U (en) * 2014-11-26 2015-03-18 王春 The access case of monitoring, communication network access terminal equipment
CN204498499U (en) * 2015-03-31 2015-07-22 中国建筑第六工程局有限公司 Gather and the protective housing of transmitting apparatus for steel construction Monitoring Data

Also Published As

Publication number Publication date
CN104754893A (en) 2015-07-01

Similar Documents

Publication Publication Date Title
CN104754893B (en) The protective housing and installation method of equipment are gathered and sent for steel construction Monitoring Data
CN204498499U (en) Gather and the protective housing of transmitting apparatus for steel construction Monitoring Data
CN207703907U (en) A kind of rapid heat dissipation and safe ammeter box
CN205793818U (en) A kind of electric cabinet with external cabling metallic channel
CN102290710A (en) Intelligent distribution transformer terminal box fixed on wire pole
CN204633169U (en) Outdoor concentrated earth terminal case
CN213425494U (en) Electric power cabinet capable of displaying electrified state of grounding cabinet
CN204479774U (en) A kind of weather station outdoor cabinet
CN207396578U (en) A kind of dust-proof electrical energy metering tank of outdoor rainproof
CN207782368U (en) Distribution line filled type grounding-for-lightning device
CN114172029A (en) Anti-creeping intelligent power generation system distribution box and assembling method thereof
CN208257312U (en) A kind of gantry convenient for lineation and isolation
CN201965721U (en) Multi-mode-mounted electric fire hazard monitoring detector
CN207124392U (en) A kind of distribution box being easily installed
CN210926743U (en) Prevent electrostatic interference switch board
CN219226995U (en) Novel ammeter case
CN205178180U (en) Antenna revolving stage lightning protection switching device
CN206640247U (en) outdoor cable branch box
CN205377095U (en) Intelligent protection system control box of power transmission and transformation net
CN219389138U (en) Instrument mounting rack
CN208548677U (en) A kind of transmission line of electricity drainage thread wind-proof device
CN220628486U (en) Outdoor monitoring lightning protection camera device
CN104836134B (en) A kind of distributed board outdoor
CN215819020U (en) Intelligent microcomputer comprehensive protection device
CN201674016U (en) Special terminal cable junction box for axle counters

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination