It is a kind of can be from the water pipe head of water side water yield adjusting
Technical field
The present invention relates to a kind of water pipe head for running water pipe connection, particularly one kind can be adjusted out from water side
The water pipe head of the water yield, belongs to the optimisation technique of water pipe head.
Background technology
Connection between water supply pipe, the connection between water pipe and tap are realized all by joint.To building
Supply water, typically have a two ways, it is a kind of be using booster pump from bottom to top send water mode, one kind is to dispose water tank in roof,
The mode for being conveyed using water-head from top to bottom.Either any to send water mode, different floor hydraulic pressure also can be different, can lead
Cause different floor water yields different.Therefore, there is the water pipe head design of the balanced-out water yield now with some, it is intended to make different buildings
The water yield of layer tends to identical.
Disclose a kind of water pipe head in the patent document of Patent No. 201020694120.3, advantage is can be from entering
Water end (W.E.) adjusts the prestressing force of spring by position of the set screw in throttle valve stem, so as to set max water yield, with
During water, water pipe head can be automatically adjusted according to the change of hydraulic pressure, use water quantity holding setting maximum magnitude in.No
Foot is in use, as the setting of max water yield is adjusted from water inlet end, and to be only installed to water pipe head
The effect of regulation can be just seen on running water pipe, need to adjust repeatedly with reach be satisfied with water yield when, just must repeatedly by water pipe
Joint is removed and is refilled back, is adjusted inconvenient.
Particularly domestic consumer, as each leading purposes is different, the requirement to water yield is also different, and dish is washed in such as kitchen
Washing one's face for tap and toilet and sprays first-class at tap, as the difference of purposes, the requirement to water yield are also different, for example, washes
The water yield of face tap be maintained at 4 liters/min it is just much of that, and spray the water yield requirement of head more than 8 liters/min, therefore, use
Family is also required to be adjusted the maximum output of each tap, if being adjusted from water inlet end, it is necessary to repeatedly by correlation
Equipment is loaded on after removing regulation and tries again, and till satisfaction, the operating time is long, dismounts also cumbersome.
The water pipe head of Application No. 2013206552162, is set to adjusting means the water side of the through hole on valve seat,
By the water side of valve seat just can regulating valve seat in intrinsic position, therefore, water pipe head is installed to tap water pipe network
After upper, in addition it is also necessary to during water yield adjusting, can be adjusted from the water side of water pipe head, it is not necessary to by water pipe head from originally
Remove on grid.But due to having stronger hydraulic pressure in tap water pipe network, during regulation, water can be from the through hole of valve seat outwards
Injection, causes to adjust difficult, and surrounding enviroment of easily getting wet.
It is, thus, sought for a kind of from the water side water yield adjusting of water pipe head, and can not only be prevented from adjusting
The water pipe head that water outwards sprays during section.
The content of the invention
The purpose of the present invention is:Offer is a kind of from the water side water yield adjusting of water pipe head, and can not only to adjust
The water pipe head that when section water retention can only flowed outwardly.
The technical scheme is that:It is a kind of can be from the water pipe head of water side water yield adjusting, mainly by body, work
Plug 1, support 2, prestressed spring 3 and prestressing force screw 4 are constituted, and described piston includes piston head and piston rod, piston rod again
The adjustment hole of the direction depression from piston-rod end to piston head is provided with, the outer spiral shell with prestressing force screw is provided with adjustment hole
The female thread that stricture of vagina matches;The boss to inner process of the circle of inner body wall one is provided around in inner body wall, is set at boss center
There is a water hole being engaged with piston head, the water hole that piston head can be entered on boss in the presence of external force by water hole
It is completely plugged;Support adopts concentric double circular ring structures, and equally distributed connecting rod is provided between double annulus, make double annulus and
Peripheral through holes are formed between connecting rod, the locking post prominent to the center of support are provided with the interior annular inwall of support;From piston
Outer wall of the head to piston-rod end along piston rod is provided with the quantity identical locking slot for locking post in quantity and support, described
Locking slot is engaged with the locking post on support, when central through hole of the piston rod through support, the locking post position of each support
In a locking slot;Described water pipe head also includes closing spring 5, push-plate 6 and platen 7, push-plate towards platen wall
On face, average mark is furnished with the push rod of more than two equal lengths, and push-rod hole corresponding with push rod is provided with boss, in two phases
Setting one between adjacent push-rod hole is unloaded water hole water supply stream and is passed through, and platen is placed in the sheet between boss and water inlet end in vivo, push rod
Wall of the platen towards water side can be arrived to through after the push-rod hole on boss away from the end of push-plate, be imposed on push-plate outer
During power, push-plate can promote push rod and drive platen to move along push-rod hole;Described push-plate is hollow annulus, push-plate and platen
Parallel, the external diameter of push-plate is less than the minimum-value aperture of the female thread of the body port of export;The external diameter of platen is straight less than endoporus in the middle part of body
Footpath but be more than piston head maximum gauge, platen center is provided with central through hole, peripheral through holes is provided with platen;During assembling, piston
Central through hole of the bar through platen, will close spring housing on the piston rod, then be located on piston rod by the locking post on support
Piston-rod end through the central through hole of support, is made closing spring positioned at the work between support and platen by the mode in locking slot
On stopper rod, then prestressed spring 3 is enclosed within into piston-rod end, then prestressing force screw 4 is screwed in the endoporus of piston rod, will be pre-
Stress spring is fixed between the nut of prestressing force screw and support 2, by adjusting prestressing force screw position on the piston rod
Adjust the prestressing force of prestressed spring;Again by piston head towards water side direction by the part after combining from the water inlet of body
End plug enters this in vivo, is screwed on the female thread of body water inlet end by the external thread rotary on support, rotates prestressing force using instrument
Screw, makes support precession or back-out on body;Support to water side move when, support can will closing spring compression in piston head
On, piston head is pressed in the endoporus of boss from water inlet end to the direction of water side, piston head compression boss makes not to be had between the two
Gap, prevents current from passing through;Push-plate is made into push rod towards body is pressed into from the water side of body in the way of water inlet end by push rod
End arrive to platen towards on the wall of water side through the push-rod hole on boss, when the power towards water inlet end is imposed to push-plate
During amount, push-plate promotes platen to move to the direction of water inlet end, and closing spring is pressed to support, and closing spring is pressed on piston head
Strength reduces, and piston head is moved to the direction of water inlet end in the presence of prestressed spring tension force, in piston head with boss
The space that water supply stream passes through is produced between hole.
Regulating tank is provided with piston head towards on the wall of water side, the instrument matched with regulating tank is stretched from water side
Enter body and be inserted into regulating tank rotation, support rotation is driven by locating slot on piston rod, support rotation change piston head away from
With a distance from the water hole on boss, so as to change the size of the hydraulic pressure being pressed into piston head required for water hole.
The central through hole inwall of described platen is provided with the locking post corresponding with the locking slot on piston rod, works as piston rod
When in insertion central through hole, in the locking slot that the locking post on platen is entered on piston rod.
The push rod groove of a ring shape is provided with towards on the wall of push rod in platen, platen can under external force in push rod
Top rotates and the position of push rod is constant.
Beneficial effect:
1st, push-plate and platen are set in the water side of water pipe head, when inflow is adjusted from water side, piston head is in envelope
The water hole for blocking boss under tension force of spring effect to water side movement is closed, is prevented water from flowing outwardly, is adjusted
After finishing, faucet is screwed in water pipe head from water side, as faucet is moved to the direction of water inlet end,
Push-plate and platen can be just promoted to move to the direction of water inlet end, platen compresses closing spring to the direction of support,
The strength that closing spring is imposed by platen on piston head reduces, and piston head will be moved from the direction of trend water inlet end
It is dynamic, until closing spring pushes against platen, make space to be left between piston head and boss and is supplied water to flow through, so as to realize
From water side water yield adjusting when, current can be cut off by water pipe head automatically, wait regulation to finish and install the fire hose
Water outlet again after head.
Description of the drawings
Fig. 1 is the surface structure schematic diagram of the present invention;
Fig. 2 is the explosive view of the present invention;
Fig. 3 is the body generalized section of the present invention;
Fig. 4 is the dimensional structure diagram of the support of the present invention;
Fig. 5 is the dimensional structure diagram of the piston of the present invention;
Fig. 6 is that the partial cutaway of the present invention shows dimensional structure diagram;
Fig. 7 is that the partial cutaway of the present invention shows dimensional structure diagram;
Fig. 8 is the schematic diagram that current can flow through after the water side of the present invention connects faucet;
Fig. 9 is schematic diagram of the present invention in water outlet is unable to when being adjusted from water side.
Specific embodiment
As shown in Fig. 1 to Fig. 3, it is a kind of can from the water pipe head of water side water yield adjusting, mainly by body, piston 1,
Support 2, prestressed spring 3 and prestressing force screw 4 are constituted, and described piston includes piston head and piston rod again, sets on piston rod
There is the adjustment hole of the direction depression from piston-rod end to piston head, the external screw thread phase with prestressing force screw is provided with adjustment hole
The female thread of matching.
The boss to inner process of the circle of inner body wall one is provided around in inner body wall, is provided with and piston head at boss center
The water hole being engaged, the water hole that piston head can be entered on boss in the presence of external force are simultaneously completely plugged by water hole,
Also boss can be left in the presence of external force to be made space to be left between piston head and boss and is supplied water to flow through.
As shown in Figure 4 and Figure 5, support adopts concentric double circular ring structures, and equally distributed company is provided between double annulus
Extension bar, makes double peripheral through holes to be formed between annulus and connecting rod;It is provided with prominent to the center of support in the interior annular inwall of support
Locking post;Quantity is provided with along the outer wall of piston rod from piston head to piston-rod end identical with the quantity of the locking post on support
Locking slot, described locking slot is engaged with the locking post on support, when central through hole of the piston rod through support, each
The locking post of support is located in a locking slot.Corresponding with the locking post on support locking slot is set on piston rod for from going out
Support rotation is driven during water end (W.E.) water yield adjusting, changes position of the support on body, reached in boss so as to change piston head
The distance in hole, so as to change the hydraulic pressure size for promoting piston head to enter required for boss endoporus, so as to have adjusted max water yield.
As shown in Fig. 6 to Fig. 7, described water pipe head also includes closing spring 5, push-plate 6 and platen 7, in push-plate direction
On the wall of platen, average mark is furnished with the push rod of more than two equal lengths, and push-rod hole corresponding with push rod is provided with boss,
The setting one between two adjacent push-rod holes is unloaded water hole water supply stream and is passed through, and platen is placed in the body between boss and water inlet end
Interior, push rod can arrive to wall of the platen towards water side through after the push-rod hole on boss away from the end of push-plate, in push-plate
On when imposing external force, push-plate can promote push rod and drive platen to move along push-rod hole.
Described push-plate is hollow annulus, and push-plate is parallel with platen, the interior spiral shell of the external diameter of push-plate less than the body port of export
The minimum-value aperture of stricture of vagina;The external diameter of platen is less than diameter of bore in the middle part of body but is more than piston head maximum gauge, and platen center is provided with
Central through hole, is provided with platen and the peripheral through holes quantity identical peripheral through holes on support.
During assembling, central through hole of the piston rod through platen will close spring housing on the piston rod, then by the lock on support
Tight post is located at the mode in the locking slot on piston rod by piston-rod end through the central through hole of support, is located at closing spring
On piston rod between support and platen, then prestressed spring 3 is enclosed within into piston-rod end, then prestressing force screw 4 is screwed to
In the endoporus of piston rod, prestressed spring is fixed between the nut of prestressing force screw and support 2, by adjusting prestressing force spiral shell
The prestressing force of silk position adjustments prestressed spring on the piston rod;After combining towards the direction of water side by piston head again
Part fill in this in vivo from the water inlet end of body, be screwed on the female thread of body water inlet end by the external thread rotary on support,
Using instrument, such as Phillips screwdriver or straight screwdriver rotate prestressing force screw, make support precession or back-out on body.By
When support is moved to water side, support can make piston head from water inlet end to water side by closing spring compression on piston head
Direction be pressed in the endoporus of boss, piston head compresses boss to be made very close to each other between the two, prevents current from passing through.Push-plate is pressed
Push rod is pressed into body from the water side of body towards the mode of water inlet end, the end of push rod is arrived to through the push-rod hole on boss
Towards on the wall of water side, when the strength towards water inlet end is imposed to push-plate, push-plate promotes platen to water inlet end to platen
Direction is moved, and closing spring is pressed to support, closes the strength reduction that spring is pressed on piston head, and piston head is in prestressed spring
Move to the direction of water inlet end in the presence of tension force, the space that water supply stream passes through is produced between the endoporus of piston head and boss.
When adjusting inflow from water side, piston head blocks boss to water side movement under closing tension force of spring effect
Water hole, prevent water from flowing outwardly, after regulation is finished, faucet be screwed in water pipe head from water side, with water
Tap is moved to the direction of water inlet end, it becomes possible to promote push-plate and platen to move to the direction of water inlet end, side of the platen to support
To closing spring is compressed, the strength reduction that spring is imposed by platen on piston head is closed, piston head will be from trend water inlet end
Direction movement, until piston head pushes against platen, make to leave space between piston head and boss and supply water and flow through.
Regulating tank is provided with piston head towards on the wall of water side, the instrument matched with regulating tank is stretched from water side
Enter body and be inserted into regulating tank rotation, drive support rotation, support rotation support is moved forward and backward on body by piston rod,
So as to change the distance of water hole of the piston head on boss, so as to change the hydraulic pressure being pressed into piston head required for water hole
Size, play a part of water yield adjusting.
The push rod groove of a ring shape is provided with towards on the wall of push rod in platen, platen can under external force in push rod
Top rotates and the position of push rod is constant.
Using the present invention New type water pipe joint, water pipe head be installed to running water pipe it is online after, when also need to adjust
During water yield, it is only necessary to turn on the water pipe being connected with water pipe head positioned at water pipe head water side or faucet, such as Fig. 9 institutes
Show, push-plate is as without the pressure from water pipe or faucet, platen will be under closing tension force of spring effect to water outlet
The direction movement at end, so as to make piston head be blocked into boss endoporus under the influence of hydraulic pressure, prevents water from flowing out, at this moment
The regulating tank water yield adjusting being inserted into from the water side of water pipe head with instrument on piston head again, is not changing prestressed spring
Under the premise of prestressed, piston head is pressed into the size of the hydraulic pressure required for water hole for change.
As shown in figure 8, after adjusting and finishing, then screw on water pipe or faucet, water pipe or faucet are by push-plate and platen to entering
The direction of water end (W.E.) compresses, and so as to compress closing spring, closes the strength reduction that spring is imposed by platen on piston head, piston
Head is moved to the direction of water inlet end in the presence of prestressed spring tension force, makes piston head leave boss endoporus, until piston head
Platen is pushed against, enables water to stay by the space between piston head and boss endoporus inwall.When hydraulic pressure is larger, piston is promoted
Head is moved to boss endoporus, changes space between the two, and when hydraulic pressure is excessive, piston head will be boss endoporus completely plugged, at this moment,
The water hole of unloading that current can only pass through on boss is flowed out, so as to prevent water yield excessive.
Above-described embodiment is intended merely to the purposes of the interpretation present invention, and is not limitation of the present invention, this technology
The those of ordinary skill in field, in the essential scope of the present invention, makes a variety of changes or substitutes, and should also belong to the guarantor of the present invention
Shield category.