CN104743578A - Mine brine pretreatment method - Google Patents

Mine brine pretreatment method Download PDF

Info

Publication number
CN104743578A
CN104743578A CN201510156224.6A CN201510156224A CN104743578A CN 104743578 A CN104743578 A CN 104743578A CN 201510156224 A CN201510156224 A CN 201510156224A CN 104743578 A CN104743578 A CN 104743578A
Authority
CN
China
Prior art keywords
bittern
water
outlet
tempering device
fireproof tempering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510156224.6A
Other languages
Chinese (zh)
Other versions
CN104743578B (en
Inventor
王和荣
刘川
高莉霞
林权
涂代兵
周良全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING HECHUAN SALINIZATION INDUSTRY Co Ltd
Original Assignee
CHONGQING HECHUAN SALINIZATION INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING HECHUAN SALINIZATION INDUSTRY Co Ltd filed Critical CHONGQING HECHUAN SALINIZATION INDUSTRY Co Ltd
Priority to CN201510156224.6A priority Critical patent/CN104743578B/en
Publication of CN104743578A publication Critical patent/CN104743578A/en
Application granted granted Critical
Publication of CN104743578B publication Critical patent/CN104743578B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Incineration Of Waste (AREA)

Abstract

The invention discloses a mine brine pretreatment method. The method comprises the following steps: introducing water by virtue of a brine inlet main pipe, separating the inflow water into two parts, namely brine and associated gas by virtue of a moisture separator, conveying the brine into a salt making workshop for salt manufacturing, and conveying the associated gas to a waste gas combustion device for combusting. The method is characterized in that before the associated gas is conveyed into the waste gas combustion device, the moisture mixed in the associated gas is separated and returns into the salt making workshop, so that the combustion effect of the waste gas combustion device is guaranteed, and the brine utilization rate is improved. The method disclosed by the invention has the advantages that the brine separation degree is high, the brine utilization rate is high, the separated associated gas is full in combustion, the combustion flame is stable, flameout is difficultly caused, repeated ignition of workers is avoided, the operational risk coefficient of the workers is reduced, the condition that the environmental pollution is caused due to overflow of the associated gas is avoided by virtue of closed brine extraction, and the like.

Description

A kind of well mine salt bittern pretreatment process
Technical field
The present invention relates to well mine salt brine treatment field, relate to a kind of well mine salt bittern pretreatment process especially.
Background technology
Well mine salt refers to that the salt and the salt of recovery of subterranean rock salt through being processed into that underground natural bittern makes is drawn in drilling well.The production process of well mine salt divides mining and salt manufacturing two parts.Underground natural bittern bailing method, gas lift method or Submerged bittern pump draw; Rock salt is according to geology of mineral deposit, occurrence condition and grade height, and point roadway exploits (drought is adopted) and solution mining.
In rock salt drilling solution mining process, often there are the gas together outputs such as methane, hydrogen sulfide, methane total hydrocarbon; Can not process for processing be directly used in, need to carry out pre-treatment to bittern, isolate associated gas contained in bittern.Also need to carry out reprocessing to the associated gas after being separated, often in well mine salt bittern, the content of associated gas is unstable and tolerance is few, can not produce the value of recycling simultaneously.If directly discharge not only can polluted air, when reaching finite concentration, also harm can be brought to the healthy of neighbouring resident.Current way is discharged after directly burning.It is inadequate to there is separation degree in existing isolation technique, tolerance instability cause burning time burn insufficient, the exhaust emission of combustionmaterial is larger, noise is large, easily stops working, and needs artificial relight, improve the danger coefficient of operative, in addition, adopt open type collection halogen to still have associated gas to overflow, pollute the shortcomings such as surrounding enviroment.
Summary of the invention
For above-mentioned the deficiencies in the prior art, technical problem to be solved by this invention is: provide a kind of well mine salt bittern separation degree high, the associated gas sufficient combustion be separated, the exhaust emission of combustionmaterial is less, noise is little, not easily stops working, without the need to artificial relight, reduce the danger coefficient of operative, adopt closed collection halogen to pollute little pretreatment process.
In order to solve the problems of the technologies described above, present invention employs following technical scheme:
A kind of well mine salt bittern pretreatment process, in the method, first by after the water inlet of bittern water inlet manifold, water inlet is separated into bittern and associated gas two portions by a moisture separator again, then brine transportation is carried out salt manufacturing to salt manufacturing workshop, associated gas is transported to waste gas burner burning, it is characterized in that, before associated gas is transported to waste gas burner, the moisture be mingled with is separated and be back to salt manufacturing workshop in associated gas, to ensure waste gas burner combustion efficacy and to improve bittern utilization ratio.
In the method, specifically comprise the following steps:
A, first obtain the well mine salt bittern pretreatment system of following structure, this system comprises bittern water inlet manifold, with the moisture separator that bittern water inlet manifold is connected, moisture separator water side is connected to salt manufacturing workshop by outlet conduit, outlet conduit is provided with halogen transmitting pump, moisture separator outlet side is connected to waste gas burner by outlet pipe, described outlet pipe is provided with air water separator, the inlet mouth of described air water separator is connected with the outlet side of described moisture separator, and the air outlet of described air water separator is connected with described waste gas burner; Water outlet bottom described air water separator by pipeline communication to salt manufacturing workshop.
B, when specifically processing, bittern just enters moisture separator by bittern water inlet manifold, and the bittern after moisture separator flash trapping stage is sent to salt manufacturing workshop by outlet conduit via halogen transmitting pump; The associated gas that moisture separator flash trapping stage goes out is sent into air water separator by outlet pipe and is carried out the second-order separation, and bittern contained in associated gas is sent to salt manufacturing workshop by the water outlet bottom air water separator after the second-order separation; Associated gas after air water separator the second-order separation is sent in waste gas burner and burns.
Like this, after being separated by bittern contained in associated gas, the concentration of associated gas improves, and water content reduces, and more easily lights a fire, and not easily extinguishes, without the need to artificial relight operation, reduce the danger coefficient of operation during burning; Meanwhile, the bittern after the second-order separation is sent to salt manufacturing Workshop Production, improves the utilization ratio of bittern.
As optimization, in the method, the well mine salt bittern pretreatment system adopted also is included between described air water separator and described waste gas burner and is provided with the first fireproof tempering device; The inlet mouth of described first fireproof tempering device is connected with the air outlet of described air water separator; The pipeline that the air outlet of described first fireproof tempering device is connected with described waste gas burner is provided with a switch-valve; During concrete process, first the switch-valve on the air outlet pipeline of the first fireproof tempering device cuts out, after air water separator the second-order separation for some time, open the switch-valve of the air outlet of the first fireproof tempering device, finally light a fire in waste gas burner.
Like this, in the device start stage, associated gas content is less, if igniting easily causes loss of ignition at once, after air water separator the second-order separation for some time, the content of associated gas is high, easily lights a fire.Meanwhile, increase by the first fireproof tempering device and the flame in waste gas burner or Mars can be avoided to enter in air water separator set off an explosion, improve whole system security.
As further optimization, in the method, the well mine salt bittern pretreatment system adopted also comprises between described moisture separator water side to salt manufacturing workshop and is provided with brine treatment unit, brine treatment unit comprises described outlet conduit, described brine treatment unit also comprises a bittern hold-up vessel, bittern hold-up vessel comprises a sealed tank body, tank body is provided with feed-water end to be connected with described moisture separator water side, the top of tank body is provided with vacuum pressure valves, and tank base is communicated to salt manufacturing workshop by described outlet conduit; Described outlet conduit is provided with outlet valve; Upper part of described bittern hold-up vessel is provided with overflow port, described overflow port by pipeline communication to salt manufacturing workshop; During concrete process, first closed by the outlet valve on outlet conduit, the bittern after moisture separator flash trapping stage enters sealed bittern hold-up vessel by feed-water end and stores, and bittern hold-up vessel keeps pressure equilibrium by the vacuum pressure valves at top and normal atmosphere; When bittern in bittern hold-up vessel flows out from overflow port, open the outlet valve on outlet conduit, be sent to salt manufacturing Workshop Production via halogen transmitting pump.
Like this, before the outlet valve on outlet conduit is opened, if the bittern liquid level entering bittern storage tank exceedes overflow port, the bittern of excess portion sends into salt manufacturing Workshop Production by pipeline.The safety of effective protection bittern hold-up vessel, the bittern of overflow also can salt manufacturing Workshop Production, reduces the waste of bittern.Adopt sealed bittern hold-up vessel to carry out collection halogen, the associated gas overflowed in bittern can be prevented directly to be discharged in air, to the environment of surrounding.Simultaneously; bittern after moisture separator is separated because of associated gas separate after cause flow rate fluctuation large, be sent to salt manufacturing workshop again by the storage of bittern hold-up vessel, bittern stability of flow can be made; enhance productivity, also effectively protect the life-span of halogen transmitting pump and salt making equipment.
As optimization, in the method, the well mine salt bittern pretreatment system adopted also comprises described bittern hold-up vessel top and is also provided with venting port, and described venting port is connected to waste gas burner by gas exhaust duct; The feed-water end internal diameter of described bittern hold-up vessel is less than the outlet conduit internal diameter of described tank base; The second fireproof tempering device is provided with between described bittern hold-up vessel and described waste gas burner; The inlet mouth of described second fireproof tempering device is connected with the venting port at described bittern hold-up vessel top; The pipeline that the air outlet of described second fireproof tempering device is connected with described waste gas burner is provided with a switch-valve; During concrete process, when the bittern in bittern hold-up vessel flows out from overflow port, open the outlet valve on outlet conduit; The associated gas at bittern hold-up vessel top enters the second fireproof tempering device by the gas exhaust duct communicated with venting port, finally sends in waste gas burner and burns.
Like this, after opening outlet valve, water outlet speed is faster than water intake velocity, tiny structure is formed at bittern hold-up vessel top, be conducive to associated gas to overflow from bittern, the associated gas of spilling can be sent to burn processing in waste gas burner by gas exhaust duct, makes discharge more meet environmental requirement.Meanwhile, between bittern hold-up vessel and waste gas burner, be provided with the bittern hold-up vessel that the second fireproof tempering device can avoid the Mars in waste gas burner to scurry into tiny structure under pressure cause explosion hazard, improve the security of system.
As optimization, in the method, the well mine salt bittern pretreatment system adopted also is comprised described first fireproof tempering device and is connected with described bittern water inlet manifold by the pipeline being provided with switch-valve with described second fireproof tempering device feed-water end; Inlet mouth and air outlet in communicating with air outlet in described first fireproof tempering device and described second fireproof tempering device inside are provided with and communicate with inlet mouth, described interior inlet mouth is lower than interior air outlet; The water side arranged in the middle part of described first fireproof tempering device and described second fireproof tempering device by pipeline communication to salt manufacturing workshop; Described water side is between described interior inlet mouth and described interior air outlet; During concrete process, first open with the switch-valve that bittern water inlet manifold is connected on pipeline, bittern is introduced in the first fireproof tempering device and the second fireproof tempering device, when bittern flows out from water side, close the switch-valve be connected pipeline with bittern water inlet manifold.
Like this, in the first fireproof tempering device and the second fireproof tempering device, define water seal, interior inlet mouth is positioned at below liquid level, and interior air outlet is positioned at more than liquid level.During work, associated gas inlet mouth in communicating with inlet mouth enters the first fireproof tempering device and the second fireproof tempering device is inner, overflows from liquid level, is sent to waste gas burner via air outlet in communicating with air outlet.Even if the Mars in waste gas burner scurries into fireproof tempering device, also cannot enter the device interior of fireproof tempering device inlet end, ensure that the safety of fireproof tempering device inlet end equipment.
As optimization, in the method, the well mine salt bittern pretreatment system adopted also comprises one and stores halogen pond; The described feed-water end storing halogen pond is connected with the water side of described second fireproof tempering device with the overflow port of the water outlet bottom described air water separator, described bittern hold-up vessel upper part and described first fireproof tempering device by pipeline simultaneously; Described storing bottom halogen pond is provided with a water drain valve, described water drain valve by pipeline communication to salt manufacturing workshop; During concrete process, close the water drain valve stored bottom halogen pond, bittern that the water side of the overflow port of the water outlet bottom air water separator, bittern hold-up vessel upper part and described first fireproof tempering device and described second fireproof tempering device is flowed out is collected to be stored in halogen pond, after storing the bittern in halogen pond and filling, open the water drain valve stored bottom halogen pond, bittern is sent into salt manufacturing Workshop Production.Like this, the production capacity of salt making equipment can be made full use of by focusing on bittern regenerative ratio, improving the efficiency of producing.
As optimization, in the method, waste gas burner in the well mine salt bittern pretreatment system adopted comprises the smoke evacuation chimney vertically arranged, and bottom described smoke evacuation chimney, be provided with the overall smoke collection cover in inverted tubaeform, this smoke collection cover upper end smoke outlet and described smoke evacuation chimney are tightly connected; Vertically combustion chamber is provided with bottom described smoke collection cover; The inside of described combustion chamber is vertically provided with incendiary pencil; Be provided with overall in flaring combustion head upwards at the top of described incendiary pencil; In described incendiary pencil, be provided with hush pipe in the same way, this hush pipe top seal, and bottom air inlet one end passes the bottom of described incendiary pencil; The body being positioned at incendiary pencil inside at described hush pipe is provided with some apertures; Described hush pipe bottom air inlet is connected with described outlet pipe; During concrete process, after the associated gas entering waste gas burner enters hush pipe from hush pipe bottom air inlet, the aperture side direction on hush pipe body flows out, and finally reaches combustion head burn processing.
Like this, after associated gas enters hush pipe from hush pipe bottom air inlet, flow out from the aperture hush pipe body from side direction, the flow direction of forcibly changing air-flow and state, energy dissipating is carried out to air-flow, make the associated gas air-flow of arrival combustion head more steady, reduce its noise and make burning more stable, not easily stopping working, without the need to carrying out relight, enhance safety coefficient, burn more complete simultaneously, discharge environmental protection more.
Contrast prior art, the present invention has the following advantages:
1, the associated gas purity adopting the present invention can make to separate is high, drier, and improve ignition success rate, not easily stop working, combustion flame is more stable, reduces the frequent ignition operation of workman, reduces the danger of operative.
2, adopt the present invention that the bittern purity being sent to salt manufacturing workshop can be made higher, the defeated halogen amount of bittern is more stable, improves the work-ing life of working efficiency and equipment, adopts closed collection halogen also can prevent associated gas from overflowing the environmental pollution caused.
3, adopt the present invention that isolated associated gas can be made to burn more abundant, discharge more meets environmental requirement, and noise during burning is little, reduces the interference to people and injury.
4, adopt the present invention to carry out burn processing to associated gas, Mars can be avoided to enter container and cause explosion hazard, improve the security of system.
Accompanying drawing explanation
A kind of structural representation of well mine salt bittern pretreatment system of Fig. 1 for adopting when the inventive method is implemented.
Fig. 2 is the structural representation of waste gas burner inside in Fig. 1.
Embodiment
Below in conjunction with accompanying drawing, the present invention is described in further detail.
When well mine salt bittern pretreatment process of the present invention is specifically implemented: first by after the water inlet of bittern water inlet manifold, water inlet is separated into bittern and associated gas two portions by a moisture separator again, again brine transportation is carried out salt manufacturing to salt manufacturing workshop, associated gas is transported to waste gas burner burning, its main points are, before associated gas is transported to waste gas burner, the moisture be mingled with in associated gas is separated and is back to salt manufacturing workshop, to ensure waste gas burner combustion efficacy and to improve bittern utilization ratio.
More particularly, when the present invention specifically implements, first obtain the well mine salt bittern pretreatment system of structure as described below, and rely on and use this system to carry out bittern pre-treatment and be able to concrete enforcement to make present method.
As depicted in figs. 1 and 2, a kind of well mine salt bittern pretreatment system of the present invention, comprise bittern water inlet manifold 1, the moisture separator 2 be connected with bittern water inlet manifold 1, moisture separator 2 water side is connected to salt manufacturing workshop by outlet conduit, outlet conduit is provided with halogen transmitting pump 3, moisture separator 2 outlet side is connected to waste gas burner 4 by outlet pipe, described outlet pipe is provided with air water separator 5, the inlet mouth of described air water separator 5 is connected with the outlet side of described moisture separator 2, the air outlet of described air water separator 5 is connected with described waste gas burner 4, water outlet bottom described air water separator 5 by pipeline communication to salt manufacturing workshop.Like this, during use, bittern enters moisture separator 2 by bittern water inlet manifold 1, and the bittern after moisture separator 2 flash trapping stage is sent to salt manufacturing workshop by outlet conduit via halogen transmitting pump 3; The associated gas that moisture separator 2 flash trapping stage goes out is sent in air water separator 5 by outlet pipe and is carried out the second-order separation, and the bittern contained by associated gas is sent to salt manufacturing workshop by the water outlet bottom air water separator 5 after separating, and improves the utilization ratio of bittern; Associated gas purity after air water separator 5 the second-order separation is higher, drier, and be sent in waste gas burner 4 and more easily light a fire, combustion flame is more stable, decreases the ignition operation of workman, thus the operational danger of workman is reduced.
Wherein, between described air water separator 5 and described waste gas burner 4, the first fireproof tempering device 7 is provided with; The inlet mouth of described first fireproof tempering device 7 is connected with the air outlet of described air water separator 5; The pipeline that the air outlet of described first fireproof tempering device 7 is connected with described waste gas burner 4 is provided with a ball valve.Like this, Mars during use in waste gas burner 4 cannot enter air water separator 5 under the blocking-up of the first fireproof tempering device 7, ensure that the safety of air water separator 5, after the first fireproof tempering device 7, be provided with ball valve simultaneously, ball valve can be closed in the work starting stage, the association tolerance of enough lighting deposited by collection, improves the success ratio of igniting.
Wherein, brine treatment unit is provided with between moisture separator 2 water side to salt manufacturing workshop, brine treatment unit comprises described outlet conduit, and described brine treatment unit also comprises a bittern hold-up vessel 8, and bittern hold-up vessel 8 comprises a sealed tank body, the middle part of tank body is provided with feed-water end and is connected with described moisture separator 2 water side, like this, have employed sealed tank body, when can ensure collection halogen, associated gas in bittern overflows directly cannot enter air, pollutes surrounding enviroment; Wherein, the top of tank body is provided with vacuum pressure valves, like this, can ensure no matter be add bittern to sealed tank body or put bittern outward, can ensure tank body and atmospheric balance; Tank base is communicated to salt manufacturing workshop by described outlet conduit; Described outlet conduit is provided with outlet valve 9, like this, close outlet valve 9 bittern after flash trapping stage to be collected in bittern hold-up vessel 8, during salt manufacturing, outlet valve 9 is opened, the bittern of bittern hold-up vessel 8 can be stable supply halogen transmitting pump 3, ensure that the stable of defeated halogen flow, improve the production efficiency in salt manufacturing workshop.Meanwhile, stable defeated halogen flow, also improves the work-ing life of equipment.
Wherein, described bittern hold-up vessel 8 top is also provided with venting port, and described venting port is connected to waste gas burner 4 by gas exhaust duct.Like this, the associated gas being collected in bittern hold-up vessel 8 top can be sent in waste gas burner 4 by gas exhaust duct and burn, and discharges the pollution to air between minimizing.
Wherein, the feed-water end internal diameter of described bittern hold-up vessel 8 is less than the outlet conduit internal diameter of described tank base; Like this, when bottom bittern hold-up vessel 8, outlet valve 9 is opened, water outlet speed is larger than water intake velocity, the gas phase portion pressure at bittern hold-up vessel 8 top will reduce, simultaneously under the effect of vacuum pressure valves, bittern hold-up vessel 8 top can form tiny structure, is conducive to the spilling of the associated gas in bittern, improves the purity of bittern further.
Wherein, between described bittern hold-up vessel 8 and described waste gas burner 4, the second fireproof tempering device 10 is provided with; The inlet mouth of described second fireproof tempering device 10 is connected with the venting port at described bittern hold-up vessel 8 top; The pipeline that the air outlet of described second fireproof tempering device 10 is connected with described waste gas burner 4 is provided with a ball valve.Like this, the Mars in waste gas burner 4, under the blocking-up of the second fireproof tempering device 10, cannot enter bittern hold-up vessel 8, ensure that the safety of bittern hold-up vessel 8.In addition, when equipment does not work, the ball valve of the second fireproof tempering device 10 air outlet can be closed, prevent the associated gas exhaust emission air overflowed inside hold-up vessel.
Wherein, the position on described bittern hold-up vessel 8 top 2/3 is provided with overflow port, described overflow port by pipeline communication to salt manufacturing workshop.Like this, when closing outlet valve 9 and collecting bittern, once bittern exceeds the permission capacity of bittern hold-up vessel 8, the overflow port from bittern hold-up vessel 8 top is flowed into salt manufacturing workshop by unnecessary bittern, ensure that the safety of bittern hold-up vessel 8.
Wherein, described first fireproof tempering device 7 is connected with described bittern water inlet manifold 1 by the pipeline being provided with gate valve with described second fireproof tempering device 10 feed-water end; Inlet mouth and air outlet in communicating with air outlet in described first fireproof tempering device 7 and described second fireproof tempering device 10 inside are provided with and communicate with inlet mouth, described interior inlet mouth is lower than interior air outlet; Like this, open the switch-valve be connected on pipeline with bittern water inlet manifold, poured into by bittern in the first fireproof tempering device and the second fireproof tempering device, interior inlet mouth is flooded by bittern, in ensureing, air outlet is more than liquid level simultaneously, can realize the effect of fireproof tempering device.In the middle part of described first fireproof tempering device 7 and described second fireproof tempering device 10 arrange water side by pipeline communication to salt manufacturing workshop; Described water side is between described interior inlet mouth and described interior air outlet.Like this, water side is arranged between interior inlet mouth and interior air outlet, conveniently can controls liquid level and just flood interior inlet mouth, and ensure that interior air outlet is more than liquid level.
Wherein, described brine treatment unit also comprises one and stores halogen pond 6; The described feed-water end storing halogen pond 6 is connected with the water side of described second fireproof tempering device 10 with the overflow port of the water outlet bottom described air water separator 5, described bittern hold-up vessel 8 upper part, described first fireproof tempering device 7 by pipeline simultaneously; Described storing bottom halogen pond 6 is provided with a water drain valve, described water drain valve by pipeline communication to salt manufacturing workshop.
Wherein, described first fireproof tempering device 7 and described second fireproof tempering device 10 bottom by the pipeline that is provided with ball valve with store halogen pond 6 and be connected.Like this, storing halogen pond 6 can collect focus utilization by scrappy bittern, can increase operation rate.
Wherein, as shown in Figure 2, described waste gas burner 4 comprises the smoke evacuation chimney 41 vertically arranged, and bottom described smoke evacuation chimney 41, be provided with the overall smoke collection cover 42 in up-small and down-big inverted tubaeform, this smoke collection cover 42 upper end smoke outlet and described smoke evacuation chimney 41 are tightly connected; Combustion chamber 43 is vertically provided with bottom described smoke collection cover 42; The inside of described combustion chamber 43 is vertically provided with incendiary pencil 44; Be provided with overall in up big and down small tubaeform combustion head 45 upwards at the top of described incendiary pencil 44; Like this, the associated gas entering incendiary pencil 44 can be lighted at combustion head 45 place.
Wherein, in described incendiary pencil 44, be provided with hush pipe 46 in the same way, this hush pipe 46 top seal, and bottom air inlet one end passes the bottom of described incendiary pencil 44; The body being positioned at incendiary pencil 44 inside at described hush pipe 46 is covered with and is uniformly distributed aperture; Described hush pipe 46 bottom air inlet is connected with described outlet pipe.Like this, after waste gas enters hush pipe from hush pipe bottom air inlet, flow out from the aperture hush pipe body from side direction, the flow direction of forcibly changing air-flow and state, energy-eliminating noise-reducing is carried out to air-flow, make the off-gas flows of arrival combustion head more steady, reduce its noise and make burning more stable, not easily stopping working, without the need to carrying out relight, enhance safety coefficient, burn more complete simultaneously, discharge environmental protection more.Better selection is the breathing area that the hush pipe total breathing area of aperture be positioned on the body of incendiary pencil inside is more than or equal to combustion head, makes above-mentioned erasure effect best like this.Described aperture is preferably set to the aperture that jet noise is high frequency or ultra-high frequency frequency spectrum in addition, make this structure can produce the effect of aperture sound damper so simultaneously, after association waste gas enters hush pipe from the inlet mouth bottom hush pipe, the aperture of air-flow on sound damper, the frequency spectrum of jet noise will shift to high frequency or ultra-high frequency, audible sound composition in frequency spectrum is obviously reduced, thus the interference reduced people and injury.
Wherein, a shrouding is provided with bottom described incendiary pencil 44; The periphery of described hush pipe 46 and described shrouding fixed seal connection.Like this, air-flow is avoided to flow out bottom incendiary pencil and reduce erasure effect.Form pressure letdown chamber between hush pipe and the inner chamber of incendiary pencil, step-down can be carried out to associated gas, further reduce noise and improve the stability of flame.
Wherein, described smoke collection cover 42 is in coniform, and its drift angle is 90 degree.When specifically arranging, if when opening angle is excessive, gas collection scope is excessive, is unfavorable for the collection of flue gas; If when opening angle is too small, gas collection effect improves, but reduces the discharge rate of flue gas; By test, when the opening angle of smoke collection cover be 70 to 90 spend time collection cigarette effect and emission effect best.During concrete enforcement, smoke collection cover 42 also can adopt other shapes, than following large little hexahedral shape; Drift angle is also not limited only to 90 degree of settings, environmentally air pressure, other utility appliance such as draft fan etc. and smoke collection cover shape can arrange other greater or lesser angle.
Wherein, the cross-sectional area of described combustion chamber 43 is 11:1 with the ratio of the cross-sectional area of incendiary pencil 44.During Actual combustion, no matter be methane, Sweet natural gas or hydrogen sulfide, during perfect combustion and the ratio of oxygen all at about 1:2, and the aerial ratio of oxygen is 1:5, for ensureing that associated gas can perfect combustion, the ratio of the associated gas and air that enter combustion chamber should be greater than 1:10, considers the restriction of combustion chamber outside dimension, ensure perfect combustion, combustion chamber and the cross-sectional area ratio of incendiary pencil are set to 10:1 to 12:1 for best simultaneously.Like this, the perfect combustion of associated gas can be ensured from the air capacity entered between combustion chamber 43 and incendiary pencil 44 in combustion chamber 43.
Wherein, described combustion chamber 43 is round shape, and all coaxially arranges with smoke evacuation chimney 41, smoke collection cover 42, incendiary pencil 44 and hush pipe 46.Adopt this coaxially arranged, the change of flow area when air and associated gas circulation can be avoided, make air-flow more stable.
Wherein, described combustion chamber 43 is positioned at combustion head 45 place At The Height and is provided with a porthole.Like this, operator can see the combustion case of flame easily by this porthole.
Wherein, described porthole is provided with a hermatic door 47, described hermatic door 47 can be made up of heat-stable material.During concrete enforcement, the transparent material with resistance toheat can also being adopted, like this, while flame situation can being observed when closing hermatic door 47, can ensure that the tail gas after burning can not overflow from porthole.
During concrete enforcement, the height of described smoke evacuation chimney 41 is 30 meters, and like this, the gas after burning can be discharged into high-altitude, avoids direct low-altitude discharged to make the combustion tail gas too high levels of low latitude densely inhabited district.
The foregoing is only preferred embodiment of the present invention, is not restriction with the present invention, and all any amendments done within the spirit and principles in the present invention, equivalent replacement and improvement etc., all should be included within protection scope of the present invention.

Claims (8)

1. a well mine salt bittern pretreatment process, in the method, first by after bittern water inlet manifold (1) water inlet, water inlet is separated into bittern and associated gas two portions by a moisture separator (2) again, again brine transportation is carried out salt manufacturing to salt manufacturing workshop, associated gas is transported to waste gas burner (4) burning, it is characterized in that, before associated gas is transported to waste gas burner (4), the moisture be mingled with in associated gas is separated and is back to salt manufacturing workshop, to ensure waste gas burner (4) combustion efficacy and to improve bittern utilization ratio.
2. well mine salt bittern pretreatment process as claimed in claim 1, is characterized in that, in the method, specifically comprise the following steps,
A, first obtain the well mine salt bittern pretreatment system of following structure, this system comprises bittern water inlet manifold (1), the moisture separator (2) be connected with bittern water inlet manifold (1), moisture separator (2) water side is connected to salt manufacturing workshop by outlet conduit, outlet conduit is provided with halogen transmitting pump (3), moisture separator (2) outlet side is connected to waste gas burner (4) by outlet pipe, described outlet pipe is provided with air water separator (5), the inlet mouth of described air water separator (5) is connected with the outlet side of described moisture separator (2), the air outlet of described air water separator (5) is connected with described waste gas burner (4), described air water separator (5) bottom water outlet by pipeline communication to salt manufacturing workshop,
B, when specifically processing, bittern enters moisture separator (2) by bittern water inlet manifold (1), and the bittern after moisture separator (2) flash trapping stage is sent to salt manufacturing workshop by outlet conduit via halogen transmitting pump (3); The associated gas that moisture separator (2) flash trapping stage goes out is sent into air water separator (5) by outlet pipe and is carried out the second-order separation, and bittern contained in associated gas is sent to salt manufacturing workshop by the water outlet of air water separator (5) bottom after the second-order separation; Associated gas after air water separator (5) the second-order separation is sent to burning in waste gas burner (4).
3. well mine salt bittern pretreatment process as claimed in claim 2, it is characterized in that, in the method, the well mine salt bittern pretreatment system adopted also is included between described air water separator (5) and described waste gas burner (4) and is provided with the first fireproof tempering device (7); The inlet mouth of described first fireproof tempering device (7) is connected with the air outlet of described air water separator (5); The pipeline that the air outlet of described first fireproof tempering device (7) is connected with described waste gas burner (4) is provided with a switch-valve; During concrete process, first the switch-valve on the air outlet pipeline of the first fireproof tempering device (7) cuts out, the switch-valve of the air outlet of the first fireproof tempering device (7) is opened, finally igniting in waste gas burner (4) after air water separator (5) the second-order separation for some time.
4. well mine salt bittern pretreatment process as claimed in claim 3, it is characterized in that, in the method, the well mine salt bittern pretreatment system adopted also comprises between described moisture separator (2) water side to salt manufacturing workshop and is provided with brine treatment unit, brine treatment unit comprises described outlet conduit, described brine treatment unit also comprises a bittern hold-up vessel (8), bittern hold-up vessel (8) comprises a sealed tank body, tank body is provided with feed-water end to be connected with described moisture separator (2) water side, the top of tank body is provided with vacuum pressure valves, tank base is communicated to salt manufacturing workshop by described outlet conduit, described outlet conduit is provided with outlet valve (9), upper part of described bittern hold-up vessel (8) is provided with overflow port, described overflow port by pipeline communication to salt manufacturing workshop, during concrete process, first the outlet valve (9) on outlet conduit is closed, bittern after moisture separator (2) flash trapping stage enters sealed bittern hold-up vessel (8) by feed-water end and stores, and bittern hold-up vessel (8) keeps pressure equilibrium by the vacuum pressure valves at top and normal atmosphere, when bittern in bittern hold-up vessel (8) flows out from overflow port, open the outlet valve (9) on outlet conduit, be sent to salt manufacturing Workshop Production via halogen transmitting pump (3).
5. well mine salt bittern pretreatment process as claimed in claim 4, it is characterized in that, in the method, the well mine salt bittern pretreatment system adopted also comprises described bittern hold-up vessel (8) top and is also provided with venting port, and described venting port is connected to waste gas burner (4) by gas exhaust duct; The feed-water end internal diameter of described bittern hold-up vessel (8) is less than the outlet conduit internal diameter of described tank base; The second fireproof tempering device (10) is provided with between described bittern hold-up vessel (8) and described waste gas burner (4); The inlet mouth of described second fireproof tempering device (10) is connected with the venting port at described bittern hold-up vessel (8) top; The pipeline that the air outlet of described second fireproof tempering device (10) is connected with described waste gas burner (4) is provided with a switch-valve; During concrete process, when the bittern in bittern hold-up vessel (8) flows out from overflow port, open the outlet valve (9) on outlet conduit; The associated gas at bittern hold-up vessel (8) top enters the second fireproof tempering device (10) by the gas exhaust duct communicated with venting port, finally sends into burning in waste gas burner (4).
6. well mine salt bittern pretreatment process as claimed in claim 5, it is characterized in that, in the method, the well mine salt bittern pretreatment system adopted also is comprised described first fireproof tempering device (7) and is connected with described bittern water inlet manifold (1) by the pipeline being provided with switch-valve with described second fireproof tempering device (10) feed-water end; Inlet mouth and air outlet in communicating with air outlet in described first fireproof tempering device (7) and described second fireproof tempering device (10) inside are provided with and communicate with inlet mouth, described interior inlet mouth is lower than interior air outlet; Described first fireproof tempering device (7) and described second fireproof tempering device (10) middle part arrange water side by pipeline communication to salt manufacturing workshop; Described water side is between described interior inlet mouth and described interior air outlet; During concrete process, first open with the switch-valve that bittern water inlet manifold (1) is connected on pipeline, bittern is introduced in the first fireproof tempering device (7) and the second fireproof tempering device (10), when bittern flows out from water side, close the switch-valve be connected pipeline with bittern water inlet manifold (1).
7. well mine salt bittern pretreatment process as claimed in claim 6, it is characterized in that, in the method, the well mine salt bittern pretreatment system adopted also comprises one and stores halogen pond (6); The described feed-water end storing halogen pond (6) is connected with the water side of described second fireproof tempering device (10) with the water outlet of described air water separator (5) bottom, the overflow port of described bittern hold-up vessel (8) upper part and described first fireproof tempering device (7) by pipeline simultaneously; Described store halogen pond (6) bottom be provided with a water drain valve, described water drain valve by pipeline communication to salt manufacturing workshop; During concrete process, closedown stores the water drain valve of bottom, halogen pond (6), the bittern of the overflow port of air water separator (5) bottom water outlet, bittern hold-up vessel (8) upper part and the water side outflow of described first fireproof tempering device (7) and described second fireproof tempering device (10) is collected to be stored in halogen pond (6), after storing the bittern in halogen pond and filling, open the water drain valve stored bottom halogen pond, bittern is sent into salt manufacturing Workshop Production.
8. well mine salt bittern pretreatment process as claimed in claim 7, it is characterized in that, in the method, waste gas burner (4) in the well mine salt bittern pretreatment system adopted comprises the smoke evacuation chimney (41) vertically arranged, be provided with the overall smoke collection cover (42) in inverted tubaeform in described smoke evacuation chimney (41) bottom, this smoke collection cover (42) upper end smoke outlet and described smoke evacuation chimney (41) are tightly connected; Described smoke collection cover (42) bottom is vertically provided with combustion chamber (43); The inside of described combustion chamber (43) is vertically provided with incendiary pencil (44); Be provided with overall in flaring combustion head (45) upwards at the top of described incendiary pencil (44); In described incendiary pencil (44), be provided with hush pipe (46) in the same way, this hush pipe (46) top seal, and bottom air inlet one end passes the bottom of described incendiary pencil (44); Be positioned on the inner body of incendiary pencil (44) at described hush pipe (46) and be provided with some apertures; Described hush pipe (46) bottom air inlet is connected with described outlet pipe; During concrete process, after the associated gas entering waste gas burner (4) enters hush pipe (46) from hush pipe (46) bottom air inlet, the aperture side direction on hush pipe (46) body flows out, and finally reaches combustion head (45) burn processing.
CN201510156224.6A 2015-04-02 2015-04-02 A kind of well mine salt bittern preprocess method Active CN104743578B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510156224.6A CN104743578B (en) 2015-04-02 2015-04-02 A kind of well mine salt bittern preprocess method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510156224.6A CN104743578B (en) 2015-04-02 2015-04-02 A kind of well mine salt bittern preprocess method

Publications (2)

Publication Number Publication Date
CN104743578A true CN104743578A (en) 2015-07-01
CN104743578B CN104743578B (en) 2016-08-17

Family

ID=53583952

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510156224.6A Active CN104743578B (en) 2015-04-02 2015-04-02 A kind of well mine salt bittern preprocess method

Country Status (1)

Country Link
CN (1) CN104743578B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105386744A (en) * 2015-12-25 2016-03-09 茫崖兴元钾肥有限责任公司 Collection method for salt lake underground deep brine
CN115155161A (en) * 2022-06-28 2022-10-11 德耐尔能源装备有限公司 High-efficient gas-water separation device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110044484A (en) * 2009-10-23 2011-04-29 강순택 Apparatus of drying sun-dried salt
CN103363532A (en) * 2012-04-01 2013-10-23 林光湧 Waste gas purification combustor
CN203837505U (en) * 2014-04-15 2014-09-17 苏州工业园区热处理设备厂有限公司 Tempering furnace waste gas burning device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110044484A (en) * 2009-10-23 2011-04-29 강순택 Apparatus of drying sun-dried salt
CN103363532A (en) * 2012-04-01 2013-10-23 林光湧 Waste gas purification combustor
CN203837505U (en) * 2014-04-15 2014-09-17 苏州工业园区热处理设备厂有限公司 Tempering furnace waste gas burning device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
高莉霞等: "卤井盐岩伴生气治理探索与实践", 《中国井矿盐》, vol. 45, no. 4, 31 July 2014 (2014-07-31), pages 18 - 20 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105386744A (en) * 2015-12-25 2016-03-09 茫崖兴元钾肥有限责任公司 Collection method for salt lake underground deep brine
CN115155161A (en) * 2022-06-28 2022-10-11 德耐尔能源装备有限公司 High-efficient gas-water separation device

Also Published As

Publication number Publication date
CN104743578B (en) 2016-08-17

Similar Documents

Publication Publication Date Title
CN101158286B (en) Coal mine light concentration mash gas safety conveying method and conveying system
CN104743578A (en) Mine brine pretreatment method
CN207849802U (en) A kind of geothermal tail water backflow device based on geothermal well association atmospheric pressure
CN109339788A (en) A method of control underground coal spontaneous combustion simultaneously develops and uses
CN109340561A (en) A kind of sewer blast protection and collecting methane system
CN104743577A (en) Well and rock salt brine pretreatment system
CN206345922U (en) A kind of oxyhydrogen generator with gas filtration function
CN1318794C (en) Coal mine gas and fine spray mixed conveying method and apparatus
CN109113785A (en) A kind of safe air-taking system of coal mine wind-lack gas
CN106351611A (en) Automatic environment-friendly combustion device for open flow of gas well
CN104632137B (en) Self-pressure remote control type condensate oil closed recovery process method and device
CN203741293U (en) Integrated recovery device for well site associated gas
CN204513419U (en) A kind of well mine salt waste gas burner
CN206071565U (en) Open flow combustion box
CN209067275U (en) A kind of safe air-taking system of coal mine wind-lack gas
CN2828530Y (en) Fine spray supplying device for gas of coal mine
CN211068846U (en) Water seal flame arrester
CN100489273C (en) Method for separating coal mine gas
CN207880123U (en) A kind of water sealed tank of more stomatas
CN205154109U (en) Coal seam gas well well head gas leakage recovery unit
CN204447652U (en) Biogas filters fireproof tempering device
CN205084460U (en) Bump and spatter formula oil and gas separator
CN205351778U (en) Discharging equipment is collected to condensate that prevents flue gas leakage
CN204803263U (en) Device of one set of coproduction coal, gas and tar
CN108387704B (en) Decomposing and burning device and method for liquid nitrogen frozen natural gas hydrate sample

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant