Prior art keywords
inspection
self
pressing plate
secondary device
intelligent substation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510094831.4A
Other languages
Chinese (zh)
Other versions
CN104734349B (en
Inventor
钱国明
姚亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing SAC Automation Co Ltd
Original Assignee
Nanjing SAC Automation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing SAC Automation Co Ltd filed Critical Nanjing SAC Automation Co Ltd
Priority to CN201510094831.4A priority Critical patent/CN104734349B/en
Publication of CN104734349A publication Critical patent/CN104734349A/en
Application granted granted Critical
Publication of CN104734349B publication Critical patent/CN104734349B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention provides an automatic pressing plate inputting and retreating method based on secondary equipment self-inspection in an intelligent substation. The automatic pressing plate inputting and retreating method based on secondary equipment self-inspection in the intelligent substation includes the following steps that firstly, self-inspection of work conditions of secondary equipment is carried out, the work conditions of the secondary equipment in the intelligent substation are monitored and self-inspected in real time, chip-level diagnosis is carried out, and an anomaly is analyzed and evaluated; secondly, the network link conditions of the secondary equipment are judged, the secondary equipment in the intelligent substation realizes information interaction through a GOOSE link and an SV link, and network positioning is carried out on the anomaly; thirdly, inputting and retreating of a pressing plate are carried out, the secondary equipment monitors information classification through self-inspection, and automatically retreats an affected interval pressing plate through evaluation on the anomaly and positioning of the anomaly in the network when the anomaly happens, and isolation of the secondary equipment on the network is realized.

Description

Based on the pressing plate automatic switching method of secondary device self-inspection in intelligent substation
Technical field
The present invention relates to a kind of pressing plate and throw annealing method, particularly, relate to a kind of pressing plate automatic switching method based on secondary device self-inspection in intelligent substation, belong to power system automation technology field.
Background technology
Along with intelligent relay protection controlling device applying at intelligent substation, the conventional hard pressing plate of the hard pressing plate of function and loop all substitute by soft pressing plate.Especially extremely many in multi-compartment protection equipment for busbar pressing plate quantity; except function pressing plate; receive pressing plate according to the sampling of interval quantity configuration, tripping operation exports pressing plate, malfunctioningly opens into pressing plate, forces enable pressing plate etc., the pressing plate quantity of the substation bus bar protective device of general scale is by more or less a hundred.In operation maintenance, relate to pressing plate throw the work of moving back and whether thornyly just seem, safety measure is complicated, and recovery operation is too much, careless slightlyly very easily makes mistakes.Consider that the related security of the route protection, tranformer protection, merge cells, intelligent terminal etc. coordinated with bus protection in maintenance is various especially again, and relate to more interconnect device.
Summary of the invention
The present invention is in order to solve the above-mentioned defect and deficiency that exist in prior art, provide a kind of pressing plate automatic switching method based on secondary device self-inspection in intelligent substation, achieve the automatic switching of pressing plate, avoid because carelessness causes pressing plate to miscarry the appearance of moving back, leaking switching, forgetting the problems such as recovery.
For solving the problems of the technologies described above, the invention provides a kind of pressing plate automatic switching method based on secondary device self-inspection in intelligent substation, comprising the following steps:
Step one, the self-inspection of secondary device working condition, the secondary device in intelligent substation carries out real time monitoring, self-inspection to the working condition of himself, carries out chip-scale diagnosis, and analyzes the exception occurred, assess;
Step 2, secondary device network linking situation differentiates, the secondary device in intelligent substation realizes information interaction by GOOSE link and SV link communication, realizes network positions to the exception occurred;
Step 3, pressing plate is thrown and is moved back, secondary device according to the classification of self-inspection monitor message, existing abnormal time, by the assessment of exception and location in a network, automatically exit affected interval pressing plate, realize the isolation of secondary device on network; For recoverable exception, to disappear or after inspecting state returns until abnormal, secondary device by pressing plate state when automatically recovering normal, for expendable exception, after completing maintenance, by manual reversion to normal pressing plate state.
Wherein, in described step one, the self-inspection of secondary device working condition comprises, to the self-inspection of the self-inspection in analog acquisition loop, switch amount input circuit, to the self-inspection of CPU operation conditions and the self-inspection to device status between communication.
Described step one SMIS chip level diagnosis refers to, when normally running, secondary device carries out cycle read-write to cpu chip and patrols and examines, and realizes on-line monitoring; When receiving external command, secondary device performs file read-write operations, realizes application monitors; Secondary device, to by after the operation of read-write cpu chip, according to return parameters, judges that whether cpu chip working condition is normal, prompting error message time abnormal, realizes the chip-scale location of fault thus, and complete failure diagnosis according to error message.
The aforementioned self-inspection to analog acquisition loop comprises the self-inspection to AC/DC loop.
The self-inspection of aforementioned switch amount input circuit comprise to the hard pressing plate of function open into self-inspection and to secondary device inside open into self-inspection.
The aforementioned self-inspection to CPU operation conditions comprises the self-inspection to internal storage, and described internal storage comprises RAM, FLASH and EPROM.
The aforementioned self-inspection to device status between communication comprise the self-inspection to carrier channel, the self-inspection to optical-fibre channel, to the self-inspection of SV link, the self-inspection to GOOSE link.
The Advantageous Effects that the present invention reaches:
The information evaluation that the present invention can monitor according to secondary device is abnormal, the throwing of pressing plate is moved back and adaptive failure situation with good conditionsi can be occurred and recover, solve in intelligent substation because secondary device pressing plate is too much, the network of relation link degree of coupling is strong, the problem of safety measure complexity in operation maintenance, avoid, because carelessness causes pressing plate to miscarry the appearance of moving back, leaking switching, forgetting the hidden danger such as recovery, decreasing the security measure work of overhaul of the equipments, improve the safety of operation maintenance work.
Accompanying drawing explanation
Fig. 1 schematic flow sheet of the present invention.
Embodiment
In order to the technique effect that auditor can better understand technical characteristic of the present invention, technology contents and reach, now accompanying drawing of the present invention is described in detail in conjunction with the embodiments.But shown accompanying drawing, just in order to technical scheme of the present invention is better described, auditor please not limit claims of the present invention with regard to accompanying drawing.
Below in conjunction with drawings and Examples, patent of the present invention is further illustrated.
As described in Figure 1, the invention provides a kind of pressing plate automatic switching method based on secondary device self-inspection in intelligent substation, comprise the following steps:
Step one, the self-inspection of secondary device working condition, the secondary device be made up of relay protection controlling device and process layer devices in current intelligent substation is based on embedded system development, secondary device carries out real time monitoring, self-inspection to the working condition of himself, carry out chip-scale diagnosis, and the exception occurred is analyzed, assessed; If when secondary device needs to overhaul, according to IEC61850-7-3 regulation, secondary device can be put " TRUE " quality (quality) the 11st inspecting state (Test).
The self-inspection of secondary device working condition comprises, to the self-inspection of the self-inspection in analog acquisition loop, switch amount input circuit, to the self-inspection of CPU operation conditions and the self-inspection to device status between communication.Self-inspection to AC/DC loop is comprised to the self-inspection in analog acquisition loop.The self-inspection of switch amount input circuit comprise to the hard pressing plate of function open into self-inspection and to secondary device inside open into self-inspection.Comprise the self-inspection to internal storage to the self-inspection of CPU operation conditions, described internal storage comprises RAM, FLASH and EPROM.To the self-inspection of device status between communication comprise the self-inspection to carrier channel, the self-inspection to optical-fibre channel, to the self-inspection of SV link, the self-inspection to GOOSE link.
Chip-scale diagnosis refers to, when normally running, secondary device carries out cycle read-write to cpu chip and patrols and examines, and realizes on-line monitoring; When receiving external command, secondary device performs file read-write operations, realizes application monitors; Secondary device, to by after the operation of read-write cpu chip, according to return parameters, judges that whether cpu chip working condition is normal, prompting error message time abnormal, realizes the chip-scale location of fault thus, and complete failure diagnosis according to error message.
Step 2, secondary device network linking situation differentiates, the secondary device in intelligent substation realizes information interaction by GOOSE link and SV link communication, realizes network positions to the exception occurred;
Step 3, pressing plate is thrown and is moved back, secondary device is classified according to self-inspection monitor message, existing abnormal time, by to the assessment of exception and location in a network, automatically exit affected interval pressing plate, as SV link receives pressing plate, GOOSE link trip pressing plate, the malfunctioning pressing plate of GOOSE link or function pressing plate etc., realize the isolation of secondary device on network; For recoverable exception, to disappear or after inspecting state returns until abnormal, secondary device by pressing plate state when automatically recovering normal, for expendable exception, after completing maintenance, by manual reversion to normal pressing plate state.
Below disclose the present invention with preferably embodiment, so it is not intended to limiting the invention, allly takes equivalent replacement or technical scheme that the scheme of equivalent transformation obtains, all drops in protection scope of the present invention.

Claims (7)

1. in intelligent substation based on the pressing plate automatic switching method of secondary device self-inspection, it is characterized in that: comprise the following steps:
Step one, the self-inspection of secondary device working condition, the secondary device in intelligent substation carries out real time monitoring, self-inspection to the working condition of himself, carries out chip-scale diagnosis, and analyzes the exception occurred, assess;
Step 2, secondary device network linking situation differentiates, the secondary device in intelligent substation realizes information interaction by GOOSE link and SV link communication, realizes network positions to the exception occurred;
Step 3, pressing plate is thrown and is moved back, secondary device according to the classification of self-inspection monitor message, existing abnormal time, by the assessment of exception and location in a network, automatically exit affected interval pressing plate, realize the isolation of secondary device on network; For recoverable exception, to disappear or after inspecting state returns until abnormal, secondary device by pressing plate state when automatically recovering normal, for expendable exception, after completing maintenance, by manual reversion to normal pressing plate state.
2. in intelligent substation according to claim 1 based on the pressing plate automatic switching method of secondary device self-inspection, it is characterized in that: in described step one, the self-inspection of secondary device working condition comprises, to the self-inspection of the self-inspection in analog acquisition loop, switch amount input circuit, to the self-inspection of CPU operation conditions and the self-inspection to device status between communication.
3. in intelligent substation according to claim 1 based on the pressing plate automatic switching method of secondary device self-inspection, it is characterized in that: described step one SMIS chip level diagnosis refers to, during normal operation, secondary device carries out cycle read-write to cpu chip and patrols and examines, and realizes on-line monitoring; When receiving external command, secondary device performs file read-write operations, realizes application monitors; Secondary device, to by after the operation of read-write cpu chip, according to return parameters, judges that whether cpu chip working condition is normal, prompting error message time abnormal, realizes the chip-scale location of fault thus, and complete failure diagnosis according to error message.
4. in intelligent substation according to claim 2 based on the pressing plate automatic switching method of secondary device self-inspection, it is characterized in that: the described self-inspection to analog acquisition loop comprises the self-inspection to AC/DC loop.
5. in intelligent substation according to claim 2 based on the pressing plate automatic switching method of secondary device self-inspection, it is characterized in that: the self-inspection of described switch amount input circuit comprise to the hard pressing plate of function open into self-inspection and to secondary device inside open into self-inspection.
6. in intelligent substation according to claim 2 based on the pressing plate automatic switching method of secondary device self-inspection, it is characterized in that: the described self-inspection to CPU operation conditions comprises the self-inspection to internal storage, and described internal storage comprises RAM, FLASH and EPROM.
7. in intelligent substation according to claim 2 based on the pressing plate automatic switching method of secondary device self-inspection, it is characterized in that: the described self-inspection to device status between communication comprise the self-inspection to carrier channel, the self-inspection to optical-fibre channel, to the self-inspection of SV link, the self-inspection to GOOSE link.
CN201510094831.4A 2015-03-03 2015-03-03 Pressing plate automatic switching method in intelligent substation based on secondary device self-inspection Active CN104734349B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510094831.4A CN104734349B (en) 2015-03-03 2015-03-03 Pressing plate automatic switching method in intelligent substation based on secondary device self-inspection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510094831.4A CN104734349B (en) 2015-03-03 2015-03-03 Pressing plate automatic switching method in intelligent substation based on secondary device self-inspection

Publications (2)

Publication Number Publication Date
CN104734349A true CN104734349A (en) 2015-06-24
CN104734349B CN104734349B (en) 2017-03-08

Family

ID=53457927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510094831.4A Active CN104734349B (en) 2015-03-03 2015-03-03 Pressing plate automatic switching method in intelligent substation based on secondary device self-inspection

Country Status (1)

Country Link
CN (1) CN104734349B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106357423A (en) * 2016-08-19 2017-01-25 南京国电南自电网自动化有限公司 Abnormal diagnosis method of secondary equipment of intelligent substation based on fault tree
CN106557054A (en) * 2017-01-05 2017-04-05 上海泽鑫电力科技股份有限公司 The system and method that the failure of transformer cooler intelligent controlling device is repaired automatically
CN106655520A (en) * 2017-02-14 2017-05-10 国网辽宁省电力有限公司 Method for ensuring safe and reliable execution of relay protection remote operation
CN108828344A (en) * 2018-04-17 2018-11-16 国网河南省电力公司电力科学研究院 One kind is for substation line protective device pressing plate detection alarm method and device
CN109066419A (en) * 2018-08-28 2018-12-21 国网河北省电力有限公司电力科学研究院 Diagnostic method, system and the terminal device of secondary device maintenance safety measure operation
CN109327009A (en) * 2018-08-22 2019-02-12 贵州电网有限责任公司 The anti-miscarrying method of risky pressing plate is directed to when a kind of breaker protection regular inspection

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8667060B2 (en) * 2010-11-23 2014-03-04 General Electric Company Data collection from utility meters over advanced metering infrastructure
CN103744422A (en) * 2014-01-06 2014-04-23 国家电网公司 Automatic testing method for relay protection device based on IEC61850 standard

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8667060B2 (en) * 2010-11-23 2014-03-04 General Electric Company Data collection from utility meters over advanced metering infrastructure
CN103744422A (en) * 2014-01-06 2014-04-23 国家电网公司 Automatic testing method for relay protection device based on IEC61850 standard

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106357423A (en) * 2016-08-19 2017-01-25 南京国电南自电网自动化有限公司 Abnormal diagnosis method of secondary equipment of intelligent substation based on fault tree
CN106557054A (en) * 2017-01-05 2017-04-05 上海泽鑫电力科技股份有限公司 The system and method that the failure of transformer cooler intelligent controlling device is repaired automatically
CN106557054B (en) * 2017-01-05 2019-01-25 上海泽鑫电力科技股份有限公司 The system and method that the failure of transformer cooler intelligent controlling device is automatically repaired
CN106655520A (en) * 2017-02-14 2017-05-10 国网辽宁省电力有限公司 Method for ensuring safe and reliable execution of relay protection remote operation
CN106655520B (en) * 2017-02-14 2019-07-16 国网辽宁省电力有限公司 Ensure the method that relay protection remote operation securely and reliably executes
CN108828344A (en) * 2018-04-17 2018-11-16 国网河南省电力公司电力科学研究院 One kind is for substation line protective device pressing plate detection alarm method and device
CN108828344B (en) * 2018-04-17 2021-01-29 国网河南省电力公司电力科学研究院 Pressing plate detection warning method and device for transformer substation line protection device
CN109327009A (en) * 2018-08-22 2019-02-12 贵州电网有限责任公司 The anti-miscarrying method of risky pressing plate is directed to when a kind of breaker protection regular inspection
CN109327009B (en) * 2018-08-22 2020-01-07 贵州电网有限责任公司 Method for preventing misoperation of dangerous pressing plate during circuit breaker protection scheduled inspection
CN109066419A (en) * 2018-08-28 2018-12-21 国网河北省电力有限公司电力科学研究院 Diagnostic method, system and the terminal device of secondary device maintenance safety measure operation
CN109066419B (en) * 2018-08-28 2020-06-26 国网河北省电力有限公司电力科学研究院 Diagnosis method and system for secondary equipment maintenance safety measure operation and terminal equipment

Also Published As

Publication number Publication date
CN104734349B (en) 2017-03-08

Similar Documents

Publication Publication Date Title
CN104734349A (en) Automatic pressing plate inputting and retreating method based on secondary equipment self-inspection in intelligent substation
CN101944771B (en) Secondary loop panoramic state monitoring system for electric operating mechanism of circuit breaker
CN102709889B (en) Self-healing method and self-healing system for faults of power distribution network
CN101980418B (en) System for detecting secondary wiring of relay protection system in transformer substation on line
CN103618377B (en) For being connected to backup auto-activating device system and the spare power automatic switching method of small power supply
CN103051065A (en) Distribution-automation distributed type FA (feeder automation) linkage test method and system
CN103308794A (en) Electric installation maintenance method and device
CN106571688A (en) Method for monitoring operation mode of direct current system and operation state of isolating switch
CN103684903B (en) The online test method that a kind of GOOSE message is abnormal
CN103197271A (en) Testing method for maximum metal condition (MMC) topological flexible direct-current transmission testing platform
CN106208372A (en) Based on visualization and the switch remote operation method of anti-error topological analysis comprehensively
CN101752909B (en) Remote checking method of operation circuit
CN109473968B (en) Junction box with component-level short-circuit protection for photovoltaic power station and control method
CN109546741B (en) Self-checking system of storage battery remote maintenance equipment
CN105049282A (en) Intelligent relay protection device control overhauling method based on on-line monitoring information
CN104734353A (en) Intelligent substation hovering fault monitoring method based on network message
CN102636705B (en) Device for judging fault of remote leakage protector and blockage or fault of alternating current contactor, and analysis method thereof
CN103679546A (en) N-1 calculating method for combined calculation of main networks and distribution networks and automatic spare-power switching actions
CN106610593A (en) Detection method and system based on RTDS intelligent safety control system
CN110907812A (en) Detection system and method for mechanical characteristics of circuit breaker
CN106774068B (en) The anti-error implementation method of intelligent substation and realization system
CN104333143B (en) Intelligent feeder terminal device for power distribution network fault detection
CN207069551U (en) A kind of novel pressboard
CN103558466A (en) Method for on-line whole group logic calibration of 10kV protecting device
CN206038788U (en) Analog switch for device overhaul is cut soon to power

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant