CN104731656B - A kind of resource allocation methods and device - Google Patents
A kind of resource allocation methods and device Download PDFInfo
- Publication number
- CN104731656B CN104731656B CN201310719478.5A CN201310719478A CN104731656B CN 104731656 B CN104731656 B CN 104731656B CN 201310719478 A CN201310719478 A CN 201310719478A CN 104731656 B CN104731656 B CN 104731656B
- Authority
- CN
- China
- Prior art keywords
- hardware resource
- active system
- hardware
- resource
- specifically includes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Hardware Redundancy (AREA)
Abstract
This application provides a kind of resource allocation methods and devices.The method includes:Obtain the hardware resource seizure condition information of active system;Judge whether the seizure condition information meets preset condition;When judging that the seizure condition information meets preset condition, the first hardware resource is distributed for the active system.Using the present processes or device, hardware resource can be dynamically distributed, when the hardware resource deficiency of active system, dilatation can be carried out to the hardware resource of active system, avoid whole network system jam.
Description
Technical field
This application involves data processing fields, more particularly to a kind of resource allocation methods and device.
Background technology
In large-scale network system, after breaking down in order to ensure certain network equipments, the operation of network will not be by tight
Ghost image is rung, and usually can all dispose two systems.This two systems is properly termed as active system and back-up system.
Wherein, when network normal operation, business related with the network is responsible for processing by active system, is produced when running business
Raw data can be synchronized and be stored to back-up system.When the device fails in active system, back-up system can take over master
The business carried with system.
With the continuous development of network technology and the quantity of user terminal is continuously increased, the business of active system carrying
It becomes increasingly complex, needs the data stored also more and more huger.
But in the prior art, when the hardware resource deficiency of active system, active system will break down, and standby
With system due to identical as the hardware resource condition of active system, also can not the business that is carried of take over active system, finally lead
Whole network system is caused to break down.
Invention content
The purpose of the application is to provide a kind of resource allocation methods and device, can pass through and dynamically distribute hardware resource, solution
Certainly when the hardware resource deficiency of active system, the problem of whole network system will break down.
To achieve the above object, this application provides following schemes:
According to the first possible realization method of the first aspect of the application, the application provides a kind of resource allocation side
Method, including:
Obtain the hardware resource seizure condition information of active system;
Judge whether the seizure condition information meets preset condition;
When judging that the seizure condition information meets preset condition, the first hardware money is distributed for the active system
Source.
Second of possible realization method with reference to first aspect, it is described to distribute the first hardware resource for the active system
Later, further include:
The second hardware resource is distributed for the back-up system of the active system;
Wherein, same type of hardware resource, quantity in second hardware resource are greater than or equal to described the
Quantity in one hardware resource.
The third possible realization method with reference to first aspect, the hardware resource seizure condition for obtaining active system
Information specifically includes:
Obtain the computing resource occupation proportion of active system;
Judge whether the seizure condition information meets preset condition correspondingly, described, specifically includes:
Judge whether the computing resource occupation proportion is more than first threshold;
Alternatively, the hardware resource seizure condition information for obtaining active system, specifically includes:
Obtain the storage resource occupation proportion of active system;
Judge whether the seizure condition information meets preset condition correspondingly, described, specifically includes:
Judge whether the storage resource occupation proportion is more than second threshold;
Alternatively, the hardware resource seizure condition information for obtaining active system, specifically includes:
Obtain the resource occupying ratio of active system;
Judge whether the seizure condition information meets preset condition correspondingly, described, specifically includes:
Judge whether the resource occupying ratio is more than third threshold value.
The 4th kind of possible realization method with reference to first aspect distributes the first hardware resource, tool for the active system
Body includes:
Determine the required hardware asset information of the active system;The hardware asset information includes at least described primary
The type and the required quantity of each type of hardware resource of the required hardware resource of system;
The first request comprising the hardware asset information is sent to the first hardware resource management server;Described first asks
It is the first use that the active system distributes the first hardware resource to ask for asking the first hardware resource management server
Permission;
It is that the active system distributes first access right by the first hardware resource management server.
The first specific implementation of second of possible realization method with reference to first aspect is the active system
Back-up system distribute the second hardware resource, specifically include:
Determine the required hardware asset information of the back-up system;The hardware asset information includes at least described spare
The type and the required quantity of each type of hardware resource of the required hardware resource of system;
The second request comprising the hardware asset information is sent to the second hardware resource management server;Described second asks
It is the second use that the back-up system distributes the second hardware resource to ask for asking the second hardware resource management server
Permission;
It is that the back-up system distributes second access right by the second hardware resource management server.
Second of specific implementation of second of possible realization method with reference to first aspect, described is described primary
The back-up system of system is distributed after the second hardware resource, further includes:
It controls the back-up system and uses second hardware resource;
It controls the active system and uses first hardware resource.
The first of second of specific implementation of second of possible realization method with reference to first aspect is more specific
Realization method, if second hardware resource is resources of virtual machine, the control back-up system uses described second
Hardware resource specifically includes:
It controls corresponding second virtual machine of second hardware resource and runs the second application program;
The second database is set on second virtual machine;
Wherein, second application program is when the active system breaks down, to carry the business of the active system
Used application program;Second database is database used by synchronizing the data of the active system.
The first of second of specific implementation of second of possible realization method with reference to first aspect is more specific
Realization method, if first hardware resource is resources of virtual machine, the control active system is hard using described first
Part resource, specifically includes:
It controls corresponding first virtual machine of first hardware resource and runs the first application program;
First database is set on first virtual machine;
Wherein, first application program is application program used by carrying the business of the active system;Described
One database is database used by storing the data of the active system.
According to the first possible realization method of the second aspect of the application, the application provides a kind of resource allocation dress
It sets, including:
Acquiring unit, the hardware resource seizure condition information for obtaining active system;
Judging unit, for judging whether the seizure condition information meets preset condition;
First allocation unit, for when judging that the seizure condition information meets preset condition, being the primary system
System the first hardware resource of distribution.
In conjunction with second of possible realization method of second aspect, further include:
Second allocation unit, for being described primary after first hardware resource of distribution for the active system
The back-up system of system distributes the second hardware resource;
Wherein, same type of hardware resource, quantity in second hardware resource are greater than or equal to described the
Quantity in one hardware resource.
In conjunction with the third possible realization method of second aspect, the acquiring unit specifically includes:
First obtains subelement, the computing resource occupation proportion for obtaining active system;
Correspondingly, the judging unit, specifically includes:
First judgment sub-unit, for judging whether the computing resource occupation proportion is more than first threshold;
Alternatively, the acquiring unit, specifically includes:
Second obtains subelement, the storage resource occupation proportion for obtaining active system;
Correspondingly, the judging unit, specifically includes:
Second judgment sub-unit, for judging whether the storage resource occupation proportion is more than second threshold;
Alternatively, the acquiring unit, specifically includes:
Third obtains subelement, the resource occupying ratio for obtaining active system;
Correspondingly, the judging unit, specifically includes:
Third judgment sub-unit, for judging whether the resource occupying ratio is more than third threshold value.
In conjunction with the 4th kind of possible realization method of second aspect, first allocation unit specifically includes:
First determination subelement, for determining the required hardware asset information of the active system;The hardware resource
Information is required including at least the type of the required hardware resource of the active system and each type of hardware resource
Quantity;
First request transmission sub-unit, believes for being sent to the first hardware resource management server comprising the hardware resource
First request of breath;First request is for asking the first hardware resource management server to be distributed for the active system
First access right of the first hardware resource;
So that the first hardware resource management server is that the active system distributes first access right.
In conjunction with the first concrete implementation mode of the 4th kind of possible realization method of second aspect, second distribution
Unit specifically includes:
Second determination subelement, for determining the required hardware asset information of the back-up system;The hardware resource
Information is required including at least the type of the required hardware resource of the back-up system and each type of hardware resource
Quantity;
Second request transmitting unit includes the hardware asset information for being sent to the second hardware resource management server
Second request;Second request is back-up system distribution for asking the second hardware resource management server
Second access right of two hardware resources;
So that the second hardware resource management server is that the back-up system distributes second access right.
In conjunction with second aspect four kinds of possible realization methods in second of concrete implementation mode, further include:
First control unit, after distributing the second hardware resource in the back-up system for the active system,
It controls the back-up system and uses second hardware resource;
Second control unit is provided for controlling the back-up system in first control unit using second hardware
After source, controls the active system and use first hardware resource.
In conjunction with second aspect four kinds of possible realization methods in second of concrete implementation mode the first is specific
Realization method, if second hardware resource is resources of virtual machine, first control unit specifically includes:
First control subelement runs second using journey for controlling corresponding second virtual machine of second hardware resource
Sequence;
First setting subelement, for the second database to be arranged on second virtual machine;
Wherein, second application program is when the active system breaks down, to carry the business of the active system
Used application program;Second database is database used by synchronizing the data of the active system.
In conjunction with second aspect four kinds of possible realization methods in second of second of concrete implementation mode it is specific
Realization method, if second hardware resource is resources of virtual machine, second control unit specifically includes:
Second control subelement runs first using journey for controlling corresponding first virtual machine of first hardware resource
Sequence;
Second setting subelement, for first database to be arranged on first virtual machine;
Wherein, first application program is application program used by carrying the business of the active system;Described
One database is database used by storing the data of the active system.
According to specific embodiment provided by the present application, this application discloses following technique effects:
Resource allocation methods or device disclosed in the present application, the hardware resource seizure condition by obtaining active system are believed
Breath, judges whether the seizure condition information meets preset condition, if it is satisfied, then distributing the first hardware for the active system
Resource;It, can be to the hardware of active system when the hardware resource deficiency of active system so as to dynamically distribute hardware resource
Resource carries out dilatation, avoids whole network system jam.
Description of the drawings
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, below will be to institute in embodiment
Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the application
Example, for those of ordinary skill in the art, without having to pay creative labor, can also be according to these attached drawings
Obtain other attached drawings.
Fig. 1 is the flow chart of the resource allocation methods embodiment 1 of the application;
Fig. 2 is the flow chart of the resource allocation methods embodiment 2 of the application;
Fig. 3 is the flow chart of the resource allocation methods embodiment 3 of the application;
Fig. 4 is the structure chart of the resource allocation device embodiment of the application;
Fig. 5 is the structure chart of the calculate node of the application.
Specific implementation mode
Below in conjunction with the attached drawing in the embodiment of the present application, technical solutions in the embodiments of the present application carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of embodiments of the present application, instead of all the embodiments.It is based on
Embodiment in the application, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall in the protection scope of this application.
In order to make the above objects, features, and advantages of the present application more apparent, below in conjunction with the accompanying drawings and it is specific real
Applying mode, the present application will be further described in detail.
Fig. 1 is the flow chart of the resource allocation methods embodiment 1 of the application.The executive agent of this method can be primary system
Server in system, as shown in Figure 1, this method may include:
Step 101:Obtain the hardware resource seizure condition information of active system;
The active system may include working traffic node(Front End, FE)With primary back end(Back
End, BE).
Wherein, FE is the general designation of a kind of network element, such as home location register(Home Location Register,
HLR), home subscriber server(Home Subscriber Server, HSS), "Policy and Charging Rules Function network element(Policy
And Charging Rule Function, PCRF), enhancing name server(Enhanced Name Server, ENS)Deng.
FE is mainly responsible for be docked with signaling element, handles signaling message.
BE is a database, is mainly responsible for the storage relevant data of network element signaling, while providing tent business, is responsible for whole
The data modification of system and maintenance.
The hardware resource can refer to having the hardware resource of computing capability, or the hardware with storage capacity provides
Source, or the hardware resource with network capacity.
The seizure condition information can be the information for indicating the occupation proportion to the hardware resource.The occupancy ratio
Example, can be the ratio between used hardware resource and available hardware resource.
Step 102:Judge whether the seizure condition information meets preset condition;
The preset condition can be configured according to the seizure condition information specifically used.
For example, when the seizure condition information indicates between used computing resource and available computing resource
When ratio, the preset condition can be first threshold.When the ratio that the seizure condition information indicates, it is greater than or equal to described
When first threshold, it is possible to determine that the seizure condition information meets preset condition.
Similarly, when the seizure condition information indicates the occupation proportion of other hardware resources, the preset condition can be with
It is that the occupation proportion is greater than or equal to second threshold or third threshold value etc..
Step 103:When judging that the seizure condition information meets preset condition, first is distributed for the active system
Hardware resource.
When judging that the seizure condition information meets preset condition, the hardware resource that active system has used is indicated
Occupy the larger proportion of whole available hardware resources.Business if necessary to processing becomes more complicated, number to be treated
According to continuing growing, then active system may be caused to break down.
In the embodiment of the present invention, the active system can be connected with cloud system.In cloud system there is other hardware to provide
Source.Specifically, the cloud system can be made of multiple computers.Computer in cloud system can become for primary
The hardware resource that system uses.
When the seizure condition information meets preset condition, the hardware resource in cloud system can be distributed to primary system
System uses, to expand the capacity of the hardware resource of the active system.
In conclusion in the present embodiment, by obtaining the hardware resource seizure condition information of active system, accounted for described in judgement
Whether meet preset condition with status information, if it is satisfied, then distributing the first hardware resource for the active system;So as to
Hardware resource is dynamically distributed, when the hardware resource deficiency of active system, dilatation can be carried out to the hardware resource of active system,
Avoid whole network system jam.
In practical application, after the active system dilatation, if the back-up system not dilatation of the active system, when
When the business of active system carrying breaks down more than the bearing capacity and active system of the hardware resource of back-up system, spare system
System also can not take over active system business, cause back-up system that can not play the role of application.
In order to avoid the above situation occurs, the present invention provides the following examples.
Fig. 2 is the flow chart of the resource allocation methods embodiment 2 of the application.As shown in Fig. 2, this method may include:
Step 201:Obtain the hardware resource seizure condition information of active system;
Step 202:Judge whether the seizure condition information meets preset condition, obtains judging result;
Step 203:When the judging result is to be, the first hardware resource is distributed for the active system.
Step 204:The second hardware resource is distributed for the back-up system of the active system;
Wherein, same type of hardware resource, quantity in second hardware resource are greater than or equal to described the
Quantity in one hardware resource.
The back-up system can also be connected with cloud system.Hardware resource in cloud system can be distributed to described spare
System.The quantity of the second hardware resource of back-up system is distributed to, it in principle should be hard not less than distribute to active system first
The quantity of part resource.
For example, distribute to the storage resource of active system 100GB, then distribute to back-up system storage resource do not answer yet it is small
In 100GB.It can ensure that back-up system is identical as the bearing capacity of active system, can break down in active system in this way
When, the business of take over active system.
It should be noted that in each embodiment of the present invention, the first hardware resource is distributed for the active system, specifically may be used
To include the following steps:
Determine the required hardware asset information of the active system;The hardware asset information includes at least described primary
The type and the required quantity of each type of hardware resource of the required hardware resource of system;
The first request comprising the hardware asset information is sent to the first hardware resource management server;Described first asks
It is the first use that the active system distributes the first hardware resource to ask for asking the first hardware resource management server
Permission;
It is that the active system distributes first access right by the first hardware resource management server.
Wherein, the type of the required hardware resource of the active system can specifically include storage resource type, calculate
Resource type and network resource type.For storage resource, it can indicate that the memory space of needs is big in hardware asset information
It is small;For computing resource, the dominant frequency for the processor that needs use and the processing of needs can be indicated in hardware asset information
The number of device;For Internet resources, the network transmission bandwidth of needs can be indicated in hardware asset information.
It may include hardware resource management server in cloud system.Server in active system can be to hardware resource pipe
It manages server and sends the first request.It, can will be in cloud system after hardware resource management server receives first request
The access right of hardware resource distribute to active system.Active system can be used corresponding hard by the access right
Part resource.
Similarly, it is that the back-up system of the active system distributes the second hardware resource, specifically in each embodiment of the present invention
It may comprise steps of:
Determine the required hardware asset information of the back-up system;The hardware asset information includes at least described spare
The type and the required quantity of each type of hardware resource of the required hardware resource of system;
The second request comprising the hardware asset information is sent to the second hardware resource management server;Described second asks
It is the second use that the back-up system distributes the second hardware resource to ask for asking the second hardware resource management server
Permission;
It is that the back-up system distributes second access right by the second hardware resource management server.
In practical application, hardware resource is distributed to after active system or back-up system, it is also necessary to enable active system or
Back-up system runs corresponding program using the hardware resource, and the hardware resource can be made really to be utilized.But
It is, between active system and back-up system, it is necessary to meet specific operating status, i.e.,:Active system is generated in the business of operation
Data, need to synchronize and be stored in back-up system.Therefore, for the hardware resource of active system and back-up system, it is also desirable to
It is enabled in particular order, above-mentioned specific operating status could be met, realize seamless dilatation.
In order to meet above-mentioned operating status, seamless dilatation is realized, the present invention also provides the following examples.
Fig. 3 is the flow chart of the resource allocation methods embodiment 3 of the application.As shown in figure 3, this method may include:
Step 301:Obtain the hardware resource seizure condition information of active system;
Step 302:Judge whether the seizure condition information meets preset condition, obtains judging result;
Step 303:When the judging result is to be, the first hardware resource is distributed for the active system.
Step 304:The second hardware resource is distributed for the back-up system of the active system;
Wherein, same type of hardware resource, quantity in second hardware resource are greater than or equal to described the
Quantity in one hardware resource.
Step 305:It controls the back-up system and uses second hardware resource;
Step 306:It controls the active system and uses first hardware resource.
In the present embodiment, first controls the back-up system and use second hardware resource, then control the active system
Use first hardware resource, it is ensured that the bearing capacity of the hardware resource of back-up system is not less than always active system
Hardware resource bearing capacity realizes seamless dilatation so as to meet above-mentioned operating status.
In practical application, the hardware resource can be resources of virtual machine.Virtual machine(Virtual Machine, VM)It is
Refer to by software simulate have complete hardware system function, operate in complete computers system in a completely isolated environment
System.Two can be simulated on a physical computer or more virtual computers, these virtual machines can be as real
Computer equally works.On a virtual machine, operation carries the required application program of business of the active system, so that it may
So that the hardware resource is used.
Correspondingly, the control active system uses first hardware resource, can specifically include:
It controls corresponding first virtual machine of first hardware resource and runs the first application program;
First database is set on first virtual machine;
Wherein, first application program is application program used by carrying the business of the active system;Described
One database is database used by storing the data of the active system.
The control back-up system uses second hardware resource, can specifically include:
It controls corresponding second virtual machine of second hardware resource and runs the second application program;
The second database is set on second virtual machine;
Wherein, second application program is when the active system breaks down, to carry the business of the active system
Used application program;Second database is database used by synchronizing the data of the active system.
Present invention also provides a kind of resource allocation devices.Described device, which can have, executes preceding method embodiment
The server of ability.The server can be arranged in active system, can also be arranged in back-up system, can also be arranged
In cloud system.
Fig. 4 is the structure chart of the resource allocation device embodiment of the application.As shown in figure 4, the device may include:
Acquiring unit 401, the hardware resource seizure condition information for obtaining active system;
The active system may include working traffic node(Front End, FE)With primary back end(Back
End, BE).
Wherein, FE is the general designation of a kind of network element, such as home location register(Home Location Register,
HLR), home subscriber server(Home Subscriber Server, HSS), UPCC, enhancing name server(Enhanced
Name Server, ENS)Deng.FE is mainly responsible for be docked with signaling element, handles signaling message.
BE is a database, is mainly responsible for the storage relevant data of network element signaling, while providing tent business, is responsible for whole
The data modification of system and maintenance.
The hardware resource can refer to having the hardware resource of computing capability, or the hardware with storage capacity provides
Source, or the hardware resource with network capacity.
The seizure condition information can be the information for indicating the occupation proportion to the hardware resource.The occupancy ratio
Example, can be the ratio between used hardware resource and available hardware resource.
Judging unit 402, for judging whether the seizure condition information meets preset condition;
The preset condition can be configured according to the seizure condition information specifically used.
For example, when the seizure condition information indicates between used computing resource and available computing resource
When ratio, the preset condition can be first threshold.When the ratio that the seizure condition information indicates, it is greater than or equal to described
When first threshold, it is possible to determine that the seizure condition information meets preset condition.
Similarly, when the seizure condition information indicates the occupation proportion of other hardware resources, the preset condition can be with
It is that the occupation proportion is greater than or equal to second threshold or third threshold value etc..
First allocation unit 403, for when judging that the seizure condition information meets preset condition, being described primary
System distributes the first hardware resource.
When judging that the seizure condition information meets preset condition, the hardware resource that active system has used is indicated
Occupy the larger proportion of whole available hardware resources.Business if necessary to processing becomes more complicated, number to be treated
According to continuing growing, then active system may be caused to break down.
In the embodiment of the present invention, the active system can be connected with cloud system.In cloud system there is other hardware to provide
Source.Specifically, the cloud system can be made of multiple computers.Computer in cloud system can become for primary
The hardware resource that system uses.
When the seizure condition information meets preset condition, the hardware resource in cloud system can be distributed to primary system
System uses, to expand the capacity of the hardware resource of the active system.
In conclusion in the present embodiment, by obtaining the hardware resource seizure condition information of active system, accounted for described in judgement
Whether meet preset condition with status information, if it is satisfied, then distributing the first hardware resource for the active system;So as to
Hardware resource is dynamically distributed, when the hardware resource deficiency of active system, dilatation can be carried out to the hardware resource of active system,
Avoid whole network system jam.
In practical application, after the active system dilatation, if the back-up system not dilatation of the active system, when
When the business of active system carrying breaks down more than the bearing capacity and active system of the hardware resource of back-up system, spare system
System also can not take over active system business, cause back-up system that can not play the role of application.
In order to avoid the above situation occurs, described device can also include:
Second allocation unit, for being described primary after first hardware resource of distribution for the active system
The back-up system of system distributes the second hardware resource;
Wherein, same type of hardware resource, quantity in second hardware resource are greater than or equal to described the
Quantity in one hardware resource.
In practical application, the acquiring unit 401 can specifically include:
First obtains subelement, the computing resource occupation proportion for obtaining active system;
Correspondingly, the judging unit 402, can specifically include:
First judgment sub-unit, for judging whether the computing resource occupation proportion is more than first threshold;
Alternatively, the acquiring unit 401, can specifically include:
Second obtains subelement, the storage resource occupation proportion for obtaining active system;
Correspondingly, the judging unit 402, can specifically include:
Second judgment sub-unit, for judging whether the storage resource occupation proportion is more than second threshold;
Alternatively, the acquiring unit 401, can specifically include:
Third obtains subelement, the resource occupying ratio for obtaining active system;
Correspondingly, the judging unit 402, can specifically include:
Third judgment sub-unit, for judging whether the resource occupying ratio is more than third threshold value.
In practical application, first allocation unit 403 can specifically include:
First determination subelement, for determining the required hardware asset information of the active system;The hardware resource
Information is required including at least the type of the required hardware resource of the active system and each type of hardware resource
Quantity;
First request transmission sub-unit, believes for being sent to the first hardware resource management server comprising the hardware resource
First request of breath;First request is for asking the first hardware resource management server to be distributed for the active system
First access right of the first hardware resource;
So that the first hardware resource management server is that the active system distributes first access right.
In practical application, second allocation unit can specifically include:
Second determination subelement, for determining the required hardware asset information of the back-up system;The hardware resource
Information is required including at least the type of the required hardware resource of the back-up system and each type of hardware resource
Quantity;
Second request transmitting unit includes the hardware asset information for being sent to the second hardware resource management server
Second request;Second request is back-up system distribution for asking the second hardware resource management server
Second access right of two hardware resources;
So that the second hardware resource management server is that the back-up system distributes second access right.
In practical application, hardware resource is distributed to after active system or back-up system, it is also necessary to enable active system or
Back-up system runs corresponding program using the hardware resource, and the hardware resource can be made really to be utilized.But
It is, between active system and back-up system, it is necessary to meet specific operating status, i.e.,:Active system is generated in the business of operation
Data, need to synchronize and be stored in back-up system.Therefore, for the hardware resource of active system and back-up system, it is also desirable to
It is enabled in particular order, above-mentioned specific operating status could be met, realize seamless dilatation.
In order to meet above-mentioned operating status, seamless dilatation is realized, which can also include:
First control unit, after distributing the second hardware resource in the back-up system for the active system,
It controls the back-up system and uses second hardware resource;
Second control unit is provided for controlling the back-up system in first control unit using second hardware
After source, controls the active system and use first hardware resource.
In practical application, first control unit can specifically include:
First control subelement runs second using journey for controlling corresponding second virtual machine of second hardware resource
Sequence;
First setting subelement, for the second database to be arranged on second virtual machine;
Wherein, second application program is when the active system breaks down, to carry the business of the active system
Used application program;Second database is database used by synchronizing the data of the active system.
In practical application, second control unit can specifically include:
Second control subelement runs first using journey for controlling corresponding first virtual machine of first hardware resource
Sequence;
Second setting subelement, for first database to be arranged on first virtual machine;
Wherein, first application program is application program used by carrying the business of the active system;Described
One database is database used by storing the data of the active system.
In addition, the embodiment of the present application also provides a kind of calculate node, calculate node may be the master comprising computing capability
Machine server personal computer PC or portable portable computer or terminal etc., the application are specifically real
Example is applied not limit the specific implementation of calculate node.
Fig. 5 is the structure chart of the calculate node of the application.As shown in figure 5, calculate node 700 includes:
Processor (processor) 710, communication interface (Communications Interface) 720, memory
(memory) 730, bus 740.
Processor 710, communication interface 720, memory 730 complete mutual communication by bus 740.
Processor 710, for executing program 732.
Specifically, program 732 may include program code, and said program code includes computer-managed instruction.
Processor 710 may be a central processor CPU or specific integrated circuit ASIC(Application
Specific Integrated Circuit), or be arranged to implement the integrated electricity of one or more of the embodiment of the present application
Road.
Memory 730, for storing program 732.Memory 730 may include high-speed RAM memory, it is also possible to further include
Nonvolatile memory(non-volatile memory), a for example, at least magnetic disk storage.Program 732 can specifically wrap
The corresponding module or unit in embodiment illustrated in fig. 4 are included, this will not be repeated here.
Finally, it is to be noted that, herein, relational terms such as first and second and the like be used merely to by
One entity or operation are distinguished with another entity or operation, without necessarily requiring or implying these entities or operation
Between there are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant meaning
Covering non-exclusive inclusion, so that the process, method, article or equipment including a series of elements includes not only that
A little elements, but also include other elements that are not explicitly listed, or further include for this process, method, article or
The intrinsic element of equipment.In the absence of more restrictions, the element limited by sentence "including a ...", is not arranged
Except there is also other identical elements in the process, method, article or apparatus that includes the element.
Through the above description of the embodiments, those skilled in the art can be understood that the application can be by
Software adds the mode of required hardware platform to realize, naturally it is also possible to all implemented by hardware, but in many cases before
Person is more preferably embodiment.Based on this understanding, the technical solution of the application contributes to background technology whole or
Person part can be expressed in the form of software products, which can be stored in a storage medium, such as
ROM/RAM, magnetic disc, CD etc., including some instructions are used so that a computer equipment(Can be personal computer, service
Device or the network equipment etc.)Execute the method described in certain parts of each embodiment of the application or embodiment.
Each embodiment is described by the way of progressive in this specification, the highlights of each of the examples are with other
The difference of embodiment, just to refer each other for identical similar portion between each embodiment.For device disclosed in embodiment
For, since it is corresponded to the methods disclosed in the examples, so description is fairly simple, related place is said referring to method part
It is bright.
Specific examples are used herein to illustrate the principle and implementation manner of the present application, and above example is said
It is bright to be merely used to help understand the present processes and its core concept;Meanwhile for those of ordinary skill in the art, foundation
The thought of the application, there will be changes in the specific implementation manner and application range.In conclusion the content of the present specification is not
It is interpreted as the limitation to the application.
Claims (12)
1. a kind of resource allocation methods, which is characterized in that including:
Obtain the hardware resource seizure condition information of active system;
Judge whether the seizure condition information meets preset condition;
When judging that the seizure condition information meets preset condition, the first hardware resource is distributed for the active system;
The first hardware resource is distributed for the active system, is specifically included:
Determine the required hardware asset information of the active system;The hardware asset information includes at least the active system
The type of required hardware resource and the required quantity of each type of hardware resource;
The first request comprising the hardware asset information is sent to the first hardware resource management server;First request is used
It is the first access right that the active system distributes the first hardware resource in asking the first hardware resource management server;
It is that the active system distributes first access right by the first hardware resource management server;
The hardware resource seizure condition information for obtaining active system, specifically includes:The computing resource for obtaining active system accounts for
Use ratio;Judge whether the seizure condition information meets preset condition correspondingly, described, specifically includes:Judge the calculating
Whether resource occupation ratio is more than first threshold;
Alternatively, the hardware resource seizure condition information for obtaining active system, specifically includes:Obtain the storage money of active system
Source occupation proportion;Judge whether the seizure condition information meets preset condition correspondingly, described, specifically includes:Described in judgement
Whether storage resource occupation proportion is more than second threshold;
Alternatively, the hardware resource seizure condition information for obtaining active system, specifically includes:Obtain the network money of active system
Source occupation proportion;Judge whether the seizure condition information meets preset condition correspondingly, described, specifically includes:Described in judgement
Whether resource occupying ratio is more than third threshold value.
2. according to the method described in claim 1, it is characterized in that, it is described for the active system distribute the first hardware resource it
Afterwards, further include:
The second hardware resource is distributed for the back-up system of the active system;
Wherein, same type of hardware resource, the quantity in second hardware resource are greater than or equal to hard described first
Quantity in part resource.
3. according to the method described in claim 2, it is characterized in that, the back-up system for the active system distributes the second hardware
Resource specifically includes:
Determine the required hardware asset information of the back-up system;The hardware asset information includes at least the back-up system
The type of required hardware resource and the required quantity of each type of hardware resource;
The second request comprising the hardware asset information is sent to the second hardware resource management server;Second request is used
It is the second access right that the back-up system distributes the second hardware resource in asking the second hardware resource management server;
It is that the back-up system distributes second access right by the second hardware resource management server.
4. according to the method described in claim 2, it is characterized in that, the back-up system for the active system distributes second
After hardware resource, further include:
It controls the back-up system and uses second hardware resource;
It controls the active system and uses first hardware resource.
If 5. according to the method described in claim 4, it is characterized in that, second hardware resource be resources of virtual machine, institute
It states the control back-up system and uses second hardware resource, specifically include:
It controls corresponding second virtual machine of second hardware resource and runs the second application program;
The second database is set on second virtual machine;
Wherein, second application program is that when the active system breaks down, the business for carrying the active system is adopted
Application program;Second database is database used by synchronizing the data of the active system.
If 6. according to the method described in claim 4, it is characterized in that, first hardware resource be resources of virtual machine, it is described
It controls the active system and uses first hardware resource, specifically include:
It controls corresponding first virtual machine of first hardware resource and runs the first application program;
First database is set on first virtual machine;
Wherein, first application program is application program used by carrying the business of the active system;First number
It is database used by storing the data of the active system according to library.
7. a kind of resource allocation device, which is characterized in that including:
Acquiring unit, the hardware resource seizure condition information for obtaining active system;
Judging unit, for judging whether the seizure condition information meets preset condition;
First allocation unit, for when judging that the seizure condition information meets preset condition, dividing for the active system
With the first hardware resource;
First allocation unit, specifically includes:
First determination subelement, for determining the required hardware asset information of the active system;The hardware asset information
Type including at least the required hardware resource of the active system and the required number of each type of hardware resource
Amount;
First request transmission sub-unit, for being sent to the first hardware resource management server comprising the hardware asset information
First request;First request is that the active system distributes first for asking the first hardware resource management server
First access right of hardware resource;
So that the first hardware resource management server is that the active system distributes first access right;
The acquiring unit, specifically includes:First obtains subelement, the computing resource occupation proportion for obtaining active system;
Correspondingly, the judging unit, specifically includes:First judgment sub-unit, for whether judging the computing resource occupation proportion
More than first threshold;
Alternatively, the acquiring unit, specifically includes:Second obtains subelement, and the storage resource for obtaining active system occupies
Ratio;Correspondingly, the judging unit, specifically includes:Second judgment sub-unit, for judging the storage resource occupation proportion
Whether second threshold is more than;
Alternatively, the acquiring unit, specifically includes:Third obtains subelement, the resource occupying for obtaining active system
Ratio;Correspondingly, the judging unit, specifically includes:Third judgment sub-unit, for judging the resource occupying ratio
Whether third threshold value is more than.
8. device according to claim 7, which is characterized in that further include:
Second allocation unit, for being the active system after first hardware resource of distribution for the active system
Back-up system distribute the second hardware resource;
Wherein, same type of hardware resource, the quantity in second hardware resource are greater than or equal to hard described first
Quantity in part resource.
9. device according to claim 8, which is characterized in that second allocation unit specifically includes:
Second determination subelement, for determining the required hardware asset information of the back-up system;The hardware asset information
Type including at least the required hardware resource of the back-up system and the required number of each type of hardware resource
Amount;
Second request transmitting unit, for sending the comprising the hardware asset information to the second hardware resource management server
Two requests;Second request is that back-up system distribution second is hard for asking the second hardware resource management server
Second access right of part resource;
So that the second hardware resource management server is that the back-up system distributes second access right.
10. device according to claim 8, which is characterized in that further include:
First control unit, after distributing the second hardware resource in the back-up system for the active system, control
The back-up system uses second hardware resource;
Second control unit, for first control unit control the back-up system using second hardware resource it
Afterwards, it controls the active system and uses first hardware resource.
11. device according to claim 10, which is characterized in that if second hardware resource is resources of virtual machine,
First control unit, specifically includes:
First control subelement runs the second application program for controlling corresponding second virtual machine of second hardware resource;
First setting subelement, for the second database to be arranged on second virtual machine;
Wherein, second application program is that when the active system breaks down, the business for carrying the active system is adopted
Application program;Second database is database used by synchronizing the data of the active system.
12. device according to claim 10, which is characterized in that if second hardware resource is resources of virtual machine,
Second control unit, specifically includes:
Second control subelement runs the first application program for controlling corresponding first virtual machine of first hardware resource;
Second setting subelement, for first database to be arranged on first virtual machine;
Wherein, first application program is application program used by carrying the business of the active system;First number
It is database used by storing the data of the active system according to library.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310719478.5A CN104731656B (en) | 2013-12-23 | 2013-12-23 | A kind of resource allocation methods and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310719478.5A CN104731656B (en) | 2013-12-23 | 2013-12-23 | A kind of resource allocation methods and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104731656A CN104731656A (en) | 2015-06-24 |
CN104731656B true CN104731656B (en) | 2018-10-30 |
Family
ID=53455571
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310719478.5A Active CN104731656B (en) | 2013-12-23 | 2013-12-23 | A kind of resource allocation methods and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104731656B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109408225A (en) * | 2018-09-18 | 2019-03-01 | 平安科技(深圳)有限公司 | Resource capacity expansion method, apparatus, computer equipment and storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101217678A (en) * | 2007-12-28 | 2008-07-09 | 华为技术有限公司 | System upgrade method, system and device |
CN102388570A (en) * | 2011-09-30 | 2012-03-21 | 华为技术有限公司 | Single board running method and system under active-standby mode |
CN102722413A (en) * | 2012-05-16 | 2012-10-10 | 上海兆民云计算科技有限公司 | Distributed resource scheduling method for desktop cloud cluster |
CN103336574A (en) * | 2013-07-23 | 2013-10-02 | 北京百度网讯科技有限公司 | Energy-saving control method and device of data center |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4848660B2 (en) * | 2005-03-30 | 2011-12-28 | ソニー株式会社 | Information processing distributed system, information processing apparatus, and information processing distributed method |
-
2013
- 2013-12-23 CN CN201310719478.5A patent/CN104731656B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101217678A (en) * | 2007-12-28 | 2008-07-09 | 华为技术有限公司 | System upgrade method, system and device |
CN102388570A (en) * | 2011-09-30 | 2012-03-21 | 华为技术有限公司 | Single board running method and system under active-standby mode |
CN102722413A (en) * | 2012-05-16 | 2012-10-10 | 上海兆民云计算科技有限公司 | Distributed resource scheduling method for desktop cloud cluster |
CN103336574A (en) * | 2013-07-23 | 2013-10-02 | 北京百度网讯科技有限公司 | Energy-saving control method and device of data center |
Also Published As
Publication number | Publication date |
---|---|
CN104731656A (en) | 2015-06-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105830394B (en) | Configuration method, system and its Virtual NE and network management system of virtual network strategy | |
CN101657804B (en) | Extensible and programmable multi-tenant service architecture | |
CN105242957A (en) | Method and system for cloud computing system to allocate GPU resources to virtual machine | |
CN103078965B (en) | The IP address management method of virtual machine | |
CN104598316B (en) | A kind of storage resource distribution method and device | |
CN104158826B (en) | A kind of dispatching method and its system of the migration of Virtual machine | |
CN105335229A (en) | Business resource scheduling method and apparatus | |
CN102510400B (en) | A kind of method of the suspectableness degree for determining user, device and equipment | |
WO2012167378A1 (en) | System and method of optimization of in-memory data grid placement | |
CN105308553B (en) | Dynamic provides storage | |
CN105227489A (en) | A kind of bandwidth management method and electronic equipment | |
CN100489791C (en) | Method and system for local authority partitioning of client resources | |
CN104142871B (en) | Data backup method and device and distributed file system | |
CN107111520A (en) | Method and system for the real time resources consumption control in DCE | |
CN106502840A (en) | A kind of data back up method, apparatus and system | |
CN104850394A (en) | Management method of distributed application program and distributed system | |
CN104537045A (en) | Service distribution method and device based on distributive system | |
CN105187256A (en) | Disaster recovery method, device and system | |
CN103544047A (en) | Cloud system data management method | |
CN115033340A (en) | Host selection method and related device | |
CN102904919A (en) | Stream processing method and distributed system for realizing stream processing | |
KR101250881B1 (en) | Method for doubly processing data of block storage service | |
CN104731656B (en) | A kind of resource allocation methods and device | |
CN105430093A (en) | Method and system for realizing user access load balance | |
CN104657216A (en) | Resource allocation method and device for resource pool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200206 Address after: 518129 Bantian HUAWEI headquarters office building, Longgang District, Guangdong, Shenzhen Patentee after: HUAWEI TECHNOLOGIES Co.,Ltd. Address before: 210012 HUAWEI Nanjing base, 101 software Avenue, Yuhuatai District, Jiangsu, Nanjing Patentee before: Huawei Technologies Co.,Ltd. |