CN104730417A - Electric transmission line single-terminal ranging method with negative sequence current as polarizing quantity - Google Patents

Electric transmission line single-terminal ranging method with negative sequence current as polarizing quantity Download PDF

Info

Publication number
CN104730417A
CN104730417A CN201510104631.2A CN201510104631A CN104730417A CN 104730417 A CN104730417 A CN 104730417A CN 201510104631 A CN201510104631 A CN 201510104631A CN 104730417 A CN104730417 A CN 104730417A
Authority
CN
China
Prior art keywords
phase
current
voltage
transmission line
sequence current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510104631.2A
Other languages
Chinese (zh)
Other versions
CN104730417B (en
Inventor
张冰
傅磊
王亮
杨冬
邢鲁华
许晓康
张翰
李晓志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd, State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510104631.2A priority Critical patent/CN104730417B/en
Publication of CN104730417A publication Critical patent/CN104730417A/en
Application granted granted Critical
Publication of CN104730417B publication Critical patent/CN104730417B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Protection Circuit Devices (AREA)

Abstract

The invention discloses an electric transmission line single-terminal ranging method with negative sequence current as the polarizing quantity. The method comprises the following steps that a current value and a voltage value at the protection installation position of an electric transmission line are obtained and are subjected to low-pass filtering, and a current fundamental component and a voltage fundamental component with high-frequency components eliminated are obtained; the current fundamental component and the voltage fundamental component after low-pass filtering are subjected to Fourier transform, then the current value, the voltage value and the compensation voltage value are computed, and the fault distance of the electric transmission line is measured by judging whether the compensation voltage value is the same as the phase position of the negative sequence current. The electric transmission line single-terminal ranging method is not affected by load current and fault types, the ranging precision is obviously superior to that of an existing single-terminal ranging method, the offside data of the line are not needed, synchronization is not needed, new sampling values are not needed, and the calculation amount is small.

Description

A kind of take negative-sequence current as the transmission line of electricity method of single end distance measurement of amount of polarization
Technical field
The present invention relates to a kind of method of field of relay protection in power, being specifically related to a kind of take negative-sequence current as the transmission line of electricity method of single end distance measurement of amount of polarization.
Background technology
After transmission line of electricity breaks down, need to carry out fault localization and carry out localization of fault, the method for single end distance measurement computing formula that current power transmission circuit adopts is
Z i = U · i I · i + 3 k I 0
In formula, for protection installation place i phase voltage (i=A, B, C), for protection installation place electric current (i=A, B, C), k is zero-utility theory, I 0for zero-sequence current.
This distance-finding method is by the impact of load current, and distance accuracy is not enough.
In order to overcome the impact of load current, protection installation place zero-sequence current phase place is utilized to substitute bucking voltage is utilized to find range than mutually with zero-sequence current, but when there is phase fault, without zero-sequence component, so this distance-finding method is by the impact of fault type.
Therefore, need to provide a kind of not by the transmission line of electricity method of single end distance measurement that load current and fault type affect.
Summary of the invention
Object of the present invention is exactly to solve the problem, and providing a kind of take negative-sequence current as the transmission line of electricity method of single end distance measurement of amount of polarization, and it has not by the advantage that load current and fault type affect.
To achieve these goals, the present invention adopts following technical scheme:
Take negative-sequence current as a transmission line of electricity method of single end distance measurement for amount of polarization, comprise the following steps:
Step (1): the current value and the magnitude of voltage that obtain line protection installation place, and low-pass filtering is carried out to current value and magnitude of voltage, the current first harmonics component of the high fdrequency component that is eliminated and voltage fundamental component;
Step (2): Fourier transform is carried out to the current first harmonics component after low-pass filtering and voltage fundamental component, obtains the i-th phase current i-th phase voltage ij phase current ij phase voltage i phase negative-sequence current with ij phase negative-sequence current i=A, B, C; Ij=AB, BC, CA;
Step (3): calculate the i-th phase bucking voltage and ij phase bucking voltage
Step (4): for singlephase earth fault, for given total track length counterpart impedance, compares with phase place,
When with when the two phase place is identical, corresponding Z is the impedance of protection installation place to trouble spot, l=Z/Z 1, Z 1for unit length circuit positive sequence impedance;
When with when both phase places are different, just reduce Z, until with the two phase place is identical; If when Z is 0, with the two phase place is still not identical, stops calculating, and the meaning of parameters of l is fault distance.
I-th phase bucking voltage of described step (3) computing method be: the meaning of parameters of Z is impedance of adjusting, meaning of parameters be zero-sequence current, the meaning of parameters of k is zero-utility theory.
The computing method of the ij phase bucking voltage of described step (3) are:
Take negative-sequence current as a transmission line of electricity method of single end distance measurement for amount of polarization, comprise the following steps:
Step (1): the current value and the magnitude of voltage that obtain line protection installation place, and low-pass filtering is carried out to current value and magnitude of voltage, the current first harmonics component of the high fdrequency component that is eliminated and voltage fundamental component;
Step (2): Fourier transform is carried out to the current first harmonics component after low-pass filtering and voltage fundamental component, obtains the i-th phase current i-th phase voltage ij phase current ij phase voltage i phase negative-sequence current with ij phase negative-sequence current i=A, B, C; Ij=AB, BC, CA;
Step (3): calculate the i-th phase bucking voltage and ij phase bucking voltage
Step (4): for line to line fault, for given total track length counterpart impedance, compares with phase place,
When with when the two phase place is identical, corresponding Z is the impedance of protection installation place to trouble spot, l=Z/Z 1, Z 1for unit length circuit positive sequence impedance;
When with when both phase places are different, just reduce Z, until with the two phase place is identical; If when Z is 0, with the two phase place is still not identical, stops calculating.
I-th phase bucking voltage of described step (3) computing method be: the meaning of parameters of Z is impedance of adjusting, meaning of parameters be zero-sequence current, the meaning of parameters of k is zero-utility theory.
The computing method of the ij phase bucking voltage of described step (3) are:
This method is adapted to overhead transmission line
The present invention has following beneficial effect:
Transmission line of electricity method of single end distance measurement provided by the invention, is not subject to the impact of load current and fault type.Distance accuracy is significantly better than existing one-terminal data distance-finding method, and does not need circuit to side data, does not need to carry out synchronously without the need to increasing new sampled value, and calculated amount is little.
Accompanying drawing explanation
The transmission line of electricity method of single end distance measurement process flow diagram one of Fig. 1 to be a kind of based on negative-sequence current be amount of polarization;
The transmission line of electricity method of single end distance measurement flowchart 2 of Fig. 2 to be a kind of based on negative-sequence current be amount of polarization;
Fig. 3 is embodiments of the invention schematic diagram.
Embodiment
Below in conjunction with accompanying drawing and embodiment, the invention will be further described.
As shown in Figure 1, a kind of take negative-sequence current as the transmission line of electricity method of single end distance measurement of amount of polarization, comprises the following steps:
Step (1): the current value and the magnitude of voltage that obtain line protection installation place, and low-pass filtering is carried out to current value and magnitude of voltage, the current first harmonics component of the high fdrequency component that is eliminated and voltage fundamental component;
Step (2): Fourier transform is carried out to the current first harmonics component after low-pass filtering and voltage fundamental component, obtains the i-th phase current i-th phase voltage ij phase current ij phase voltage i phase negative-sequence current with ij phase negative-sequence current i=A, B, C; Ij=AB, BC, CA;
Step (3): calculate the i-th phase bucking voltage and ij phase bucking voltage
Step (4): for singlephase earth fault, for given total track length counterpart impedance, compares with phase place,
When with when the two phase place is identical, corresponding Z is the impedance of protection installation place to trouble spot, l=Z/Z 1, Z 1for unit length circuit positive sequence impedance;
When with when both phase places are different, just reduce Z, until with the two phase place is identical; If when Z is 0, with the two phase place is still not identical, stops calculating, and the meaning of parameters of l is fault distance.
I-th phase bucking voltage of described step (3) computing method be: the meaning of parameters of Z is impedance of adjusting, meaning of parameters be zero-sequence current, the meaning of parameters of k is zero-utility theory.
The computing method of the ij phase bucking voltage of described step (3) are:
As shown in Figure 2, a kind of take negative-sequence current as the transmission line of electricity method of single end distance measurement of amount of polarization, comprises the following steps:
Step (1): the current value and the magnitude of voltage that obtain line protection installation place, and low-pass filtering is carried out to current value and magnitude of voltage, the current first harmonics component of the high fdrequency component that is eliminated and voltage fundamental component;
Step (2): Fourier transform is carried out to the current first harmonics component after low-pass filtering and voltage fundamental component, obtains the i-th phase current i-th phase voltage ij phase current ij phase voltage i phase negative-sequence current with ij phase negative-sequence current i=A, B, C; Ij=AB, BC, CA;
Step (3): calculate the i-th phase bucking voltage and ij phase bucking voltage
Step (4): for line to line fault, for given total track length counterpart impedance, compares with phase place,
When with when the two phase place is identical, corresponding Z is the impedance of protection installation place to trouble spot, l=Z/Z 1, Z 1for unit length circuit positive sequence impedance;
When with when both phase places are different, just reduce Z, until with the two phase place is identical; If when Z is 0, with the two phase place is still not identical, stops calculating.
I-th phase bucking voltage of described step (3) computing method be: the meaning of parameters of Z is impedance of adjusting, meaning of parameters be zero-sequence current, the meaning of parameters of k is zero-utility theory.
The computing method of the ij phase bucking voltage of described step (3) are:
Be described in further detail below in conjunction with accompanying drawing 3 pairs of the specific embodiment of the present invention.
(1) there is A phase earth fault in F1 point
I, the electric current obtaining described line protection installation place, magnitude of voltage low-pass filtering is carried out to it;
II, carry out Fourier transform and Phase-Sequence Transformation, obtain phasor and negative-sequence current
III, calculation compensation voltage U · A ′ = U · A - ( I · A + 3 k I · 0 ) Z ;
IV, to compare with phase place, the Z corresponding when the two phase place is identical be protection installation place to the impedance of trouble spot, l=Z/Z 1, Z 1for unit length circuit positive sequence impedance.
(2) there is the short circuit of AB phase in F1 point
I, the electric current obtaining described line protection installation place, magnitude of voltage low-pass filtering is carried out to it;
II, carry out Fourier transform and Phase-Sequence Transformation, obtain phasor and negative-sequence current
III, calculation compensation voltage U · AB ′ = U · AB - I · AB Z ;
IV, to compare with phase place, the Z corresponding when the two phase place is identical be protection installation place to the impedance of trouble spot, l=Z/Z 1, Z 1for unit length circuit positive sequence impedance.
By reference to the accompanying drawings the specific embodiment of the present invention is described although above-mentioned; but not limiting the scope of the invention; one of ordinary skill in the art should be understood that; on the basis of technical scheme of the present invention, those skilled in the art do not need to pay various amendment or distortion that creative work can make still within protection scope of the present invention.

Claims (6)

1. be a transmission line of electricity method of single end distance measurement for amount of polarization with negative-sequence current, it is characterized in that, comprise the following steps:
Step (1): the current value and the magnitude of voltage that obtain line protection installation place, and low-pass filtering is carried out to current value and magnitude of voltage, the current first harmonics component of the high fdrequency component that is eliminated and voltage fundamental component;
Step (2): Fourier transform is carried out to the current first harmonics component after low-pass filtering and voltage fundamental component, obtains the i-th phase current i-th phase voltage ij phase current ij phase voltage i phase negative-sequence current with ij phase negative-sequence current i=A, B, C; Ij=AB, BC, CA;
Step (3): calculate the i-th phase bucking voltage and ij phase bucking voltage
Step (4): for singlephase earth fault, for given total track length counterpart impedance, compares with phase place,
When with when the two phase place is identical, corresponding Z is the impedance of protection installation place to trouble spot, l=Z/Z 1, Z 1for unit length circuit positive sequence impedance;
When with when both phase places are different, just reduce Z, until with the two phase place is identical; If when Z is 0, with the two phase place is still not identical, stops calculating, and the meaning of parameters of l is fault distance.
2. a kind of as claimed in claim 1 take negative-sequence current as the transmission line of electricity method of single end distance measurement of amount of polarization, it is characterized in that, the i-th phase bucking voltage of described step (3) computing method be: the meaning of parameters of Z is impedance of adjusting, meaning of parameters be zero-sequence current, the meaning of parameters of k is zero-utility theory.
3. a kind of as claimed in claim 1 take negative-sequence current as the transmission line of electricity method of single end distance measurement of amount of polarization, and it is characterized in that, the computing method of the ij phase bucking voltage of described step (3) are:
4. be a transmission line of electricity method of single end distance measurement for amount of polarization with negative-sequence current, it is characterized in that, comprise the following steps:
Step (1): the current value and the magnitude of voltage that obtain line protection installation place, and low-pass filtering is carried out to current value and magnitude of voltage, the current first harmonics component of the high fdrequency component that is eliminated and voltage fundamental component;
Step (2): Fourier transform is carried out to the current first harmonics component after low-pass filtering and voltage fundamental component, obtains the i-th phase current i-th phase voltage ij phase current ij phase voltage i phase negative-sequence current with ij phase negative-sequence current i=A, B, C; Ij=AB, BC, CA;
Step (3): calculate the i-th phase bucking voltage and ij phase bucking voltage
Step (4): for line to line fault, for given total track length counterpart impedance, compares with phase place,
When with when the two phase place is identical, corresponding Z is the impedance of protection installation place to trouble spot, l=Z/Z 1, Z 1for unit length circuit positive sequence impedance;
When with when both phase places are different, just reduce Z, until with the two phase place is identical; If when Z is 0, with the two phase place is still not identical, stops calculating.
5. a kind of as claimed in claim 4 take negative-sequence current as the transmission line of electricity method of single end distance measurement of amount of polarization, it is characterized in that, the i-th phase bucking voltage of described step (3) computing method be: the meaning of parameters of Z is impedance of adjusting, meaning of parameters be zero-sequence current, the meaning of parameters of k is zero-utility theory.
6. a kind of as claimed in claim 4 take negative-sequence current as the transmission line of electricity method of single end distance measurement of amount of polarization, and it is characterized in that, the computing method of the ij phase bucking voltage of described step (3) are:
CN201510104631.2A 2015-03-10 2015-03-10 It is a kind of using negative-sequence current as the transmission line of electricity method of single end distance measurement of amount of polarization Active CN104730417B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510104631.2A CN104730417B (en) 2015-03-10 2015-03-10 It is a kind of using negative-sequence current as the transmission line of electricity method of single end distance measurement of amount of polarization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510104631.2A CN104730417B (en) 2015-03-10 2015-03-10 It is a kind of using negative-sequence current as the transmission line of electricity method of single end distance measurement of amount of polarization

Publications (2)

Publication Number Publication Date
CN104730417A true CN104730417A (en) 2015-06-24
CN104730417B CN104730417B (en) 2018-05-29

Family

ID=53454501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510104631.2A Active CN104730417B (en) 2015-03-10 2015-03-10 It is a kind of using negative-sequence current as the transmission line of electricity method of single end distance measurement of amount of polarization

Country Status (1)

Country Link
CN (1) CN104730417B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111796202A (en) * 2019-04-08 2020-10-20 Abb电网瑞士股份公司 Time domain distance protection based on polarity comparison for power transmission line
WO2022032492A1 (en) * 2020-08-11 2022-02-17 Abb Schweiz Ag Method of determining line fault of power system

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0869599A2 (en) * 1997-04-02 1998-10-07 Kabushiki Kaisha Toshiba Method and apparatus for detecting out-of-step in electric power system
CN101325330A (en) * 2008-07-30 2008-12-17 北京四方继保自动化股份有限公司 Method for implementing earthing distance measurement element
CN101325329A (en) * 2008-07-30 2008-12-17 北京四方继保自动化股份有限公司 Method for implementing earthing distance measurement element based on negative sequence fault current component
CN101325332A (en) * 2008-07-30 2008-12-17 北京四方继保自动化股份有限公司 Method for implementing element for measuring earthing distance without relevance to load current and ground resistance
WO2011031684A1 (en) * 2009-09-08 2011-03-17 Schweitzer Engineering Laboratories, Inc. Apparatus and method for identifying a faulted phase in a shunt capacitor bank
CN102707194A (en) * 2012-05-17 2012-10-03 中国电力科学研究院 Power distribution network broken line fault location method
CN103163428A (en) * 2013-03-26 2013-06-19 昆明理工大学 Method for improving single-ended traveling wave distance measurement reliability
CN103245876A (en) * 2013-04-15 2013-08-14 国家电网公司 Method for realizing line interphase fault single-ended distance measurement by means of real part characteristics of voltage drop
CN103293444A (en) * 2013-05-19 2013-09-11 国家电网公司 Transition resistance and load current influence resisting line single-phase earth fault single-terminal location method
US20140236503A1 (en) * 2013-02-21 2014-08-21 Mitsubishi Electric Research Laboratories, Inc. Method for Locating Faults in Ungrounded Power Distribution Systems

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0869599A2 (en) * 1997-04-02 1998-10-07 Kabushiki Kaisha Toshiba Method and apparatus for detecting out-of-step in electric power system
CN101325330A (en) * 2008-07-30 2008-12-17 北京四方继保自动化股份有限公司 Method for implementing earthing distance measurement element
CN101325329A (en) * 2008-07-30 2008-12-17 北京四方继保自动化股份有限公司 Method for implementing earthing distance measurement element based on negative sequence fault current component
CN101325332A (en) * 2008-07-30 2008-12-17 北京四方继保自动化股份有限公司 Method for implementing element for measuring earthing distance without relevance to load current and ground resistance
WO2011031684A1 (en) * 2009-09-08 2011-03-17 Schweitzer Engineering Laboratories, Inc. Apparatus and method for identifying a faulted phase in a shunt capacitor bank
CN102707194A (en) * 2012-05-17 2012-10-03 中国电力科学研究院 Power distribution network broken line fault location method
US20140236503A1 (en) * 2013-02-21 2014-08-21 Mitsubishi Electric Research Laboratories, Inc. Method for Locating Faults in Ungrounded Power Distribution Systems
CN103163428A (en) * 2013-03-26 2013-06-19 昆明理工大学 Method for improving single-ended traveling wave distance measurement reliability
CN103245876A (en) * 2013-04-15 2013-08-14 国家电网公司 Method for realizing line interphase fault single-ended distance measurement by means of real part characteristics of voltage drop
CN103293444A (en) * 2013-05-19 2013-09-11 国家电网公司 Transition resistance and load current influence resisting line single-phase earth fault single-terminal location method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111796202A (en) * 2019-04-08 2020-10-20 Abb电网瑞士股份公司 Time domain distance protection based on polarity comparison for power transmission line
CN111796202B (en) * 2019-04-08 2023-06-02 日立能源瑞士股份公司 Method and device for fault detection of power transmission line of power transmission system
WO2022032492A1 (en) * 2020-08-11 2022-02-17 Abb Schweiz Ag Method of determining line fault of power system

Also Published As

Publication number Publication date
CN104730417B (en) 2018-05-29

Similar Documents

Publication Publication Date Title
CN104730416A (en) Electric transmission line single-terminal ranging method with sudden change of current as polarizing quantity
CN102435851B (en) Method for measuring zero-sequence parameters of double-circuit transmission lines
CN102175954B (en) Circuit inter-phase fault single-end ranging method
CN103176032B (en) Voltage measuring method for single-phase ground fault point of extra-high-voltage alternating-current transmission line
CN104062550B (en) Method for locating non-homonymic phase overline earth fault of double-circuit line based on binary search
CN102023275A (en) Circuit single-end ranging method based on phase aberration characteristic of positioning function
CN104090210B (en) The non-same famous prime minister's cross-line earth fault method of single end distance measurement of double-circuit line
CN103176102B (en) A kind of range finding yardstick minimum principle that utilizes realizes line single-phase earth fault single-terminal location method
CN104062539B (en) Single-ended distance measuring method for double-circuit line non-same-name phase crossover line ground fault
CN103217623B (en) The line double-end fault distance-finding method had nothing to do with transition resistance and load current
CN103293445B (en) Distribution parameter measurement impedance magnitude characteristic is utilized to realize circuit inter-phase fault single-end ranging
CN103245878A (en) Single-end distance measurement method for electric transmission line single-phase earth fault
CN102788903A (en) Three-phase asymmetric power frequency parameter actual measuring method of high-voltage transmission line
CN105652156B (en) Ultrahigh voltage alternating current transmission lines single-phase earthing voltage-phase is mutated distance measuring method
CN111141995A (en) Line double-end steady-state distance measuring method and system based on amplitude comparison principle
CN109188181B (en) Virtual connection judgment method for neutral line of secondary circuit of power grid voltage transformer
CN103296654B (en) Distributed constant is utilized to realize single-phase line earth fault relay protection method
CN104035005A (en) Double-circuit line non-same-phase overline earth fault locating method
CN104035004A (en) Zero sequence compensation double-circuit-line non-same-name-phase line-cross ground fault single-ended distance measurement method
CN104090213A (en) Double-circuit-line non-same-name phase overline ground fault positioning method
CN104062551B (en) A kind of non-same famous prime minister's cross-line earth fault method for rapidly positioning of double-circuit line
CN103762566B (en) Hyperbolic tangent function amplitude characteristic is utilized to realize line interphase fault relay protection method
CN104730417A (en) Electric transmission line single-terminal ranging method with negative sequence current as polarizing quantity
CN103293444B (en) The line single-phase earth fault single-terminal location method of anti-transition resistance and load current impact
CN102735993B (en) Double-end distance measurement method used in line protection

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant