CN104729007B - The information processing method and device of each tie point in air-conditioning system - Google Patents

The information processing method and device of each tie point in air-conditioning system Download PDF

Info

Publication number
CN104729007B
CN104729007B CN201310724467.6A CN201310724467A CN104729007B CN 104729007 B CN104729007 B CN 104729007B CN 201310724467 A CN201310724467 A CN 201310724467A CN 104729007 B CN104729007 B CN 104729007B
Authority
CN
China
Prior art keywords
tie point
floor
information
air
point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310724467.6A
Other languages
Chinese (zh)
Other versions
CN104729007A (en
Inventor
罗晓
牟桂贤
张宜宁
赵志刚
宋海川
林成霖
马楚雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201310724467.6A priority Critical patent/CN104729007B/en
Publication of CN104729007A publication Critical patent/CN104729007A/en
Application granted granted Critical
Publication of CN104729007B publication Critical patent/CN104729007B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Atmospheric Sciences (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The invention discloses the information processing method and device of each tie point in a kind of air-conditioning system.Wherein, this method includes:Obtain the structure information of each air-conditioning system in any two floors;Extract the connection point information of the first tie point of the first floor in any two floors from structure information, and the connection point information of the second tie point of the second floor in any two floors;The connection point information of first tie point is assigned to the second tie point, alternatively, the connection point information of the second tie point is assigned to the first tie point.By means of the invention it is possible to realize the demand of different floor structure air-conditioning systems.

Description

The information processing method and device of each tie point in air-conditioning system
Technical field
The present invention relates to household appliance technical field, at a kind of information of each tie point in air-conditioning system Manage method and device.
Background technology
The residential central air conditioning that the prior art provides, is the multi-line system for being mainly directed towards domestic consumer, and at least In more than two layers of scene, above-mentioned central air conditioner system is also suitable.Therefore, existing central air conditioner system is applicable not only to public affairs Residence, is also very suitable for the buildings such as compound, villa.At present, can be come according to the actual conditions of Domestic central air conditioner group type selecting A residential central air conditioning Selection Software is developed, which is developed based on two-dimensional format, can show central hollow in building The layout scenarios of adjusting system, and in air-conditioning system each tie point information, but be only able to display the house type situation of individual layer at present, But for compound, villa etc., the situation for having the multiple floors of demand to share same air-conditioning system, can not know the skies of different floors The structure information of adjusting system.
Central air-conditioning is applied in more floors building currently for correlation technique, can not know the air-conditioning of different floors The problem of structure information of system, effective solution is not yet proposed at present.
The content of the invention
Central air-conditioning is applied in more floors building for correlation technique, can not know the air-conditioning system of different floors Structure information the problem of, effective solution is not yet proposed at present, for this reason, it is a primary object of the present invention to provide one kind The information processing method and device of each tie point in air-conditioning system, to solve the above problems.
To achieve these goals, according to an aspect of the invention, there is provided each tie point in a kind of air-conditioning system Information processing method, this method includes:Obtain the structure information of each air-conditioning system in any two floors;Believe from structure In the connection point information of the first tie point of the first floor in any two floors, and any two floors is extracted in breath The connection point information of second tie point of two floors;The connection point information of first tie point is assigned to the second tie point, alternatively, The connection point information of second tie point is assigned to the first tie point.
Alternatively, when the first tie point is the tie point of the first indoor unit in air-conditioning system, the contact of the first tie point Information includes:The floor information of the System Number of first indoor unit, the first floor, wherein, the tie point of the first tie point is believed The step of breath is assigned to the second tie point includes:By the System Number of the first indoor unit in the first tie point and the first floor Floor information is preserved into the second tie point;Wherein, when selecting the second tie point, show that first is indoor on the second tie point The floor information of the System Number of machine and the first floor.
Alternatively, when the first tie point is the tie point of the first outdoor unit in air-conditioning system, the contact of the first tie point Information includes:The floor information of the System Number of first outdoor unit, the first floor, wherein, the tie point of the first tie point is believed The step of breath is assigned to the second tie point includes:By the System Number of the first outdoor unit in the first tie point and the first floor Floor information is preserved into the second tie point;Wherein, when selecting the second tie point, show that first is outdoor on the second tie point The floor information of the System Number of machine and the first floor.
Alternatively, when the first tie point is the tie point of the first branch pipe in air-conditioning system, the contact of the first tie point Information includes:The floor information of the System Number of first branch pipe, the first floor, wherein, the tie point of the first tie point is believed The step of breath is assigned to the second tie point includes:By the System Number of the first branch pipe in the first tie point and the first floor Floor information is preserved into the second tie point;Wherein, when selecting the second tie point, the first difference is shown on the second tie point The floor information of the System Number of pipe and the first floor.
Alternatively, the second tie point of the second floor is tie point, the second outdoor unit of the second indoor unit in air-conditioning system Tie point or the second branch pipe tie point, wherein, the connection point information of the tie point of the second indoor unit includes:Second floor Floor information and the second indoor unit System Number;The connection point information of the tie point of second outdoor unit includes:Second floor Floor information and the second outdoor unit System Number;The connection point information of the tie point of second branch pipe includes:Second floor Floor information and the second branch pipe System Number.
Alternatively, before the structure information of each air-conditioning system in obtaining any two floors, method further includes:Wound The structure information of the air-conditioning system of each floor is built, structure information includes:The connection point information of all tie points;Select all buildings Any two floor in layer, and select the air-conditioning system in any two floor.
To achieve these goals, according to another aspect of the present invention, there is provided each tie point in a kind of air-conditioning system Information processor, which includes:Acquisition module, for obtaining the structure of each air-conditioning system in any two floors Information;Extraction module, the connection of the first tie point for extracting the first floor in any two floors from structure information The connection point information of second tie point of the second floor in point information, and any two floors;Assignment module, for by first The connection point information of tie point is assigned to the second tie point, alternatively, the connection point information of the second tie point is assigned to the first company Contact.
Alternatively, when the first tie point is the tie point of the first indoor unit in air-conditioning system, the contact of the first tie point Information includes:The floor information of the System Number of first indoor unit, the first floor, wherein, assignment module includes:First preserves mould Block, for preserving the floor information of the System Number of the first indoor unit in the first tie point and the first floor to the second connection Point in;Wherein, device further includes:First display module, for when selecting the second tie point, showing on the second tie point The floor information of the System Number of one indoor unit and the first floor.
Alternatively, when the first tie point is the tie point of the first outdoor unit in air-conditioning system, the contact of the first tie point Information includes:The floor information of the System Number of first outdoor unit, the first floor, wherein, assignment module includes:Second preserves mould Block, for preserving the floor information of the System Number of the first outdoor unit in the first tie point and the first floor to the second connection Point in;Wherein, device further includes:Second display module, for when selecting the second tie point, showing on the second tie point The floor information of the System Number of one outdoor unit and the first floor.
Alternatively, when the first tie point is the tie point of the first branch pipe in air-conditioning system, the contact of the first tie point Information includes:The floor information of the System Number of first branch pipe, the first floor, wherein, assignment module includes:3rd preserves mould Block, for preserving the floor information of the System Number of the first branch pipe in the first tie point and the first floor to the second connection Point in;Wherein, device further includes:3rd display module, for when selecting the second tie point, showing on the second tie point The floor information of the System Number of one branch pipe and the first floor.
Alternatively, device further includes:Creation module, the structure information of the air-conditioning system for creating each floor, structure Information includes:The connection point information of all tie points;Selecting module, for selecting any two floor in all floors, and Select the air-conditioning system in any two floor.
By the present invention, using the structure information for obtaining each air-conditioning system in any two floors;From structure information The connection point information of first tie point of the first floor in middle any two floors of extraction, and second in any two floors The connection point information of second tie point of floor;The connection point information of first tie point is assigned to the second tie point, alternatively, will The connection point information of second tie point is assigned to the first tie point, solves applying central air-conditioning in more floors for correlation technique In building, the problem of can not knowing the structure information of air-conditioning system of different floors, and then realize different floors structure air-conditioning systems The effect of the demand of system.
Brief description of the drawings
Attached drawing described herein is used for providing a further understanding of the present invention, forms the part of the application, this hair Bright schematic description and description is used to explain the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the structural representation of the information processor of each tie point in air-conditioning system according to embodiments of the present invention Figure;
Fig. 2 is the flow chart of the information processing method of each tie point in air-conditioning system according to embodiments of the present invention;With And
Fig. 3 is the information processing method of each tie point in a kind of preferably air-conditioning system according to embodiment illustrated in fig. 2 Flow chart.
Embodiment
It should be noted that in the case where there is no conflict, the feature in embodiment and embodiment in the application can phase Mutually combination.Below with reference to the accompanying drawings and the present invention will be described in detail in conjunction with the embodiments.
Embodiment one:
Before the further detail below of description various embodiments of the present invention, it will be described with reference to Figure 1 and can be used for realizing this hair The suitable counting system structure of one of bright principle.In the following description, except as otherwise noted, otherwise will refer to by one or Action that multiple computers perform and the symbolic indication of operation describe various embodiments of the present invention.As such, it will be understood that sometimes Being referred to as this kind of action of computer execution and operation includes the processing unit of computer to representing data with structured form The manipulation of electric signal.It is safeguarded on this manipulation transforms data or position in the accumulator system of computer, this is with this The mode that the technical staff in field understands reconfigures or changes the operation of computer.The data structure for safeguarding data is that have The physical location of the memory of particular community defined in the form of data.However, although this hair described in above-mentioned context It is bright, but it does not mean restrictive, as understood by those skilled in the art, action described below and operation Each side can also be realized with hardware.
Attached drawing is turned to, wherein identical reference number refers to identical element, the principle of the present invention is illustrated as in a conjunction Realized in suitable computing environment.It is described below based on described the embodiment of the present invention, and is not considered as on herein not The alternative embodiment that is expressly recited and limit the present invention.
In its most basic configuration, Fig. 1 is the information of each tie point in air-conditioning system according to embodiments of the present invention The structure diagram of processing unit.
As shown in Figure 1, the information processor of each tie point can include in the air-conditioning system:One acquisition module 101, One extraction module 103 and an assignment module 105.
Wherein, acquisition module 101, for obtaining the structure information of each air-conditioning system in any two floors;Extraction Module 103, the connection point information of the first tie point for extracting the first floor in any two floors from structure information, With the connection point information of the second tie point of the second floor in any two floors;Assignment module 105, for first to be connected The connection point information of point is assigned to the second tie point, alternatively, the connection point information of the second tie point is assigned to the first tie point.
The scheme that the above embodiments of the present application are provided, is believed by the structure for obtaining the air-conditioning system in any two floor Breath, to extract the connection point information of the above-mentioned each tie point of each floor, by the connection point information assignment of one of floor After the tie point of another floor, there is provided a kind of method for different floors structure air-conditioning system, solves phase Applying central air-conditioning in more floors building for pass technology, can not know that the structure information of the air-conditioning systems of different floors is asked Topic, and then realize the effect of the demand of different floor structure air-conditioning systems.Above method embodiment is primarily adapted for use in domestic central Air-conditioning type selecting, belongs to automatic field.
Tie point herein can be a kind of transfer tie point, important record current floor information, outdoor unit, branch pipe There is floor number attribute with indoor unit.When selecting the branch pipe of floor 1, transfer tie point A is created, record floor number is 1;Again When selecting the branch pipe of floor 2, the floor number of transfer tie point A is assigned to the branch pipe of floor 2.
Specifically, the tie point in the application device embodiment also refers to outdoor machine of air-conditioner, air-conditioning branch pipe and air-conditioning The connection interface tube of interior machine.The first tie point in above-described embodiment can be any one in the first floor in air-conditioning system The tie point of component, for example, it may be in the first floor the outdoor machine of air-conditioner of air-conditioning system, air-conditioning branch pipe or air-conditioning internal machine company Adapter interface.
Herein it should be noted that the tie point of the indoor apparatus of air conditioner in the above embodiments of the present application can record it is right with it The air-conditioning branch pipe and/or the numbering of air-conditioner outdoor unit answered, that is, have recorded the numbering of the air-conditioning system residing for the indoor apparatus of air conditioner. The tie point of air-conditioner outdoor unit can record corresponding at least one air-conditioning branch pipe and/or at least one indoor apparatus of air conditioner Numbering, that is, have recorded the numbering of the air-conditioning system residing for the air-conditioner outdoor unit.
In above-mentioned each embodiment that the application provides, above device can also include:Creation module, it is each for creating The structure information of the air-conditioning system of floor, structure information include:The connection point information of all tie points;Selecting module, for selecting Any two floor in all floors is selected, and selects the air-conditioning system in any two floor.
Specifically, above-mentioned creation module and selecting module realize, the different respective air-conditioning systems of floor are being built respectively. After building the air-conditioning system installed in every layer of building respectively in central air-conditioning Selection Software, any two building can be selected The air-conditioning system of the two floors, is built into unified air-conditioning system by the air-conditioning system in layer.The above embodiments of the present application In building type can include:Compound or villa, and determine the number of floor.
Preferably, in a kind of embodiment of the application above device embodiment, when the first tie point is in air-conditioning system During the tie point of the first indoor unit, the contact information of the first tie point includes:The System Number of first indoor unit, first floor Floor information, wherein, above-mentioned assignment module 105 can include:First preserving module, for by the first Room in the first tie point The floor information of the System Number of interior machine and the first floor is preserved into the second tie point.It is aobvious that above device can also include first Show module, wherein, first display module, for when selecting the second tie point, showing that first is indoor on the second tie point The floor information of the System Number of machine and the first floor.
Specifically, above embodiments enabling in addition the contact information of an indoor apparatus of air conditioner in the first floor is assigned to On the second tie point in one floor, so as to construct two floors based on an indoor apparatus of air conditioner on the first floor Air-conditioning system.
Herein it should be noted that the second connection on assignment the second floor of the first tie point contact information herein Point, can be following any one or more tie points in the second floor:The connection of the tie point, air-conditioning branch pipe of outdoor machine of air-conditioner The tie point of point and air-conditioning internal machine.
Preferably, in the another embodiment of the application above device embodiment, when the first tie point is air-conditioning system In the first outdoor unit tie point when, the contact information of the first tie point includes:The System Number of first outdoor unit, the first floor Floor information, wherein, above-mentioned assignment module 105 can include:Second preserving module, for by first in the first tie point The floor information of the System Number of outdoor unit and the first floor is preserved into the second tie point.Above device can also include second Display module, wherein, second display module, for when selecting the second tie point, the first Room to be shown on the second tie point The floor information of the System Number of outer machine and the first floor.
Specifically, above embodiments enabling in addition the contact information of an air-conditioner outdoor unit in the first floor is assigned to On the second tie point in one floor, so as to construct two floors based on an air-conditioner outdoor unit on the first floor Air-conditioning system.
Herein it should be noted that the second connection on assignment the second floor of the first tie point contact information herein Point, can be following any one or more tie points in the second floor:The connection of the tie point, air-conditioning branch pipe of outdoor machine of air-conditioner The tie point of point and air-conditioning internal machine.
Preferably, in the another embodiment of the application above device embodiment, when the first tie point is air-conditioning system In the first branch pipe tie point when, the contact information of the first tie point includes:The System Number of first branch pipe, the first floor Floor information, wherein, above-mentioned assignment module 105 can include:3rd preserving module, for by first in the first tie point The floor information of the System Number of branch pipe and the first floor is preserved into the second tie point.Above device can also include the 3rd Display module, wherein, the 3rd display module, for when selecting the second tie point, first point to be shown on the second tie point The floor information of the System Number of manifold and the first floor.
Specifically, above embodiments enabling in addition the contact information of an air-conditioning branch pipe in the first floor is assigned to On the second tie point in one floor, so as to construct two floors based on an air-conditioner outdoor unit on the first floor Air-conditioning system.
Herein it should be noted that the second connection on assignment the second floor of the first tie point contact information herein Point, can be following any one or more tie points in the second floor:The connection of the tie point, air-conditioning branch pipe of outdoor machine of air-conditioner The tie point of point and air-conditioning internal machine.
Embodiment two:
Fig. 2 is the flow chart of the information processing method of each tie point in air-conditioning system according to embodiments of the present invention.
As shown in Fig. 2, this method comprises the following steps:
Step S10, can obtain each air-conditioning system in any two floors by the acquisition module 101 shown in Fig. 1 The structure information of system.
Step S30, can be performed by the extraction module 103 shown in Fig. 1 and extract any two floors from structure information In the first floor the first tie point connection point information, and the second tie point of the second floor in any two floors Connection point information.
Step S50, can be assigned the connection point information of the first tie point to perform by the assignment module 105 shown in Fig. 1 It is worth to the second tie point, alternatively, the connection point information of the second tie point is assigned to the first tie point.
The scheme that the above embodiments of the present application are provided, is believed by the structure for obtaining the air-conditioning system in any two floor Breath, to extract the connection point information of the above-mentioned each tie point of each floor, by the connection point information assignment of one of floor After the tie point of another floor, there is provided a kind of method for different floors structure air-conditioning system, solves phase Applying central air-conditioning in more floors building for pass technology, can not know that the structure information of the air-conditioning systems of different floors is asked Topic, and then realize the effect of the demand of different floor structure air-conditioning systems.Above method embodiment is primarily adapted for use in domestic central Air-conditioning type selecting, belongs to automatic field.
Specifically, the tie point in the application embodiment of the method also refers to outdoor machine of air-conditioner, air-conditioning branch pipe and air-conditioning The connection interface tube of interior machine.The first tie point in above-described embodiment can be any one in the first floor in air-conditioning system The tie point of component, for example, it may be in the first floor the outdoor machine of air-conditioner of air-conditioning system, air-conditioning branch pipe or air-conditioning internal machine company Adapter interface.
Herein it should be noted that the tie point of the indoor apparatus of air conditioner in the above embodiments of the present application can record it is right with it The air-conditioning branch pipe and/or the numbering of air-conditioner outdoor unit answered, that is, have recorded the numbering of the air-conditioning system residing for the indoor apparatus of air conditioner. The tie point of air-conditioner outdoor unit can record corresponding at least one air-conditioning branch pipe and/or at least one indoor apparatus of air conditioner Numbering, that is, have recorded the numbering of the air-conditioning system residing for the air-conditioner outdoor unit.
In above-mentioned each embodiment that the application provides, each air-conditioning system in step S10 obtains any two floors Before the structure information of system, it can also include step is implemented as follows:
Step S101, creates the structure information of the air-conditioning system of each floor, and structure information includes:The company of all tie points Contact information.
Step S102, selects any two floor in all floors, and selects the air-conditioning system in any two floor.
Specifically, above-mentioned steps S101 and step S102 are realized, the different respective air-conditioning systems of floor are being built respectively. After building the air-conditioning system installed in every layer of building respectively in central air-conditioning Selection Software, any two building can be selected The air-conditioning system of the two floors, is built into unified air-conditioning system by the air-conditioning system in layer.The above embodiments of the present application In building type can include:Compound or villa, and determine the number of floor.
Preferably, in a kind of embodiment of the application above method embodiment, when the first tie point is in air-conditioning system During the tie point of the first indoor unit, the contact information of the first tie point includes:The System Number of first indoor unit, first floor Floor information, wherein, the connection point information of the first tie point is assigned to the second tie point by step S50 can include following step Suddenly:The floor information of the System Number of the first indoor unit in first tie point and the first floor is preserved to the second tie point In;Wherein, when selecting the second tie point, the System Number and the first floor of the first indoor unit are shown on the second tie point Floor information.
Specifically, above embodiments enabling in addition the contact information of an indoor apparatus of air conditioner in the first floor is assigned to On the second tie point in one floor, so as to construct two floors based on an indoor apparatus of air conditioner on the first floor Air-conditioning system.
Herein it should be noted that the second connection on assignment the second floor of the first tie point contact information herein Point, can be following any one or more tie points in the second floor:The connection of the tie point, air-conditioning branch pipe of outdoor machine of air-conditioner The tie point of point and air-conditioning internal machine.
Preferably, in the another embodiment of the application above method embodiment, when the first tie point is air-conditioning system In the first outdoor unit tie point when, the contact information of the first tie point includes:The System Number of first outdoor unit, the first floor Floor information, wherein, the connection point information of the first tie point is assigned to the second tie point by step S50 can include following step Suddenly:The floor information of the System Number of the first outdoor unit in first tie point and the first floor is preserved to the second tie point In;Wherein, when selecting the second tie point, the System Number and the first floor of the first outdoor unit are shown on the second tie point Floor information.
Specifically, above embodiments enabling in addition the contact information of an air-conditioner outdoor unit in the first floor is assigned to On the second tie point in one floor, so as to construct two floors based on an air-conditioner outdoor unit on the first floor Air-conditioning system.
Herein it should be noted that the second connection on assignment the second floor of the first tie point contact information herein Point, can be following any one or more tie points in the second floor:The connection of the tie point, air-conditioning branch pipe of outdoor machine of air-conditioner The tie point of point and air-conditioning internal machine.
Preferably, in the another embodiment of the application above method embodiment, when the first tie point is air-conditioning system In the first branch pipe tie point when, the contact information of the first tie point includes:The System Number of first branch pipe, the first floor Floor information, wherein, the connection point information of the first tie point is assigned to the second tie point by step S50 can include following step Suddenly:The floor information of the System Number of the first branch pipe in first tie point and the first floor is preserved to the second tie point In;Wherein, when selecting the second tie point, the System Number and the first floor of the first branch pipe are shown on the second tie point Floor information.
Specifically, above embodiments enabling in addition the contact information of an air-conditioning branch pipe in the first floor is assigned to On the second tie point in one floor, so as to construct two floors based on an air-conditioner outdoor unit on the first floor Air-conditioning system.
Herein it should be noted that the second connection on assignment the second floor of the first tie point contact information herein Point, can be following any one or more tie points in the second floor:The connection of the tie point, air-conditioning branch pipe of outdoor machine of air-conditioner The tie point of point and air-conditioning internal machine.
From the foregoing, it will be observed that this application involves to above-mentioned each embodiment in, the second tie point of the second floor is air-conditioning system The tie point of the tie point of second indoor unit, the tie point of the second outdoor unit or the second branch pipe in system, wherein, the second indoor unit The connection point information of tie point include:The System Number of the floor information of second floor and the second indoor unit;Second outdoor unit The connection point information of tie point include:The System Number of the floor information of second floor and the second outdoor unit;Second branch pipe The connection point information of tie point include:The System Number of the floor information of second floor and the second branch pipe.
Fig. 3 is the information processing method of each tie point in a kind of preferably air-conditioning system according to embodiment illustrated in fig. 2 Flow chart.
Specifically, carried out in detail in the building with multiple floors as shown in figure 3, below just applying above-described embodiment Thin description.It is as follows to implement flow:
First, the different respective air-conditioning systems of floor are built respectively.Structure is every respectively i.e. in central air-conditioning Selection Software The air-conditioning system installed in layer building.Specifically, different house types can be designed each floor respectively, and it is directed to different buildings Layer arrangement air-conditioning equipment.
Then, building type is selected in residential central air conditioning Selection Software, such as:Compound or villa, it is then determined that floor Number.For example, selection building type is villa, floor number is 2 layers.
Then, can be in application Selection Software system after designing house type to each floor respectively and placing air-conditioning equipment In system, the tie point in a certain floor is selected, while have recorded the floor information of current floor.
At this point it is possible to select the tie point in another floor, the floor information of above-mentioned current floor is assigned to another building On the tie point of layer, so then the air-conditioning equipment of different floors can be built into same system.What above-mentioned tie point can refer to It is the connection interface tube of outdoor machine of air-conditioner, air-conditioning branch pipe and air-conditioning internal machine.The step, which realizes, to be needed to build air-conditioning system Another floor, alternative point of contact, current attachment point relevant information assignment to floor tie point.
Specifically, above-mentioned two step realizes, the tie point of floor 1, mark correspondUnit notes can be first selected Floor information where recording current attachment point, reselection floor 2, determines the tie point of floor 2, you can automatically tie point CorrespondUnit relevant informations assignment is built into same air-conditioning system into 2 tie point of floor, with this.
It follows that the above-mentioned preferred solution of the application by residential central air conditioning Selection Software select building type it is compound or Villa, respectively designs floor house type and places air-conditioning equipment, after a certain floor alternative point of contact, selects to connect to another floor The air-conditioning equipment of different floors, so can be then built into same system by contact.Realize the air-conditioning system of different floor structures System.
It should be noted that step shown in the flowchart of the accompanying drawings can be in such as a group of computer-executable instructions Performed in computer system, although also, show logical order in flow charts, in some cases, can be with not The order being same as herein performs shown or described step.
It can be seen from the above description that the present invention realizes following technique effect:This application provides one kind to be used for The method of different floor structure air-conditioning systems, solves applying central air-conditioning in more floors building for correlation technique, can not The problem of knowing the structure information of the air-conditioning system of different floors, and then realize the effect of the demand of different floor structure air-conditioning systems Fruit.Above method embodiment is primarily adapted for use in residential central air conditioning type selecting, belongs to automatic field.
As seen through the above description of the embodiments, those skilled in the art can be understood that the application can Realized by the mode of software plus required general hardware platform.Based on such understanding, the technical solution essence of the application On the part that contributes in other words to the prior art can be embodied in the form of software product, the computer software product It can be stored in storage medium, such as ROM/RAM, magnetic disc, CD, including some instructions are used so that a computer equipment (Can be personal computer, server, or network equipment etc.)Perform some of each embodiment of the application or embodiment Method described in part.
Each embodiment in this specification is described by the way of progressive, identical similar portion between each embodiment Divide mutually referring to what each embodiment stressed is the difference with other embodiment.It is real especially for system For applying example, since it is substantially similar to embodiment of the method, so description is fairly simple, related part is referring to embodiment of the method Part explanation.
The application can be used in numerous general or special purpose computing system environments or configuration.Such as:Personal computer, service Device computer, handheld device or portable set, laptop device, multicomputer system, the system based on microprocessor, top set Box, programmable consumer-elcetronics devices, network PC, minicom, mainframe computer including any of the above system or equipment Distributed computing environment etc..
Obviously, those skilled in the art should be understood that above-mentioned each module of the invention or each step can be with general Computing device realize that they can be concentrated on single computing device, or be distributed in multiple computing devices and formed Network on, alternatively, they can be realized with the program code that computing device can perform, it is thus possible to which they are stored Performed in the storage device by computing device, either they are fabricated to respectively each integrated circuit modules or by they In multiple modules or step be fabricated to single integrated circuit module to realize.In this way, the present invention be not restricted to it is any specific Hardware and software combines.
The foregoing is only a preferred embodiment of the present invention, is not intended to limit the invention, for the skill of this area For art personnel, the invention may be variously modified and varied.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should all be included in the protection scope of the present invention.

Claims (11)

  1. A kind of 1. information processing method of each tie point in air-conditioning system, it is characterised in that including:
    Obtain the structure information of each air-conditioning system in any two floors;
    The connection point information of the first tie point of the first floor in any two floors is extracted from the structure information, With the connection point information of the second tie point of the second floor in any two floors;
    The connection point information of first tie point is assigned to second tie point, alternatively, by second tie point Connection point information is assigned to first tie point;
    Wherein, first tie point includes following any one or more tie points in first floor:Outdoor machine of air-conditioner The tie point of tie point, the tie point of air-conditioning branch pipe and air-conditioning internal machine;Second tie point is included in second floor Any one or more tie points below:The connection of the tie point of outdoor machine of air-conditioner, the tie point and air-conditioning internal machine of air-conditioning branch pipe Point.
  2. 2. the information processing method of each tie point in air-conditioning system according to claim 1, it is characterised in that when described When first tie point is the tie point of the first indoor unit in air-conditioning system, the contact information of first tie point includes:It is described The floor information of the System Number of first indoor unit, the first floor, wherein, by the connection point information assignment of first tie point Include to the step of second tie point:
    The floor information of the System Number of first indoor unit in first tie point and first floor is preserved Into second tie point;
    Wherein, when selecting second tie point, show that the system of first indoor unit is compiled on second tie point Number and first floor floor information.
  3. 3. the information processing method of each tie point in air-conditioning system according to claim 1, it is characterised in that when described When first tie point is the tie point of the first outdoor unit in air-conditioning system, the contact information of first tie point includes:It is described The floor information of the System Number of first outdoor unit, the first floor, wherein, by the connection point information assignment of first tie point Include to the step of second tie point:
    The floor information of the System Number of first outdoor unit in first tie point and first floor is preserved Into second tie point;
    Wherein, when selecting second tie point, show that the system of first outdoor unit is compiled on second tie point Number and first floor floor information.
  4. 4. the information processing method of each tie point in air-conditioning system according to claim 1, it is characterised in that when described When first tie point is the tie point of the first branch pipe in air-conditioning system, the contact information of first tie point includes:It is described The floor information of the System Number of first branch pipe, the first floor, wherein, by the connection point information assignment of first tie point Include to the step of second tie point:
    The floor information of the System Number of first branch pipe in first tie point and first floor is preserved Into second tie point;
    Wherein, when selecting second tie point, show that the system of first branch pipe is compiled on second tie point Number and first floor floor information.
  5. 5. the information processing method of each tie point in air-conditioning system as claimed in any of claims 1 to 4, it is special Sign is that the second tie point of second floor is the tie point of the second indoor unit, the company of the second outdoor unit in air-conditioning system The tie point of contact or the second branch pipe, wherein, the connection point information of the tie point of second indoor unit includes:Second floor Floor information and second indoor unit System Number;The connection point information of the tie point of second outdoor unit includes: The System Number of the floor information of second floor and second outdoor unit;The connection point information bag of the tie point of second branch pipe Include:The System Number of the floor information of second floor and second branch pipe.
  6. 6. the information processing method of each tie point in air-conditioning system according to claim 5, it is characterised in that obtaining Before the structure information of each air-conditioning system in any two floors, the method further includes:
    The structure information of the air-conditioning system of each floor is created, the structure information includes:The tie point of all tie points Information;
    Any two floor in all floors is selected, and selects the air-conditioning system in any two floor.
  7. A kind of 7. information processor of each tie point in air-conditioning system, it is characterised in that including:
    Acquisition module, for obtaining the structure information of each air-conditioning system in any two floors;
    Extraction module, for extracting the first tie point of the first floor in any two floors from the structure information Connection point information, and the connection point information of the second tie point of the second floor in any two floors;
    Assignment module, for the connection point information of first tie point to be assigned to second tie point, alternatively, by described in The connection point information of second tie point is assigned to first tie point;
    Wherein, first tie point includes following any one or more tie points in first floor:Outdoor machine of air-conditioner The tie point of tie point, the tie point of air-conditioning branch pipe and air-conditioning internal machine;Second tie point is included in second floor Any one or more tie points below:The connection of the tie point of outdoor machine of air-conditioner, the tie point and air-conditioning internal machine of air-conditioning branch pipe Point.
  8. 8. the information processor of each tie point in air-conditioning system according to claim 7, it is characterised in that when described When first tie point is the tie point of the first indoor unit in air-conditioning system, the contact information of first tie point includes:It is described The floor information of the System Number of first indoor unit, the first floor, wherein, the assignment module includes:
    First preserving module, for by the System Number of first indoor unit in first tie point and first building described The floor information of layer is preserved into second tie point;
    Wherein, described device further includes:First display module, for when selecting second tie point, connecting described second The System Number of first indoor unit and the floor information of first floor are shown on contact.
  9. 9. the information processor of each tie point in air-conditioning system according to claim 7, it is characterised in that when described When first tie point is the tie point of the first outdoor unit in air-conditioning system, the contact information of first tie point includes:It is described The floor information of the System Number of first outdoor unit, the first floor, wherein, the assignment module includes:
    Second preserving module, for by the System Number of first outdoor unit in first tie point and first building described The floor information of layer is preserved into second tie point;
    Wherein, described device further includes:Second display module, for when selecting second tie point, connecting described second The System Number of first outdoor unit and the floor information of first floor are shown on contact.
  10. 10. the information processor of each tie point in air-conditioning system according to claim 7, it is characterised in that work as institute The first tie point is stated as during the tie point of the first branch pipe, the contact information of first tie point includes in air-conditioning system:Institute System Number, the floor information of the first floor of the first branch pipe are stated, wherein, the assignment module includes:
    3rd preserving module, for by the System Number of first branch pipe in first tie point and first building described The floor information of layer is preserved into second tie point;
    Wherein, described device further includes:3rd display module, for when selecting second tie point, connecting described second The System Number of first branch pipe and the floor information of first floor are shown on contact.
  11. 11. the information processor of each tie point in air-conditioning system according to claim 8, it is characterised in that described Device further includes:
    Creation module, the structure information of the air-conditioning system for creating each floor, the structure information include:All companies The connection point information of contact;
    Selecting module, for selecting any two floor in all floors, and selects in any two floor Air-conditioning system.
CN201310724467.6A 2013-12-24 2013-12-24 The information processing method and device of each tie point in air-conditioning system Expired - Fee Related CN104729007B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310724467.6A CN104729007B (en) 2013-12-24 2013-12-24 The information processing method and device of each tie point in air-conditioning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310724467.6A CN104729007B (en) 2013-12-24 2013-12-24 The information processing method and device of each tie point in air-conditioning system

Publications (2)

Publication Number Publication Date
CN104729007A CN104729007A (en) 2015-06-24
CN104729007B true CN104729007B (en) 2018-04-13

Family

ID=53453157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310724467.6A Expired - Fee Related CN104729007B (en) 2013-12-24 2013-12-24 The information processing method and device of each tie point in air-conditioning system

Country Status (1)

Country Link
CN (1) CN104729007B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1087712A (en) * 1993-09-01 1994-06-08 颜郁芳 Separate type central air conditioner system and control method thereof
CN1321381A (en) * 1998-10-23 2001-11-07 凯瑞有限公司 Broadband wireless mesh topology network
CN101051413A (en) * 2007-03-30 2007-10-10 王学 Monitoring and metering system and its method for central air conditioner cool and heat volume and electricity
CN102878653A (en) * 2012-10-26 2013-01-16 青岛海尔空调电子有限公司 Multi-split air conditioner and operating method thereof
CN103032921A (en) * 2012-12-21 2013-04-10 苏州海特温控技术有限公司 Split multi-unit machine room energy-saving air conditioning system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005260389A (en) * 2004-03-10 2005-09-22 Mitsubishi Electric Corp Equipment network system
CN103106306B (en) * 2013-02-01 2015-09-09 国核电力规划设计研究院 A kind of cooling tower water distribution system modeling method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1087712A (en) * 1993-09-01 1994-06-08 颜郁芳 Separate type central air conditioner system and control method thereof
CN1321381A (en) * 1998-10-23 2001-11-07 凯瑞有限公司 Broadband wireless mesh topology network
CN101051413A (en) * 2007-03-30 2007-10-10 王学 Monitoring and metering system and its method for central air conditioner cool and heat volume and electricity
CN102878653A (en) * 2012-10-26 2013-01-16 青岛海尔空调电子有限公司 Multi-split air conditioner and operating method thereof
CN103032921A (en) * 2012-12-21 2013-04-10 苏州海特温控技术有限公司 Split multi-unit machine room energy-saving air conditioning system

Also Published As

Publication number Publication date
CN104729007A (en) 2015-06-24

Similar Documents

Publication Publication Date Title
CN101820532A (en) Method for realizing full three-dimensional intelligent virtual computer room
CN109325076A (en) Data managing method, equipment, computer equipment and readable medium in Internet of Things
CN108920046A (en) A kind of control method of smart home device, device computer storage medium
CN106027328A (en) Cluster monitoring method and system based on application container deployment
CN106647304A (en) Household electrical appliance linkage control method, household electrical appliance, server, and system
CN109974224B (en) Air conditioner adaptive to use requirements of places and method and device for controlling air conditioner
CN109931285A (en) A kind of fan speed-governing method, device and electronic equipment
CN106211201B (en) Method and apparatus for determining mobile network's matter difference region
CN110554615A (en) method and device for centralized control and management of intelligent household equipment
CN104239453B (en) Data processing method and device
CN106407317A (en) Washroom information acquisition method and device
CN106802785B (en) A kind of stack analysis method and device
CN105992336A (en) Access point (AP) network element positioning method and apparatus
CN104704473A (en) Model-based configuration capture and replay in a converged infrastructure system to support remote troubleshooting
CN106708710A (en) Thread jamming identification method and apparatus
CN111190983B (en) Substation graph and model and transmission line splicing device, system and method
CN104729007B (en) The information processing method and device of each tie point in air-conditioning system
CN107770458B (en) A kind of method and terminal device of scene switching
CN104219159A (en) Method and device for performing link aggregation based on virtual interface of virtual local area network
CN107357657A (en) A kind of method and apparatus for being used to provide the sub- APP channels of target in application
WO2014003261A1 (en) Method, system and computer-readable recording medium for providing information on greenhouse gas emission from building
KR20210064629A (en) Method and system for predicting ventilation mode based on artificial neural network
Geng SUSTAINABLE DATA CENTER: STRATEGIC PLANNING, DESIGN, CONSTRUCTION, AND OPERATIONS WITH EMERGING TECHNOLOGIES
CN109688758A (en) For determining method, apparatus, electronic equipment and the medium of data center's failure
CN105337779A (en) Network topology display system based on hierarchical rendering technology and working method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180413

CF01 Termination of patent right due to non-payment of annual fee