CN104727744B - A kind of rotary drilling rig down-hole hammer Special working device - Google Patents
A kind of rotary drilling rig down-hole hammer Special working device Download PDFInfo
- Publication number
- CN104727744B CN104727744B CN201510089281.7A CN201510089281A CN104727744B CN 104727744 B CN104727744 B CN 104727744B CN 201510089281 A CN201510089281 A CN 201510089281A CN 104727744 B CN104727744 B CN 104727744B
- Authority
- CN
- China
- Prior art keywords
- hole hammer
- square
- pipe
- drill pipe
- drilling rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B4/00—Drives for drilling, used in the borehole
- E21B4/16—Plural down-hole drives, e.g. for combined percussion and rotary drilling; Drives for multi-bit drilling units
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/18—Pipes provided with plural fluid passages
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/10—Valve arrangements in drilling-fluid circulation systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/16—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor using gaseous fluids
Abstract
The invention discloses a kind of rotary drilling rig down-hole hammer construction Special working device, mast (3) is bored including rig, gooseneck boom, the steel wire rope (1) being wrapped on gooseneck boom, elevator (2), support frame (4), tap (5), long drill pipe (6), short drill pipe (7) and the down-hole hammer (8) at masthead end are bored installed in rig, steel wire rope output end is connected by the upper end of rotatable elevator and support frame, and the lower end of support frame is connected with tap;The inside of tap, long drill pipe and short drill pipe is designed with down-hole hammer supply, gas lift reverse circulation supply and three pipelines of deslagging, and is sequentially connected, and three pipelines after connection in all parts are communicated;The lower end connection down-hole hammer of short drill pipe.Down-hole hammer, tap and drilling rod follow rest are integrated by the device, can be switched fast different constructions;And because drilling rod is directly connected on drilling rod follow rest, drilling rod can mention rig and bore mast topmost, can reduce drilling rod joint number, reduce construction cost.
Description
Technical field
It is specifically a kind of driven with whole down-hole hammer and transmission dress the present invention relates to a kind of down-hole hammer Special working device
The rotary drilling rig put, belongs to rotary drilling rig down-hole hammer driving structure technical field.
Background technology
Catalase, which is principally fallen into, in rotary drilling rig construction shears into rock, the condition crushed according to rock shearing, churning driven
Machine is to realize smoothly to enter rock and must possess high pulling torque, the high rigidity of the big plus-pressure that effectively transmits and drilling tool pick with it is wear-resisting
Three big factors of property.However, due to the limitation of rear two factor, rotary drilling rig efficiency of construction under hard rock operating mode is extremely low;Moreover,
Because stratum is fluctuated greatly to the reaction force of equipment, and peak value is high, and the structural member fatigability infringement to equipment is larger.
Drilling Technology of Airdriven DTH Hammer is a kind of more drilling technology of domestic and international application, is also air drilling technology broken
An important breakthrough in rock method, it utilizes the energy production of compressed air mainly using compressed air as dynamic medium
The bottom hole power equipment of repetitive shocks, while compressed air can double as hole flushing medium.Under usual condition, pneumatic down-hole hammer
Directly it is connected with hard alloy columnar teeth drill bit to impact mode detritus, low speed turns round total cost management of not coring.If by aeratic hidden hole
Hammer is supported the use with rotary drilling rig, can not only increase substantially drilling efficiency but also hole quality is preferable, construction cost is low,
It is suitable for Rock penetrating more than medium hardness, particularly in competent bed drilling.
Existing pneumatic down-hole hammer point direct circulation down-hole hammer and reverse circulation down-the-hole hammer, generally, direct circulation down-hole hammer
Using direct circulation construction technology, reacting cycle hammer uses reverse circulation construction technique.Direct circulation construction technology, which refers to be turned round by rig, to be filled
Drive drilling rod and the broken ground of drill bit revolution cutting are put, then mud is input into from slush pump toward drilling rod, mud rises along drilling rod hole wall,
Overflowed from aperture and flow into mud pit, circulatory pool is returned through precipitation.Reverse circulation construction technique, which refers to be driven by rig slewing equipment, to be bored
Bar and the broken ground of drill bit revolution cutting, are then bored using the measures such as pumping, gaslift, injection suction circulation slurry coat method, entrainment
Slag suctions out the forming hole method outside hole from drilling rod inner chamber.
When rotary drilling rig and down-hole hammer are used cooperatively, because triple channel structure hardly possible is designed, and in the market reacting cycle down-the-hole
Hammer aperture into shape smaller, most 0.3 meter or so of great talent, and direct circulation down-hole hammer diameter maximum can be to 2 meters, therefore reverse circulation down-the-hole hammer can not be fitted
Rotary digging construction requirement is answered, only direct circulation down-hole hammer can be used cooperatively with rotary drilling rig.But enter according to direct circulation construction technology
Row construction, is to prevent collapse hole during construction, it is necessary to sets full casing sleeve pipe follow-up construction, so not only increases cost, and arranged
Slag does not allow easily collecting, and environmental pollution is larger.Direct circulation construction technology institute can be solved by carrying out deslagging using reverse circulation construction technique
The problem of bringing, but how construct large aperture when realized with direct circulation down-hole hammer reacting cycle construction be pile foundation industry always
The difficult point not broken through.
In addition, traditional pneumatic down-hole hammer device, which is drilling rod and tap, is coupled with unit head upper and lower side, by unit head
Transfer port and investigation hole on drilling rod, tap is driven to be transformed into by unit head in drilling rod.Though this structure can also realize rotary digging
Rig is used cooperatively with pneumatic down-hole hammer, but unit head changes larger, it is impossible to very easily realize common rotary digging and aeratic hidden hole
Hammer the switching between rotary digging into shape.
The content of the invention
In view of the above-mentioned problems of the prior art, the present invention provides a kind of rotary drilling rig down-hole hammer construction special work clothes
Put, down-hole hammer, tap and drilling rod follow rest are integrated by the device, can be switched fast different constructions;And due to
Drilling rod is directly connected on drilling rod follow rest, and drilling rod can mention rig and bore mast topmost, reduce drilling rod joint number, and reduction is constructed into
This.
To achieve these goals, the technical solution adopted by the present invention is, a kind of rotary drilling rig down-hole hammer is constructed special tool
Make device, including rig bores mast, the steel wire rope for boring the gooseneck boom at masthead end installed in rig and being wrapped on gooseneck boom, its feature exists
In in addition to elevator, support frame, tap, long drill pipe, short drill pipe and down-hole hammer, the output end of the steel wire rope pass through
The upper end connection of rotatable elevator and support frame, the lower end of support frame is connected with tap;It is provided with the tap
The drilling rod follow rest that mast is slided can be bored along rig, and provided with slag-drip opening, gas lift reverse circulation air inlet and down-hole hammer air supply opening;It is described
The inside of tap, long drill pipe and short drill pipe is designed with down-hole hammer supply, gas lift reverse circulation supply and three pipelines of deslagging, the fire hose
Head, long drill pipe and short drill pipe are sequentially connected, and three pipelines after connection in all parts are communicated;The lower end connection of short drill pipe is latent
Drift.
The housing assembly of the tap including triple channel, revolving body, make the housing assembly of triple channel relative with revolving body
The bearing of motion, the outer six square shaft assemblies of the output being connected with revolving body and inner ring are fixed on drilling rod follow rest, outer ring is solid
The pivoting support of fixed outer six square shaft assemblies, the housing assembly of the triple channel includes housing I, housing II and housing III;On housing I
Provided with slag-drip opening and ring flange, construction medium stone and debris can be discharged by slag-drip opening, and ring flange is connected with transition body;Transition body
Lower end is fixed with housing II, and housing II is provided with gas lift reverse circulation air inlet, and gas lift reverse circulation air inlet can be provided in construction
Source of the gas, realizes gas-lift slag discharging;The lower end of housing II is fixed with housing III, and housing III is provided with down-hole hammer air supply opening, in construction, is dived
Drift air supply opening can be used for providing source of the gas supply down-hole hammer work.
The housing assembly of the triple channel is fixed on drilling rod follow rest, and drilling rod follow rest installs seam provided with bearing;
The outer ring of the bearing is installed seam with drilling rod follow rest bearing and coordinated, and inner ring coordinates with revolving body to be installed, and makes the shell of triple channel
Body assembly and drilling rod follow rest do not rotate;Being provided between revolving body and the housing assembly of triple channel is used to seal each passage
The rotatory sealing for preventing source of the gas from leaking, making can mutually relative motion between revolving body and the housing assembly of triple channel;Revolving body with
Outer six square shafts assembly is connected, and mounting hole is designed with outer six square shafts assembly, can make outer six square shaft assemblies and pivoting support outer ring
Connection, pivoting support inner ring is fixed on drilling rod follow rest;Outer six square shafts assembly is provided with and six square joints in jumping chisel boom end
Outer six square joint used cooperatively.
The short drill pipe includes stub boring bar body, supply air line and dreg removing system;The upper end of the stub boring bar body is provided with
Interior six square joint, lower end is provided with outer six square joint;It is provided with and is connected with interior six square joint I for gaslift row in the stub boring bar body
The gaslift supply pipe of slag;The supply air line includes air inlet pipe I, adapter cavity and curved air inlet pipe II, and the upper end of air inlet pipe I passes through mistake
Cross chamber to connect with interior six square joint, the lower end of air inlet pipe I connects curved air inlet pipe II by adapter cavity, curved air inlet pipe II connects outer
Six square joints;The dreg removing system includes mud hole and scum pipe a, and the scum pipe a is arranged in stub boring bar body, and with it is interior
Six square joints are connected, and stub boring bar body bottom offers some mud holes connected with scum pipe a.
The short drill pipe body lower part periphery is provided with casing, and casing is arranged with the shield for collecting slag.
The long drill pipe includes hollow outer bar, and the two ends of the outer bar are connected with interior six square joint of centre bore respectively
With outer six square joint, centre bore on steel-tube seat, inside and outside six square joint is equipped with the centre bore of inside and outside six square joint
Periphery is provided with oval hole slot;Two ends are provided with the cylindrical transition chamber concentric with outer bar, the outer bar and are cased with the inside of the outer bar
Place and traverse with one heart the first steel pipe of two sections of adapter cavities, the centre bore of the two ends of the first steel pipe respectively with inside and outside six square joint
Docking;The second steel pipe of two sections of adapter cavities of connection is disposed with ring-shaped cylinder cavity between the outer bar and the first steel pipe;Institute
State and the 3rd steel pipe for crossing the first steel pipe is disposed with the first steel pipe, six square joint centers in one end insertion of the 3rd steel pipe
Steel-tube seat in hole, the other end passes the steel-tube seat in outer six square joints centre bore;Two sections of adapter cavities are respectively with inside and outside six
Oval hole slot connection on square joint;Oval hole slot, adapter cavity and the second steel pipe formation down-the-hole of inside and outside six square joint
Hammer supply air line into shape;The steel-tube seat formation gas lift reverse circulation pipeline of 3rd steel pipe and inside and outside six square joint;Described inside and outside six
Cavity formation deslagging pipeline between the centre bore of square joint and the first steel pipe and the 3rd steel pipe.
The steel wire rope is linked together by the bearing pin I on the elevator and the elevator;And institute
Bearing pin I is stated provided with split pin I, jump ring I is installed in split pin I;The elevator other end by pin shaft II with it is described
Support frame links together, and the pin shaft II is provided with split pin II, and jump ring II is provided with split pin II.
Support frame as described above is linked together by pin shaft III with the tap, and locking function is provided with pin shaft III
Round nut.
The connection end of the tap, long drill pipe and short drill pipe is designed with inside and outside six square joint being mutually matched,
Connect between the tap and long drill pipe, between long drill pipe and short drill pipe by being arranged on a pair of respective end inside and outside six sides
Head connection;It is each to being connected between inside and outside six square joint by bearing pin.
The sealing ring for being used for ensureing respective pipeline sealing is provided between inside and outside six square joint.
The beneficial effects of the invention are as follows, first, down-hole hammer, tap and drilling rod follow rest are integrated by the device,
The switching between common rotary digging and pneumatic down-hole hammer rotary digging can be conveniently realized, the other parts of rotary drilling rig are not changed;Its
It is secondary, the mutual cooperation between the device, it is possible to increase operating efficiency of the rotary drilling rig under hard rock operating mode, and work can be reduced
When the fatigability of device structure part is damaged because of ground reaction force;Then, the device uses triple channel multi-function water tap, water
The relative revolution of leading internal mechanism, realizes down-hole hammer supply, gas lift reverse circulation supply and deslagging except three pipeline independent operatings,
External connection structure can realize at any time the function of sliding up and down with rotary drilling rig perfect cooperation;Further, since being designed with triple channel
Structure, can be achieved down-hole hammer two kinds of constructions of reverse circulation;When being constructed for direct circulation, can be passed the imperial examinations at the provincial level reacting cycle air inlet
Mouth is shut, and direct circulation construction is done using another two passage.Finally, the apparatus structure is simple, and operation is flexible, can effectively reduce work
Make cost, increase economic efficiency.
Brief description of the drawings
Fig. 1 is assembling front view of the present invention;
Fig. 2 is steel wire rope of the present invention and elevator and tap connection diagram;
Fig. 3 is tap schematic diagram of the present invention;
Fig. 4 is the sectional view of tap of the present invention;
Fig. 5 is tap part-structure schematic diagram of the present invention;
Fig. 6 is tap of the present invention and long drill pipe schematic diagram;
Fig. 7 is the structural representation of long drill pipe of the present invention;
Fig. 8 is the sectional view of long drill pipe of the present invention;
Fig. 9 be in Fig. 8 A-A to schematic diagram;
Figure 10 is B-B direction schematic diagram in Fig. 8;
Figure 11 is long drill pipe of the present invention and short drill pipe schematic diagram;
Figure 12 is the structural representation of short drill pipe of the present invention;
Figure 13 is the sectional view of short drill pipe of the present invention;
Figure 14 be in Figure 13 A-A to schematic diagram;
Figure 15 is short drill pipe of the present invention and down-hole hammer connection diagram;
Figure 16 is down-hole hammer schematic diagram of the present invention.
In figure, 1, steel wire rope, 2, elevator, 3, rig bore mast, 4, support frame, 5, tap, 501, air cavity, 502, close
Envelope, 503, bearing, 504, pivoting support, 505, bolt IV, 506, bolt III, 507, air flue, 508, outer six square shafts assembly,
509th, bolt II, 510, revolving body, 511, bolt I, 512, the housing assembly of triple channel, 513, housing I, 514, transition body,
515th, housing II, 516, housing III, 6, long drill pipe, 61, outer bar, 62, adapter cavity, the 63, the 3rd steel pipe, the 64, second steel pipe, 65,
First steel pipe, 7, short drill pipe, 71, short drill pipe, 72, adapter cavity, 73, gaslift supply pipe, 74, air inlet pipe I, 75, casing, 76, shield
Cover, 77, scum pipe a, 78, curved air inlet pipe II, 79, mud hole, 8, down-hole hammer, 9, bearing pin I, 10, jump ring I, 11, split pin I,
12nd, pin shaft II, 13, jump ring II, 14, split pin II, 15, pin shaft III, 16, round nut, 17, slag-drip opening, 18, gas lift reverse circulation enters
Gas port, 19, down-hole hammer air supply opening, 20, drilling rod follow rest, 21, outer six square joint I, 22, bearing pin IV, 23, interior six square joint I,
24th, o types sealing I, 25, outer six square joint II, 26, bearing pin V, 27, o types sealing II, 28, interior six square joint II, 29, outer six side
Joint III, 30, bearing pin VI, 31, interior six square joint III, 32, o types sealing III.
Embodiment
Below in conjunction with accompanying drawing, the invention will be further described.
As depicted in figs. 1 and 2, a kind of rotary drilling rig down-hole hammer construction Special working device, including including rig bore mast 3,
The steel wire rope 1 for boring the gooseneck boom on mast 3 top installed in rig and being wrapped on gooseneck boom, it is characterised in that also including elevator 2,
Support frame 4, tap 5, long drill pipe 6, short drill pipe 7 and down-hole hammer 8, the output end of the steel wire rope 1 are carried by rotatable
Lead device 2 is connected with the upper end of support frame 4, and the lower end of support frame 4 is connected with tap 5;Being provided with the tap 5 can be along brill
The drilling rod follow rest 20 that machine drill mast 3 is slided, and provided with slag-drip opening 17, gas lift reverse circulation air inlet 18 and down-hole hammer air supply opening 19;
The inside of the tap 5, long drill pipe 6 and short drill pipe 7 is designed with down-hole hammer supply, three pipes of gas lift reverse circulation supply and deslagging
Road, tap 5, long drill pipe 6 and short drill pipe 7 are sequentially connected, and three pipelines after connection in all parts are communicated;Short drill pipe 7
Lower end connection down-hole hammer 8.
Preferably, as shown in Figures 3 to 5, the housing assembly 512 of the tap 5 including triple channel, revolving body 510, make
Outer six sides of output that the housing assembly 512 of triple channel is connected with the bearing 503 of the relative motion of revolving body 510, with revolving body 510
Axle assembly 508 and inner ring are fixed on drilling rod follow rest 20, the pivoting support 504 of the outer six square shaft assemblies 508 of outer ring fixation, institute
Stating the housing assembly 512 of triple channel includes housing I 513, housing II 515 and housing III 516;Housing I 513 provided with slag-drip opening and
Ring flange, construction medium stone and debris can be discharged by slag-drip opening, and ring flange is connected with transition body 514;The lower end of transition body 514 with
Housing II 515 is fixed, and housing II 515 is provided with gas lift reverse circulation air inlet, and gas lift reverse circulation air inlet can be provided in construction
Source of the gas, realizes gas-lift slag discharging;The lower end of housing II 515 is fixed with housing III 516, and housing III 516 is provided with down-hole hammer air supply opening,
In construction, down-hole hammer air supply opening can be used for providing source of the gas supply down-hole hammer work.
Preferably, the housing assembly 512 of the triple channel is fixed on drilling rod follow rest 20, and drilling rod follow rest 20 is provided with
Bearing installs seam;The outer ring of the bearing 503 is installed seam with the bearing of drilling rod follow rest 20 and coordinated, inner ring and revolving body 510
Coordinate and install, the housing assembly 512 and drilling rod follow rest 20 of triple channel is not rotated;Revolving body 510 and triple channel
Being provided between housing assembly 512 is used to seal the rotatory sealing that each passage prevents source of the gas from leaking, and makes revolving body 510 and triple channel
Can mutually relative motion between housing assembly 512;Revolving body 510 is connected with outer six square shafts assembly 508, outer six square shafts assembly
Mounting hole is designed with 508, outer six square shaft assemblies 508 can be made to be connected with the outer ring of pivoting support 504, the inner ring of pivoting support 504 is consolidated
It is scheduled on drilling rod follow rest 20;Outer six square shafts assembly 508 is provided with outer six used cooperatively with six square joints in the end of long drill pipe 6
Square joint.
Preferably, as shown in Figure 12 to 14, the short drill pipe 7 may include stub boring bar body 71, supply air line and deslagging system
System;The upper end of the stub boring bar body 71 is provided with interior six square joints, and lower end is provided with outer six square joint;In the stub boring bar body 71
Provided with the gaslift supply pipe 73 connected with interior six square joint I 23 for gas-lift slag discharging;The supply air line include air inlet pipe I 74,
Adapter cavity 72 and curved air inlet pipe II 78, the upper end of air inlet pipe I 74 are connected by adapter cavity 72 with interior six square joint, air inlet pipe I 74
Lower end connects curved air inlet pipe II 78, curved outer six square joints of the connection of air inlet pipe II 78 by adapter cavity 72;The dreg removing system
Including mud hole 79 and scum pipe a77, the scum pipe a77 is arranged in stub boring bar body 71, and is connected with interior six square joint,
The bottom of stub boring bar body 71 offers some mud holes 79 connected with scum pipe a77.Outside the bottom of stub boring bar body 71
Week is provided with casing 75, and casing 75 is arranged with the shield 76 for collecting slag.
Preferably, as shown in Fig. 7 to 10, the long drill pipe 6 may include hollow outer bar 61, the two ends point of the outer bar 61
It is not connected with interior six square joint and outer six square joint of centre bore, the centre bore of inside and outside six square joint and is equipped with steel
The periphery of centre bore is provided with oval hole slot on base, inside and outside six square joint;The inner side two ends of outer bar 61 are provided with same with outer bar 61
It is cased with placing and traversing with one heart the first steel pipe 65 of two sections of adapter cavities 62 in the cylindrical transition chamber 62 of the heart, the outer bar 61, the
Centre bore of the two ends of one steel pipe 65 respectively with inside and outside six square joint is docked;Ring between the steel pipe 65 of outer bar 61 and first
The second steel pipe 64 of two sections of adapter cavities 62 of connection is disposed with shape cylindrical cavity;It is disposed with first steel pipe 65 and crosses first
Steel-tube seat in 3rd steel pipe 63 of steel pipe 65, one end insertion of the 3rd steel pipe 63 in six square joint centre bores, the other end
Pass the steel-tube seat in outer six square joints centre bore;Two sections of adapter cavities 62 respectively with the slotted hole on inside and outside six square joint
Groove is connected;Oval hole slot, the steel pipe 64 of the adapter cavity 62 and second formation down-hole hammer supply air line of inside and outside six square joint;
The steel-tube seat formation gas lift reverse circulation pipeline of 3rd steel pipe 63 and inside and outside six square joint;In inside and outside six square joint
Cavity formation deslagging pipeline between heart hole and the first steel pipe 65 and the 3rd steel pipe 63.
Preferably, the steel wire rope 1 is connected to by the bearing pin I 9 on the elevator 2 with the elevator 2
Together;And the bearing pin I 9 is provided with split pin I 11, and jump ring I 10 is provided with split pin I 11;The elevator 2 is another
End is linked together by pin shaft II 12 with support frame as described above 4, and the pin shaft II 12 is provided with split pin II 14, in opening
Jump ring II 13 is installed in pin II 14.Wherein, the connection transition of elevator 2, it is ensured that steel wire rope 1 is kept when lower end drilling rod rotates
Vertically decentralization is not rotated
Preferably, support frame as described above 4 is linked together by pin shaft III 15 with the tap 5, and in pin shaft III 15
The round nut 16 of locking function is installed, support frame 4, which has, to be play a part of to lift whole tap 5 and following device.Tap 5
On drilling rod follow rest 20 is installed, when down-hole hammer 8 is crept into, drilling rod follow rest 20 can along rig bore mast 3 slide up and down, it is ensured that
The guidance quality of whole equipment.
Preferably, the connection end of the tap 5, long drill pipe 6, short drill pipe 7 and down-hole hammer 8 is designed with what is be mutually matched
Inside and outside six square joint, between the tap 5 and long drill pipe 6, between long drill pipe 6 and short drill pipe 7, short drill pipe 7 and down-hole hammer 8
Connected by a pair that are arranged on respective end inside and outside six square joints;It is each to being connected between inside and outside six square joint by bearing pin.
Wherein, in order to ensure the sealing of junction, sealing ring can be set up between inside and outside six square joint.
As shown in figure 3, the lower end of tap 5 is provided with outer six square joints I 21.As shown in figure 4, the upper end of long drill pipe 6 is pacified
Equipped with interior six square joint I 23.Outer six square joints I 21 are coordinated by bearing pin IV 22 with interior six square joint I 23, and in institute
State and o types sealing I 24 is installed in the gap that outer six square joint I 21 and interior six square joint I 23 coordinate.As shown in figure 5, long drill pipe 6
Lower end is provided with outer six square joints II 25.As shown in fig. 6, the upper end of short drill pipe 7 is installed with interior six square joints II 28.It is described outer
Six square joints II 25 are cooperated by bearing pin V 26 and interior six square joint II 28, and in outer six square joint II 25 and interior six
O types sealing II 27 is installed in the gap that square joint II 28 coordinates.As shown in fig. 7, the lower end of short drill pipe 7 is installed with outer six sides
Joint III 29.As shown in Figure 8 and Figure 9, the upper end of down-hole hammer 8 is installed with interior six square joints III 31.Outer six square joints III
29 are cooperated by bearing pin VI 30 and interior six square joint III 31;And in outer six square joints III 29 and interior six square joint III 31
O types sealing III 32 is installed in the gap of cooperation.The radial direction for sealing I 24, o types, II 27 and o of sealing types sealing III 32 by o types is close
Envelope, it can be ensured that confined gas in pipeline.
During work, compressed air enters spigot channel from down-hole hammer air supply opening, enters by each jointed rod, short drill pipe
Into down-hole hammer 8, compressed air can double as hole flushing, lubricant medium simultaneously.Pneumatic down-hole hammer is using high-pressure air source as power, continuously
Impact mode detritus, low speed turns round total cost management of not coring.The rubble cut is entered by the slag inlet designed in short drill pipe
In short drill pipe, meanwhile, gas lift reverse circulation air inlet enters source of the gas, and the rubble gaslift entered in short drill pipe is entered by each drilling rod
Tap, then discharged from tap slag-drip opening.
In whole device, down-hole hammer air supply opening, act reacting cycle air inlet and mud hole are mutually communicated in each junction, and
Sealed and closed by each junction, the problem of effectively to prevent gas leakage, become flat.
In summary, down-hole hammer, tap and drilling rod follow rest are integrated by the device, can conveniently realize common
The other parts of rotary drilling rig are not changed by the switching between rotary digging and pneumatic down-hole hammer rotary digging;Secondly, the phase between the device
Because of ground reaction force when mutually coordinating, it is possible to increase operating efficiency of the rotary drilling rig under hard rock operating mode, and can reduce work
Fatigability infringement to device structure part;Then, the device uses triple channel multi-function water tap, the phase of tap internal mechanism
To revolution, down-hole hammer supply, gas lift reverse circulation supply and deslagging are realized except three pipeline independent operatings, and external connection structure can be with
Rotary drilling rig perfect cooperation, realizes at any time the function of sliding up and down;Further, since being designed with triple channel structure, down-the-hole can be achieved
Hammer two kinds of constructions of reverse circulation into shape;When being constructed for direct circulation, the reacting cycle air inlet that can be passed the imperial examinations at the provincial level is shut, and utilizes another two
Individual passage does direct circulation construction.Finally, the apparatus structure is simple, and operation is flexible, effectively reduces job costs, improves economy
Benefit.
Claims (9)
- The Special working device 1. a kind of rotary drilling rig down-hole hammer is constructed, including rig bore mast (3), mast (3) top are bored installed in rig The gooseneck boom at end and the steel wire rope (1) being wrapped on gooseneck boom, it is characterised in that also including elevator (2), support frame (4), the fire hose Head (5), long drill pipe (6), short drill pipe (7) and down-hole hammer (8), the output end of the steel wire rope (1) are drawn by rotatable carry Device (2) is connected with the upper end of support frame (4), and the lower end of support frame (4) is connected with tap (5);Installed on the tap (5) Have can along rig bore mast (3) slide drilling rod follow rest (20), and provided with slag-drip opening (17), gas lift reverse circulation air inlet (18) and Down-hole hammer air supply opening (19);The inside of the tap (5), long drill pipe (6) and short drill pipe (7) is designed with down-hole hammer supply, gas Reacting cycle supply and three pipelines of deslagging are lifted, tap (5), long drill pipe (6) and short drill pipe (7) are sequentially connected, and it is each after connection Three pipelines in individual part are communicated;The lower end connection down-hole hammer (8) of short drill pipe (7);The tap (5) includes triple channel Housing assembly (512), revolving body (510), the housing assembly (512) for making triple channel and the bearing of revolving body (510) relative motion (503), the outer six square shaft assemblies (508) of the output being connected with revolving body (510) and inner ring are fixed on drilling rod follow rest (20) The pivoting support (504) of outer six square shaft assemblies (508) is fixed in upper, outer ring, and the housing assembly (512) of the triple channel includes housing I (513), housing II (515) and housing III (516);Housing I (513) is provided with slag-drip opening and ring flange, construction medium stone and miscellaneous Thing can be discharged by slag-drip opening, and ring flange is connected with transition body (514);Transition body (514) lower end is fixed with housing II (515), Housing II (515) is provided with gas lift reverse circulation air inlet, and gas lift reverse circulation air inlet can provide source of the gas in construction, realize gaslift Deslagging;Housing II (515) lower end is fixed with housing III (516), and housing III (516) is provided with down-hole hammer air supply opening, in construction, Down-hole hammer air supply opening can be used for providing source of the gas supply down-hole hammer work.
- 2. a kind of rotary drilling rig down-hole hammer construction Special working device according to claim 1, it is characterised in that described three The housing assembly (512) of passage is fixed on drilling rod follow rest (20), and drilling rod follow rest (20) installs seam provided with bearing;Institute The outer ring and drilling rod follow rest (20) bearing for stating bearing (503) are installed seam and coordinated, and inner ring coordinates with revolving body (510) to be installed, The housing assembly (512) and drilling rod follow rest (20) of triple channel is set not to rotate;Revolving body (510) and the housing of triple channel Being provided between assembly (512) is used to seal the rotatory sealing that each passage prevents source of the gas from leaking, and makes revolving body (510) and triple channel Can mutually relative motion between housing assembly (512);Revolving body (510) is connected with outer six square shafts assembly (508), outer six square shaft Assembly is designed with mounting hole on (508), outer six square shaft assemblies (508) can be made to be connected with pivoting support (504) outer ring, pivoting support (504) inner ring is fixed on drilling rod follow rest (20);Outer six square shafts assembly (508) is provided with and six sides in long drill pipe (6) end Outer six square joint that joint is used cooperatively.
- 3. a kind of rotary drilling rig down-hole hammer construction Special working device according to claim 1, it is characterised in that described short Drilling rod (7) includes stub boring bar body (71), supply air line and dreg removing system;The upper end of the stub boring bar body (71) is provided with interior six Square joint, lower end is provided with outer six square joint;It is provided with and is connected with interior six square joint I (23) for gas in the stub boring bar body (71) Lift the gaslift supply pipe (73) of deslagging;The supply air line includes air inlet pipe I (74), adapter cavity (72) and curved air inlet pipe II (78), air inlet pipe I (74) upper end is connected by adapter cavity (72) with interior six square joint, and air inlet pipe I (74) lower end passes through adapter cavity (72) curved air inlet pipe II (78), curved outer six square joints of air inlet pipe II (78) connection are connected;The dreg removing system includes deslagging Hole (79) and scum pipe a (77), the scum pipe a (77) are arranged in stub boring bar body (71), and are connected with interior six square joint, Stub boring bar body (71) bottom offers some mud holes (79) connected with scum pipe a (77).
- 4. a kind of rotary drilling rig down-hole hammer construction Special working device according to claim 3, it is characterised in that described short Drilling rod body (71) lower, outer perimeter is provided with casing (75), and casing (75) is arranged with the shield (76) for collecting slag.
- 5. a kind of rotary drilling rig down-hole hammer construction Special working device according to claim 1, it is characterised in that the length Drilling rod (6) includes hollow outer bar (61), the two ends of the outer bar (61) be connected with respectively centre bore interior six square joint and The outer of centre bore on steel-tube seat, inside and outside six square joint is equipped with outer six square joint, the centre bore of inside and outside six square joint The oval hole slots of Zhou Kaiyou;Two ends are provided with the cylindrical transition chamber (62) concentric with outer bar (61) on the inside of the outer bar (61), described It is cased with placing and traversing with one heart the first steel pipe (65) of two sections of adapter cavities (62), the two ends point of the first steel pipe (65) in outer bar (61) Centre bore not with inside and outside six square joint is docked;In ring-shaped cylinder cavity between the outer bar (61) and the first steel pipe (65) It is disposed with the second steel pipe (64) of two sections of adapter cavities (62) of connection;It is disposed with first steel pipe (65) and crosses the first steel pipe (65) steel-tube seat in the 3rd steel pipe (63), one end insertion of the 3rd steel pipe (63) in six square joint centre bores, it is another End passes the steel-tube seat in outer six square joints centre bore;Two sections of adapter cavities (62) respectively with the length on inside and outside six square joint Circle hole groove is connected;Oval hole slot, adapter cavity (62) and the second steel pipe (64) the formation down-hole hammer of inside and outside six square joint are supplied Air pipe;3rd steel pipe (63) and the steel-tube seat formation gas lift reverse circulation pipeline of inside and outside six square joint;Described inside and outside six Cavity formation deslagging pipeline between the centre bore of square joint and the first steel pipe (65) and the 3rd steel pipe (63).
- 6. a kind of rotary drilling rig down-hole hammer construction Special working device according to claim 1, it is characterised in that the steel Cord (1) is linked together by the bearing pin I (9) on the elevator (2) with the elevator (2);And it is described Bearing pin I (9) is provided with split pin I (11), and jump ring I (10) is provided with split pin I (11);Elevator (2) other end Linked together by pin shaft II (12) with support frame as described above (4), and the pin shaft II (12) is provided with split pin II (14), Jump ring II (13) is installed in split pin II (14).
- 7. a kind of rotary drilling rig down-hole hammer construction Special working device according to claim 1, it is characterised in that the branch Support (4) is linked together by pin shaft III (15) with the tap (5), and is provided with locking function in pin shaft III (15) Round nut (16).
- 8. a kind of rotary drilling rig down-hole hammer construction Special working device according to claim 1 or 3, it is characterised in that institute The connection end for stating the tap (5), long drill pipe (6) and short drill pipe (7) is designed with inside and outside six square joint being mutually matched, By being arranged between the tap (5) and long drill pipe (6), between long drill pipe (6) and short drill pipe (7) a pair of respective end Inside and outside six square joints connection;It is each to being connected between inside and outside six square joint by bearing pin.
- 9. a kind of rotary drilling rig down-hole hammer construction Special working device according to claim 8, it is characterised in that described The sealing ring for being used for ensureing respective pipeline sealing is provided between inside and outside six square joint.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510089281.7A CN104727744B (en) | 2015-02-26 | 2015-02-26 | A kind of rotary drilling rig down-hole hammer Special working device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510089281.7A CN104727744B (en) | 2015-02-26 | 2015-02-26 | A kind of rotary drilling rig down-hole hammer Special working device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104727744A CN104727744A (en) | 2015-06-24 |
CN104727744B true CN104727744B (en) | 2017-07-25 |
Family
ID=53452087
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510089281.7A Active CN104727744B (en) | 2015-02-26 | 2015-02-26 | A kind of rotary drilling rig down-hole hammer Special working device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104727744B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109611044A (en) * | 2019-01-24 | 2019-04-12 | 河北永明地质工程机械有限公司 | Rotary drilling rig tap |
CN112443283A (en) * | 2020-11-13 | 2021-03-05 | 中国人民解放军陆军工程大学 | Continuous slurry (gas) supply type elevator |
CN112647840B (en) * | 2021-01-19 | 2022-11-18 | 贵阳云海岩土工程有限公司 | Rotary pneumatic device of large-depth down-the-hole hammer |
CN114135237B (en) * | 2021-11-22 | 2024-04-19 | 山东力强机械有限责任公司 | Multifunctional elevator |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2477803Y (en) * | 2001-04-23 | 2002-02-20 | 张安良 | Sliding drill block engineering drilling machine |
CN101435312A (en) * | 2007-11-13 | 2009-05-20 | 上海金泰工程机械有限公司 | Multifunctional hammer drill |
CN102392630A (en) * | 2011-10-14 | 2012-03-28 | 上海中联重科桩工机械有限公司 | rotary drilling rig and control mode thereof |
CN102995631A (en) * | 2011-09-09 | 2013-03-27 | 五冶集团上海有限公司 | Trepanning pore-forming construction method of cast-in-place pile |
CN204691658U (en) * | 2015-02-26 | 2015-10-07 | 徐州徐工基础工程机械有限公司 | rotary drilling rig down-hole hammer construction special working device |
-
2015
- 2015-02-26 CN CN201510089281.7A patent/CN104727744B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2477803Y (en) * | 2001-04-23 | 2002-02-20 | 张安良 | Sliding drill block engineering drilling machine |
CN101435312A (en) * | 2007-11-13 | 2009-05-20 | 上海金泰工程机械有限公司 | Multifunctional hammer drill |
CN102995631A (en) * | 2011-09-09 | 2013-03-27 | 五冶集团上海有限公司 | Trepanning pore-forming construction method of cast-in-place pile |
CN102392630A (en) * | 2011-10-14 | 2012-03-28 | 上海中联重科桩工机械有限公司 | rotary drilling rig and control mode thereof |
CN204691658U (en) * | 2015-02-26 | 2015-10-07 | 徐州徐工基础工程机械有限公司 | rotary drilling rig down-hole hammer construction special working device |
Also Published As
Publication number | Publication date |
---|---|
CN104727744A (en) | 2015-06-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204691658U (en) | rotary drilling rig down-hole hammer construction special working device | |
CN104695854B (en) | Rotary drilling rig capable of realizing positive and negative circulation pneumatic down-hole hammer construction method | |
CN108412435B (en) | Multi-circulation flow passage drilling system and drilling process for large-size well bore hard rock drilling | |
CN104832082B (en) | Pneumatic DTH hammer reverse circulation slagging construction process for rotary drilling rig | |
CN101435312B (en) | Multifunctional hammer drill | |
CN104727744B (en) | A kind of rotary drilling rig down-hole hammer Special working device | |
CN207673301U (en) | Light gas lift reverse circulation drilling device | |
CN105401879A (en) | Rotary drilling machine for reverse-circulation pneumatic down hole hammer and construction method for rotary drilling machine | |
CN105041246B (en) | A kind of reverse circulation down-hole hammer transformational structure | |
CN105041255A (en) | Hole bottom combined drilling tool used for fishing broken falling objects in drilled hole and fishing method of hole bottom combined drilling tool | |
CN112664197A (en) | Shaft excavation device, large-diameter shaft heading machine and construction method | |
CN204728997U (en) | The fragmentation of hydraulic rotary drilling rig down-the-hole enters rock and bores | |
CN204703757U (en) | The rotary drilling rig of positive and negative circulation pneumatic down-hole hammer engineering method can be realized | |
CN206888940U (en) | A kind of reacting cycle double wall drill tool for rotary drilling rig equipment | |
CN204782754U (en) | Double dynamical first all -hydraulic well rig | |
CN112727352A (en) | Gas-lift reverse circulation down-the-hole hammer drill driven by rotary drilling rig and use method thereof | |
CN108915582B (en) | A kind of drilling machine for rotary digging drill bit and impactor switching construction | |
CN204663435U (en) | Reverse circulation down-hole hammer transformational structure | |
CN112727350A (en) | Using method of drill rod suspension type down-the-hole hammer drill and down-the-hole hammer drill | |
CN104695882B (en) | A kind of pneumatic down-hole hammer triple channel multi-function water tap | |
CN103527078A (en) | Hole forming technology and device for bored pile construction through down-the-hole hammer | |
CN204899815U (en) | Multi -functional tap of pneumatic downhole hammer three channels | |
CN209430126U (en) | The high-intensitive Anti-leakage type rotary joint device of screw pile machine whirl spraying reaming | |
CN208089876U (en) | A kind of rotary drilling rig and its power head torsion increasing device | |
CN101139915B (en) | Casing milling salvaging adaptor for oil well |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |