CN104727352A - 一种phc管桩光纤应变计安装的方法 - Google Patents

一种phc管桩光纤应变计安装的方法 Download PDF

Info

Publication number
CN104727352A
CN104727352A CN201510060103.1A CN201510060103A CN104727352A CN 104727352 A CN104727352 A CN 104727352A CN 201510060103 A CN201510060103 A CN 201510060103A CN 104727352 A CN104727352 A CN 104727352A
Authority
CN
China
Prior art keywords
strain gage
fiber optic
optical fiber
pile tube
fibre wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510060103.1A
Other languages
English (en)
Inventor
王海军
官福海
胡骏文
汤雷
巫天明
步建明
邹玉光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Original Assignee
Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources filed Critical Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Priority to CN201510060103.1A priority Critical patent/CN104727352A/zh
Publication of CN104727352A publication Critical patent/CN104727352A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Length Measuring Devices By Optical Means (AREA)

Abstract

本发明提供了一种PHC管桩光纤应变计安装的方法,包括:在PHC管桩的桩身周围埋设容纳光纤应变计的若干槽位的步骤;在所述槽位之间埋设与容纳光纤导线的穿线管道的步骤;将所述光纤应变计依次放入所述槽位中,以及将所述光纤导线依次穿过所述穿线管道与所述光纤应变计连接的步骤。利用本方法不仅能避免了光纤应变计在制桩过程中可能受到的损坏,也避免了打桩过程中桩周土体给光纤应变计带来的损坏。

Description

一种PHC管桩光纤应变计安装的方法
技术领域
本发明涉及土木工程领域,更具体而言,特别涉及一种PHC管桩光纤应变计安装的方法。
背景技术
在各类建筑、码头、港口与桥梁等需要运用到基桩的工程中,基桩作为将上部结构荷载传递至基础的结构,其安全性和适用性对于整个工程的重要性是不言而喻的;而对桩身应变的检测是评价基桩安全性与适用性中关键的一环。
近些年来,PHC管桩以其优异的承载性能、低廉的造价以及生产和施工速度快而得到广泛的运用。
目前,PHC管桩应变数据的采集一股通过安装在桩身上的应变计或粘贴在桩身上的应变片所获取,通过分析所得数据进而了解桩身应变变化的情况。由于PHC桩制作工艺较为特殊,如果在制桩时将应变计埋入桩内,则应变计必然会因桩身在制作中的离心转动以及高温高压养护而受到不同程度的损坏,难以保证存活率。另外,如果将应变计安装在桩身表面,则在打桩过程中容易与土体发生相互作用而导致应变计失准甚至损坏,也难以保证存活率。
发明内容
本发明旨在至少解决背景技术中存在的问题之一。
本发明的目的之一在于利用本发明解决目前PHC管桩光纤应变计安装上的困难等问题。
为达到上述目的,本发明采取如下技术方案,它包括:
在PHC管桩的桩身周围埋设容纳光纤应变计的若干槽位的步骤;在所述槽位之间埋设与容纳光纤导线的穿线管道的步骤;将所述光纤应变计依次放入所述槽位中,以及将所述光纤导线依次穿过所述穿线管道与所述光纤应变计连接的步骤。
进一步地,上述在所述槽位之间埋设与容纳光纤导线的穿线管道的步骤之后,还包括靠近桩顶位置设置有所述光纤导线的总穿出口的步骤。
进一步地,在上述将所述光纤应变计依次放入所述槽位中,并将所述光纤导线依次穿过所述穿线管道与所述光纤应变计连接的步骤之后,还包括所述光纤导线从所述总穿出口中穿出与光纤分析仪连接的步骤。
进一步地,所述光纤导线从所述总穿出口中穿出与光纤分析仪连接的步骤之后,还包括:
对所述光纤应变计进行调试的步骤;调试确定所述光纤应变计及所述光纤导线正常工作后,将与所述PHC管桩同强度的环氧树脂砂浆充填至所述槽位的步骤。
本发明的有益效果在于提供了一种PHC管桩光纤应变计安装的方法,利用本方法不仅能避免了光纤应变计在制桩过程中可能受到的损坏,也避免了打桩过程中桩周土体给光纤应变计带来的损坏。
附图说明
图1是本发明实施例一种PHC管桩光纤应变计安装的方法的流程图。
具体实施方式
下文将结合具体实施例详细描述本发明。应当注意的是,下述实施例中描述的技术特征或者技术特征的组合不应当被认为是孤立的,它们可以被相互组合从而达到更好的技术效果。
图1是本发明实施例一种PHC管桩光纤应变计安装的方法的流程图。
下面结合图1详细描述本发明的实施例,它包括:
步骤100:在PHC管桩的桩身周围埋设容纳光纤应变计的若干槽位的步骤;
步骤200:在所述槽位之间埋设与容纳光纤导线的穿线管道的步骤;
步骤400:将所述光纤应变计依次放入所述槽位中,以及将所述光纤导线依次穿过所述穿线管道与所述光纤应变计连接的步骤。
在步骤200中需要保证上述槽位与上述穿线管道在离心过程中不会发生位置移动或变形。
在本发明实施例中,上述步骤200:在所述槽位之间埋设与容纳光纤导线的穿线管道的步骤之后,还包括步骤300:靠近桩顶位置设置有所述光纤导线的总穿出口的步骤。
在本发明实施例中,在上述步骤400:将所述光纤应变计依次放入所述槽位中,并将所述光纤导线依次穿过所述穿线管道与所述光纤应变计连接的步骤之后,还包括步骤500:所述光纤导线从所述总穿出口中穿出与光纤分析仪连接的步骤。
在本发明实施例中,在上述步骤500:所述光纤导线从所述总穿出口中穿出与光纤分析仪连接的步骤之后,还包括:
步骤600:对所述光纤应变计进行调试的步骤;
步骤700:调试确定所述光纤应变计及所述光纤导线正常工作后,将与所述PHC管桩同强度的环氧树脂砂浆充填至所述槽位的步骤。
在所述步骤700中所述环氧树脂砂浆的强度必须等于或大于所述PHC管桩的强度,填充时需饱满,填充后需抹平。
在本发明实施例中,所述光纤应变计在安装时需固定在所述槽位内,防止在所述环氧树脂砂浆填充时所述光纤应变计发生错位,同时所述光纤导线要避免过度弯折,防止损坏所述光纤导线。
本发明实施例提供了一种PHC管桩光纤应变计安装的方法,利用本方法不仅能避免了光纤应变计在制桩过程中可能受到的损坏,也避免了打桩过程中桩周土体给光纤应变计带来的损坏。
本文虽然已经给出了本发明的一些实施例,但是本领域的技术人员应当理解,在不脱离本发明精神的情况下,可以对本文的实施例进行改变。上述实施例只是示例性的,不应以本文的实施例作为本发明权利范围的限定。

Claims (4)

1.一种PHC管桩光纤应变计安装的方法,其特征在于,包括:
在PHC管桩的桩身周围埋设容纳光纤应变计的若干槽位的步骤;
在所述槽位之间埋设与容纳光纤导线的穿线管道的步骤;
将所述光纤应变计依次放入所述槽位中,以及将所述光纤导线依次穿过所述穿线管道与所述光纤应变计连接的步骤。
2.如权利要求1所述的PHC管桩光纤应变计安装的方法,其特征在于,上述在所述槽位之间埋设与所述槽位在离心过程中不发生位置移动或变形的光纤导线的穿线管道的步骤之后,还包括靠近桩顶位置设置有所述光纤导线的总穿出口的步骤。
3.如权利要求2所述的PHC管桩光纤应变计安装的方法,其特征在于,在上述将所述光纤应变计依次放入所述槽位中,并将所述光纤导线依次穿过所述穿线管道与所述光纤应变计连接的步骤之后,还包括所述光纤导线从所述总穿出口中穿出与光纤分析仪连接的步骤。
4.如权利要求3所述的PHC管桩光纤应变计安装的方法,其特征在于,所述光纤导线从所述总穿出口中穿出与光纤分析仪连接的步骤之后,还包括:
对所述光纤应变计进行调试的步骤;
调试确定所述光纤应变计及所述光纤导线正常工作后,将与所述PHC管桩同强度的环氧树脂砂浆充填至所述槽位的步骤。
CN201510060103.1A 2015-02-04 2015-02-04 一种phc管桩光纤应变计安装的方法 Pending CN104727352A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510060103.1A CN104727352A (zh) 2015-02-04 2015-02-04 一种phc管桩光纤应变计安装的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510060103.1A CN104727352A (zh) 2015-02-04 2015-02-04 一种phc管桩光纤应变计安装的方法

Publications (1)

Publication Number Publication Date
CN104727352A true CN104727352A (zh) 2015-06-24

Family

ID=53451714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510060103.1A Pending CN104727352A (zh) 2015-02-04 2015-02-04 一种phc管桩光纤应变计安装的方法

Country Status (1)

Country Link
CN (1) CN104727352A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532589A (zh) * 2018-05-25 2018-09-14 北京市地质工程公司 一种安装有桩身应力计的空心预制管桩及其加工方法
CN110685300A (zh) * 2019-09-12 2020-01-14 同济大学 针对钢桩应力分布实时监测的结构及其安装方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001221664A (ja) * 2000-02-09 2001-08-17 Railway Technical Res Inst 地中用光ファイバーセンサー及びその光ファイバーセンサーシステム
US20060213279A1 (en) * 2005-03-25 2006-09-28 Yong-Kyu Choi Apparatus and method for measuring supporting force of large diameter ferroconcrete piles
CN102127917A (zh) * 2010-12-03 2011-07-20 中国民航大学 用于检测超长混凝土灌注桩完整性的低应变测试装置
CN103215975A (zh) * 2013-04-19 2013-07-24 浙江华东工程安全技术有限公司 分布式传感光缆在基桩中的埋设方法
CN103512686A (zh) * 2013-10-12 2014-01-15 青岛理工大学 一种静压高强预应力混凝土管桩桩身应力测试装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001221664A (ja) * 2000-02-09 2001-08-17 Railway Technical Res Inst 地中用光ファイバーセンサー及びその光ファイバーセンサーシステム
US20060213279A1 (en) * 2005-03-25 2006-09-28 Yong-Kyu Choi Apparatus and method for measuring supporting force of large diameter ferroconcrete piles
CN102127917A (zh) * 2010-12-03 2011-07-20 中国民航大学 用于检测超长混凝土灌注桩完整性的低应变测试装置
CN103215975A (zh) * 2013-04-19 2013-07-24 浙江华东工程安全技术有限公司 分布式传感光缆在基桩中的埋设方法
CN103512686A (zh) * 2013-10-12 2014-01-15 青岛理工大学 一种静压高强预应力混凝土管桩桩身应力测试装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532589A (zh) * 2018-05-25 2018-09-14 北京市地质工程公司 一种安装有桩身应力计的空心预制管桩及其加工方法
CN110685300A (zh) * 2019-09-12 2020-01-14 同济大学 针对钢桩应力分布实时监测的结构及其安装方法
CN110685300B (zh) * 2019-09-12 2021-04-30 同济大学 针对钢桩应力分布实时监测方法

Similar Documents

Publication Publication Date Title
CN104142187A (zh) 沿空留巷膏体填充体在线检测方法
CN202899174U (zh) 管桩光纤光栅传感器测试系统
CN103471747A (zh) 一种非金属抗浮锚杆杆体应力测试装置
CN103278384B (zh) 一种煤矿巷道煤岩体锚固性能测试装置及测量方法
CN103487179A (zh) 一种非金属抗浮锚杆杆体应力测试方法
CN104897108A (zh) 一种新型应变计
CN103512686A (zh) 一种静压高强预应力混凝土管桩桩身应力测试装置
CN107643137B (zh) 一种微型钢管桩桩身应力测试方法
CN104897109A (zh) 应变计
CN104264719A (zh) 真空预压室内模型试验装置
CN103215974A (zh) 基于分布式光纤传感技术的基桩挠度量测方法
CN104897110A (zh) 一种新型混凝土应变计
CN104897113A (zh) 应变计
CN104897323A (zh) 一种新型应变计
CN104569351B (zh) 一种用于相似模拟的光纤传感器铺设装置及铺设方法
CN104727352A (zh) 一种phc管桩光纤应变计安装的方法
CN202281762U (zh) 一种桩基施工质量检测装置
CN103063175B (zh) 一种悬吊式电动位移量测装置
CN105004460A (zh) 一种复合结构的空心包体应力计
CN207215329U (zh) 一种微型钢管桩桩身应力测试装置
Xue et al. Study on the Life‐Cycle Health Monitoring Technology of Water‐Rich Loess Tunnel
CN105423935B (zh) 系泊基础安装缆绳在海床土中的形态测量方法及测量装置
CN103105308A (zh) 跨断层埋地管线原位试验方法
CN203479435U (zh) 一种非金属抗浮锚杆杆体应力测试装置
CN204988574U (zh) 一种复合结构的空心包体应力计

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Wang Haijun

Inventor after: Guan Fuhai

Inventor after: Hu Junwen

Inventor after: Tang Lei

Inventor after: Wu Tianming

Inventor after: Bu Jianming

Inventor after: Zou Yuguang

Inventor after: Gu Peiying

Inventor before: Wang Haijun

Inventor before: Guan Fuhai

Inventor before: Hu Junwen

Inventor before: Tang Lei

Inventor before: Wu Tianming

Inventor before: Bu Jianming

Inventor before: Zou Yuguang

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160204

Address after: 210029 Nanjing, Gulou District, Jiangsu, No. 223 Guangzhou Road

Applicant after: Nanjing Hydraulic Research Institute, Ministry of Water Resources & Ministry of Transport & National

Applicant after: Zhenjiang Port Construction Engineering Quality Supervision Station

Address before: 210000 No. 223, Guangzhou Road, Gulou District, Jiangsu, Nanjing

Applicant before: Nanjing Hydraulic Research Institute, Ministry of Water Resources & Ministry of Transport & National

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150624