CN104727206A - Soft subgrade grouting treatment constructing method - Google Patents

Soft subgrade grouting treatment constructing method Download PDF

Info

Publication number
CN104727206A
CN104727206A CN201510167417.1A CN201510167417A CN104727206A CN 104727206 A CN104727206 A CN 104727206A CN 201510167417 A CN201510167417 A CN 201510167417A CN 104727206 A CN104727206 A CN 104727206A
Authority
CN
China
Prior art keywords
construction
slurry
stake
drilling rod
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510167417.1A
Other languages
Chinese (zh)
Inventor
成军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510167417.1A priority Critical patent/CN104727206A/en
Publication of CN104727206A publication Critical patent/CN104727206A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Agronomy & Crop Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a soft subgrade grouting treatment constructing method. The method includes steps of construction preparation, lofting, drill in-place arrangement, high-pressure pump drilling starting, cement slurry preparation, drill rod lifting, rotation and slurry spraying, washing, displacement, slurry treatment, technical parameter determination and construction abnormality treatment. The original jet flow parameters and nozzle by the high-pressure spraying injection method are improved partially, the construction period is shortened, the soft subgrade is reinforced, the bearing capability of composite subgrade is improved significantly, the requirements on construction quality are met, and the fine social benefits and economic benefits are gained.

Description

Weak subgrade injecting treatment construction method
Technical field
The present invention relates to a kind of weak subgrade injecting treatment construction method.
Background technology
Along with the fast development of engineering construction, construction land day is becoming tight, reinforcement and strengthening is obtained for making soft layer, to meet the intensity of upper part work to ground, high pressure jet grouting consolidation process road foundation technology has that reinforcing body intensity is high, uniform quality, controlled shape, bearing capacity of foundation soil improves, and is applied to the engineering soft layers such as highway, municipal administration, water conservancy gradually and reinforces.
Summary of the invention
A kind of construction period is the object of the present invention is to provide to shorten, the weak subgrade injecting treatment construction method that after Reinforcement of Soft Soil Subgrade, Bearing Capacity of Composite Foundation significantly improves.
Technical solution of the present invention is:
A kind of weak subgrade injecting treatment construction method, is characterized in that: comprise the following steps:
(1) preparation of construction
(a) technique preparation:
According to the requirement of construction design drawing, adjust engineering quantity, establishment constructure scheme; Safety education and technical annotation in construction are carried out to the personnel participating in construction.Carry out technology to construction area to know the real situation, comprising: original ground absolute altitude; The position relationship of adjacent structure, circuit and construction area;
B () levelling of the land and pioneer road: smooth construction plant, weed a garden, surface dust.Reasonable Arrangement pioneer road, can supply goods and materials in time and keep levelling of the land clean;
C () experimental examination: the experiment completing raw-material inspection and simulated mud, tentatively determines construction equipment parameter;
(2) setting-out
First lay out pile in conjunction with drawing and field condition, subregion, numbering; Then surveying and locating goes out the stake of construction area border, releases other positions according to border stake and drawing, and indicates with short bamboo pole and lime;
(3) driller insertion
After driller insertion, center, drill bit align piles position, corrects rig with spirit level and makes drilling rod vertical; Then by stable for rig adjustment, prevent rig to be shifted, depart from Zhuan Wei center;
(4) open high-pressure hydraulic pump to creep into
Rig corrects fixing, and after drill bit centering, open air compressor machine, low-pressure pump, high-pressure hydraulic pump, after running well, aspirated and water sending in hole, simultaneously sinking rod boring pore-forming, until projected depth; Run of steel is determined in advance, to ensure absolute altitude at the bottom of a top mark and stake;
(5) cement grout is prepared
Cement grout preparation is carried out with boring simultaneously, is used while allocating, the match ratio strict measurement that the cement of slurries, water and adulterating agent must be determined by laboratory test and on-the-spot test pile, adopts the even mixing of pulper; Slurries mixing time in mixer is not less than eight minutes;
The cement grout that mixing is good has to pass through filtration, and removing lump, sandstone, in order to avoid blocking pipeline and nozzle; The slurries prepared are the round-the-clock stirring of palpus in churning process, prevents precipitation;
(6) promote drilling rod, rotate whitewashing
Treating that pore-forming arrives projected depth, slurry mixing good cement grout impouring aggregate bin, sending slurry unlatching to send stock pump to send slurry by sending water to change into low-lift pump, enough cement slurry volumes are had for ensureing that stake is low, answer stop-spraying 35 seconds kinds, then rotation limit in limit promotes, till design stake top mark height.
(7), clean, be shifted
After whitewashing pile terminates, propose drilling rod, send stock pump by clean water, drilling rod and stock line etc. simultaneously, be then displaced to the operation of new bore position;
(8) mud conditioning: scene is built by laying bricks or stones or excavated mud pit, mud is transported outward;
(9) determination of technical data
By the construction of test pile, debug in each construction parameter scope of design, finally determine the formal construction parameter in soil property situation at the scene; Each important technological parameters scope is as follows:
(a) jet groutinl pressure and nozzle
Reinforced soft soil ground Grouting Pipe is single pipe method, and its nozzle diameter is 2.5mm ~ 4.5mm, and its pressure is 22 Mpa ~ 40Mpa;
B () sprays hoisting velocity
Adopt 20 ~ 25cm/min;
C () sprays rotary speed: 25r/min;
(d) slurry water gray scale: adopt 1:1 ~ 1.5:1 during rotary jet grouting;
(10) construction abnormality processing
Stop for some reason in (a) formation of pile, Grouting Pipe should be sunk down into 0.5m place, below disconnected slurry face, lifting of whitewashing again during whitewashing to be restored; If shut down more than 3 hours, should grout pipe line be dismantled, clean up, in side, former stake position piling;
Occur in (b) slip casting process again that pressure suddenly rises or declines, a large amount of grout situation time, stop promoting and slip casting, in case section stake;
C, in () lifting process, as occurred, drilling rod or drill bit come off, will left in part in time and propose, then piling is carried out on side.
The present invention passes through parameter and the nozzle of the original jet grounting injection stream of local improvement, and the construction period shortens, and after Reinforcement of Soft Soil Subgrade, Bearing Capacity of Composite Foundation significantly improves, and meets the requirement of construction quality, has good Social benefit and economic benefit.
As the high pressure jet grouting technique of ground stabilization and Foundation Anti-seepage, adopt and improve the single fixing sprayed construction parameter of original high pressure jet grouting technique and burner design, make slurries become non-single, suitable high pressure nozzle jet, obtain the reinforcing body of packed uniform.This method has that reinforcing body intensity is high, reinforcing body controlled shape, the advantage that Bearing Capacity of Composite Foundation significantly improves.
Be applicable to the soft layer consolidation process such as artificial earth fill, sandy soil, cohesive soil, mud, mucky soil, be also applicable to existing building, bridge pier, deep foundation ditch, dyke building, underground construction ground stabilization.
Below in conjunction with embodiment, the invention will be further described.
Detailed description of the invention
A kind of weak subgrade injecting treatment construction method, comprises the following steps:
(1) preparation of construction
(a) technique preparation:
According to the requirement of construction design drawing, adjust engineering quantity, establishment constructure scheme; Safety education and technical annotation in construction are carried out to the personnel participating in construction.Carry out technology to construction area to know the real situation, comprising: original ground absolute altitude; The position relationship of adjacent structure, circuit and construction area;
B () levelling of the land and pioneer road: smooth construction plant, weed a garden, surface dust.Reasonable Arrangement pioneer road, can supply goods and materials in time and keep levelling of the land clean;
C () experimental examination: the experiment completing raw-material inspection and simulated mud, tentatively determines construction equipment parameter;
(2) setting-out
First lay out pile in conjunction with drawing and field condition, subregion, numbering; Then surveying and locating goes out the stake of construction area border, releases other positions according to border stake and drawing, and indicates with short bamboo pole and lime;
(3) driller insertion
After driller insertion, center, drill bit align piles position, corrects rig with spirit level and makes drilling rod vertical; Then by stable for rig adjustment, prevent rig to be shifted, depart from Zhuan Wei center;
(4) open high-pressure hydraulic pump to creep into
Rig corrects fixing, and after drill bit centering, open air compressor machine, low-pressure pump, high-pressure hydraulic pump, after running well, aspirated and water sending in hole, simultaneously sinking rod boring pore-forming, until projected depth; Run of steel is determined in advance, to ensure absolute altitude at the bottom of a top mark and stake;
(5) cement grout is prepared
Cement grout preparation is carried out with boring simultaneously, is used while allocating, the match ratio strict measurement that the cement of slurries, water and adulterating agent must be determined by laboratory test and on-the-spot test pile, adopts the even mixing of pulper; Slurries mixing time in mixer is not less than eight minutes;
The cement grout that mixing is good has to pass through filtration, and removing lump, sandstone, in order to avoid blocking pipeline and nozzle; The slurries prepared are the round-the-clock stirring of palpus in churning process, prevents precipitation;
(6) promote drilling rod, rotate whitewashing
Treating that pore-forming arrives projected depth, slurry mixing good cement grout impouring aggregate bin, sending slurry unlatching to send stock pump to send slurry by sending water to change into low-lift pump, enough cement slurry volumes are had for ensureing that stake is low, answer stop-spraying 35 seconds kinds, then rotation limit in limit promotes, till design stake top mark height.
(7), clean, be shifted
After whitewashing pile terminates, propose drilling rod, send stock pump by clean water, drilling rod and stock line etc. simultaneously, be then displaced to the operation of new bore position;
(8) mud conditioning: scene is built by laying bricks or stones or excavated mud pit, mud is transported outward;
(9) determination of technical data
By the construction of test pile, debug in each construction parameter scope of design, finally determine the formal construction parameter in soil property situation at the scene; Each important technological parameters scope is as follows:
(a) jet groutinl pressure and nozzle
Reinforced soft soil ground Grouting Pipe is single pipe method, and its nozzle diameter is 2.5mm ~ 4.5mm, and its pressure is 22 Mpa ~ 40Mpa;
B () sprays hoisting velocity
Adopt 20 ~ 25cm/min;
C () sprays rotary speed: 25r/min;
(d) slurry water gray scale: adopt 1:1 ~ 1.5:1 during rotary jet grouting;
(10) construction abnormality processing
Stop for some reason in (a) formation of pile, Grouting Pipe should be sunk down into 0.5m place, below disconnected slurry face, lifting of whitewashing again during whitewashing to be restored; If shut down more than 3 hours, should grout pipe line be dismantled, clean up, in side, former stake position piling;
Occur in (b) slip casting process again that pressure suddenly rises or declines, a large amount of grout situation time, stop promoting and slip casting, in case section stake;
C, in () lifting process, as occurred, drilling rod or drill bit come off, will left in part in time and propose, then piling is carried out on side.

Claims (1)

1. a weak subgrade injecting treatment construction method, is characterized in that: comprise the following steps:
(1) preparation of construction
(a) technique preparation:
According to the requirement of construction design drawing, adjust engineering quantity, establishment constructure scheme; Safety education and technical annotation in construction are carried out to the personnel participating in construction.Carry out technology to construction area to know the real situation, comprising: original ground absolute altitude; The position relationship of adjacent structure, circuit and construction area;
B () levelling of the land and pioneer road: smooth construction plant, weed a garden, surface dust.Reasonable Arrangement pioneer road, can supply goods and materials in time and keep levelling of the land clean;
C () experimental examination: the experiment completing raw-material inspection and simulated mud, tentatively determines construction equipment parameter;
(2) setting-out
First lay out pile in conjunction with drawing and field condition, subregion, numbering; Then surveying and locating goes out the stake of construction area border, releases other positions according to border stake and drawing, and indicates with short bamboo pole and lime;
(3) driller insertion
After driller insertion, center, drill bit align piles position, corrects rig with spirit level and makes drilling rod vertical; Then by stable for rig adjustment, prevent rig to be shifted, depart from Zhuan Wei center;
(4) open high-pressure hydraulic pump to creep into
Rig corrects fixing, and after drill bit centering, open air compressor machine, low-pressure pump, high-pressure hydraulic pump, after running well, aspirated and water sending in hole, simultaneously sinking rod boring pore-forming, until projected depth; Run of steel is determined in advance, to ensure absolute altitude at the bottom of a top mark and stake;
(5) cement grout is prepared
Cement grout preparation is carried out with boring simultaneously, is used while allocating, the match ratio strict measurement that the cement of slurries, water and adulterating agent must be determined by laboratory test and on-the-spot test pile, adopts the even mixing of pulper; Slurries mixing time in mixer is not less than eight minutes;
The cement grout that mixing is good has to pass through filtration, and removing lump, sandstone, in order to avoid blocking pipeline and nozzle; The slurries prepared are the round-the-clock stirring of palpus in churning process, prevents precipitation;
(6) promote drilling rod, rotate whitewashing
Treating that pore-forming arrives projected depth, slurry mixing good cement grout impouring aggregate bin, sending slurry unlatching to send stock pump to send slurry by sending water to change into low-lift pump, enough cement slurry volumes are had for ensureing that stake is low, answer stop-spraying 35 seconds kinds, then rotation limit in limit promotes, till design stake top mark height.
(7), clean, be shifted
After whitewashing pile terminates, propose drilling rod, send stock pump by clean water, drilling rod and stock line etc. simultaneously, be then displaced to the operation of new bore position;
(8) mud conditioning: scene is built by laying bricks or stones or excavated mud pit, mud is transported outward;
(9) determination of technical data
By the construction of test pile, debug in each construction parameter scope of design, finally determine the formal construction parameter in soil property situation at the scene; Each important technological parameters scope is as follows:
(a) jet groutinl pressure and nozzle
Reinforced soft soil ground Grouting Pipe is single pipe method, and its nozzle diameter is 2.5mm ~ 4.5mm, and its pressure is 22 Mpa ~ 40Mpa;
B () sprays hoisting velocity
Adopt 20 ~ 25cm/min;
C () sprays rotary speed: 25r/min;
(d) slurry water gray scale: adopt 1:1 ~ 1.5:1 during rotary jet grouting;
(10) construction abnormality processing
Stop for some reason in (a) formation of pile, Grouting Pipe should be sunk down into 0.5m place, below disconnected slurry face, lifting of whitewashing again during whitewashing to be restored; If shut down more than 3 hours, should grout pipe line be dismantled, clean up, in side, former stake position piling;
Occur in (b) slip casting process again that pressure suddenly rises or declines, a large amount of grout situation time, stop promoting and slip casting, in case section stake;
C, in () lifting process, as occurred, drilling rod or drill bit come off, will left in part in time and propose, then piling is carried out on side.
CN201510167417.1A 2015-04-10 2015-04-10 Soft subgrade grouting treatment constructing method Pending CN104727206A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510167417.1A CN104727206A (en) 2015-04-10 2015-04-10 Soft subgrade grouting treatment constructing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510167417.1A CN104727206A (en) 2015-04-10 2015-04-10 Soft subgrade grouting treatment constructing method

Publications (1)

Publication Number Publication Date
CN104727206A true CN104727206A (en) 2015-06-24

Family

ID=53451570

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510167417.1A Pending CN104727206A (en) 2015-04-10 2015-04-10 Soft subgrade grouting treatment constructing method

Country Status (1)

Country Link
CN (1) CN104727206A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105064351A (en) * 2015-08-14 2015-11-18 云南大学 Pile planting method
CN110747847A (en) * 2019-10-24 2020-02-04 湖北盛达泰水利水电工程有限公司 Double-pipe high-pressure jet grouting construction method for building impervious wall in soft foundation
CN111042228A (en) * 2019-12-29 2020-04-21 北京中岩大地科技股份有限公司 Multifunctional stirring model test box and use method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105064351A (en) * 2015-08-14 2015-11-18 云南大学 Pile planting method
CN110747847A (en) * 2019-10-24 2020-02-04 湖北盛达泰水利水电工程有限公司 Double-pipe high-pressure jet grouting construction method for building impervious wall in soft foundation
CN111042228A (en) * 2019-12-29 2020-04-21 北京中岩大地科技股份有限公司 Multifunctional stirring model test box and use method thereof
CN111042228B (en) * 2019-12-29 2024-02-13 北京中岩大地科技股份有限公司 Multifunctional stirring model test box and application method thereof

Similar Documents

Publication Publication Date Title
CN102418344B (en) Injector, drill bit combination structure and combination drilling tool
CN104631470B (en) The large particle diameter sand gravel of high water level geology deep basal pit combination supporting construction method
CN100591866C (en) Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method
CN106759297A (en) A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits
CN110005442A (en) Under wear existing building Urban Underground mining sectbn surrounding rock consolidation technique
CN110359467A (en) A kind of construction method that base pit engineering high-pressure rotary jet grouting pile is reinforced
CN1487150A (en) Combined grouting construction process of reinforcing foundation
CN104612179B (en) Through the construction method of the diaphram wall of super thick silty sand ground
CN107989032A (en) A kind of construction method of punching interlocking pile
CN107983761A (en) The method for repairing and constructing of heavy metal and VOCs combined contamination soils
CN106894430A (en) A kind of three axes agitating pile waterproof curtain construction method
CN102337732A (en) Seawall construction method with top pipes penetrating through block stone
CN104153371A (en) Grouting-to-stop-water construction method of underwater rubble bed
CN108265706A (en) Engineering pile in karst cave geology and pile forming process
CN206070508U (en) Device for reinforcing foundation
CN114808990A (en) High-pressure pre-filling karst cave pile foundation construction method
CN102953374A (en) High pressure rotary jet grouting pile construction method for power transmission line iron tower pile foundation construction
CN104727206A (en) Soft subgrade grouting treatment constructing method
CN105971638A (en) Application of WSS construction method in shield tool changing reinforcement of water-rich sand layer
CN108755671B (en) Construction method of triaxial mixing pile of water-rich gravel layer
CN104775412B (en) Stratum reinforcement PSC construction method
CN102235007A (en) Method for supporting deep foundation with upper nail-lower pile combination
CN102235008B (en) Engineering pile deviation preventing structure of soft soil foundation and pretreatment method
Raju Ground improvement-applications and quality control
CN109881696B (en) HPPG (high Performance Poly propylene glycol) bottom sealing construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150624